mt-a2013018_Earthwork_Logs.pdf

PDF 38 KB Posted

Attached to
MT PHILLIPS 201(1), Old Highway 2 and Bridge Replacement Federal contract opportunity
Solicitation number
DTFH7015B00023
Issued by
Department of Transportation Federal Highway Administration

About this file

mt-a2013018_Earthwork_Logs

View the file

Other files for this federal contract opportunity

Other files attached to MT PHILLIPS 201(1), Old Highway 2 and Bridge Replacement, newest first.
File Type Posted
Bid_Opening_Summary_for_DTFH70-15-B-00023.pdf PDF
Q A_0705.pdf PDF
A001_MT_Phillips_201(1).pdf PDF
SWPPP-Old_Highway_2_and_Bridge_Restoration _MT_PHILLIPS_201(1)_Phillips_County _Montana.pdf PDF
mt-a2013018_DodsonSouthCanalBridgeInspectionReport.pdf PDF
mt-a203018_Cross_Sections_160406.pdf PDF
mt-a2013018_Pavement_Report.pdf PDF
IFB_MT_Phillips_201(1) _Old_Highway_2_and_Bridge_Replacement.pdf PDF
Plan_Request_Form.pdf PDF
mt-a2013018_Geotechnical_Bridge_Report.pdf PDF
mt-a2013018_Plans_160406.pdf PDF
Preliminary_Letter.pdf PDF
Amendment_to_Presolicitation_Notice.pdf PDF
mt-a203018_Plans_Final(update).pdf PDF
PROJECT_DESCRIPTION.pdf PDF
mt-a203018_Plans_Final.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Preliminary_Letter.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

MT PHILLIPS 201(1)

OLD HIGHWAY 2 AND BRIDGE REPLACEMENT

GEOPAK EARTHWORK DATA LISTING

MARCH 2016

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

SKIP STATION RANGE = 0+00.00 to 0+00.00

12+90.72 RDWYEXC

Excavation 139.90 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0

TOPSOIL

Excavation 21.16 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 46.83 0 0 0.00 0 0

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 109.27 0 0 0.00 0 0

13+00.00 RDWYEXC

Excavation 9.10 26 26 1.00 26 Subsoil Exc 0.00 0 0 1.00 0 Fill 71.47 12 12 1.00 14 12

TOPSOIL

Excavation 9.63 5 0 0.00 5 Subsoil Exc 39.07 7 0 0.00 7 Fill 0.00 0 0 0.00 14 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 29.28 13 0 0.00 14 13

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 69.77 31 0 0.00 14 31

13+03.90 RDWYEXC

Excavation 1.37 1 1 1.00 27 Subsoil Exc 0.00 0 0 1.00 0 Fill 143.93 16 16 1.00 -1 28

TOPSOIL

Excavation 3.54 1 0 0.00 6 Subsoil Exc 39.17 6 0 0.00 13 Fill 0.00 0 0 0.00 -1 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 25.08 4 0 0.00 -1 17

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 59.98 9 0 0.00 -1 40

13+33.00 RDWYEXC

Excavation 0.00 1 1 1.00 28 Subsoil Exc 0.00 0 0 1.00 0

Fill 380.06 282 282 1.00 -282 310

TOPSOIL

Excavation 0.00 2 0 0.00 8 Subsoil Exc 31.88 38 0 0.00 51 Fill 0.00 0 0 0.00 -282 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.87 20 0 0.00 -282 37

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 29.16 48 0 0.00 -282 88

13+50.00 RDWYEXC

Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 155.42 169 169 1.00 -451 479

TOPSOIL

Excavation 0.00 0 0 0.00 8 Subsoil Exc 20.72 17 0 0.00 68 Fill 0.00 0 0 0.00 -451 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.64 7 0 0.00 -451 44

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.95 17 0 0.00 -451 105

13+55.02 RDWYEXC

Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 147.50 28 28 1.00 -479 507

TOPSOIL

Excavation 0.00 0 0 0.00 8 Subsoil Exc 20.12 4 0 0.00 72 Fill 0.00 0 0 0.00 -479 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.47 2 0 0.00 -479 46

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.56 4 0 0.00 -479 109

13+60.00 RDWYEXC

Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 142.49 27 27 1.00 -506 534

TOPSOIL

Excavation 0.00 0 0 0.00 8 Subsoil Exc 19.77 4 0 0.00 76 Fill 0.00 0 0 0.00 -506 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 9.44 2 0 0.00 -506 48

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.49 4 0 0.00 -506 113

14+00.00 RDWYEXC

Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 327.09 348 348 1.00 -854 882

TOPSOIL

Excavation 0.05 0 0 0.00 8 Subsoil Exc 26.56 34 0 0.00 110 Fill 0.00 0 0 0.00 -854 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.44 14 0 0.00 -854 62

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.49 35 0 0.00 -854 148

14+28.76 RDWYEXC

Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 357.43 365 365 1.00 -1219 1247

TOPSOIL

Excavation 0.00 0 0 0.00 8 Subsoil Exc 20.35 25 0 0.00 135 Fill 0.00 0 0 0.00 -1219 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.44 10 0 0.00 -1219 72

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.49 25 0 0.00 -1219 173

14+50.00 RDWYEXC

Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 301.19 259 259 1.00 -1478 1506

TOPSOIL

Excavation 0.00 0 0 0.00 8 Subsoil Exc 15.68 14 0 0.00 149 Fill 0.00 0 0 0.00 -1478 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.39 7 0 0.00 -1478 79

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.36 18 0 0.00 -1478 191

14+64.80 RDWYEXC

Excavation 0.00 0 0 1.00 28

Fill 260.86 154 154 1.00 -1632 1660

Excavation 0.00 0 0 0.00 8 Subsoil Exc 14.88 8 0 0.00 157 Fill 0.00 0 0 0.00 -1632 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.29 5 0 0.00 -1632 84

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.13 13 0 0.00 -1632 204

14+90.00 RDWYEXC

Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 205.13 217 217 1.00 -1849 1877

TOPSOIL

Excavation 0.00 0 0 0.00 8 Subsoil Exc 19.14 16 0 0.00 173 Fill 0.00 0 0 0.00 -1849 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.69 9 0 0.00 -1849 93

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 26.42 23 0 0.00 -1849 227

15+00.00 RDWYEXC

Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 127.46 62 62 1.00 -1911 1939

TOPSOIL

Excavation 0.00 0 0 0.00 8 Subsoil Exc 9.56 5 0 0.00 178 Fill 0.00 0 0 0.00 -1911 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.46 4 0 0.00 -1911 97

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.51 9 0 0.00 -1911 236

15+18.15 RDWYEXC

Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 86.35 72 72 1.00 -1983 2011

TOPSOIL

Excavation 0.00 0 0 0.00 8 Subsoil Exc 9.28 6 0 0.00 184 Fill 0.00 0 0 0.00 -1983 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Fill 7.77 5 0 0.00 -1983 102

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.89 13 0 0.00 -1983 249

15+47.22 RDWYEXC

Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 30.69 63 63 1.00 -2046 2074

TOPSOIL

Excavation 0.00 0 0 0.00 8 Subsoil Exc 6.96 9 0 0.00 193 Fill 0.00 0 0 0.00 -2046 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.17 8 0 0.00 -2046 110

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.88 19 0 0.00 -2046 268

15+50.00 RDWYEXC

Excavation 0.00 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 25.68 3 3 1.00 -2049 2077

TOPSOIL

Excavation 0.00 0 0 0.00 8 Subsoil Exc 6.09 1 0 0.00 194 Fill 0.00 0 0 0.00 -2049 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.00 1 0 0.00 -2049 111

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.48 2 0 0.00 -2049 270

15+70.36 RDWYEXC

Excavation 0.54 0 0 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.36 12 12 1.00 -2061 2089

TOPSOIL

Excavation 0.00 0 0 0.00 8 Subsoil Exc 2.45 3 0 0.00 197 Fill 0.00 0 0 0.00 -2061 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.27 4 0 0.00 -2061 115

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.80 11 0 0.00 -2061 281

15+83.15 RDWYEXC

Excavation 3.41 1 1 1.00 29

Fill 2.07 2 2 1.00 -2062 2091

Excavation 0.07 0 0 0.00 8 Subsoil Exc 1.46 1 0 0.00 198 Fill 0.00 0 0 0.00 -2062 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.19 2 0 0.00 -2062 117

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.62 6 0 0.00 -2062 287

16+00.00 RDWYEXC

Excavation 8.06 3 3 1.00 32 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.28 1 1 1.00 -2060 2092

TOPSOIL

Excavation 2.31 1 0 0.00 9 Subsoil Exc 1.26 1 0 0.00 199 Fill 0.00 0 0 0.00 -2060 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.19 3 0 0.00 -2060 120

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.63 9 0 0.00 -2060 296

16+50.00 RDWYEXC

Excavation 16.28 22 22 1.00 54 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.37 2 2 1.00 -2040 2094

TOPSOIL

Excavation 5.60 7 0 0.00 16 Subsoil Exc 0.37 2 0 0.00 201 Fill 0.00 0 0 0.00 -2040 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2040 130

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2040 321

17+00.00 RDWYEXC

Excavation 15.79 30 30 1.00 84 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.42 1 1 1.00 -2011 2095

TOPSOIL

Excavation 4.99 10 0 0.00 26 Subsoil Exc 0.42 1 0 0.00 202 Fill 0.00 0 0 0.00 -2011 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Fill 5.20 10 0 0.00 -2011 140

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2011 346

G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 84 84 1.00 Subsoil Exc 0 0 1.00 Fill 2095 2095 1.00

TOPSOIL

Excavation 26 0 0.00 Subsoil Exc 202 0 0.00 Fill 0 0 0.00

ASPHALT

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 140 0 0.00

AGG

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 346 0 0.00

S P L I T S U M M A R Y T O T A L S

XS Quant XS Quant Add/Sub Quant Add/Sub Quant

Material Name Unadjusted Adjusted Unadjusted Adjusted Mult Volume Volume Volume Volume Factor

(cu. yd.) (cu. yd.) (cu. yd.) (cu. yd.)

RDWYEXC

Excavation 84 84 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 2095 2095 0 0 1.00

TOPSOIL

Excavation 26 0 0 0 0.00 Subsoil Exc 202 0 0 0 0.00 Fill 0 0 0 0 0.00

ASPHALT

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 140 0 0 0 0.00

Excavation 0 0 0 0

0.00 Subsoil Exc 0 0 0 0 0.00 Fill 346 0 0 0 0.00

B A L A N C E P O I N T S U M M A R Y Material Name Cumulative Incremental Mult Unadjusted Adjusted Unadjusted Adjusted Factor Volumes Volumes Volumes Volumes

(cu. yd.) (cu. yd.) (cu. yd.) (cu. yd.)

Station = 13+03.64

RDWYEXC

Excavation 27 27 27 27 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 27 27 27 27 1.00

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

171+50.00 RDWYEXC

Excavation 11.82 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.69 0 0 1.00 0 0

TOPSOIL

Excavation 1.34 0 0 0.00 0 Subsoil Exc 2.35 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 0 0 0.00 0 0

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 0 0 0.00 0 0

172+00.00 RDWYEXC

Excavation 8.07 18 18 1.00 18 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.02 7 7 1.00 11 7

TOPSOIL

Excavation 1.09 2 0 0.00 2 Subsoil Exc 4.17 6 0 0.00 6 Fill 0.00 0 0 0.00 11 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 11 10

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 11 25

172+50.00 RDWYEXC

Excavation 0.00 7 7 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 32.56 35 35 1.00 -17 42

TOPSOIL

Excavation 0.00 1 0 0.00 3 Subsoil Exc 10.20 13 0 0.00 19 Fill 0.00 0 0 0.00 -17 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -17 20

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -17 50

173+00.00 RDWYEXC

Excavation 0.00 0 0 1.00 25

Fill 69.04 94 94 1.00 -111 136

Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.62 19 0 0.00 38 Fill 0.00 0 0 0.00 -111 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -111 30

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -111 75

173+50.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 104.24 160 160 1.00 -271 296

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 11.32 20 0 0.00 58 Fill 0.00 0 0 0.00 -271 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -271 40

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -271 100

174+00.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 137.33 224 224 1.00 -495 520

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 11.91 22 0 0.00 80 Fill 0.00 0 0 0.00 -495 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -495 50

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -495 125

174+50.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 103.67 223 223 1.00 -718 743

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.73 17 0 0.00 97 Fill 0.00 0 0 0.00 -718 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0

Fill 5.10 10 0 0.00 -718 60

Subsoil Exc 0.00 0 0 0.00 0 Fill 12.68 24 0 0.00 -718 149

174+66.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 104.93 62 62 1.00 -780 805

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.81 4 0 0.00 101 Fill 0.00 0 0 0.00 -780 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 3 0 0.00 -780 63

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.69 8 0 0.00 -780 157

174+70.98 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 105.16 19 19 1.00 -799 824

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.85 1 0 0.00 102 Fill 0.00 0 0 0.00 -799 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.10 1 0 0.00 -799 64

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.68 2 0 0.00 -799 159

175+00.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 170.59 148 148 1.00 -947 972

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 12.42 10 0 0.00 112 Fill 0.00 0 0 0.00 -947 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.43 6 0 0.00 -947 70

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.37 16 0 0.00 -947 175

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0

Fill 1.35 1 0 0.00 -947 1

175+08.48 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 180.29 55 55 1.00 -1002 1027

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 12.99 4 0 0.00 116 Fill 0.00 0 0 0.00 -1002 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.52 2 0 0.00 -1002 72

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.45 6 0 0.00 -1002 181

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.73 0 0 0.00 -1002 1

175+10.98 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 185.91 17 17 1.00 -1019 1044

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 13.24 1 0 0.00 117 Fill 0.00 0 0 0.00 -1019 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.52 1 0 0.00 -1019 73

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.09 2 0 0.00 -1019 183

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.00 0 0 0.00 -1019 1

175+22.67 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 185.00 80 80 1.00 -1099 1124

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 13.66 6 0 0.00 123 Fill 0.00 0 0 0.00 -1099 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.74 2 0 0.00 -1099 75

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.05 8 0 0.00 -1099 191

SHOULDERBACKFILL

Fill 2.36 1 0 0.00 -1099 2

175+35.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 215.32 91 91 1.00 -1190 1215

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 16.25 7 0 0.00 130 Fill 0.00 0 0 0.00 -1190 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.04 4 0 0.00 -1190 79

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 28.89 11 0 0.00 -1190 202

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.18 1 0 0.00 -1190 3

175+47.67 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 103.37 75 75 1.00 -1265 1290

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.86 6 0 0.00 136 Fill 0.00 0 0 0.00 -1265 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.92 4 0 0.00 -1265 83

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.30 12 0 0.00 -1265 214

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.62 1 0 0.00 -1265 4

175+48.48 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 102.81 3 3 1.00 -1268 1293

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.88 0 0 0.00 136 Fill 0.00 0 0 0.00 -1268 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.96 0 0 0.00 -1268 83

AGG

Fill 20.40 1 0 0.00 -1268 215

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.62 0 0 0.00 -1268 4

175+50.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 101.03 6 6 1.00 -1274 1299

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.79 0 0 0.00 136 Fill 0.00 0 0 0.00 -1274 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.96 0 0 0.00 -1274 83

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.40 1 0 0.00 -1274 216

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.62 0 0 0.00 -1274 4

175+60.17 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 80.96 34 34 1.00 -1308 1333

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.78 3 0 0.00 139 Fill 0.00 0 0 0.00 -1308 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.96 3 0 0.00 -1308 86

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.40 8 0 0.00 -1308 224

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.62 0 0 0.00 -1308 4

175+78.25 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 67.32 50 50 1.00 -1358 1383

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.27 5 0 0.00 144 Fill 0.00 0 0 0.00 -1358 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0

Fill 6.34 5 0 0.00 -1358 91

Subsoil Exc 0.00 0 0 0.00 0 Fill 20.09 14 0 0.00 -1358 238

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.78 1 0 0.00 -1358 5

175+85.17 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 59.17 16 16 1.00 -1374 1399

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.68 2 0 0.00 146 Fill 0.00 0 0 0.00 -1374 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.56 2 0 0.00 -1374 93

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 5 0 0.00 -1374 243

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 0 0 0.00 -1374 5

175+96.50 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 55.34 24 24 1.00 -1398 1423

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.82 3 0 0.00 149 Fill 0.00 0 0 0.00 -1398 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.56 3 0 0.00 -1398 96

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 8 0 0.00 -1398 251

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 1 0 0.00 -1398 6

176+00.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 53.69 7 7 1.00 -1405 1430

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.72 1 0 0.00 150 Fill 0.00 0 0 0.00 -1405 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Fill 6.56 1 0 0.00 -1405 97

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 2 0 0.00 -1405 253

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 0 0 0.00 -1405 6

176+04.50 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 68.38 10 10 1.00 -1415 1440

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 5.90 1 0 0.00 151 Fill 0.00 0 0 0.00 -1415 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.56 1 0 0.00 -1415 98

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 3 0 0.00 -1415 256

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 0 0 0.00 -1415 6

SKIP STATION RANGE = 176+04.51 to 176+99.82

177+00.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 63.19 0 0 1.00 -1415 1440

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.38 0 0 0.00 151 Fill 0.00 0 0 0.00 -1415 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.56 0 0 0.00 -1415 98

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 0 0 0.00 -1415 256

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 0 0 0.00 -1415 6

177+08.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 63.59 19 19 1.00 -1434 1459

Excavation 0.00 0 0 0.00 3

Subsoil Exc 7.33 2 0 0.00 153 Fill 0.00 0 0 0.00 -1434 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.56 2 0 0.00 -1434 100

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 6 0 0.00 -1434 262

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 0 0 0.00 -1434 6

177+19.33 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 67.23 27 27 1.00 -1461 1486

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.52 3 0 0.00 156 Fill 0.00 0 0 0.00 -1461 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.56 3 0 0.00 -1461 103

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 8 0 0.00 -1461 270

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.23 1 0 0.00 -1461 7

177+44.33 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 95.61 75 75 1.00 -1536 1561

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.26 8 0 0.00 164 Fill 0.00 0 0 0.00 -1536 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.34 6 0 0.00 -1536 109

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.88 18 0 0.00 -1536 288

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.29 2 0 0.00 -1536 9

177+50.00 RDWYEXC

Fill 101.57 21 21 1.00 -1557 1582

Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.73 2 0 0.00 166 Fill 0.00 0 0 0.00 -1557 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.28 1 0 0.00 -1557 110

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.40 4 0 0.00 -1557 292

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.40 0 0 0.00 -1557 9

177+56.02 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 108.75 23 23 1.00 -1580 1605

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.82 2 0 0.00 168 Fill 0.00 0 0 0.00 -1580 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.22 1 0 0.00 -1580 111

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.40 5 0 0.00 -1580 297

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.46 1 0 0.00 -1580 10

177+56.83 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 108.53 3 3 1.00 -1583 1608

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.76 0 0 0.00 168 Fill 0.00 0 0 0.00 -1583 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.21 0 0 0.00 -1583 111

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.30 1 0 0.00 -1583 298

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0

Fill 2.42 0 0 0.00 -1583 10

177+81.83 RDWYEXC

Subsoil Exc 0.00 0 0 1.00 0 Fill 97.98 96 96 1.00 -1679 1704

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.46 10 0 0.00 178 Fill 0.00 0 0 0.00 -1679 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.74 6 0 0.00 -1679 117

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.05 19 0 0.00 -1679 317

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.36 2 0 0.00 -1679 12

177+93.52 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 92.72 41 41 1.00 -1720 1745

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.18 4 0 0.00 182 Fill 0.00 0 0 0.00 -1720 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.52 2 0 0.00 -1720 119

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.09 8 0 0.00 -1720 325

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.00 1 0 0.00 -1720 13

177+96.02 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 86.51 8 8 1.00 -1728 1753

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 9.49 1 0 0.00 183 Fill 0.00 0 0 0.00 -1728 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.52 1 0 0.00 -1728 120

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.45 2 0 0.00 -1728 327

Fill 1.73 0 0 0.00 -1728 13

178+00.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 82.32 12 12 1.00 -1740 1765

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 9.18 1 0 0.00 184 Fill 0.00 0 0 0.00 -1740 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.48 1 0 0.00 -1740 121

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.95 3 0 0.00 -1740 330

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.55 0 0 0.00 -1740 13

178+33.52 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 85.32 104 104 1.00 -1844 1869

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 11.18 13 0 0.00 197 Fill 0.00 0 0 0.00 -1844 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 7 0 0.00 -1844 128

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 20 0 0.00 -1844 350

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 1 0 0.00 -1844 14

178+50.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 77.71 50 50 1.00 -1894 1919

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.53 7 0 0.00 204 Fill 0.00 0 0 0.00 -1894 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 3 0 0.00 -1894 131

AGG

Fill 13.68 8 0 0.00 -1894 358

179+00.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 60.43 128 128 1.00 -2022 2047

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 9.90 19 0 0.00 223 Fill 0.00 0 0 0.00 -2022 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2022 141

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2022 383

179+50.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 39.72 93 93 1.00 -2115 2140

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 8.65 17 0 0.00 240 Fill 0.00 0 0 0.00 -2115 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2115 151

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2115 408

180+00.00 RDWYEXC

Excavation 0.00 0 0 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.28 53 53 1.00 -2168 2193

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 7.00 14 0 0.00 254 Fill 0.00 0 0 0.00 -2168 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2168 161

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2168 433

180+50.00 RDWYEXC

Excavation 2.92 3 3 1.00 28 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.84 19 19 1.00 -2184 2212

TOPSOIL

Excavation 0.15 0 0 0.00 3 Subsoil Exc 2.45 9 0 0.00 263

Fill 0.00 0 0 0.00 -2184 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2184 171

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2184 458

181+00.00 RDWYEXC

Excavation 16.01 18 18 1.00 46 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.32 3 3 1.00 -2169 2215

TOPSOIL

Excavation 6.20 5 0 0.00 8 Subsoil Exc 0.32 3 0 0.00 266 Fill 0.00 0 0 0.00 -2169 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2169 181

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2169 483

181+50.00 RDWYEXC

Excavation 19.84 34 34 1.00 80 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.32 1 1 1.00 -2136 2216

TOPSOIL

Excavation 5.96 11 0 0.00 19 Subsoil Exc 0.32 1 0 0.00 267 Fill 0.00 0 0 0.00 -2136 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.20 10 0 0.00 -2136 191

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.68 25 0 0.00 -2136 508

G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 80 80 1.00 Subsoil Exc 0 0 1.00 Fill 2216 2216 1.00

TOPSOIL

Excavation 19 0 0.00 Subsoil Exc 267 0 0.00 Fill 0 0 0.00

ASPHALT

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00

Fill 191 0 0.00

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 508 0 0.00

SHOULDERBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 14 0 0.00

S P L I T S U M M A R Y T O T A L S

XS Quant XS Quant Add/Sub Quant Add/Sub Quant

Material Name Unadjusted Adjusted Unadjusted Adjusted Mult Volume Volume Volume Volume Factor

(cu. yd.) (cu. yd.) (cu. yd.) (cu. yd.)

RDWYEXC

Excavation 80 80 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 2216 2216 0 0 1.00

TOPSOIL

Excavation 19 0 0 0 0.00 Subsoil Exc 267 0 0 0 0.00 Fill 0 0 0 0 0.00

ASPHALT

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 191 0 0 0 0.00

AGG

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 508 0 0 0 0.00

SHOULDERBACKFILL

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 14 0 0 0 0.00

B A L A N C E P O I N T S U M M A R Y Material Name Cumulative Incremental Mult Unadjusted Adjusted Unadjusted Adjusted Factor Volumes Volumes Volumes Volumes

(cu. yd.) (cu. yd.) (cu. yd.) (cu. yd.)

Station = 172+19.64

RDWYEXC

Excavation 21 21 21 21 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 21 21 21 21 1.00

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

SKIP STATION RANGE = 0+00.00 to 0+00.00

500+10.00 RDWYEXC

Excavation 82.34 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 32.24 0 0 0.00 0 0

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 75.24 0 0 0.00 0 0

500+13.40 RDWYEXC

Excavation 104.11 11 11 1.00 11 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 11 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 26.18 4 0 0.00 11 4

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 62.73 9 0 0.00 11 9

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.08 0 0 0.00 11 0

500+25.00 RDWYEXC

Excavation 3.81 23 23 1.00 34 Subsoil Exc 0.00 0 0 1.00 0 Fill 121.18 26 26 1.00 8 26

TOPSOIL

Excavation 0.20 0 0 0.00 0 Subsoil Exc 27.40 6 0 0.00 6 Fill 0.00 0 0 0.00 8 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.66 9 0 0.00 8 13

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 42.86 23 0 0.00 8 32

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.08 0 0 0.00 8 0

500+39.47 RDWYEXC

Excavation 0.00 1 1 1.00 35 Subsoil Exc 0.00 0 0 1.00 0 Fill 244.24 98 98 1.00 -89 124

Subsoil Exc 23.05 14 0 0.00 20 Fill 0.00 0 0 0.00 -89 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.62 8 0 0.00 -89 21

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 33.43 20 0 0.00 -89 52

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.08 0 0 0.00 -89 0

500+50.00 RDWYEXC

Excavation 0.00 0 0 1.00 35 Subsoil Exc 0.00 0 0 1.00 0 Fill 171.70 81 81 1.00 -170 205

TOPSOIL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 20.14 8 0 0.00 28 Fill 0.00 0 0 0.00 -170 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 -170 26

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 30.43 12 0 0.00 -170 64

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.08 0 0 0.00 -170 0

500+67.30 RDWYEXC

Excavation 8.48 3 3 1.00 38 Subsoil Exc 0.00 0 0 1.00 0 Fill 67.75 77 77 1.00 -244 282

TOPSOIL

Excavation 0.30 0 0 0.00 0 Subsoil Exc 12.40 10 0 0.00 38 Fill 0.00 0 0 0.00 -244 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.92 7 0 0.00 -244 33

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 27.12 18 0 0.00 -244 82

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.08 0 0 0.00 -244 0

500+75.00 RDWYEXC

Excavation 15.16 4 4 1.00 42

Fill 50.49 17 17 1.00 -257 299

TOPSOIL

Excavation 1.32 0 0 0.00 0 Subsoil Exc 9.35 3 0 0.00 41 Fill 0.00 0 0 0.00 -257 0 Mass ordinate for TOPSOIL = 0

ASPHALT

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.92 3 0 0.00 -257 36

AGG

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 27.12 8 0 0.00 -257 90

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.08 0 0 0.00 -257 0

500+79.13 RDWYEXC

Excavation 15.28 2 2 1.00 44