PROJECT_DESCRIPTION.pdf
PDF 19 KB Posted
- Attached to
- MT PHILLIPS 201(1), Old Highway 2 and Bridge Replacement Federal contract opportunity
- Solicitation number
- DTFH7015B00023
About this file
Project Description
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_for_DTFH70-15-B-00023.pdf | ||
| Q A_0705.pdf | ||
| A001_MT_Phillips_201(1).pdf | ||
| mt-a2013018_Earthwork_Logs.pdf | ||
| SWPPP-Old_Highway_2_and_Bridge_Restoration _MT_PHILLIPS_201(1)_Phillips_County _Montana.pdf | ||
| mt-a2013018_DodsonSouthCanalBridgeInspectionReport.pdf | ||
| mt-a203018_Cross_Sections_160406.pdf | ||
| mt-a2013018_Pavement_Report.pdf | ||
| IFB_MT_Phillips_201(1) _Old_Highway_2_and_Bridge_Replacement.pdf | ||
| Plan_Request_Form.pdf | ||
| mt-a2013018_Geotechnical_Bridge_Report.pdf | ||
| mt-a2013018_Plans_160406.pdf | ||
| Amendment_to_Presolicitation_Notice.pdf | ||
| Preliminary_Letter.pdf | ||
| mt-a203018_Plans_Final(update).pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| mt-a203018_Plans_Final.pdf | ||
| Preliminary_Letter.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT PHILLIPS 201(1), Old Highway 2 and Bridge Restoration, Phillips County, Montana
The work consists of grading, drainage, bridge, cement treated base, asphalt, concrete pavement, chip seal and other small items of work. The project includes construction of a single span, 95.5-foot long concrete bulb tee girder bridge, with a 2-inch asphalt overlay. Abutments are founded on driven H Piles. The work includes removal and demolition of the existing timber bridge.
Project length: 6.12 Miles
Tentative Fixed Completion Date: Fall 2016 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Between $3million and $5million
Location: 1 Mile East of Malta, Montana
DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14 Base Schedule
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) 900 LNFT 158 Watering for Dust Control 800 MGAL
DIVISION 200 – Earthwork 201 Clearing & Grubbing 0.9 ACRE 203 Removal of Structures & Obstructions (Dodson South Canal Bridge) 1 LPSM 204 Excavation & Embankment 9,500 CUYD 207 Earthwork Geosynthetics 4,000 SQYD 208 Structure Excavation 160 CUYD 211 Roadway Obliteration 5,000 SQYD
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 1,500 TON 304 Full Depth Reclamation 43,500 SQYD 305 Full Depth Reclamation With Cement 57,000 SQYD 307 Cement Treated Aggregate Course 1,850 TON
DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14 Base Schedule
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 8,000 TON 406 Fog Seal 1 TON 407 Chip Seal 30,000 SQYD 412 Asphalt Tack Coat (asphalt surface treatment) 42 TON 414 Asphalt Pavement Crack Sealing & Filling 16,000 LNFT
DIVISION 550 – Bridge Construction 551 Driven Piles 1,200 LNFT 552 Structural Concrete (concrete – major structures) 90 CUYD 553 Prestressed Concrete 378 LNFT 554 Reinforcing Steel 15,600 LB 556 Bridge Railing 223 LNFT 559 Waterproofing (concrete – major structures) 255 SQYD 564 Bearing Devices 8 EACH
DIVISION 600 – Incidental Construction 602 Culverts 660 LNFT 607 Cleaning, Relaying, & Repairing Existing Drainage Structures 3 EACH 617 Guardrail 228 LNFT 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (landscaping & related items) 1.0 ACRE 625 Turf Establishment (indicate seeding or mulching separately) 19 SLRY 633 Permanent Traffic Control (traffic control devices) 61 SQFT 634 Permanent Pavement Markings (traffic pavement markings) 41,400 LNFT 635 Temporary Traffic Control – Flagger 2,500 FXHR 635 Temporary Traffic Control – Construction Sign 350 SQFT