mt-a2013018_Earthwork_Logs.pdf
PDF 38 KB Posted
- Attached to
- MT PHILLIPS 201(1), Old Highway 2 and Bridge Replacement Federal contract opportunity
- Solicitation number
- DTFH7015B00023
About this file
mt-a2013018_Earthwork_Logs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_for_DTFH70-15-B-00023.pdf | ||
| Q A_0705.pdf | ||
| A001_MT_Phillips_201(1).pdf | ||
| SWPPP-Old_Highway_2_and_Bridge_Restoration _MT_PHILLIPS_201(1)_Phillips_County _Montana.pdf | ||
| mt-a2013018_DodsonSouthCanalBridgeInspectionReport.pdf | ||
| mt-a203018_Cross_Sections_160406.pdf | ||
| mt-a2013018_Pavement_Report.pdf | ||
| IFB_MT_Phillips_201(1) _Old_Highway_2_and_Bridge_Replacement.pdf | ||
| Plan_Request_Form.pdf | ||
| mt-a2013018_Geotechnical_Bridge_Report.pdf | ||
| mt-a2013018_Plans_160406.pdf | ||
| Preliminary_Letter.pdf | ||
| Amendment_to_Presolicitation_Notice.pdf | ||
| mt-a203018_Plans_Final(update).pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| mt-a203018_Plans_Final.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Preliminary_Letter.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
MT PHILLIPS 201(1)
OLD HIGHWAY 2 AND BRIDGE REPLACEMENT
GEOPAK EARTHWORK DATA LISTING
MARCH 2016
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
SKIP STATION RANGE = 0+00.00 to 0+00.00
12+90.72 RDWYEXC
Excavation 139.90 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0
TOPSOIL
Excavation 21.16 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 46.83 0 0 0.00 0 0
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 109.27 0 0 0.00 0 0
13+00.00 RDWYEXC
Excavation 9.10 26 26 1.00 26 Subsoil Exc 0.00 0 0 1.00 0 Fill 71.47 12 12 1.00 14 12
TOPSOIL
Excavation 9.63 5 0 0.00 5 Subsoil Exc 39.07 7 0 0.00 7 Fill 0.00 0 0 0.00 14 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 29.28 13 0 0.00 14 13
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 69.77 31 0 0.00 14 31
13+03.90 RDWYEXC
Excavation 1.37 1 1 1.00 27 Subsoil Exc 0.00 0 0 1.00 0 Fill 143.93 16 16 1.00 -1 28
TOPSOIL
Excavation 3.54 1 0 0.00 6 Subsoil Exc 39.17 6 0 0.00 13 Fill 0.00 0 0 0.00 -1 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 25.08 4 0 0.00 -1 17
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 59.98 9 0 0.00 -1 40
13+33.00 RDWYEXC
Excavation 0.00 1 1 1.00 28 Subsoil Exc 0.00 0 0 1.00 0
Fill 380.06 282 282 1.00 -282 310
TOPSOIL
Excavation 0.00 2 0 0.00 8 Subsoil Exc 31.88 38 0 0.00 51 Fill 0.00 0 0 0.00 -282 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.87 20 0 0.00 -282 37
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 29.16 48 0 0.00 -282 88
13+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 155.42 169 169 1.00 -451 479
TOPSOIL
Excavation 0.00 0 0 0.00 8 Subsoil Exc 20.72 17 0 0.00 68 Fill 0.00 0 0 0.00 -451 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.64 7 0 0.00 -451 44
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.95 17 0 0.00 -451 105
13+55.02 RDWYEXC
Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 147.50 28 28 1.00 -479 507
TOPSOIL
Excavation 0.00 0 0 0.00 8 Subsoil Exc 20.12 4 0 0.00 72 Fill 0.00 0 0 0.00 -479 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.47 2 0 0.00 -479 46
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.56 4 0 0.00 -479 109
13+60.00 RDWYEXC
Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 142.49 27 27 1.00 -506 534
TOPSOIL
Excavation 0.00 0 0 0.00 8 Subsoil Exc 19.77 4 0 0.00 76 Fill 0.00 0 0 0.00 -506 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 9.44 2 0 0.00 -506 48
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.49 4 0 0.00 -506 113
14+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 327.09 348 348 1.00 -854 882
TOPSOIL
Excavation 0.05 0 0 0.00 8 Subsoil Exc 26.56 34 0 0.00 110 Fill 0.00 0 0 0.00 -854 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.44 14 0 0.00 -854 62
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.49 35 0 0.00 -854 148
14+28.76 RDWYEXC
Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 357.43 365 365 1.00 -1219 1247
TOPSOIL
Excavation 0.00 0 0 0.00 8 Subsoil Exc 20.35 25 0 0.00 135 Fill 0.00 0 0 0.00 -1219 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.44 10 0 0.00 -1219 72
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.49 25 0 0.00 -1219 173
14+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 301.19 259 259 1.00 -1478 1506
TOPSOIL
Excavation 0.00 0 0 0.00 8 Subsoil Exc 15.68 14 0 0.00 149 Fill 0.00 0 0 0.00 -1478 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.39 7 0 0.00 -1478 79
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.36 18 0 0.00 -1478 191
14+64.80 RDWYEXC
Excavation 0.00 0 0 1.00 28
Fill 260.86 154 154 1.00 -1632 1660
Excavation 0.00 0 0 0.00 8 Subsoil Exc 14.88 8 0 0.00 157 Fill 0.00 0 0 0.00 -1632 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.29 5 0 0.00 -1632 84
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.13 13 0 0.00 -1632 204
14+90.00 RDWYEXC
Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 205.13 217 217 1.00 -1849 1877
TOPSOIL
Excavation 0.00 0 0 0.00 8 Subsoil Exc 19.14 16 0 0.00 173 Fill 0.00 0 0 0.00 -1849 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.69 9 0 0.00 -1849 93
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 26.42 23 0 0.00 -1849 227
15+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 127.46 62 62 1.00 -1911 1939
TOPSOIL
Excavation 0.00 0 0 0.00 8 Subsoil Exc 9.56 5 0 0.00 178 Fill 0.00 0 0 0.00 -1911 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.46 4 0 0.00 -1911 97
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.51 9 0 0.00 -1911 236
15+18.15 RDWYEXC
Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 86.35 72 72 1.00 -1983 2011
TOPSOIL
Excavation 0.00 0 0 0.00 8 Subsoil Exc 9.28 6 0 0.00 184 Fill 0.00 0 0 0.00 -1983 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Fill 7.77 5 0 0.00 -1983 102
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.89 13 0 0.00 -1983 249
15+47.22 RDWYEXC
Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 30.69 63 63 1.00 -2046 2074
TOPSOIL
Excavation 0.00 0 0 0.00 8 Subsoil Exc 6.96 9 0 0.00 193 Fill 0.00 0 0 0.00 -2046 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.17 8 0 0.00 -2046 110
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.88 19 0 0.00 -2046 268
15+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 25.68 3 3 1.00 -2049 2077
TOPSOIL
Excavation 0.00 0 0 0.00 8 Subsoil Exc 6.09 1 0 0.00 194 Fill 0.00 0 0 0.00 -2049 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.00 1 0 0.00 -2049 111
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.48 2 0 0.00 -2049 270
15+70.36 RDWYEXC
Excavation 0.54 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.36 12 12 1.00 -2061 2089
TOPSOIL
Excavation 0.00 0 0 0.00 8 Subsoil Exc 2.45 3 0 0.00 197 Fill 0.00 0 0 0.00 -2061 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.27 4 0 0.00 -2061 115
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.80 11 0 0.00 -2061 281
15+83.15 RDWYEXC
Excavation 3.41 1 1 1.00 29
Fill 2.07 2 2 1.00 -2062 2091
Excavation 0.07 0 0 0.00 8 Subsoil Exc 1.46 1 0 0.00 198 Fill 0.00 0 0 0.00 -2062 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.19 2 0 0.00 -2062 117
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.62 6 0 0.00 -2062 287
16+00.00 RDWYEXC
Excavation 8.06 3 3 1.00 32 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.28 1 1 1.00 -2060 2092
TOPSOIL
Excavation 2.31 1 0 0.00 9 Subsoil Exc 1.26 1 0 0.00 199 Fill 0.00 0 0 0.00 -2060 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.19 3 0 0.00 -2060 120
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.63 9 0 0.00 -2060 296
16+50.00 RDWYEXC
Excavation 16.28 22 22 1.00 54 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.37 2 2 1.00 -2040 2094
TOPSOIL
Excavation 5.60 7 0 0.00 16 Subsoil Exc 0.37 2 0 0.00 201 Fill 0.00 0 0 0.00 -2040 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2040 130
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2040 321
17+00.00 RDWYEXC
Excavation 15.79 30 30 1.00 84 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.42 1 1 1.00 -2011 2095
TOPSOIL
Excavation 4.99 10 0 0.00 26 Subsoil Exc 0.42 1 0 0.00 202 Fill 0.00 0 0 0.00 -2011 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Fill 5.20 10 0 0.00 -2011 140
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2011 346
G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 84 84 1.00 Subsoil Exc 0 0 1.00 Fill 2095 2095 1.00
TOPSOIL
Excavation 26 0 0.00 Subsoil Exc 202 0 0.00 Fill 0 0 0.00
ASPHALT
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 140 0 0.00
AGG
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 346 0 0.00
S P L I T S U M M A R Y T O T A L S
XS Quant XS Quant Add/Sub Quant Add/Sub Quant
Material Name Unadjusted Adjusted Unadjusted Adjusted Mult Volume Volume Volume Volume Factor
(cu. yd.) (cu. yd.) (cu. yd.) (cu. yd.)
RDWYEXC
Excavation 84 84 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 2095 2095 0 0 1.00
TOPSOIL
Excavation 26 0 0 0 0.00 Subsoil Exc 202 0 0 0 0.00 Fill 0 0 0 0 0.00
ASPHALT
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 140 0 0 0 0.00
Excavation 0 0 0 0
0.00 Subsoil Exc 0 0 0 0 0.00 Fill 346 0 0 0 0.00
B A L A N C E P O I N T S U M M A R Y Material Name Cumulative Incremental Mult Unadjusted Adjusted Unadjusted Adjusted Factor Volumes Volumes Volumes Volumes
(cu. yd.) (cu. yd.) (cu. yd.) (cu. yd.)
Station = 13+03.64
RDWYEXC
Excavation 27 27 27 27 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 27 27 27 27 1.00
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
171+50.00 RDWYEXC
Excavation 11.82 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.69 0 0 1.00 0 0
TOPSOIL
Excavation 1.34 0 0 0.00 0 Subsoil Exc 2.35 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 0 0 0.00 0 0
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 0 0 0.00 0 0
172+00.00 RDWYEXC
Excavation 8.07 18 18 1.00 18 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.02 7 7 1.00 11 7
TOPSOIL
Excavation 1.09 2 0 0.00 2 Subsoil Exc 4.17 6 0 0.00 6 Fill 0.00 0 0 0.00 11 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 11 10
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 11 25
172+50.00 RDWYEXC
Excavation 0.00 7 7 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 32.56 35 35 1.00 -17 42
TOPSOIL
Excavation 0.00 1 0 0.00 3 Subsoil Exc 10.20 13 0 0.00 19 Fill 0.00 0 0 0.00 -17 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -17 20
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -17 50
173+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 25
Fill 69.04 94 94 1.00 -111 136
Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.62 19 0 0.00 38 Fill 0.00 0 0 0.00 -111 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -111 30
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -111 75
173+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 104.24 160 160 1.00 -271 296
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 11.32 20 0 0.00 58 Fill 0.00 0 0 0.00 -271 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -271 40
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -271 100
174+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 137.33 224 224 1.00 -495 520
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 11.91 22 0 0.00 80 Fill 0.00 0 0 0.00 -495 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -495 50
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -495 125
174+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 103.67 223 223 1.00 -718 743
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.73 17 0 0.00 97 Fill 0.00 0 0 0.00 -718 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0
Fill 5.10 10 0 0.00 -718 60
Subsoil Exc 0.00 0 0 0.00 0 Fill 12.68 24 0 0.00 -718 149
174+66.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 104.93 62 62 1.00 -780 805
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.81 4 0 0.00 101 Fill 0.00 0 0 0.00 -780 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 3 0 0.00 -780 63
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.69 8 0 0.00 -780 157
174+70.98 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 105.16 19 19 1.00 -799 824
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.85 1 0 0.00 102 Fill 0.00 0 0 0.00 -799 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.10 1 0 0.00 -799 64
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.68 2 0 0.00 -799 159
175+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 170.59 148 148 1.00 -947 972
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 12.42 10 0 0.00 112 Fill 0.00 0 0 0.00 -947 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.43 6 0 0.00 -947 70
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.37 16 0 0.00 -947 175
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0
Fill 1.35 1 0 0.00 -947 1
175+08.48 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 180.29 55 55 1.00 -1002 1027
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 12.99 4 0 0.00 116 Fill 0.00 0 0 0.00 -1002 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.52 2 0 0.00 -1002 72
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.45 6 0 0.00 -1002 181
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.73 0 0 0.00 -1002 1
175+10.98 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 185.91 17 17 1.00 -1019 1044
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 13.24 1 0 0.00 117 Fill 0.00 0 0 0.00 -1019 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.52 1 0 0.00 -1019 73
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.09 2 0 0.00 -1019 183
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.00 0 0 0.00 -1019 1
175+22.67 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 185.00 80 80 1.00 -1099 1124
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 13.66 6 0 0.00 123 Fill 0.00 0 0 0.00 -1099 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.74 2 0 0.00 -1099 75
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.05 8 0 0.00 -1099 191
SHOULDERBACKFILL
Fill 2.36 1 0 0.00 -1099 2
175+35.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 215.32 91 91 1.00 -1190 1215
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 16.25 7 0 0.00 130 Fill 0.00 0 0 0.00 -1190 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.04 4 0 0.00 -1190 79
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 28.89 11 0 0.00 -1190 202
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.18 1 0 0.00 -1190 3
175+47.67 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 103.37 75 75 1.00 -1265 1290
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.86 6 0 0.00 136 Fill 0.00 0 0 0.00 -1265 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.92 4 0 0.00 -1265 83
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.30 12 0 0.00 -1265 214
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.62 1 0 0.00 -1265 4
175+48.48 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 102.81 3 3 1.00 -1268 1293
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.88 0 0 0.00 136 Fill 0.00 0 0 0.00 -1268 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.96 0 0 0.00 -1268 83
AGG
Fill 20.40 1 0 0.00 -1268 215
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.62 0 0 0.00 -1268 4
175+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 101.03 6 6 1.00 -1274 1299
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.79 0 0 0.00 136 Fill 0.00 0 0 0.00 -1274 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.96 0 0 0.00 -1274 83
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.40 1 0 0.00 -1274 216
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.62 0 0 0.00 -1274 4
175+60.17 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 80.96 34 34 1.00 -1308 1333
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.78 3 0 0.00 139 Fill 0.00 0 0 0.00 -1308 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.96 3 0 0.00 -1308 86
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.40 8 0 0.00 -1308 224
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.62 0 0 0.00 -1308 4
175+78.25 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 67.32 50 50 1.00 -1358 1383
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.27 5 0 0.00 144 Fill 0.00 0 0 0.00 -1358 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0
Fill 6.34 5 0 0.00 -1358 91
Subsoil Exc 0.00 0 0 0.00 0 Fill 20.09 14 0 0.00 -1358 238
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.78 1 0 0.00 -1358 5
175+85.17 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 59.17 16 16 1.00 -1374 1399
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.68 2 0 0.00 146 Fill 0.00 0 0 0.00 -1374 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.56 2 0 0.00 -1374 93
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 5 0 0.00 -1374 243
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 0 0 0.00 -1374 5
175+96.50 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 55.34 24 24 1.00 -1398 1423
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.82 3 0 0.00 149 Fill 0.00 0 0 0.00 -1398 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.56 3 0 0.00 -1398 96
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 8 0 0.00 -1398 251
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 1 0 0.00 -1398 6
176+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 53.69 7 7 1.00 -1405 1430
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.72 1 0 0.00 150 Fill 0.00 0 0 0.00 -1405 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Fill 6.56 1 0 0.00 -1405 97
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 2 0 0.00 -1405 253
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 0 0 0.00 -1405 6
176+04.50 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 68.38 10 10 1.00 -1415 1440
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 5.90 1 0 0.00 151 Fill 0.00 0 0 0.00 -1415 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.56 1 0 0.00 -1415 98
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 3 0 0.00 -1415 256
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 0 0 0.00 -1415 6
SKIP STATION RANGE = 176+04.51 to 176+99.82
177+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 63.19 0 0 1.00 -1415 1440
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.38 0 0 0.00 151 Fill 0.00 0 0 0.00 -1415 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.56 0 0 0.00 -1415 98
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 0 0 0.00 -1415 256
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 0 0 0.00 -1415 6
177+08.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 63.59 19 19 1.00 -1434 1459
Excavation 0.00 0 0 0.00 3
Subsoil Exc 7.33 2 0 0.00 153 Fill 0.00 0 0 0.00 -1434 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.56 2 0 0.00 -1434 100
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 6 0 0.00 -1434 262
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 0 0 0.00 -1434 6
177+19.33 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 67.23 27 27 1.00 -1461 1486
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.52 3 0 0.00 156 Fill 0.00 0 0 0.00 -1461 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.56 3 0 0.00 -1461 103
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 8 0 0.00 -1461 270
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 1 0 0.00 -1461 7
177+44.33 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 95.61 75 75 1.00 -1536 1561
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.26 8 0 0.00 164 Fill 0.00 0 0 0.00 -1536 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.34 6 0 0.00 -1536 109
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.88 18 0 0.00 -1536 288
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.29 2 0 0.00 -1536 9
177+50.00 RDWYEXC
Fill 101.57 21 21 1.00 -1557 1582
Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.73 2 0 0.00 166 Fill 0.00 0 0 0.00 -1557 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.28 1 0 0.00 -1557 110
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.40 4 0 0.00 -1557 292
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.40 0 0 0.00 -1557 9
177+56.02 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 108.75 23 23 1.00 -1580 1605
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.82 2 0 0.00 168 Fill 0.00 0 0 0.00 -1580 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.22 1 0 0.00 -1580 111
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.40 5 0 0.00 -1580 297
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.46 1 0 0.00 -1580 10
177+56.83 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 108.53 3 3 1.00 -1583 1608
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.76 0 0 0.00 168 Fill 0.00 0 0 0.00 -1583 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.21 0 0 0.00 -1583 111
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.30 1 0 0.00 -1583 298
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0
Fill 2.42 0 0 0.00 -1583 10
177+81.83 RDWYEXC
Subsoil Exc 0.00 0 0 1.00 0 Fill 97.98 96 96 1.00 -1679 1704
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.46 10 0 0.00 178 Fill 0.00 0 0 0.00 -1679 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.74 6 0 0.00 -1679 117
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.05 19 0 0.00 -1679 317
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.36 2 0 0.00 -1679 12
177+93.52 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 92.72 41 41 1.00 -1720 1745
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.18 4 0 0.00 182 Fill 0.00 0 0 0.00 -1720 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.52 2 0 0.00 -1720 119
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.09 8 0 0.00 -1720 325
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.00 1 0 0.00 -1720 13
177+96.02 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 86.51 8 8 1.00 -1728 1753
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 9.49 1 0 0.00 183 Fill 0.00 0 0 0.00 -1728 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.52 1 0 0.00 -1728 120
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.45 2 0 0.00 -1728 327
Fill 1.73 0 0 0.00 -1728 13
178+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 82.32 12 12 1.00 -1740 1765
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 9.18 1 0 0.00 184 Fill 0.00 0 0 0.00 -1740 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.48 1 0 0.00 -1740 121
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.95 3 0 0.00 -1740 330
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.55 0 0 0.00 -1740 13
178+33.52 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 85.32 104 104 1.00 -1844 1869
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 11.18 13 0 0.00 197 Fill 0.00 0 0 0.00 -1844 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 7 0 0.00 -1844 128
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 20 0 0.00 -1844 350
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 1 0 0.00 -1844 14
178+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 77.71 50 50 1.00 -1894 1919
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.53 7 0 0.00 204 Fill 0.00 0 0 0.00 -1894 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 3 0 0.00 -1894 131
AGG
Fill 13.68 8 0 0.00 -1894 358
179+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 60.43 128 128 1.00 -2022 2047
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 9.90 19 0 0.00 223 Fill 0.00 0 0 0.00 -2022 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2022 141
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2022 383
179+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 39.72 93 93 1.00 -2115 2140
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 8.65 17 0 0.00 240 Fill 0.00 0 0 0.00 -2115 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2115 151
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2115 408
180+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.28 53 53 1.00 -2168 2193
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.00 14 0 0.00 254 Fill 0.00 0 0 0.00 -2168 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2168 161
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2168 433
180+50.00 RDWYEXC
Excavation 2.92 3 3 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.84 19 19 1.00 -2184 2212
TOPSOIL
Excavation 0.15 0 0 0.00 3 Subsoil Exc 2.45 9 0 0.00 263
Fill 0.00 0 0 0.00 -2184 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2184 171
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2184 458
181+00.00 RDWYEXC
Excavation 16.01 18 18 1.00 46 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.32 3 3 1.00 -2169 2215
TOPSOIL
Excavation 6.20 5 0 0.00 8 Subsoil Exc 0.32 3 0 0.00 266 Fill 0.00 0 0 0.00 -2169 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2169 181
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2169 483
181+50.00 RDWYEXC
Excavation 19.84 34 34 1.00 80 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.32 1 1 1.00 -2136 2216
TOPSOIL
Excavation 5.96 11 0 0.00 19 Subsoil Exc 0.32 1 0 0.00 267 Fill 0.00 0 0 0.00 -2136 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2136 191
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2136 508
G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 80 80 1.00 Subsoil Exc 0 0 1.00 Fill 2216 2216 1.00
TOPSOIL
Excavation 19 0 0.00 Subsoil Exc 267 0 0.00 Fill 0 0 0.00
ASPHALT
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00
Fill 191 0 0.00
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 508 0 0.00
SHOULDERBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 14 0 0.00
S P L I T S U M M A R Y T O T A L S
XS Quant XS Quant Add/Sub Quant Add/Sub Quant
Material Name Unadjusted Adjusted Unadjusted Adjusted Mult Volume Volume Volume Volume Factor
(cu. yd.) (cu. yd.) (cu. yd.) (cu. yd.)
RDWYEXC
Excavation 80 80 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 2216 2216 0 0 1.00
TOPSOIL
Excavation 19 0 0 0 0.00 Subsoil Exc 267 0 0 0 0.00 Fill 0 0 0 0 0.00
ASPHALT
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 191 0 0 0 0.00
AGG
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 508 0 0 0 0.00
SHOULDERBACKFILL
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 14 0 0 0 0.00
B A L A N C E P O I N T S U M M A R Y Material Name Cumulative Incremental Mult Unadjusted Adjusted Unadjusted Adjusted Factor Volumes Volumes Volumes Volumes
(cu. yd.) (cu. yd.) (cu. yd.) (cu. yd.)
Station = 172+19.64
RDWYEXC
Excavation 21 21 21 21 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 21 21 21 21 1.00
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
SKIP STATION RANGE = 0+00.00 to 0+00.00
500+10.00 RDWYEXC
Excavation 82.34 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 32.24 0 0 0.00 0 0
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 75.24 0 0 0.00 0 0
500+13.40 RDWYEXC
Excavation 104.11 11 11 1.00 11 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 11 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 26.18 4 0 0.00 11 4
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 62.73 9 0 0.00 11 9
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.08 0 0 0.00 11 0
500+25.00 RDWYEXC
Excavation 3.81 23 23 1.00 34 Subsoil Exc 0.00 0 0 1.00 0 Fill 121.18 26 26 1.00 8 26
TOPSOIL
Excavation 0.20 0 0 0.00 0 Subsoil Exc 27.40 6 0 0.00 6 Fill 0.00 0 0 0.00 8 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.66 9 0 0.00 8 13
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 42.86 23 0 0.00 8 32
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.08 0 0 0.00 8 0
500+39.47 RDWYEXC
Excavation 0.00 1 1 1.00 35 Subsoil Exc 0.00 0 0 1.00 0 Fill 244.24 98 98 1.00 -89 124
Subsoil Exc 23.05 14 0 0.00 20 Fill 0.00 0 0 0.00 -89 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.62 8 0 0.00 -89 21
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 33.43 20 0 0.00 -89 52
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.08 0 0 0.00 -89 0
500+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 35 Subsoil Exc 0.00 0 0 1.00 0 Fill 171.70 81 81 1.00 -170 205
TOPSOIL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 20.14 8 0 0.00 28 Fill 0.00 0 0 0.00 -170 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 -170 26
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 30.43 12 0 0.00 -170 64
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.08 0 0 0.00 -170 0
500+67.30 RDWYEXC
Excavation 8.48 3 3 1.00 38 Subsoil Exc 0.00 0 0 1.00 0 Fill 67.75 77 77 1.00 -244 282
TOPSOIL
Excavation 0.30 0 0 0.00 0 Subsoil Exc 12.40 10 0 0.00 38 Fill 0.00 0 0 0.00 -244 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.92 7 0 0.00 -244 33
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 27.12 18 0 0.00 -244 82
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.08 0 0 0.00 -244 0
500+75.00 RDWYEXC
Excavation 15.16 4 4 1.00 42
Fill 50.49 17 17 1.00 -257 299
TOPSOIL
Excavation 1.32 0 0 0.00 0 Subsoil Exc 9.35 3 0 0.00 41 Fill 0.00 0 0 0.00 -257 0 Mass ordinate for TOPSOIL = 0
ASPHALT
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.92 3 0 0.00 -257 36
AGG
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 27.12 8 0 0.00 -257 90
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.08 0 0 0.00 -257 0
500+79.13 RDWYEXC
Excavation 15.28 2 2 1.00 44