mt-a2013018_Plans_160406.pdf
PDF 14 MB Posted
- Attached to
- MT PHILLIPS 201(1), Old Highway 2 and Bridge Replacement Federal contract opportunity
- Solicitation number
- DTFH7015B00023
About this file
mt-a2013018_Plans_160406
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_for_DTFH70-15-B-00023.pdf | ||
| Q A_0705.pdf | ||
| A001_MT_Phillips_201(1).pdf | ||
| mt-a2013018_Pavement_Report.pdf | ||
| IFB_MT_Phillips_201(1) _Old_Highway_2_and_Bridge_Replacement.pdf | ||
| Plan_Request_Form.pdf | ||
| mt-a2013018_Geotechnical_Bridge_Report.pdf | ||
| mt-a2013018_Earthwork_Logs.pdf | ||
| SWPPP-Old_Highway_2_and_Bridge_Restoration _MT_PHILLIPS_201(1)_Phillips_County _Montana.pdf | ||
| mt-a2013018_DodsonSouthCanalBridgeInspectionReport.pdf | ||
| mt-a203018_Cross_Sections_160406.pdf | ||
| mt-a203018_Plans_Final(update).pdf | ||
| Preliminary_Letter.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Amendment_to_Presolicitation_Notice.pdf | ||
| Preliminary_Letter.pdf | ||
| mt-a203018_Plans_Final.pdf | ||
| PROJECT_DESCRIPTION.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material A
M
F e b r u a r y
U
S C
F H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n G e n e r a l I n fo r m a ti o n m t-a a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 PHILLIPS 201(1) MT
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub
Ø spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle x x x x x
1 6
B N S F
Nelson
B la ck
C o u le e
S o u th
B N S
F
A.3
STATE PROJECT
NUMBER
MT
PHILLIPS 201(1)
F e b
P
M m t-a a c .d g n
U
S I n t2
D
B .W
A C
K
R h e c k e d b y
V O
E R
M A e s ig n e d b y
1 0.5 0 1 2
SCALE IN MILES
VICINITY MAP
N
REFUGE
WILDLIFE
NATIONAL
BOWDOIN
LAKE BOWDOIN
PHILLIPS COUNTY
STRATER RD
S T
R A
T E
R R
D
BOWDOIN
RD
A U T O T O
U R R
O U T E
B O
W D
O
IN
R
E
FU
G E
MONTANA
MALTA
CANAL BRIDGE
DODSON SOUTH
DODSON SOUTH CANAL
B L
A C
K C
O U
L E E
BRIDGE REPLACEMENT
OLD HIGHWAY 2 AND
MT PHILLIPS 201(1)
END PROJECT
R. 30 E.
T
N
T
N
R. 31 E.
STA. 12+90.72
BRIDGE REPLACEMENT
OLD HIGHWAY 2 AND
MT PHILLIPS 201(1)
BEGIN PROJECT
STA. 206+00.00
BRIDGE REPLACEMENT
OLD HIGHWAY 2 AND
MT PHILLIPS 201(1)
BEGIN RESURFACING
END REHABILITATION
REFUGE HEADQUARTERS
BOWDOIN NATIONAL WILDLIFE
1.0 miles
Malta
STA. 314+36.00
BRIDGE REPLACEMENT
OLD HIGHWAY 2 AND
MT PHILLIPS 201(1)
HEADQUARTERS ACCESS ROAD
BEGIN RESURFACING
OLD HIGHWAY 2
END RESURFACING
Sheet and Description
Section C Section D Section E Section F Section G Section H Section K Section L
Typical Sections Plan & Profile Approach
Roads Erosion Control Bridge Drainage Temporary
Traffic Control Permanent
Traffic Control Allowance Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,854 46 1,900
A0140 15801-0000 WATERING FOR DUST CONTROL MGAL 800
A0160 20101-0000 CLEARING AND GRUBBING ACRE 0.8 0.1 0.9 Contract Quantity
A0180 20301-2400 REMOVAL OF SIGN EACH 23 2 25
A0200 20304-2000 REMOVAL OF BRIDGE (DODSON SOUTH CANAL BRIDGE) LPSM ALL
A0220 20401-0000 ROADWAY EXCAVATION CUYD 678 238 916 Contract Quantity
A0240 20402-0000 SUBEXCAVATION (TYPE 1) CUYD 740 60 800
A0260 20402-0000 SUBEXCAVATION (TYPE 2) CUYD 760 40 800
A0280 20411-0000 SELECT BORROW TON 2,535 7,971 427 567 11,500
A0300 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE A (NONWOVEN) SQYD 3,011 489 3,500
A0320 20801-0000 STRUCTURE EXCAVATION CUYD 133 7 140
A0340 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 4,831 169 5,000
A0360 30202-1000 ROADWAY AGGREGATE, METHOD 1 TON 218 32 250
A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 444 388 168 1,000
A0400 30402-5000 FULL DEPTH RECLAMATION, METHOD 2 SQYD 42,761 739 43,500
A0420 30502-0000 FULL DEPTH RECLAMATION WITH CEMENT (14-INCH
DEPTH) SQYD 10,392 608 11,000
A0440 30502-0000 FULL DEPTH RECLAMATION WITH CEMENT (7-INCH
DEPTH) SQYD 32,369 631 33,000
A0460 30510-0000 CEMENTITIOUS MATERIAL TON 1,102 98 1,200
A0480 30702-0000 CEMENT TREATED AGGREGATE COURSE TON 1,683 167 1,850
A0500 40301-0200 ASPHALT CONCRETE PAVEMENT, TYPE 2 TON 7,494 151 355 8,000
A0520 40601-0000 FOG SEAL TON 1 1
A0540 40702-0300 CHIP SEAL, TYPE 1C SQYD 29,692 308 30,000
A0560 40711-0000 EMULSIFIED ASPHALT TON 33 2 35
A0580 41201-0000 TACK COAT TON 40 1 4 45
A0600 41401-1000 CRACKS, ROUTING, CLEANING AND SEALING LNFT 15,096 904 16,000
A0620 55101-1900 STEEL H-PILE, 14 X 89, IN PLACE LNFT 1,147 53 1,200
A0640 55104-1000 DYNAMIC PILE LOAD TEST EACH 2 2
A0660 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 83 2 85
A0680 55302-3700 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE Contract Quantity
GIRDER LNFT 378 378
A0700 55401-2000 REINFORCING STEEL, EPOXY COATED LB 13,452 13,452 Contract Quantity
A0720 55601-0900 BRIDGE RAILING, STEEL LNFT 223 223 Contract Quantity
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-F eb -2
:0
PM
C
F_ dr iv e\
H ig hw ay s\
FH
W A\
_O ld
_H ig hw ay
_2 \E st im at e\
Si gn of f\
[m t-a2
_E st im at e-
.x ls x] Sh ee t
STATE PROJECT
B.1PHILLIPS 201(1)MT
Sheet and Description
Section C Section D Section E Section F Section G Section H Section K Section L
Typical Sections Plan & Profile Approach
Roads Erosion Control Bridge Drainage Temporary
Traffic Control Permanent
Traffic Control Allowance Bid Schedule
A0740 55901-0000 MEMBRANE WATERPROOFING SQYD 260 260 Contract Quantity
A0760 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 8 8 Contract Quantity
A0780 60201-0600 18-INCH PIPE CULVERT LNFT 246 14 260
A0800 60201-0800 24-INCH PIPE CULVERT LNFT 288 12 300
A0820 60201-0900 30-INCH PIPE CULVERT LNFT 44 6 50
A0840 60201-1000 36-INCH PIPE CULVERT LNFT 46 4 50
A0860 60704-0000 CLEANING CULVERT IN PLACE EACH 2 1 3
A0880 61701-1200 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL
POSTS LNFT 76 76
A0900 61702-0800 TERMINAL SECTION TYPE TANGENT EACH 4 4
A0920 61707-0000 STRUCTURE TRANSITION RAILING LNFT 52 52
A0940 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 20
A0960 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 24-INCH WIDTH HOUR 20
A0980 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 20
A1000 62301-0000 GENERAL LABOR HOUR 40
A1020 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH ACRE 0.6 0.1 0.3 1.0
A1040 62503-0000 TURF ESTABLISHMENT (HYDRAULIC METHOD) SLRY 17 1 2 20
A1060 63302-0000 SIGN SYSTEM SQFT 61 61
A1080 63309-0100 DELINEATOR, TYPE 1 EACH 40 5 45
A1100 63316-1000 REMOVE AND RESET SIGN EACH 1 1
A1120 63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID (WHITE) LNFT 1,104 46 1,150
A1140 63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID (YELLOW) LNFT 11,314 86 11,400
A1160 63401-0200 PAVEMENT MARKINGS, TYPE A, BROKEN (YELLOW) LNFT 35,150 350 35,500
A1180 63502-0500 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2 EACH 10 10
A1200 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 6 6
A1220 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH EACH 20 20
A1240 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE
C EACH 20 20
A1260 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 402 8 410
A1280 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 2,400 100 2,500
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-M ar -2
:4
PM
F:
\h ig hw ay s\
FH
W
A\
_O ld _H ig hw ay _2
\S ub m itt al s\
_S ig no ff _U pd at ed m t-a2
_E st im at e-
.x ls x] Sh ee t
(2
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2PHILLIPS 201(1)MT
42,761 42,761 SQYD
32,369 32,369 SQYD
10,392 10,392 SQYD
682 1,001 1,683 TON
272 5,062 1,625 371 7,330 TON
1 1 TON
29,692 29,692 SQYD
33 33 TON
1 27 9 2 39 TON
See sheets C.3 and C.5 for details.
Based on 1.97 TON/CUYD.
Includes quantity for transitions between Typical Section No. 1 and Typical Section No. 3 See Typical Section Quantities table for application rate.
Typical No. 7
Typical No. 4
TYPICAL SECTION QUANTITIES
Description Unit Remarks
30402-5600
Emulsified asphalt
Item 20411-0000 Select borrow
(TON)
40711-0000 Based on 0.26 GAL/SQYD and 240 GAL/TON 40702-0300 40601-0000
Item 20402-0000 Subexcavation
(type 1)
(CUYD)
2,535
30510-0000 Cementitious material
177+00.00 to 180+00.00
Tack coat
41201-0000
Total 740
30502-0000
Item Number Total
Station to Station
Chip seal, type 1C
30502-0000
40301-0200 Asphalt concrete pavement, type 2
Full depth reclamation, method 2
Full depth reclamation with cement (14-inch depth)
Typical No. 3
Typical No. 1
Typical No. 2
Typical No. 5
Typical No. 6
208+00 to 223+00
Station to Station
Based on 1.97 TON/CUYDCement treated aggregate course
1,102 TON
208+00.00 to 223+00.00
Item 20402-0000 Subexcavation
(type 2)
(CUYD)
30702-0000
Item 20701-0100 Separation-stabilization geotextile, class 1, type A (nonwoven)
(SQYD)
Length
(LNFT)
Item 40301-0200 Asphalt concrete pavement, type 2
(TON)
Headquarters Access Road
223+00 to 314+36 Headquarters Access Road
Headquarters Access Road Headquarters Parking Area
Based on 1.94 TON/CUYD
Based on 0.10 GAL/SQYD and 240 GAL/TON
Item 30202-2000 Roadway aggregate, method 2
(TON)
206+00 to 208+00 300 208+00 to 223+00 2300
Total 15096
206+00 to 208+00
223+00 to 314+36
SUBEXCAVATION QUANTITIES
223+00.00 to 314+36.00 83
174+40.00 to 176+04.50 636
0.1
Item 41201-0000 Tack coat
(TON)
0.8
0.1
1643,011
1,278
30106
Based on 5% by weight of items 30502-0000 and 30702-0000
Full depth reclamation with cement (7-inch depth)
Fog seal Based on 0.10 GAL/SQYD and 240 GAL/TON
FOOTNOTE:
Based on 20' road width less 5' subexcavation, cracks 25' on center
ITEM 41401-1000
CRACKS, ROUTING, CLEANING AND SEALING
(LNFT)
Remarks
Transverse Cracking
Longitudinal Cracking
Based on 20' road width and cracks 25' on center
Based on 20' road width and cracks 25' on center Based on 18' road width and cracks 30' on center
STATE PROJECT
PHILLIPS 201(1) C.1MT
C
F_ dr iv e\
H ig hw ay s\
FH
W A\
_O ld
_H ig hw ay
_2 \D es ig n\ Ty pi ca l S ec ti on s\ [M
T-
-F eb
-2
9:
A
M C
V O
ER
M
A N
S 2/
B
W A C K
ER
2/
D es ig ne d by
C he ck ed b y:
NUMBER
TABULATION OF TYPICAL
SECTION QUANTITIES
C.2
STATE PROJECT
A p r
P
M m t-
A
C A .D
G N
U
S I n t2
W A
C K e c k e d b
V O
E R
M A s ig n e d b y
FOOTNOTE:
TYPICAL SECTIONS
LC
2% Crown
2% Crown
1:3
10'10'
1:3
Profile grade
Original ground or existing pavement
LC
2% Crown 2% Crown
Center line
Existing pavement surface
5 5 li m it s
C le a r in g li m it s
C le a r in g
Original ground
Original ground
181+50.00 to 206+00.00
17+00.00 to 171+50.00
TYPICAL SECTION NO. 2
Va ria bl e m in
3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 2, Placing conserved topsoil, 4-inch depth
Placing conserved topsoil, 4-inch depth
Va ria ble
1:3
Va ria bl e
Variable
(below asphalt and between lifts)
Tack coat
Traveled Lane Traveled Lane
12+90.72 to 17+00.00
TYPICAL SECTION NO. 1
10'-9"10'-9"
LC
2% Crown 2% Crown
Center line
5 5
Original ground 1:
3 1:3
3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 2, (7-inch depth)
Full depth reclamation with cement, (below asphalt and between lifts)
Tack coat
194+00.00 to 206+00.00
165+00.00 to 171+50.00
17+00.00 to 134+00.00
TYPICAL SECTION NO. 3
10'10'
Existing reclamation surface
Traveled Lane Traveled Lane
Turf establishment (hydraulic method)
Turf establishment (hydraulic method)
(7-inch depth)
Cement treated aggregate course Suitable roadway excavation or select borrow
Full depth reclamation, method 2
(9-inch depth)
Construct to Typical Section No. 2. prior to completing this work.
Complete according to Section 304.
Construct no steeper than 1:2.
Adjust to meet field conditions as approved.
Match existing roadway superelevation on curves as approved.
See sheet D.1 for locations and quantities.
Construct slopes as shown in the Staking Report.
on the plan and profile curve data.
Superelevate roadway on curves at the rate "e" as indicated
Construct curve widening as shown in the Staking Report.
C.3
A p r
P
M m t-
A
C A .D
G N
U
S I n t2
W A
C K e c k e d b
V O
E R
M A s ig n e d b y
FOOTNOTE:
TYPICAL SECTIONS
LC
2% Crown 2% Crown
Center line
10'10'
1 1
Original ground 1:
3 1:3
3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 2, (14-inch depth)
Full depth reclamation with cement, (below asphalt and between lifts)
Tack coat
181+50.00 to 194+00.00
134+00.00 to 165+00.00
TYPICAL SECTION NO. 4
Original ground
Profile grade
Select borrow, 24" compacted depth
Existing pavement
177+00.00 to 181+50.00
171+50.00 to 176+04.50
TYPICAL SECTION NO. 5
Existing reclamation surface li m it s
C le a r in g
Placing conserved topsoil, 4-inch depth
1:3
Va ria ble
Traveled Lane
2% Crown 2% Crown
Traveled Lane
1:3
Placing conserved topsoil, 4-inch depth li m it s
C le a r in g
10' 10'LC
3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 2, (below asphalt and between lifts)
Tack coat class 1, type A,(nonwoven)
Separation-stabilization geotextile, (depth varies)
Select Borrow
Traveled Lane Traveled Lane
3 3
4 4
Variable
6Type 1 24" Subexcavation, Turf establishment (hydraulic method)
Turf establishment (hydraulic method)
(7-inch depth)
Cement treated aggregate course
See sheet D.1 for quantities.
See sheet C.1 for locations and quantities.
Construct slopes as shown in the Staking Report.
on the plan and profile curve data.
Superelevate roadway on curves at the rate "e" as indicated
Construct curve widening as shown in the Staking Report.
Construct to Typical Section No. 2 prior to completing this work.
approved.
Match existing roadway superelevation on curves as
Existing surfacing
Center line
Original ground
Cross slope Cross slope
Chip seal, type 1C
Cracks, routing, cleaning and sealing
Headquarters Access Road (2,192 LNFT)
206+00.00 to 314+36.00
TYPICAL SECTION NO. 6
LC
C.4
STATE PROJECT
F e b
P
M m t-
A
C A .D
G N
U
S I n t2
W A
C K e c k e d b
V O
E R
M A s ig n e d b y
FOOTNOTE:
NOTE:
1. See sheet C.1 for locations and quantities.
Existing surfacing
LC
Original ground
Fog seal
5'
Display Pond Path
TYPICAL SECTION NO. 7
TYPICAL SECTIONS
Traveled Lane Traveled Lane
See sheet C.1 for locations and quantities.
Match existing crown or superelevation.
Adjust to match existing width as approved.
C.5
F e b
P
M m t-
A
C C .D
G N
U
S I n t2
W A
C K e c k e d b
V O
E R
M A s ig n e d b y
FOOTNOTE:
LC
Original ground
Select borrow, 16" compacted depth
Subexcavation limit (W)
Crown Crown
(ft) Width (W)
Locations (ft)
Total Length
1,500
(ft) Subex Length
Saw cut existing pavement (typ.)
1 1
3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 2, (nonwoven)
Separation-stabilization geotextile, class 1, type A, DETAILS
SUBEXCAVATION
On centerline1208+00 to 223+00
223+00 to 314+36
Station to Station
Access Road Headquarters
1,500
Edge of pavementEdge of pavement
SUBEXCAVATION LOCATIONS
SUBEXCATION TYPE 2
NOTE:
1. See sheet C.1 for quantities.
Remarks
Tack coat (between lifts)
S u b e x c a v a ti o n
SUBEXCAVATION (TYPE 2)
Roadway aggregate, method 2, 8" compacted depth
For use at unstable areas as approved.
conditions as approved.
Field verify with CO prior to construction. Adjust to meet field
Adjust to match existing roadway crown as approved by CO.
RT
RT 1. See sheet E.1 for approach road quantities.
LT
LT
RT
LT
RT Quantities include widening for approaches and guardrail.
LT Bridge length is not included.
RT Unadjusted quantity. Includes conserved topsoil.
LT Based on conserved topsoil depth of 4 inches in excavation areas.
See section I for details.
Adjust to meet field conditions as approved.
section J for details.
177+56.83 to 177+81.83 1 Total 76 4 52
177+06.25to 177+19.33 13 177+18.83 to 177+56.83 38 177+19.33 to 177+44.33 1
175+85.17 to 175+72.09 13 175+85.67 to 175+98.75 13 177+05.75 to 177+18.83 13
175+47.67to 175+85.67 38 175+60.17 to 175+85.17 1
GUARDRAIL QUANTITIES
Station to Station Side
Item 61701-1200 Item 61702-0800 Item 61707-0000 Guardrail system G4, Terminal section Structure transition type 2, class A type tangent railing steel posts
Station to Station
12+90.72 to 17+00.00
171+50.00 to 181+50.00
Total 181+50.00 to 206+00.00
0.4
Item 20101-0000
0.4
0.8
Item 20411-0000
(ACRE)
Clearing and grubbing
Conserved topsoil
17+00.00 to 171+50.00
(CUYD)
Turf establishment, (hydraulic method)
FOOTNOTE:
4,425 4
12+73.00 to 14+86.00 189+71.00 to 190+79.00
Total
Station to Station
(SQYD)
RT 406
RT
Item 21101-1000 Roadway obliteration, 175+22.67 to 175+47.67 1
7,971 514
Item 62503-0000
(EACH) (LNFT)
(LNFT)
NOTE:
(SLRY)
method 1
Side
4,831 5
0.6 depth
(SLRY)
ONLY
0.4 2
0.2
(ACRE)
4,366
3,605
(TON)
2862,216
Item 62406-0300 Item 62503-0000 Select Placing conserved Turf establishment,(CUYD)
Item 20401-0000 Roadway excavation topsoil, 4-inch (hydraulic method)FOR INFORMATIONborrow
4,311
Embankment
(CUYD)
ROADWAY QUANTITIES
ROADWAY OBLITERATION QUANTITIES
FOR INFORMATION
ONLY
2,095
STATE PROJECT
PHILLIPS 201(1) D.1MT
F:
\h ig hw ay s\
FH
W
A\
_O ld _H ig hw ay _2
\D es ig n\
Pl an a nd
P ro fil e\
[M T-
-M ar -2
9:
A M
C
V O
ER
M
A N
S 2/
B .W
A C K
ER
2/
D es ig ne d by
C he ck ed b y:
NUMBER
TABULATION OF PLAN
QUANTITIES
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
13601 1502580.345 2371576.669 2262.814 5/8" IR W/FHWA ALUM CAP 1.
13602 1502785.589 2374094.945 2275.593 5/8" IR W/FHWA ALUM CAP
13603 1505905.853 2390119.363 2258.617 5/8" IR W/FHWA ALUM CAP
13604 1506604.224 2390543.401 2256.903 5/8" IR W/FHWA ALUM CAP
26601 1514952.936 2396736.781 2251.696 5/8" IR W/FHWA ALUM CAP
26602 1516632.254 2398270.545 2229.412 5/8" IR W/FHWA ALUM CAP
PROJECT : OLD HIGHWAY 2 and BRIDGE RESTORATION PROJECT UNITS : INTERNATIONAL FOOT
COORDINATE SYSTEM : NAD 83(2011) MONTANA STATE PLANE COORDINATES
(Zone 2500)
EPOCH DATE : 2010
VERTICAL DATUM : NAVD88 based on Geoid 12a
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
U se rs \b ra dt
\A pp
D at a\ Lo ca l\
M ic ro so ft \W in do w s\
Te m po ra ry I nt er ne t
-M ar -2
8:
V O
ER
M
A N
S 2/
B
W A C K
ER
2/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.2
SHEET
NUMBER
PHILLIPS 201(1)MT
SURVEY CONTROL
W
R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
24" CSP
IS
A G
UES
S
FIB
ER L
OCATIO
N
IR
4RBR
IR
4RBR
,2
.4
-1.9981%
,2
.9
,2
.5
+1.1739
160' VC
K = 50
,2
.9
.7
.0
P C
.9
P T
.4
D
R= 150.00'
T= 117.66'
L= 199.55'
D
R= 2,050.00'
T= 267.75'
L= 532.48'
POT 12
+73.0
P T
.3
P C
.9
P T
.4
PC 13+
38.80 e= 0.020
BH ST-1
MT D.3
Line to be constructed
Profile grade
Existing ground
U.S . Hi ghway
Railroad
1:
:2
Culvert inlet/outlet ditch
Line to be constructed
PLAN AND PROFILE LEGEND:
ST
Typical inlet/outlet ditch
T
Structure transition railing
P ip e C u lv e r t
A p p r o a c h P ip e C u lv e r t
L
T
PHILLIPS 201(1)
10+00 15+00 20+00 25+00 30+00
P ip e C u lv e r t
P ip e C u lv e r t
A
106.28' LT
13+32.08
No Scale
CONNECTION DETAIL
surfacing asphalt
Existing section
See typical vertical joint
Sawcut for
.7
BRIDGE REPLACEMENT
OLD HIGHWAY 2 AND
MT PHILLIPS 201(1)
BEGIN REHABILITATION
See sheet D.1 for complete excavation and embankment totals.
Excavation volumes shown do not include conserved topsoil quantities.
type Tangent Terminal section, D
49.69' LT
14+70.00 method 1, See sheet J.1
Roadway obliteration, CP
13601
El. = 2,261.96
E=2,372,396.22
N=1,502,780.95
12+90.72
44.00' RT
13+75.05
38.15' RT
13+65.58
60.79' RT
13+32.73
P E
P/ E
CUYD
EXC.
CUYD
EMB.
P p r il
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D A .D
G N
B
W A
C K
E R
C
V O
E R
M A
C h e c k e d b y
D e s ig n e d b
FAP 142-A
TT
UP
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
DELINEATOR
P C
.6
P T
.2
BH ST-2
BH ST-3
P C
.6
P T
.2
D
R= 1,900.00'
T= 270.57'
L= 537.52'
Existing ground
Line to be constructed
2220 2220
30+00 35+00 40+00 45+00 50+00 55+00 60+00
N
P ip e C u lv e r t
P ip e C u lv e r t
A p p r o a c h P ip e C u lv e r t
L
T
10A
A 10
A 10
A 10
A
A 10
A 10
A
CP
13602
C u lv e r t I n P la c e
C le a n A p p r o a c h P ip e
R
T
C u lv e r t I n P la c e
C le a n A p p r o a c h P ip e
R
T
CUYD
EXC.
D.4
F e b r u a r y
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D B .D
G N
B
W A
C K
E R
C
V O
E R
M A
C h e c k e d b y
D e s ig n e d b
1001-3662,6001-8552,15001-16794
C
.2
P T
.2
BH ST-4
R= 2,050.00' T= 253.24' L= 503.93'
0 6
5 7 0 7
5 8
P C
.2
P T
.2
MT D.5
Line to be constructed
Existing ground
PHILLIPS 201(1)
2220 2220
60+00 65+00 70+00 75+00 80+00 85+00 90+00
N
A p p r o a c h P ip e C u lv e r t
L
T
A
10A
A p p r o a c h P ip e C u lv e r t
L
T
CUYD
EXC.
F e b r u a r y
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D C .D
W A
C K
V O
E R
M A
C h e c k e d b y
D e s ig n e d b
R N I
U R I
I L I T Y
W A R N I
R I
I L I T Y
W A R N I
R I
I L I T Y
W A R N I
R I
I L I
Y
BH ST-5
MT D.6
Line to be constructed
Existing ground
PHILLIPS 201(1)
A p p r o a c h P ip e C u lv e r t
R
T
2210 2210
120+00115+00110+00105+00100+0095+0090+00
N
A 18
10A
A 10
10A do not disturb
Existing box culvert
CUYD
EXC.
F e b r u a r y
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D D .D
G N
B
W A
C K
E R
C
V O
E R
M A
C h e c k e d b y
D e s ig n e d b
UP
W A R N I
R I
I L I T Y
W A R N I
R I
I L I T Y
W A R N I
R I
I L I T Y
W A R N I
R I
I L I
BH ST-6
MT D.7
Line to be constructed
Existing ground
N PHILLIPS 201(1)
P ip e C u lv e r t
2210 2210
150+00145+00140+00135+00130+00125+00120+00
A 10
A 10
See sheet C.3
Cement subgrade stabilization
CUYD
EXC.
J u ly
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D E .D
G N
B
W A
C K
E R
C
V O
E R
M A
C h e c k e d b y
D e s ig n e d b
R N I
R I
I L I T Y
,2
.2
5+0.5600%
100' VC
K = 93
,2
.5
+1.630 8%
100' VC
K = 89
SSD = 1007'
,2
.9
+0.5026%
,2
.4
,2
.7
-0.3991%
100' VC
K = 111
SSD = 1250'
.5
,2
.9
BH ST-7
BH ST-12
BH ST-13
BH ST-8
MT D.8
Line to be constructed
Profile grade
Existing ground
N PHILLIPS 201(1)
22102210
.5
.0
A 10
A 6
A 3
GR LT
GR RT
STT ST T
T ST ST T
150+00 155+00 160+00 165+00 170+00 175+00 180+00
Dodson South Canal
See sheets G.1 - G.18 Construct new bridge.
Remove existing bridge.
176+52.25 Bridge.
See sheet C.3
.5
See sheet C.3
Cement subgrade stabilization
See sheet C.3
1,440
See sheet D.1 for complete excavation and embankment totals.
Excavation volumes shown do not include conserved topsoil quantities.
CUYD
EXC.
F e b r u a r y
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D F .D
G N
B
W A
C K
E R
C
V O
E R
M A
C h e c k e d b y
D e s ig n e d b y
Subexcavation (type 1) Subexcavation (type 1)
See sheets G.1-G.18
Construct new bridge.
Remove existing bridge.
176+52.25 Bridge.
59.32' LT
175+15.00
103.39' LT
175+24.08
86.23' LT
176+07.33
42.16' LT
175+98.25
R N I
R I
I
L I
T Y
-0.3991%
,2
.1
D
R= 1,200.00'
T= 478.36'
L= 910.39'
P C
.2
P T
.6
H
S
-10
S
-9
S T -11
P C
.2
P T
.6
MT D.9
Line to be constructed
Profile grade
Existing ground
No Scale
CONNECTION DETAIL
section
See typical surfacing asphalt
Existing joint @ 15° skew
Sawcut for vertical
S T -11
0.5% max.
PHILLIPS 201(1)
2220 2220
N
180+00 185+00 190+00 195+00 200+00 205+00 210+00
A 10
A 10
A 10
A 10
B
See sheet E.2
Bowdoin Road
Approach 500+00
Mainline 190+86.74 =
76.34 RT
191+50.00
54.28 RT
191+50.00
CP
13603
13604
CP
El. = 2,257.13
E=2,390,646.66
N= 1,506,737.82
206+00.00
MT PHILLIPS 201(1)
BEGIN RESURFACING
END REHABILITATION
See sheet J.1
Roadway obliteration, method 1
See sheet C.3
Cement subgrade stabilization1 do not disturb
Existing culverts
See sheet D.1 for complete excavation and embankment totals.
Excavation volumes shown do not include conserved topsoil quantities.
Permanent easement
CUYD
EXC.
F e b r u a r y
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D G .D
G N
B
W A
C K
E R
C
V O
E R
M A
C h e c k e d b y
D e s ig n e d b
206+00 TO 266+00
OLD HIGHWAY 2
Line to be constructed
Line to be constructed
See sheet C.5
MT PHILLIPS 201(1)
BEGIN RESURFACING
END REHABILITATION
El. = 2,257.13
E=2,390,646.66
N= 1,506,737.82
206+00.00
D.10
STATE PROJECT
F e b r u a r y
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D H .D
G N
B
W A
C K
E R
C
V O
E R
M A
N S
C h e c k e d b y
D e s ig n e d b y
Subexcavation (type 2)
B H
S T
266+00 TO 314+36.00
OLD HIGHWAY 2
CP
26601
See sheet D.12
Headquarters Access Road
314+36.00
OLD HIGHWAY 2 AND BRIDGE REPLACEMENT
MT PHILLIPS 201(1)
BEGIN RESURFACING HEADQUARTERS ACCESS ROAD
END RESURFACING OLD HIGHWY 2
D.11
STATE PROJECT
F e b r u a r y
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D I .D
G N
B
W A
C K
E R
C
V O
E R
M A
N S
C h e c k e d b y
D e s ig n e d b y
AND DISPLAY POND PATH
HEADQUARTERS ACCESS ROAD
DISPLAY POND
Display pond path
Headquarters parking area
BRIDGE REPLACEMENT
OLD HIGHWAY 2 AND
END PROJECT MT PHILLIPS 201(1)
CP
26602
314+36.00
OLD HIGHWAY 2 AND BRIDGE REPLACEMENT
MT PHILLIPS 201(1)
BEGIN RESURFACING HEADQUARTERS ACCESS ROAD
END RESURFACING OLD HIGHWAY 2
REFUGE HEADQUARTERS
BOWDOIN NATIONAL WILDLIFE
Do not disturb
Wood bollards
Chip seal, type 1C
Fog seal
Access Road
Headquarters
CP
26601
Do not disturb
Gate sensor
D.12
STATE PROJECT
F e b r u a r y
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D J .D
G N
B
W A
C K
E R
C
V O
E R
M A
C h e c k e d b y
D e s ig n e d b y
174+66 LT
175+35 LT
190+87 RT
29+31 LT
30+30 RT
36+69 RT
39+03 LT
47+03 RT
48+22 RT
49+17 RT
50+21 LT
50+24 RT
74+85 LT
84+82 LT
104+01 LT
113+79 LT
116+95 LT
117+02 RT
130+99 LT
144+14 LT
154+29 LT
174+66 LT
175+35 LT
180+89 LT
181+07 RT
186+37 LT
190+87 RT 1. See sheets E.2-E.4 for approach road details.
204+95 RT
Based on 1.97 TON/CUYD.
Unadjusted quantity. Includes conserved topsoil.
Based on conserved topsoil depth of 4 inches.
Based on 1.94 TON/CUYD.
Based on 0.1 GAL/SQYD and 240 GAL/TON
Total FOOTNOTE:
APPROACH ROAD EARTHWORK QUANTITIES
Item 62406-0300 Placing conserved topsoil, 4-inch depth
(ACRE)
Item 62503-0000 Turf establishment (hydraulic method)
(SLRY)
Item 20101-0000 Clearing and grubbing
(ACRE)
Item 20401-0000 Roadway excavation
(CUYD)
Conserved topsoil
(CUYD)
FOR INFORMATION
ONLY
Item 20411-0000 Select borrow
(TON)
Mainline Station
NOTE:
0.1 238 88 0.1 1
Side
Total
APPROACH ROAD SURFACING QUANTITIES
Mainline Station Side
Item 30202-1000 Roadway aggregate, method 1
(TON)
Item 30202-2000 Roadway aggregate, method 2
(TON)
Item 40301-0200 Asphalt concrete pavement, type 2
(TON)
Item 41201-0000 Tack coat
(TON)
Embankment
(CUYD)
FOR INFORMATION
ONLY
10.1 238 88 0.1
388 151 1
218 388 151 1
STATE PROJECT
PHILLIPS 201(1) E.1MT
C
F_ dr iv e\
H ig hw ay s\
FH
W A\
_O ld
_H ig hw ay
_2 \D es ig n\ Ap pr oa ch R oa ds m t-
-F eb
-2
4:
P
M C
V O
ER
M
A N
S 2/
B
W A C K
ER
2/
D es ig ne d by
C he ck ed b y:
SHEET
NUMBER
TABULATION OF APPROACH
ROAD QUANTITIES
S
G P S
,2
.8
+0.7000% -0.9929%
,2
.7
,2
.4
3 +0.3667%
70' VC
K = 51
,2
.6
P C
.2
P T
.6
P C
.2
P T
.6
POT 500+00.00
PC 5
00+
49.
P T
.5
D
R= 50.00'
T= 34.64'
L= 60.59' e= 0.020
Line to be constructed
Profile grade
Existing ground
Bowdoin Road
NOTE:
2220 2220
500+00 505+00
(MAINLINE 190+87 RT)
500+10 TO 502+10
BOWDOIN RD.
N
1. Adjust tie in to match existing field conditions.
CP
13604
CP
13603
El.= 2,259.82
E= 2,389,746.98
N= 1,505,529.29
MAINLINE 190+86.74
500+10.00
BEGIN APPROACH ROAD
El.= 2,258.65
E= 2,389,919.25
N= 1,505,498.14
502+10.00
END APPROACH ROAD
See sheet E.1 for complete excavation and embankment totals.
Excavation volumes shown do not include conserved topsoil quantities.
Permanent easement
CUYD
EXC.
E.2
F e b r u a r y
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n A p p r o a c h R o a d s m t-
A
E B .D
G N
B
W A
C K
E R
C
V O
E R
M A
C h e c k e d b y
D e s ig n e d b y
52.34' LT
501+25.91
32.13' LT
501+34.73
Stationing Mainline x x x x x
C of highway L x x
Length Approach Road
L
APPROACH ROAD DETAILS
C of approach
E.3
STATE PROJECT
F e b
P
M m t-
A
E C .D
G N
U
S I n t2
B E e c k e d b y
T H
O M
P S
O s ig n e d b y
C of highway L
C of designed approachL
Mainline xxx+xx =
MINOR APPROACH ROAD LOCATION SYMBOL FULL-DESIGN APPROACH ROAD LOCATION SYMBOL
A
FOOTNOTE:
See sheet E.5.1
1 1 1 1
STATION
MAINLINE
R1 R2 L REMARKSW
APPROACH ROAD TABLE
B
Approach type
Type Approach
TYPE
Approach xxx+xx
2029+31 LT A
A
A
A
A
A
A
44 20 32
Farm field approach
30+30 RT 42 150 10
36+69 RT 32 90 15
39+03 LT 40 2020
A 29
47+03 RT
48+22 RT
49+17 RT
50+21 LT
74+85 LT A 31 Public approach
15 15
35 15
130 10
10 10
75 15
Farm field approach
Private approach
Private approach
Private approach
Private approach
Railroad access approach
Railroad access approach
A 10 10 10 10
A 24 30 20 10
A 21 20 20 10
A 20 25 20 18
Farm field approach
113+79 LT Farm field approach
116+95 LT
117+02 RT
Farm field approach
Railroad access approach
1 1 1 1
STATION
MAINLINE
R1 R2 L REMARKSW
APPROACH ROAD TABLE
TYPE
A 13 20 15 10
A
A
A 10
B
30 20
25 20
Private approach
Private approach
A 18 20 15 10204+95 RT Farm field approach
130+99 LT Farm field approach
144+14 LT A 15 15 10 10 Farm field approach
154+29 LT A 10 10 10 10 Farm field approach
Private approach
180+89 LT
181+07 RT 25
186+37 LT
190+87 RT
See sheet E.4.2
4 4 200 Bowdoin Road
50+24 RT A 40 25 35 10 Farm field approach
174+66 LT A Farm field approach
175+35 LT A Canal access approach
3 Adjust to match field conditions as approved by CO.
3 3
See sheet E.2.4
104+01 LT A 22 25 20 10 Farm field approach
84+82 LT
10 10 15 33
10 50 50 68
Variable 1:3
1:3Variable
Fill slope stake stake
Cut slope
Clearing Limits
APPROACH ROAD DETAILS
E.4
STATE PROJECT
F e b
P
M m t-
A
E D .D
G N
U
S I n t2
B E e c k e d b y
T H
O M
P S
O s ig n e d b y
FOOTNOTE:
1'
4-inch depth
Placing conserved topsoil, 2% crown 2% crown
Placing conserved topsoil, 4-inch depth
2 2
2% Crown 2% Crown 1:3
13'13'
1:3
Profile grade li m it s
C le a r in g li m it s
C le a r in g
Original ground Va ria bl e m in
Original ground or existing road surface
3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 2, Va ria ble
1:3
LC
TYPE B APPROACH ROAD SECTION DETAIL
Placing conserved topsoil, 4-inch depth
See sheet E.1 for locations and quantities.
Construct slopes as shown in the Staking Report.
on the plan and profile curve data.
Superelevate roadway on curves at the rate "e" as indicated
(See FAR 52.236-4).
Construct curve widening as shown in the Staking Report with adjacent roadway construction.
Construct side slopes on approaches to be compatible
Adjust to match field conditions as approved by CO.
See sheet E.3.
4 4
5 5
Tack coat
(between lifts)
TYPE A APPROACH ROAD SECTION DETAIL
Suitable roadway excavation or unclassified borrow 73-inch compacted depth
Roadway aggregate, method 1, 7-inch compacted depth
Roadway aggregate, method 2, (hydraulic method) Turf establishment
(hydraulic method) Turf establishment
Turf establishment (hydraulic method)
Placing conserved topsoil, 4-inch depth
Turf establishment (hydraulic method)
Traveled Lane Traveled Lane
Suitable roadway excavation or select borrow
C of approachL
C of highwayL
W
R
R
1 1
APPROACH ROAD DETAILS
E.5
STATE PROJECT
F e b
P
M m t-
A
E E .D
G N
U
S I n t2
W A
C K e c k e d b y
V O
E R
M A s ig n e d b y
C of roadway
Point G
10' chord a 2" depression in a exceed a 3" hump or Vertical curves not to
L c o n s tr u c ti o n
E n d o f a p p r o a c h
Edge of mainline
APPROACH ROAD PROFILE DETAIL
E d g e o f m a in li n e
FOOTNOTE:
APPROACH ROAD PLAN DETAIL
typical section Match mainline
+15% maximum
-15% maximum
L
Designed grade
APPROACH ROAD CONNECTION DETAIL - TYPE A APPROACHES
c o n s tr u c ti o n
E n d o f a p p r o a c h
Edge of mainline
L
APPROACH ROAD CONNECTION DETAIL - TYPE B APPROACHES
approach road profile and superelevation Adjust connection to match existing approach road profile and superelevation Adjust connection to match existing slope Cross
Edge of mainline
Variable
3'
Existing approach surface
Existing approach surface
See type B approach road section detail
Road Section Detail See Type A Approach
Adjust to match field conditions as approved.
to existing alignment of approach is at an angle.
Continue approach radius as required if connection
See sheet E.3.
RT
RT / LT
RT
LT
RT
LT
RT
LT
LT
LT
RT
LT
RT
LT
LT
LT
LT
LT
RT / LT
RT / LT
RT
RT
RT / LT
RT
LT
LT
RT
For use protecting drainages, wetlands or other aquatic areas throughout the project. Final locations are to be determined in the field as approved.
EROSION CONTROL QUANTITIES
Soil erosion Station to Station Side
Item 15705-1400
(LNFT)
roll
FOOTNOTE:
control, fiber
1,854
79112+73 to 14+68 12+90 to 208+00 13+24 to 13+44 13+26 to 13+42 14+60 to 14+75 15+09 to 15+32 23+99 to 24+19 23+99 to 24+19
28+98 29+60
43+90 to 44+10 43+90 to 44+10
50+05 50+41
54+09 to 54+29 54+09 to 54+29
74+69 75+38 84+67 84+97 92+66 92+90 116+78 117+24
133+90 to 134+10 174+50 to 176+17 175+70 to 176+05
176+99 176+99 Total
STATE PROJECT
PHILLIPS 201(1) F.1MT
C
F_ dr iv e\
H ig hw ay s\
FH
W A\
_O ld
_H ig hw ay
_2 \D es ig n\ Er os io n C on tr ol m t-
-F eb
-2
:3
C
V O
ER
M
A N
S 2/
B .W
A C K
ER
2/
D es ig ne d by
C he ck ed b y:
NUMBER
SHEET
TABULATION OF EROSION
CONTROL QUANTITIES
22502
22602260
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
GPS
13601
IS
A G
UES
S
FIB
ER L
OCATIO
N
60 226
22602260
2275 2275
TT
UP
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
GPS
13602
5 2
0U.S
. Hi ghway
Railroad
NOTE:
12+90.72
OLD HIGHWAY 2 AND BRIDGE REPLACEMENT
BEGIN REHABILITATION MT PHILLIPS 201(1)
N
N
Install fiber roll
Install fiber roll
Install fiber roll
Install fiber roll
Install fiber roll
EROSION CONTROL LEGEND:
Fiber roll
12+90.72 TO 60+00
EROSION CONTROL PLAN
2. Contours shown represent existing topography prior to construction.
1. Adjust to meet field conditions as approved by the CO.
Install fiber roll
F.2
STATE PROJECT
F e b r u a r y
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n E r o s io n C o n tr o l\ m t-
A F
B .D
W A
C K
V O
E R
M A
C h e c k e d b y
D e s ig n e d b
22652265
227522752275
2250225022502250225022502250225022502250225022502250225022502250225022502250225022502250 225022502250
2250 2250
0 2250 2250 2250
2250 2250
2250 2250 2250 2250 2250 2250 2250 2250
2250 2250 2250 2250 2250 2250 2250 2250 2250 2250 2250 2250 2250
2250 2250
22502250
W A R N I
R I
I L I T Y
W A R N I
R I
I L I T Y
W A R N I
R I
I L I T Y
W A R N I
R I
I L I T
BM
R21
1001-3662,6001-8552,15001-16794
0 6
5 7 0 7
5 8 0 8
N
N
NOTE:
1. Adjust to meet field conditions as approved by the CO.
Install fiber roll
Install fiber roll
60+00 TO 120+00
EROSION CONTROL PLAN
Install fiber roll
Install fiber roll
Install fiber roll
F.3
STATE PROJECT
F e b r u a r y
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n E r o s io n C o n tr o l\ m t-
A F
C .D
W A
C K
V O
E R
M A
C h e c k e d b y
D e s ig n e d b
22502250
2250 2250
2250 2250
2250 2250 2250
2250 2250 2250
225022502250
225522552255
225522552255225522552255
22552255
22552255
2255 2255
2255 2255
2255 2255 2255 2255 2255 2255 2255 2255 2255 2255 2255 2255 2255 2255 2255
225522552255
T
UP
W A R N I
R I
I L I T Y
W A R N I
R I
I L I T Y
W A R N I
R I
I L I T Y
W A R N I
R I
I L I T Y
W A R N I
R I
I L I T Y
RCP
18"
CSP
15"
CSP
18"
CPP
15"
HOLE
SCOUR
2255225522552255
2255 2255 2255
2255 2255 2255 2255 2255 2255 2255 2255 2255 2255 2255 2255 2255 2255
2255 22552255
2255225522552255 2255225522552255
225522552255225522552255225522552255225522552255
22552255225522552255
2255225522552255225522552255
2255 2255
2255 2255 2255 2255 2255 2255 2255
2255 2255
2255 2255 225522552255
22602260
N
N
NOTE:
1. Adjust to meet field conditions as approved by the CO.
Install fiber roll
Install fiber roll
Install fiber roll
Install fiber roll
Install fiber roll
120+00 TO 180+00
EROSION CONTROL PLAN
F.4
STATE PROJECT
F e b r u a r y
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n E r o s io n C o n tr o l\ m t-
A F
D .D
W A
C K
V O
E R
M A
C h e c k e d b y
D e s ig n e d b
206+00.00
MT PHILLIPS 201(1)
BEGIN RESURFACING
END REHABILITATION
N
180+00 TO 206+00
EROSION CONTROL PLAN
F.5
STATE PROJECT
F e b r u a r y
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n E r o s io n C o n tr o l\ m t-
A F E .D
W A
C K
V O
E R
M A
C h e c k e d b y
D e s ig n e d b
Drive stakes at each end and at 4' spacing
(ft)
(ft)
Excavate trench 2"
REVISED:
DETAIL APPROVED FOR USE 10/2014
FIBER ROLL
W157-21
3' min.
3' min. or m in
M in t o
1" x 1" Wood stake
3" to 5" a y
U
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n E r o s io n C o n tr o l\
D e t.
W .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
F.6PHILLIPS 201(1)MT
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
ELEVATION
Direction of runoff Fi ll slo pe
Flow
PLAN
Spacing Slope
STAKES REQUIRED
disturbed areas
Runoff from
1:1
1:2
1:3
1:4 or flatter as specified in plans
2.
1.
DRAINAGE DITCH INSTALLATION
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Fiber roll length for each roll
Stakes required
FIBER ROLL SPACINGStep 2: Backfill soil against fiber rolls and install fiber rolls
Step 1: Excavate trench
FIBER ROLL STAKING DETAIL
conditions.
Use drainage ditch installation only in low flow permanent installations.
roll while staking. Live stakes may be used for until fiber roll is secure to slope. Do not crush
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
NOTE:
NO SCALE
Fiber roll larger than fiber roll
Existing ground (typ.)
Stagger joints (typ.)
Existing ground
Fiber roll along contours.
Install fiber rolls
Flow direction to end, without overlapping the ends
Abut adjacent fiber rolls tightly, end
Install fiber rolls snugly into trench.
soil to ground level
Backfilled and compacted
Slope
Stake and entrench fiber roll water from flowing around the fiber roll
Provide sufficient length to prevent sp ac in g ch ar t
S ee f ib er r ol l
Direction of runof f from distur bed area s
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
NO. DATE BY REVISIONS
DATE
m t-
A
G A .D
G N
I n t_ ft
D
G.1
STATE PROJECT
F e b
A
M
Q V WS EL.
upstream face of bridge.
Note: Water surface elevations are at
No Scale
PROFILE GRADE DIAGRAM
ELEVATION
HYDRAULIC DATA
Bridge elevations are at profile grade @ layout line
PHILLIPS COUNTY, MT
RG3071-A
J. Schlegelmilch 1"= 6'-0" N. Bell S. Markwardt J. Schlegelmilch
PLAN & ELEVATION
Centerline bearing
Low chord El. 2,260.58
Profile grade
BEGIN BRIDGE
El. 2,264.95
STA. 176+04.50
END BRIDGE
El. 2,265.43
STA. 177+00.00
2'-9"
Top of curb
Est. Tip El. 2,147.00
Est. Tip El. 2,142.00 op max 350
Q
Q
1.0
0.9
2,258.58
2,258.27
END BRIDGEBEGIN BRIDGE
Rdwy
Bridge @LC
Approach slab
LC
PLAN
8'-0"95'-6" Bridge length8'-0"
Approach slab railing (typ.)
Structure transition
El. 2,264.95
STA. 176+04.50
El. 2,264.71
El. 2,264.71 El. 2,265.19
El. 2,265.19
El. 2,265.43
STA. 177+00.00
95'-6" Bridge length
90'-0" 2'-9"
DESCRIPTION
1:2 1:
2,260
2,270
2,250
Abutment 1 Abutment 2
Existing ground @ C of roadwayL
HP 14 x 89 piling (typ.)
+0.5026% grade bulb-tee girders
Prestressed
BRIDGE SHEET
BRIDGE SHEET INDEX
NO.
SHEET
SHEET NO.
1:
21:2
Q WS EL. = 2258.58max
Canal Flow
N
FEBRUARY 2016
DODSON SOUTH CANAL BRIDGE
GRADING PLAN & SECTION
REBAR LIST 2 OF 2
REBAR LIST 1 OF 2
APPROACH RAILING DETAILS
BRIDGE RAILING DETAILS
BRIDGE RAILING AND CURB
GIRDER DETAILS
P/S GIRDER SECTIONS
P/S GIRDERS B & C
P/S GIRDERS A & D
APPROACH SLAB
DECK PLAN DETAILS
WING WALL DETAILS
END WALL DETAILS
ABUTMENT CAP
SUBSURFACE INFORMATION
GENERAL NOTES & FOUNDATION PLAN
PLAN & ELEVATION
RG3071-R
RG3071-Q
RG3071-P
RG3071-O
RG3071-N
RG3071-M
RG3071-L
RG3071-K
RG3071-J
RG3071-I
RG3071-H
RG3071-G
RG3071-F
RG3071-E
RG3071-D
RG3071-C
RG3071-B
RG3071-A
,2
.5
+1.630 8%
100' VC
K = 89
SSD = 1007'
,2
.9
+0.5026%
,2
.4
,2
.7
-0.3991%
100' VC
K = 111
SSD = 1250'
.5
GENERAL NOTES:
RG3071-B
2 of 18 FEBRUARY 2016
G.2
STATE PROJECT
F e b
A
M m t-
A
G B .D
G N
I n t_ ft
D
NOTES:
J. Schlegelmilch 1"= 10'-0" N. Bell S. Markwardt J. Schlegelmilch
FEDERAL HIGHWAY ADMINISTRATION
PLAN
GENERAL NOTES & FOUNDATION
END BRIDGE
BEGIN BRIDGE
95'-6" Bridge length
2'-9"90'-0"2'-9"
Abutment 1
Abutment 2
1'-5" 1'-5"
2'-10"
Bridge @ RdwyLCLC
Bearing @ pileLC LC Bearing @ pileLC LC
Test pile p il e s p a ty p e q s p a
ST-12
ST-13
F lo w
FOUNDATION PLAN AND BORING LOCATIONS
Test pile
ESTIMATE
ITEM NO. DESCRIPTION UNITQUANTITY NOTES
EACH
SQYD
LNFT
LB
LNFT
CUYD
EACH
LNFT
CUYD
LPSM
FOOTNOTE:
1 Contract quantity.
56401-1000
55901-0000
55601-0900
55401-2000
55302-3700
55201-0200
55104-1000
55101-1900
20801-0000
20304-2000
BRIDGE SHEET SHEET NO.
SK Geotechnical. See Summary of Subsurface Information on Sheet G.4.
For geotechnical information see Geotechnical Report No. 14-3206G, prepared by
GEOTECHNICAL REPORT:
of the CO.
only. Do not drive piles beyond one foot below estimated tip elevation without approval fitted with driving points. The minimum tip elevation shown is for estimating quantities shall be full cross section pre-qualified groove weld butt joints. Steel H piles shall be
Steel H piles shall conform to ASTM A 572, A 588, or A 690, grade 50. All pile splices
STEEL H PILES:
to ASTM A307 galvanized.
tie connections shall be furnished in black iron finish. Diaphragm anchor bolts shall conform
ASTM A36. All structural metal shall be galvanized after fabrication except girder welded
All structural metal for welded connections, and structural steel shapes shall conform to
MISCELLANEOUS STRUCTURAL METAL:
manufacture and erection.
curb ties, joint filler, bearing devices, and any other details and material required for reinforcing steel (conventional and prestressed), concrete inserts, lifting devices, grouting, Specifications. Detail the precast prestressed girder units, indicating on the plans
Provide smooth finish on the top surface of the girders according to FP-14 Standard
LRFD Bridge Design Specifications, except limit tensile stresses to zero after losses.
Design precast prestressed concrete decked Bulb-Tee Units according to current AASHTO
PRESTRESSED CONCRETE DECKED BULB-TEE UNITS:
relaxation prestressing strand conforming to AASHTO M203 (ASTM A416).
Pretensioned, prestressing steel shall be Grade 270, 0.6-inch Ø, seven-wire, bright low
PRESTRESSING STEEL:
curbs, endwalls, pile cap, wing walls, approach slab, and sleeper beam).
unless shown otherwise on the plans. All reinforcing steel shall be epoxy coated (girders, Grade 60). The minimum concrete covering to the face of any bar shall be 2 inches, All reinforcing steel shall conform to AASHTO M31, Grade 60 deformed (ASTM, A615, REINFORCING STEEL:
expansion joint filler shall meet the requirements of AASHTO M213.
filler shall meet the requriements of ASTM D1056, type 2, Grade 2 or 3. Preformed
", unless shown otherwise on plans. Preformed flexible cellular joint 4 3concrete type II cement. All cement shall be low alkali cement. Chamfer exposed edges of all design compressive strength fc'=4000 psi. All Class A(AE) concrete shall be made with
All cast-in-place concrete shall be structural concrete Class A(AE) with a minimum 28-day
CAST-IN-PLACE:
Vehicle load : HL93: Maximum dynamic load allowance (Impact), IM=33%
LIVE LOAD:
Active lateral earth pressure: Equivalent fluid unit weight of soil, 37 pcf.
Asphalt wearing surface : 140 lb. per cubic foot.
Concrete in Prestressed concrete Units : 155 lb per cubic foot.
Cast-in-place concrete : 150 lb per cubic foot.
DEAD LOAD:
Construction of Roads and Bridges on Federal Highway Projects, FP-14.
CONSTRUCTION: Federal Highway Administration Standard Specifications for
Edition 2014.
DESIGN: AASHTO LRFD Bridge Design Specifications, Customary U.S. Units, 7th
SPECIFICATIONS:
13,452
1,147
4.
3.
2.
1.
DODSON SOUTH CANAL BRIDGE
BEARING DEVICE, ELASTOMERIC
MEMBRANE WATERPROOFING
BRIDGE RAILING, STEEL
REINFORCING STEEL, EPOXY COATED
PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE GIRDER
STRUCTURAL CONCRETE, CLASS A(AE)
DYNAMIC PILE LOAD TEST
STEEL H PILE, 14 X 89, IN PLACE
STRUCTURE EXCAVATION
REMOVAL OF BRIDGE, DODSON SOUTH CANAL BRIDGE
Do not drive any other piling at the abutment during the test pile set-up period.
criteria and the pile tip elevations. See Section 551.
12 hour set-up period. Use the dynamic load test results to establish the pile driving abutment. Perform load tests on test pile during initial drive and during re-strike after
Perform dynamic load testing with signal matching on the first pile driven at each
The factored strength 1 limit state axial load per pile = 207 kips.
Re-strike piles to 351 kip compressive nominal bearing resistance per pile.
SK Geotechnical. See Summary of Subsurface Information on Sheet RG 3071-C.
For geotechnical information see Geotechnical Report No. 14-3206G, prepared by
GEOTECHNICAL REPORT:
of the CO.
Do not drive piles beyond one foot below estimated tip elevation without approval
The minimum tip elevation shown is for estimating quantities only.
pre-qualified groove weld butt joints. Fit steel H piles with driving points.
Conform to ASTM A 572, A 588, or A 690, grade 50. Splice H piling with full cross section
STEEL H PILES:
in accordance with AASHTO M111 or M232.
to be black iron finish. Furnish diaphragm anchor bolts conforming to ASTM A307 and galvanized shapes. Galvanize all metal after fabrication, except girder welded flange-tie connections
Furnish ASTM A36 for all structural metal for field-welded connections and structural steel
MISCELLANEOUS STRUCTURAL METAL:
all concrete 3/4", unless shown otherwise on plans.
surfaces of girders is 1/4" plus or minus in 10 feet in any direction. Chamfer exposed edges of concrete curbs to 1/4” max to 1/8” minimum amplitude roughness. Overall tolerance of top
Finish top surface of the girders with a smooth finish except roughen finish under field cast
Fabricate with Class P(AE) concrete with a minimum f’c=7,000 psi and minimum f’ci=6,000 psi.
PRESTRESSED CONCRETE DECKED BULB-TEE UNITS:
prestressing strand conforming to AASHTO M203 (ASTM A416).
Furnish Grade 270, 0.6-inch diameter, seven-wire, uncoated low-relaxation
PRESTRESSING STEEL:
unless noted otherwise.
reinforcing steel. Provide a minimum concrete cover of 2 inches on formed face, Furnish epoxy coated, AASHTO M31, Grade 60 deformed (ASTM, A615, Grade 60).
REINFORCING STEEL:
Furnish preformed expansion joint filler conforming to AASHTO M213.
Furnish preformed flexible cellular joint filler conforming to ASTM D1056, Type 2, Grade 3.
shown otherwise on plans.
Use Type II, low alkali cement. Chamfer exposed edges of all concrete 3/4", unless
Furnish Class A(AE) with a minimum 28-day design compressive strength f'c = 4500 psi.
CAST-IN-PLACE:
Vehicle load : HL93: Maximum dynamic load allowance (Impact), IM=33%.
LIVE LOAD:
At rest lateral earth pressure: Equivalent fluid unit weight of soil, 57 pcf.
Active lateral earth pressure: Equivalent fluid unit weight of soil, 37 pcf.
Future wearing surface allowance: 24 psf.
At time of construction: 24 psf.
Asphalt wearing surface : 140 lb. per cubic foot.
Concrete in Prestressed concrete Units : 155 lb per cubic foot.
Cast-in-place concrete : 150 lb per cubic foot.
DEAD LOAD:
Construction of Roads and Bridges on Federal Highway Projects, FP-14.
CONSTRUCTION: Federal Highway Administration Standard Specifications for
Edition 2014.
DESIGN: AASHTO LRFD Bridge Design Specifications, Customary U.S. Units, 7th
SPECIFICATIONS:
RG3071-C
G.3
STATE PROJECT
F e b
A
M m t-
A
G C .D
G N
I n t_ ft
D
Profile grade
LEGEND:
WATER LEVELS
After drilling
At completion
While drilling
NOTES:
3.
2.
1.
Existing ground
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
J. Schlegelmilch As Shown N. Bell S. Markwardt J. Schlegelmilch
2,140
2,150
2,160
2,170
2,180
2,190
2,200
2,210
2,220
2,230
2,240
2,250
2,260
2,270
2,140
2,150
2,160
2,170
2,180
2,190
2,200
2,210
2,220
2,230
2,240
2,250
2,260
2,270
SUBSURFACE INFORMATION
BRIDGE SHEET SHEET NO.
+0.5026%
FEBRUARY 2016
geotechnical information.
by SK Geotechnical, for boring logs and other
See Geotechnical Report No. 14-3206G, prepared sampler that was used for each test depth.
the blow count indicates the size of split barrel within that particular interval. The symbol next to
50 blows, the logs show the measured…
This is the start of the file's text. The full file is on GovTribe.