Amendment 0004 The RFP Proposal Package (both Technical and Price proposals) due date of August 4, 2017, at 2:00 p.m. will remain the same.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTFH7117R00014
x x
8 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
VI DPC 34(1)07/31/20170004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/20/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project: VI DPC 34(1), Veterans Drive (Route 30)
See attached.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0004
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0004 Project VI DPC 34(1)
Veterans Drive (Route 30) Solicitation: DTFH71-17-R-00014
The purpose of this Amendment is to:
2) Revise the Solicitation Bid Schedule (B Pages) to correct a pay item description.
3) Revise the Plans to update pay item descriptions.
4) Revise Section 204 of the Special Contract Requirements to add the measurement method for select borrow.
1) Provide a summary of responses to questions/clarifications submitted by potential bidders.
The RFP Proposal Package (both Technical and Price proposals) due date of August 4, 2017, at 2:00 p.m. will remain the same.
Questions/Clarifications
Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.
Questions can be submitted at any time, but questions submitted within 7 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.
The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.
The Government’s direct response to the sender may also have been updated below for better clarity.
1. In response to Questions/Clarifications #1 issued in Amendment 1, please address the following concern regarding structural excavation beyond limits shown on Plan Sheet W-13 for construction of the modular gravity retaining wall system: Plan Sheet W-13 shows a maximum Temporary Excavation width of 10’ from the face of the retaining wall. At several stations, the depth of the excavation from the existing ground line to the bottom of a 12” minimum bedding stone leveling pad exceeds 10’. In evaluation of the soil conditions, surficial sands under the influence of current, wave action, longshore sediment movement and liquefaction, the natural angle of repose is expected to be greater than a 1V:1H and likely to be as much as 1V:3H or 1V:4H. If temporary sheet pile walls are not allowed for the construction of the permanent wall, the width of the excavation will exceed the maximum 10’ limit. If use of temporary sheet pile wall for the excavation of bedding stone and placement of the first few courses of block is prohibited, will the contractor be allowed to exceed the 10' maximum excavation limit so that excavation to the required depth can be achieved and construction personnel are working in a safe trench condition per OSHA regulations.
Response: Means and methods of construction are the responsibility of the Contractor.
The Contractor is required to maintain a safe work zone for their employees and Government inspectors, and must comply with state and Federal regulations. The maximum excavation limit in the seaside of the wall is 10 feet as shown in the plans. The slope of the ground up to the limits can vary depending on the field conditions. It is not mandatory to maintain the 1:1 slope as long as the minimum leveling pad width is achieved on this side of the wall
2. Pay Item 25710-2000 Granular Backfill (Wall Drainage Fill) and Item 25710-3000 Granular Backfill (Wall Leveling Pad) have bid quantities of 4200 CY and 3500 CY respectively.
Different precast block manufacturers have different backfill and leveling pad requirements due to the unique proprietary design.
a) Please clarify the pay limits and how the Contractor will be compensated for quantities varying from the bid quantities for the drainage fill and leveling pad.
Response: Measurement of the wall drainage fill and leveling pad will be made in accordance with Sections 109 and 257.
b) Please clarify the pay limits and how the Contractor will be compensated for quantities varying from the bid quantities for structural excavation to accommodate the any increases in drainage fill and leveling pad material requirements.
Response: Measurement of structural excavation will be made in accordance with Sections 109 and 208.
3. The bid quantity for structural excavation listed in the Schedule of Values and computed on Sheet C-07 correspond to the total excavated area shown in the Cross Section Plan sheets. The limits of payment per RFP SCR Subsection 208.13(a) exclude excavated material outside the vertical planes of the footings, foundations or leveling pads, which is significantly less than the plan quantity. Please clarify the limits of measurement and payment for this work.
Response: For bidding purposes, use the estimated quantities shown in the Schedule of Values and the amended B pages.
4. The description in Item 55201-0200 includes Bollards with a pay unit in cubic yards. Item 61904-0000 is for Bollard Posts and paid by the each. The details shown on Sheet T-18 and W- 15 show a light in each bollard. The lighting plans indicate that the light futures should be placed in every third bollard. Please clarify the following:
a) Please provide details and plan locations for the bollards paid in Item 55201-0200.
Response: This is a mistake in the pay item name for pay item 55201-0200. Pay item 55201-0200 will not be used to pay for the construciton of the bollards. Pay item description is being modified in this amendment to reflect this. All bollards will be paid under pay item 61904-0000.
Steel reinforcement for the bollards will be paid under pay item 55401-1000 Reinforcing Steel (Coping, Bollards, and Steps).
b) Please confirm that both illuminated and non-illuminated bollards along the retaining wall are paid under Item 61904-0000 and constructed per detail shown on Sheet W-15.
Response: Both illuminated and nonilluminated bollards will be paid under pay item 61904-0000 and are to be constructed as shown on plan sheets U-12, T-18, and W-15.
5. Per Specification Subsection 204.16(b), the measurement of select borrow is to be taken in its original position at the borrow source. Due to local resource availability, the select borrow will require processing to remove unsuitable and meet the gradation and specification requirements, which will require additional excavation to produce quantities needed for construction. In lieu of measuring the original position of the borrow source, will the Department consider payment for this material based on delivered tonnage using certified truck scales?
Response: Select borrow will be measured in its final position. A revision to the Subsection 204.16(b) measurement method has been included in this amendment.
6. Please confirm any adjustments to the coping due to the geometry of the wall will be measured and paid by the cubic yard.
Response: Yes.
7. The Subcontracting Plan required at bid submission makes all references to Small Business concerns having a federal designation. How is local DBE participation evaluated and accounted for in the Subcontracting Plan?
Response: Disadvantaged Business Enterprise (DBE) participation is a goal and shall be documented using the DBE Commitment form (A-585). However, DBE does not have a separate category in the required Small Business Subcontracting Plan form.
8. Based upon the response to Question 22 in Amendment 003, we are seeking additional clarification. Since uplift forces due to wave action must be considered in the wall analysis, can you please provide the anticipated uplift forces that must be accounted for?
Response: The method used in the Coastal Engineering Report should be followed for calculating all wave loads acting on the wall including the uplift force. As indicated on page 40 of the report, the method is based on The Coastal Engineering Manual, USACE (2002), Tables VI-5-53, 54 and 55. All Tables are provided in Appendix A of the same report.
Appendix A of the report also includes an example calculations to determine the modification factors, pressure coefficients, and levels of uncertainty.
9. Considering the Potential Design Impacts resulting from Addendum No.3 (preliminary designs performed by all bidders based on the RFP package), specifically due to Q&A No. 22 related to Uplift Forces Consideration, which up to now were not mentioned nor considered under the RFP documents “Structures Design Final Calculations” nor “Plan Section W”, which are both part of the RFP package; we would respectfully like to request an extension of the bid date of 14 calendar days.
Response: A time extension is not warranted for this situation. Uplift force due to wave action should be considered in the case of the wave crest where a horizontal wave force is also acting on the wall. This case should be considered according to Sheet W-2 of the plans. The method that should be used to determine horizontal wave and uplift forces due to wave action is explained in the Coastal Engineering Report (i.e., Equations VI-5-152 and VI-5-153). Appendix A of the report includes an example calculation to determine the modification factors, pressure coefficients, and levels of uncertainty necessary to determine the uplift force.
B Pages/SCR/Plans Sheet Changes
Solicitation B Pages Changes
Delete the Amendment No. 3 Solicitation B Pages Bid Schedule (pages B-1 through B-9) and Cost Proposal Summary (page B-10), and substitute the Amendment No. 4 B Pages, pages B-1 through B-10.
Changed description for pay item 55201-0200 Structural Concrete A(AE) (Coping and Steps).
Special Contract Requirement (J Pages) Changes
Add the following to Section 204 of the Special Contract Requirements, page J-58:
204.16(b). Add the following:
Measure select borrow by the cubic yard in place.
Plan Sheet Changes
Delete Plan Sheets C-01 and C-17, and substitute the amended Plan Sheets C-01 and C-17.
a) Sheet C-01 (Tabulation of Quantities) updated to revise pay item 55201-0200 description to 55201-0200 Structural Concrete A(AE) (Coping and Steps).
b) Sheet C-17 (Summary of Quantities Structures) updated to revise pay item 55201-0200 description to 55201-0200 Structural Concrete A(AE) (Coping and Steps).
B I D S C H E D U L EAMENDMENT
Schedule A
Project No: VI DPC 34(1)
Name: St. Thomas U.S.V.I. Improvements to Rte. 30 (Veterans Drive)
Item No. Quantity Unit Unit Price Amount
15101-0000
Line A0020 ALL LPSM $
15201-0000
Line A0040 ALL LPSM $
15401-0000
Line A0060 ALL LPSM $
15501-0000
Line A0080 ALL LPSM $
15705-0100
Line A0100 2,345 LNFT $ $
15705-2000
Line A0120 5,275 LNFT $ $
15706-1300
Line A0140 23 EACH $ $
15706-1500
Line A0160 38 EACH $ $
20103-0000
Line A0180 2,325 SQYD $ $
20220-1000
Line A0200 2 EACH $ $
20301-1000
Line A0220 7 EACH $ $
20301-1200
Line A0240 11 EACH $ $
20301-1400
Line A0260 21 EACH $ $
20301-1500
Line A0280 19 EACH $ $
20301-2800
Line A0300 ALL LPSM $
20301-3100
Line A0320 4 EACH $ $
20302-0100
Line A0340 7 LNFT $ $
REMOVAL OF UTILITY POLE (SIGNAL POLE)
REMOVAL OF BOX CULVERT
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, TURBIDITY BARRIER (FLOATING)
REMOVAL OF INLET
REMOVAL OF LIGHT POLE
REMOVAL OF STRUCTURES AND OBSTRUCTIONS (YATCH HAVEN GRANDE ENTRANCE)
SOIL EROSION CONTROL, INLET PROTECTION TYPE C
SOIL EROSION CONTROL, INLET PROTECTION TYPE E
CLEARING AND GRUBBING
REMOVAL, INDIVIDUAL TREE
REMOVAL OF FRAME AND GRATE (INLET TOP) (TEMPORARY)
REMOVAL OF HEADWALL
Project No: VI DPC 34(1)
Name: St. Thomas U.S.V.I. Improvements to Rte. 30 (Veterans Drive)
Item No. Quantity Unit Unit Price Amount
20302-0300
Line A0360 5,165 LNFT $ $
20302-2100
Line A0380 1,036 LNFT $ $
20303-1900
Line A0400 6,515 SQYD $ $
20303-2910
Line A0420 6,515 SQYD $ $
20303-3200
Line A0440 2,515 SQYD $ $
20303-3500
Line A0460 1,585 SQYD $ $
20304-5000
Line A0480 ALL LPSM $
20305-1000
Line A0500 3 CUYD $ $
20305-3000
Line A0520 1,235 CUYD $ $
20310-1000
Line A0540 10 EACH $ $
20315-0000
Line A0560 165 LNFT $ $
20401-0000
Line A0580 2,310 CUYD $ $
20410-0000
Line A0600 44,000 CUYD $ $
20420-0000
Line A0620 36,300 CUYD $ $
20420-1000
Line A0640 7,600 CUYD $ $
20701-0700
Line A0660 6,600 SQYD $ $
20801-0000
Line A0680 15,300 CUYD $ $
STRUCTURE EXCAVATION
SAWCUTTING PAVEMENT
ROADWAY EXCAVATION
SELECT BORROW
REMOVAL OF SIDEWALK, CONCRETE
REMOVAL OF STONE MASONRY (TOP OF CONCRETE RIPRAP)
REMOVAL OF BUILDING (EXIST. PUMP HOUSE)
REMOVAL OF CURB AND GUTTER, CONCRETE
EMBANKMENT CONSTRUCTION
EMBANKMENT CONSTRUCTION, SURCHARGE
EARTHWORK GEOTEXTILE, TYPE II-A (BETWEEN STONE BACKFILL AND EARTH)
REMOVAL OF PIPE CULVERT
REMOVAL OF PAVEMENT, ASPHALT, 3-INCH DEPTH
REMOVAL OF PAVEMENT, CONCRETE, 8-INCH DEPTH
REMOVAL OF CONCRETE (TRANSFORMER PEDESTAL)
REMOVAL OF BOULDER (RIPRAP)
PLUG, EXISTING PIPE
Project No: VI DPC 34(1)
Name: St. Thomas U.S.V.I. Improvements to Rte. 30 (Veterans Drive)
Item No. Quantity Unit Unit Price Amount
25101-0000
Line A0700 8 CUYD $ $
25703-1000
Line A0720 40,130 SQFT $ $
25710-2000
Line A0740 4,200 CUYD $ $
25710-3000
Line A0760 3,500 CUYD $ $
30102-2100
Line A0780 12,680 SQYD $ $
30106-0500
Line A0800 14,440 SQYD $ $
40201-0400
Line A0820 1,890 TON $ $
40201-1200
Line A0840 2,305 TON $ $
41102-0000
Line A0860 1,270 GAL $ $
41202-0000
Line A0880 825 GAL $ $
41301-0300
Line A0900 2,505 SQYD $ $
50101-0300
Line A0920 67 SQYD $ $
50101-1500
Line A0940 1,156 SQYD $ $
55201-0100
Line A0960 22 CUYD $ $
55201-0200
Line A0980 623 CUYD $ $
55201-0200
Line A1000 24 CUYD $ $
55401-1000
Line A1020 46,370 LB $ $
STRUCTURAL CONCRETE, CLASS A (AE) (COPING AND STEPS)
STRUCTURAL CONCRETE, CLASS A (AE) (SPECIAL HEADWALL)
REINFORCING STEEL (COPING, BOLLARDS AND STEPS)
PRIME COAT
TACK COAT
ASPHALT PAVEMENT MILLING, 1 1/4-INCH DEPTH
REINFORCED RIGID PAVEMENT, 6-INCH DEPTH, TYPE C SMOOTHNESS/ROUGHNESS
REINFORCED RIGID PAVEMENT, 10-INCH DEPTH, TYPE C SMOOTHNESS/ROUGHNESS
STRUCTURAL CONCRETE, CLASS A (CONC BOARDER)
GRANULAR BACKFILL (WALL DRAINAGE FILL)
GRANULAR BACKFILL (WALL LEVELING PAD)
AGGREGATE BASE GRADING C OR D, 8-INCH DEPTH
SUBBASE GRADING A, 12-INCH DEPTH
HOT ASPHALT CONCRETE PAVEMENT, MARSHALL TEST, CLASS A, GRADING B
HOT ASPHALT CONCRETE PAVEMENT, MARSHALL TEST, CLASS C, GRADING D
PLACED RIPRAP
RETAINING WALL, CONCRETE BLOCK (PRECAST MODULAR BLOCK SEAWALL)
Project No: VI DPC 34(1)
Name: St. Thomas U.S.V.I. Improvements to Rte. 30 (Veterans Drive)
Item No. Quantity Unit Unit Price Amount
55401-1000
Line A1040 2,345 LB $ $
55401-1000
Line A1060 2,685 LB $ $
60101-0000
Line A1080 69 CUYD $ $
60102-0000
Line A1100 2 SQYD $ $
60201-0600
Line A1120 2,760 LNFT $ $
60201-0600
Line A1140 645 LNFT $ $
60201-0800
Line A1160 595 LNFT $ $
60201-0900
Line A1180 255 LNFT $ $
60201-0900
Line A1200 215 LNFT $ $
60220-0000
Line A1220 61 LNFT $ $
60401-0000
Line A1240 10 EACH $ $
60401-0000
Line A1260 4 EACH $ $
60401-0000
Line A1280 1 EACH $ $
60403-0000
Line A1300 3 EACH $ $
60403-0000
Line A1320 2 EACH $ $
60403-0000
Line A1340 3 EACH $ $
60403-0000
Line A1360 21 EACH $ $
INLET (CURB INLET) (P1) (<10-FOOT) (DOT)
INLET (CURB INLET) (P5) (<10-FOOT) (DOT)
PRECAST REINFORCED CONCRETE BOX CULVERT (6-FOOT SPAN X 2.8-FOOT RISE) (DOT)
MANHOLE (TYPE 8) (< 10-FOOT) (DOT)
MANHOLE (OIL/SUSPENDED SOLIDS SEPARATOR)(DOT)
MANHOLE, MANHOLE TOP
INLET (GUTTER INLET) (V) (<10-FOOT) (DOT)
INLET (DITCH BOTTOM) (DOT)
CONCRETE, 6-INCH REINFORCED TRANSFORMER PAD
18-INCH PIPE CULVERT (RCP)
18-INCH PIPE CULVERT (TEMPORARY)
24-INCH PIPE CULVERT (RCP)
30-INCH PIPE CULVERT (RCP)
30-INCH PIPE CULVERT (TEMPORARY)
REINFORCING STEEL (SPECIAL HEADWALL)
REINFORCING STEEL (CONC BOARDER)
CONCRETE, DUCT BANK
Project No: VI DPC 34(1)
Name: St. Thomas U.S.V.I. Improvements to Rte. 30 (Veterans Drive)
Item No. Quantity Unit Unit Price Amount
60403-0000
Line A1380 6 EACH $ $
60403-0000
Line A1400 12 EACH $ $
60405-0000
Line A1420 4 EACH $ $
60406-0000
Line A1440 1 EACH $ $
60409-1000
Line A1460 7 EACH $ $
60801-0400
Line A1480 31 SQYD $ $
60901-1700
Line A1500 3,748 LNFT $ $
60902-0600
Line A1520 220 LNFT $ $
60902-1000
Line A1540 4,890 LNFT $ $
61102-1950
Line A1560 1,450 LNFT $ $
61102-4450
Line A1580 410 LNFT $ $
61104-0200
Line A1600 2 EACH $ $
61104-0300
Line A1620 3 EACH $ $
61104-0400
Line A1640 5 EACH $ $
61105-0000
Line A1660 9 EACH $ $
61108-1000
Line A1680 6 EACH $ $
61108-3000
Line A1700 2 EACH $ $
ADJUST WATER METER
20-INCH WATERLINE, POLYVINYL CHLORIDE (PVC)
VALVE, AIR RELEASE
VALVE, BLOW-OFF FLUSHING VALVE
VALVE, GATE 20-INCH
VALVE BOX
ADJUST WATER VALVE
INLET TOP, CONCRETE (W/FRAME & GRATE) (TEMPORARY)
PAVED WATERWAY, TYPE 4 (CONCRETE DITCH)
CURB, CONCRETE, 18-INCH DEPTH (TYPE D)
CURB AND GUTTER, CONCRETE, 8-INCH DEPTH (VALLEY GUTTER)
CURB AND GUTTER, CONCRETE, 12-INCH DEPTH (TYPE F)
2 1/2-INCH WATERLINE, POLYVINYL CHLORIDE (PVC)
INLET (CURB INLET) (P6) (<10-FOOT) (DOT)
INLET (TYPE F) (DOT) (TEMPORARY)
MANHOLE ADJUSTMENT
INLET ADJUSTMENT
Project No: VI DPC 34(1)
Name: St. Thomas U.S.V.I. Improvements to Rte. 30 (Veterans Drive)
Item No. Quantity Unit Unit Price Amount
61110-1000
Line A1720 ALL LPSM $
61114-1500
Line A1740 2 EACH $ $
61114-5000
Line A1760 2 EACH $ $
61501-0100
Line A1780 7,040 SQYD $ $
61501-0100
Line A1800 45 SQYD $ $
61501-1100
Line A1820 855 SQYD $ $
61506-1000
Line A1840 1,885 SQYD $ $
61506-2000
Line A1860 1,685 SQYD $ $
61901-0000
Line A1880 31 LNFT $ $
61901-0000
Line A1900 2,305 LNFT $ $
61901-1300
Line A1920 15 LNFT $ $
61904-0000
Line A1940 198 EACH $ $
62632-0000
Line A1960 ALL LPSM $
62640-0000
Line A1980 2 EACH $ $
62701-0000
Line A2000 3,310 SQYD $ $
63304-0900
Line A2020 129 SQFT $ $
63401-1500
Line A2040 6,400 LNFT $ $
BOLLARD POST (CONCRETE BOLLARDS 18-INCH X 18-INCH X 4-FEET H)
PLANTINGS
TREE GRATE
SOD (DITCH)
SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
PAVEMENT MARKINGS, TYPE H, SOLID, 4-INCH (WHITE)
SIDEWALK, ASPHALT, TEMPORARY
PAVING, BRICK
PAVING, COBBLESTONE (EUROCOBBLE)
FENCE (ALUMINUM PICKET RAIL)
FENCE (BOLLARD CHAIN)
FENCE, CHAIN LINK, 18-INCH HEIGHT
IRRIGATION SYSTEM
WATER SYSTEM ACCESSORY, TIE-IN (2-INCH IRRIGATION SERVICE TAP)
WATER SYSTEM ACCESSORY, CURB STOP, 1-INCH (IRRIGATION SERVICE)
SIDEWALK, CONCRETE, 4-INCH DEPTH
SIDEWALK, CONCRETE, 6-INCH DEPTH
Project No: VI DPC 34(1)
Name: St. Thomas U.S.V.I. Improvements to Rte. 30 (Veterans Drive)
Item No. Quantity Unit Unit Price Amount
63401-1500
Line A2060 6,370 LNFT $ $
63401-1500
Line A2080 700 LNFT $ $
63401-1600
Line A2100 4,170 LNFT $ $
63401-1600
Line A2120 110 LNFT $ $
63405-0050
Line A2140 3 EACH $ $
63405-0050
Line A2160 1 EACH $ $
63405-2900
Line A2180 2 EACH $ $
63405-2900
Line A2200 1 EACH $ $
63405-2950
Line A2220 2 EACH $ $
63406-0000
Line A2240 80 EACH $ $
63406-0000
Line A2260 105 EACH $ $
63501-2000
Line A2280 ALL LPSM $
63502-0400
Line A2300 54 EACH $ $
63502-1700
Line A2320 201 EACH $ $
63502-1900
Line A2340 1 EACH $ $
63502-2000
Line A2360 2 EACH $ $
63502-2100
Line A2380 11 EACH $ $
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 1
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
TEMPORARY TRAFFIC CONTROL, SHADOW VEHICLE
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, CRASH CUSHION
PAVEMENT MARKINGS, TYPE H, TURN ARROW (RIGHT)
PAVEMENT MARKINGS, TYPE H, TURN ARROW (LEFT)
PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW (LANE MERGE)
RAISED PAVEMENT MARKER (Y/Y)
RAISED PAVEMENT MARKER (W/R)
TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
PAVEMENT MARKINGS, TYPE H, SOLID, 4-INCH (YELLOW)
PAVEMENT MARKINGS, TYPE H, SOLID, 24-INCH (WHITE)
PAVEMENT MARKINGS, TYPE H, BROKEN, 10/30 SKIP 4-INCH (WHITE)
PAVEMENT MARKINGS, TYPE H, BROKEN, 2/4 SKIP 4-INCH (WHITE)
PAVEMENT MARKINGS, SYMBOLS, "BUS" AND "MERGE" WORD MESSAGE
PAVEMENT MARKINGS, SYMBOLS, "ONLY" WORD MESSAGE
Project No: VI DPC 34(1)
Name: St. Thomas U.S.V.I. Improvements to Rte. 30 (Veterans Drive)
Item No. Quantity Unit Unit Price Amount
63502-2900
Line A2400 9 EACH $ $
63502-3000
Line A2420 335 EACH $ $
63503-0400
Line A2440 5,050 LNFT $ $
63503-0500
Line A2460 5,195 LNFT $ $
63503-0700
Line A2480 13,730 LNFT $ $
63503-0700
Line A2500 16,050 LNFT $ $
63503-0700
Line A2520 585 LNFT $ $
63504-1000
Line A2540 151 SQFT $ $
63507-0400
Line A2560 100 HOUR $ $
63507-0500
Line A2580 200 HOUR $ $
63507-0600
Line A2600 48 HOUR $ $
63602-1000
Line A2620 ALL LPSM $
63602-2000
Line A2640 ALL LPSM $
63610-1600
Line A2660 90 LNFT $ $
63610-1900
Line A2680 535 LNFT $ $
63610-2800
Line A2700 500 LNFT $ $
63610-2900
Line A2720 40 LNFT $ $
CONDUIT, 2-INCH, PVC (SCHEDULE 80) (IRRIGATION SLEEVE)
CONDUIT, 2 1/2-INCH, PVC (SCHEDULE 80) (IRRIGATION SLEEVE)
CONDUIT, 4-INCH, PVC (SCHEDULE 40) (IN DUCT BANK) (UNDERGROUND)
CONDUIT, 4-INCH, RIGID GALVANIZED STEEL, POLE RISERS
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, POLICE OFFICER
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
SYSTEM INSTALLATION, TRAFFIC SIGNAL
SYSTEM INSTALLATION, LIGHTING
TEMPORARY TRAFFIC CONTROL, RAISED PAVEMENT MARKER
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, WHITE, SOLID, 4-INCH
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, YELLOW SOLID, 4-INCH
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, WHITE, SOLID, 24-INCH
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS, AND LETTERS
75.00 7,500.00
14.90 2,980.00
Project No: VI DPC 34(1)
Name: St. Thomas U.S.V.I. Improvements to Rte. 30 (Veterans Drive)
Item No. Quantity Unit Unit Price Amount
63610-3200
Line A2740 2,985 LNFT $ $
63621-1000
Line A2760 1 EACH $ $
63621-2000
Line A2780 1 EACH $ $
63622-0000
Line A2800 616 LNFT $ $
63623-1000
Line A2820 3 EACH $ $
63623-2000
Line A2840 1 EACH $ $
63701-0000
Line A2860 1 EACH $ $
64501-0000
Line A2880 ALL LPSM $
64603-0100
Line A2900 5 EACH $ $
64603-0300
Line A2920 36 EACH $ $
64603-0800
Line A2940 3 EACH $ $
FIXTURE, TRASH RECEPTACLE (BIG BELLY SOLAR, INCLUDING BASE SLAB)
FIXTURE, BENCH (72-INCH, SERIES 145-60 BY DUMOR, WITH CONCRETE BASE)
FIXTURE, KIOSK (PLAQUE STONE MASONRY BASE)
UTILITY BOX, TELEPHONE PULLBOX
UTILITY TRENCH, DUCT BANK
MANHOLE, ELECTRICAL
MANHOLE, TELEPHONE
FIELD OFFICE
LOCATE UTILITIES
CONDUIT, 6-INCH, PVC (SCHEDULE 40) (IN DUCT BANK) (UNDERGROUND)
UTILITY BOX, PULLBOX (ELECTRICAL)
B - 10
COST PROPOSAL SUMMARY
Project VI DPC 34(1)
(1) Schedule A Bid Total (from Page B-9) = (1) $____________________
Contract Administrative Cost for Total Calendar Days Bid
Schedule A Contract Administrative Cost Input the number of calendar days necessary to complete all Schedule A work from Notice to Proceed (or date specified in the Notice to Proceed) to the completion of Schedule A.
The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 675 and less than or equal to ( < ) 1,200.
(2) calendar days x $3,300 per calendar day = (2) $____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) $____________________
DO NOT INCLUDE ANY CONTRACT ADMINISTRATION COSTS IN BLOCK 17 OF THE SF-1442
Does the Bidder claim the Price Evaluation Preference for HUBZone Small Business Concerns as defined in FAR Clause 52.219-4?
Yes No