A001_MT_Phillips_201(1).pdf

PDF 39 KB Posted

Attached to
MT PHILLIPS 201(1), Old Highway 2 and Bridge Replacement Federal contract opportunity
Solicitation number
DTFH7015B00023
Issued by
Department of Transportation Federal Highway Administration

About this file

Amendment A001

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 06/22/2016 N/A MT Phillips 201(1)

Old Highway 2 and

Bridge Replacement

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH7015B00023

9B. DATED (SEE ITEM 11)

06/07/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

MT Phillips 201(1), Old Highway 2 and Bridge Replacement

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

F-21 DIVISION 600

Special Contract Requirements Project: MT PHILLIPS 201(1), Old Highway 2 and Bridge Replacement

Section 625. — TURF ESTABLISHMENT

01/01/14–FP14

Construction Requirements

625.01 General. Delete the first sentence and substitute the following:

Turf establishment consists of applying fertilizer, seed mixture, tackifier, and mulch.

Construction Requirements

625.03 General. Delete the text of this Subsection and substitute the following:

Apply turf establishment to finished slopes and ditches between October 15 and April 15. Do not apply turf establishment during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or not friable.

625.05 Watering. Delete the text of this Subsection.

625.06 Fertilizing. Delete the text of this Subsection.

625.07 Seeding. Delete the text of this Subsection.

625.08 Mulching. Delete the text of this Subsection.

625.08A Turf Establishment, Hydraulic Method. (Added Subsection).

(a) Turf Establishment Mixture. The permanent turf establishment mixture is composed of the following components. Apply in two applications placing no more than 50 percent of the mixture at any one application. The application rate must avoid sloughing or washing away the mixture on steep slopes. Adjust application rate to avoid sloughing or washing away the mixture on steep slopes as approved by the CO.

Component Application Rate

Seed conforming to Subsection 713.04 12.5 lbs pure live seed/slurry unit Fertilizer conforming to Subsection 713.03(a) 62.5 lbs/slurry unit Tackifier conforming to Subsection 713.11 50 lbs/slurry unit Wood fiber mulch conforming to Subsection 713.05(b)

500 lbs/slurry unit

(b) Equipment. Use hydro-type equipment capable of providing a uniform application using water as the carrying agent. Do not use hydro-type equipment with gear driven pumps, which

Revised by Amendment A001

File details come from the government source that posted it. Updated .