mt-a203018_Plans_Final.pdf
PDF 9 MB Posted
- Attached to
- MT PHILLIPS 201(1), Old Highway 2 and Bridge Replacement Federal contract opportunity
- Solicitation number
- DTFH7015B00023
About this file
Preliminary Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_for_DTFH70-15-B-00023.pdf | ||
| Q A_0705.pdf | ||
| A001_MT_Phillips_201(1).pdf | ||
| mt-a2013018_Pavement_Report.pdf | ||
| IFB_MT_Phillips_201(1) _Old_Highway_2_and_Bridge_Replacement.pdf | ||
| Plan_Request_Form.pdf | ||
| mt-a2013018_Geotechnical_Bridge_Report.pdf | ||
| mt-a2013018_Plans_160406.pdf | ||
| mt-a2013018_Earthwork_Logs.pdf | ||
| SWPPP-Old_Highway_2_and_Bridge_Restoration _MT_PHILLIPS_201(1)_Phillips_County _Montana.pdf | ||
| mt-a2013018_DodsonSouthCanalBridgeInspectionReport.pdf | ||
| mt-a203018_Cross_Sections_160406.pdf | ||
| Preliminary_Letter.pdf | ||
| mt-a203018_Plans_Final(update).pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Amendment_to_Presolicitation_Notice.pdf | ||
| Preliminary_Letter.pdf | ||
| PROJECT_DESCRIPTION.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
SPECIFICATION:
INDEX TO SHEETS
Projects, FP-14 US Customary Units of Roads and Bridges on Federal Highway
Standard Specifications for Construction
PROJECT MANAGER
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PLANS PREPARED FOR
PLANS FOR PROPOSED PROJECT
APPROVED:
DATE
Western Federal Lands Highway Division
Director, Project Delivery, COMMITMENT TO EXCELLENCE
FEDERAL LANDS HIGHWAY
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
A.1
STATE PROJECT
NUMBER
SHEET
MT
PHILLIPS 201(1)
A u g
A
M m t-a a a .d g n
U
S I n t2
D
B
W A
C K
E R
C h e c k e d b y
V O
E R
M A
N S e s ig n e d b y
MONTANA KEY MAP
COLUMBIA
BRITISH
ALBERTA
SASKATCHEWAN
N O
R T
H D
A K
O T
A
S O
U T
H D
A K
O T
A
WYOMING
ID
A
H O
UNITED STATES
CANADA
GLACIER
NATIONAL
PARK
YELLOWSTONE
NATIONAL
PARK
CHARLES M. RUSSELL
NATIONAL
WILDLIFE RANGE
Lake
Flathead
Elwell
Lake
M
Lake
Fort Peck
I SOS U IR
KALISPELL
MISSOULA
Anaconda
HELENA
BUTTE
BOZEMAN
Livingston
BILLINGS
City
Miles
Glendive
Point
Wolf Glasglow
HAVRE
Shelby
FALLS
GREAT
Lewistown
Dillon
E N
O T
S
WOLLEY
R E
VIR
90 15
2 2
MONTANA
REVIR
PLANS PREPARED BY
Project Location
N
43210
Scale in miles
K. WONG
ROBERT PECCIA AND ASSOCIATES
HELENA, MONTANA
MT PHILLIPS 201(1)
BRIDGE RESTORATION
OLD HIGHWAY 2 AND
MONTANA
PHILLIPS COUNTY,
T
N
MI
LK
C o u le e
S o u th
B N S
F
MALTA
CO.
PHILLIPS
HIGHWAY 2
OLD
REFUGE
WILDLIFE
NATIONAL
BOWDOIN
LAKE BOWDOIN
HEADQUARTERS
REFUGE
Dodson
ROAD
BOWDOIN
ROAD
STRATER
asphalt concrete pavement and chip seal
Grading, drainage, bridge, cement treated base, DESIGN DESIGNATION:
e (max)
V
ADT (2035)
ADT (2015)
0.060
35 MPH
MT PHILLIPS 201(1)
END PROJECT
STA. 12+90.72
MT PHILLIPS 201(1)
BEGIN PROJECT
L. PERMANENT TRAFFIC CONTROL
K. TEMPORARY TRAFFIC CONTROL
J. MISCELLANEOUS
I. GUARDRAIL
H. DRAINAGE
G. BRIDGE
F. EROSION CONTROL
E. APPROACH ROADS
D. PLAN-PROFILE
C. TYPICAL SECTIONS
B. SUMMARIES
A. GENERAL INFORMATION
TOTAL LENGTH 6.12 MILES
RESURFACING LENGTH 2.46 MILES
REHABILITATION LENGTH 3.66 MILES
STANDARD DETAILS
PERMANENT TRAFFIC CONTROL PLANS
QUANTITIES
TABULATION OF PERMANENT TRAFFIC CONTROL
STANDARD DRAWINGS
CLOSURE DETAIL
TEMPORARY TRAFFIC CONTROL ROAD
TEMPORARY TRAFFIC CONTROL PLAN
QUANTITIES
TABULATION OF TEMPORARY TRAFFIC CONTROL
ROADWAY OBLITERATION AND WATER BAR DETAILS
GUARDRAIL STANDARD DRAWINGS
DRAINAGE STANDARDS
TABULATION OF DRAINAGE QUANTITIES
BRIDGE GRADING PLAN AND SECTION
REBAR LISTS
BRIDGE CONSTRUCTION DETAILS
EROSION CONTROL DETAIL
EROSION CONTROL PLANS
TABULATION OF EROSION CONTROL QUANTITIES
APPROACH ROAD DETAILS
APPROACH ROAD PLAN AND PROFILE
TABULATION OF APPROACH ROAD QUANTITIES
POND PATH
HEADQUARTERS ACCESS ROAD AND DISPLAY
LINE GRAPHS
PLAN AND PROFILES
SURVEY CONTROL
TABULATION OF PLAN QUANTITIES
SUBEXCAVATION DETAILS
STABILIZATION DETAIL
TYPICAL SECTION AND CEMENT SUBGRADE
TYPICAL SECTIONS
TABULATION OF TYPICAL SECTION QUANTITIES
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
L.6-8
L.2-5
L.1
K.4-7
K.3
K.2
K.1
J.1
I.1-2
H.2-4
H.1
G.17
G.15-16
G.1-14
F.6
F.2-5
F.1
E.3-5
E.2
E.1
D.12
D.10-11
D.3-9
D.2
D.1
C.4
C.3
C.2
C.1
B.1-3
A.3
A.2
A.1
PRELIM
IN
ARY
Not for
C on str uc tio n x x x x x
1 6
B N S F
Nelson
B la ck
C o u le e
S o u th
B N S
F
A.3
STATE PROJECT
M a y
A
M ft p .1
.1
.2 s td p la n m t-a a c .d g n
U
S I n t2
.W
A C
K e c k e d b
V O
E R
M A s ig n e d b y
1 0.5 0 1 2
SCALE IN MILES
VICINITY MAP
N
REFUGE
WILDLIFE
NATIONAL
BOWDOIN
LAKE BOWDOIN
PHILLIPS COUNTY
STRATER RD
S T
R A
T E
R R
D
BOWDOIN
RD
A U T O T O
U R R
O U T E
B O
W D
O
IN
R
E
FU
G E
MONTANA
MALTA
CANAL BRIDGE
DODSON SOUTH
DODSON SOUTH CANAL
B L
A C
K C
O U
L E E
BRIDGE RESTORATION
OLD HIGHWAY 2 AND
MT PHILLIPS 201(1)
END PROJECT
R. 30 E.
T
N
T
N
R. 31 E.
STA. 12+90.72
BRIDGE RESTORATION
OLD HIGHWAY 2 AND
MT PHILLIPS 201(1)
BEGIN PROJECT
STA. 206+00.00
BRIDGE RESTORATION
OLD HIGHWAY 2 AND
MT PHILLIPS 201(1)
BEGIN RESURFACING
END REHABILITATION
REFUGE HEADQUARTERS
BOWDOIN NATIONAL WILDLIFE
1.0 miles
Malta
STA. 314+36.00
BRIDGE RESTORATION
OLD HIGHWAY 2 AND
MT PHILLIPS 201(1)
HEADQUARTERS ACCESS ROAD
BEGIN RESURFACING
OLD HIGHWAY 2
END RESURFACING
PRELIM
IN
ARY
Not for
C on str uc
C.2
STATE PROJECT
A u g
P
M m t-
A
C A .D
G N
U
S I n t2
W A
C K e c k e d b
V O
E R
M A s ig n e d b y
FOOTNOTE:
TYPICAL SECTIONS
LC
2% Crown
2% Crown
1:3
Traveled Way Traveled Way
10'10'
1:3
Profile grade
Original ground or existing pavement
LC
2% Crown 2% Crown
Traveled Way Traveled Way
Center line
10'10'
Existing pavement surface
5 5 li m it s
C le a r in g li m it s
C le a r in g
Original ground
Original ground 1:
3 1:3
Existing surfacing
LC
Center line
Original ground
Cross slope Cross slope
Traveled Way Traveled Way
177+00.00 to 181+50.00
171+50.00 to 176+04.50
12+90.72 to 17+00.00
TYPICAL SECTION NO. 1
181+50.00 to 206+00.00
17+00.00 to 171+50.00
TYPICAL SECTION NO. 2
Va ria bl e m in
3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 2, Chip seal, type 1C
Placing conserved topsoil, 4-inch depth
Turf establishment
Placing conserved topsoil, 4-inch depth
Turf establishment
Va ria ble
1:3
Va ria bl e
Variable
3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 2, Full depth reclamation, method 2, 9-inch depth
Cracks, routing, cleaning and sealing
(7-inch depth)
Cement treated aggregate course (grading D), (7-inch depth)
Full depth reclamation with cement, (below asphalt and between lifts)
Tack coat
(below asphalt and between lifts)
Tack coat
Suitable roadway excavation, Unclassified borrow, or select borrow
Headquarters Access Road (2,192 LNFT)
206+00.00 to 314+36.00
TYPICAL SECTION NO. 3
completing this work.
at unstable locations identified in Subsection 304.06A prior to
Complete cement subgrade stabilization as shown on Sheet C.3 depth reclamation with cement.
Complete according to Section 304 prior to completing full
See sheet D.1 for locations and quantities.
Match existing crown or superelevation.
Adjust to match existing roadway width as approved by CO.
Construct no steeper than 1:2.
Adjust to meet field conditions as approved by CO.
by CO.
Match existing roadway superelevation on curves as approved
See sheet C.1 for locations and quantities.
Construct slopes as shown in the Staking Report.
on the plan and profile curve data.
Superelevate roadway on curves at the rate "e" as indicated
(See FAR 52.236-4).
Construct curve widening as shown in the Staking Report
PRELIM
IN
ARY
Not for
C on str uc
C.3
M a y
A
M ft p .1
.1
.2 s td p la n m t-
A
C B .D
G N
U
S I n t2
W A
C K e c k e d b
V O
E R
M A s ig n e d b y
FOOTNOTE:
NOTE:
1. See sheet C.1 for locations and quantities.
Existing surfacing
LC
Original ground
Fog seal
5’
LC
Center line Pavement structure
CEMENT SUBGRADE STABILIZATION DETAIL
Va ria ble Variable
STABILIZATION DETAIL
CEMENT SUBGRADE
TYPICAL SECTION AND
Display Pond Path
TYPICAL SECTION NO. 4
Construct no steeper than 1:2.
Adjust to meet field conditions as approved by CO.
See sheet C.2.
Adjust to match existing path width as approved by CO.
10’ 10’
(14-inch depth)
Full depth reclamation with cement, PRELIM
IN
ARY
Not for
C on str uc
C.4
J u l-
A
M ft p .1
.1
.2 s td p la n m t-
A
C C .D
G N
U
S I n t2
W A
C K e c k e d b
V O
E R
M A s ig n e d b y
FOOTNOTE:LC
Original ground
Select borrow, 16" compacted depth
Subexcavation limit (W)
Crown Crown
(ft) Width (W)
Locations (ft)
Total Length
1,500
(ft) Subex Length
Saw cut existing pavement (typ.)
4 4
3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 2, (nonwoven)
Separation-stabilization geotextile, class 1, type A, LC
LC
Pavement structure
Select borrow, 17" compacted depth
Original ground
Profile grade
Pavement structure
Select borrow, 24" compacted depth
Existing pavement
(nonwoven)
Separation-stabilization geotextile, class 1, type A, (nonwoven)
Separation-stabilization geotextile, class 1, type A, Va ria ble
Variable
Va ria ble Variable
DETAILS
SUBEXCAVATION
On centerline1208+00 to 223+00
223+00 to 314+36
Station to Station
Access Road Headquarters
1,500
Edge of pavementEdge of pavement
SUBEXCAVATION LOCATIONS
SUBEXCATION TYPE 1
SUBEXCATION TYPE 2
177+00 to 180+00
SUBEXCATION TYPE 3
21.5 Full width
21.5 1 165 Full width
21.5 300 1 300 Full width
174+40 to 176+04.5 164.5
NOTE:
1. See sheet C.1 for quantities.
Remarks
Tack coat (between lifts)
Subexcavation limit (W)
Subexcavation limit (W)
S u b e x c a v a ti o n
S u b e x c a v a ti o n
S u b e x c a v a ti o n
SUBEXCAVATION (TYPE 1)
SUBEXCAVATION (TYPE 2)
SUBEXCAVATION (TYPE 3)
For use at unstable areas as approved by CO.
For use throughout project at unstable areas as approved by CO.
conditions as approved by CO.
Field verify with CO prior to construction. Adjust to meet field
Adjust to match existing roadway crown as approved by CO.
Construct slopes as shown in the staking report.
See sheet C.2.
Construct no steeper than 1:2.
Adjust to meet field conditions as approved by CO.
Roadway aggregate, method 2, 7" compacted depth
Roadway aggregate, method 2, 8" compacted depth
PRELIM
IN
ARY
Not for
C on str uc
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
24" CSP
IS
A G
UES
S
FIB
ER L
OCATIO
N
IR
4RBR
IR
4RBR
,2
.4
-1.9981%
,2
.9
,2
.5
+1.1739
160’ VC
K = 50
,2
.9
.7
.0
P C
.9
P T
.4
D
R= 150.00’
T= 117.66’
L= 199.55’
D
R= 2,050.00’
T= 267.75’
L= 532.48’
POT 12
+73.0
P T
.3
P C
.9
P T
.4
PC 13+
38.80 e= 0.020
BH ST-1
MT D.3
Line to be constructed
Profile grade
Existing ground
U.S . Hi ghway
Railroad
1:
:2
Culvert inlet/outlet ditch
Line to be constructed
PLAN AND PROFILE LEGEND:
ST
Typical inlet/outlet ditch
T
Structure transition railing
P ip e C u lv e r t
A p p r o a c h P ip e C u lv e r t
L
T
PHILLIPS 201(1)
10+00 15+00 20+00 25+00 30+00
0A
P ip e C u lv e r t
P ip e C u lv e r t
A
106.28’ LT
13+32.08
No Scale
CONNECTION DETAIL
surfacing asphalt
Existing section
See typical vertical joint
Sawcut for
.7
BRIDGE RESTORATION
OLD HIGHWAY 2 AND
MT PHILLIPS 201(1)
BEGIN REHABILITATION
See sheet D.1 for complete excavation and embankment totals.
Excavation volumes shown do not include conserved topsoil quantities.
type Tangent Terminal section, D
49.69’ LT
14+70.00 method 1, See sheet J.1
Roadway obliteration, CUYD
EXC.
CUYD
EMB.
M
J u ly
I n t_ ft
F H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D A .D
G N
B
W A
C K
E R
C
V O
E R
M A
N S
C h e c k e d b y
D e s ig n e d b y
CP
13601
El. = 2,261.96
E=2,372,396.22
N=1,502,780.95
12+90.72
PRELIM
IN
ARY
Not for
C on str uc
FAP 142-A
TT
UP
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
W A R N I N G
B U R I E D
U T I L I T Y
DELINEATOR
P C
.6
P T
.2
BH ST-2
BH ST-3
P C
.6
P T
.2
D
R= 1,900.00’
T= 270.57’
L= 537.52’
Existing ground
Line to be constructed
2220 2220
30+00 35+00 40+00 45+00 50+00 55+00 60+00
N
P ip e C u lv e r t
P ip e C u lv e r t
A p p r o a c h P ip e C u lv e r t
L
T
10A
A 10
A 10
A 10
A
A 10
A 10
A
CP
13602
C u lv e r t I n P la c e
C le a n A p p r o a c h P ip e
R
T
C u lv e r t I n P la c e
C le a n A p p r o a c h P ip e
R
T
CUYD
EXC.
D.4
J u ly
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D B .D
G N
B
W A
C K
E R
C
V O
E R
M A
N S
C h e c k e d b y
D e s ig n e d b y
PRELIM
IN
ARY
Not for
C on str uc
1001-3662,6001-8552,15001-16794
P C
.2
P T
.2
BH ST-4
R= 2,050.00’ T= 253.24’ L= 503.93’
0 6
5 7 0 7
5 8
P C
.2
P T
.2
MT D.5
Line to be constructed
Existing ground
PHILLIPS 201(1)
2220 2220
60+00 65+00 70+00 75+00 80+00 85+00 90+00
N
A p p r o a c h P ip e C u lv e r t
L
T
A
CUYD
EXC.
J u ly
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D C .D
G
W A
C K
V O
E R
M A
C h e c k e d b y
D e s ig n e d b y
10A
A p p r o a c h P ip e C u lv e r t
L
T
PRELIM
IN
ARY
Not for
C on str uc
R N I
U R I
I L I T Y
W A R N I
R I
I L I T Y
W A R N I
R I
I L I T Y
W A R N I
R I
I L I
Y
BH ST-5
MT D.6
Line to be constructed
Existing ground
PHILLIPS 201(1)
A p p r o a c h P ip e C u lv e r t
R
T
2210 2210
120+00115+00110+00105+00100+0095+0090+00
N
A 18
10A
A 10
10A
CUYD
EXC.
J u ly
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D D .D
G N
B
W A
C K
E R
C
V O
E R
M A
N S
C h e c k e d b y
D e s ig n e d b y do not disturb
Existing box culvert
PRELIM
IN
ARY
Not for
C on str uc
UP
W A R N I
R I
I L I T Y
W A R N I
R I
I L I T Y
W A R N I
R I
I L I T Y
W A R N I
R I
I L I
Y
BH ST-6
MT D.7
Line to be constructed
Existing ground
N PHILLIPS 201(1)
P ip e C u lv e r t
2210 2210
150+00145+00140+00135+00130+00125+00120+00
A 10
A 10
See sheet C.3
Cement subgrade stabilization
CUYD
EXC.
J u n e
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D E .D
G N
B
W A
C K
E R
C
V O
E R
M A
N S
C h e c k e d b y
D e s ig n e d b y
PRELIM
IN
ARY
Not for
C on str uc
R N I
R I
I L I T Y
,2
.9
,2
.2
5+0.5600%
100’ VC
K = 93
,2
.5
+1.630 8%
100’ VC
K = 89
SSD = 1007’
,2
.9
+0.5026%
,2
.4
,2
.7
-0.3991%
100’ VC
K = 111
SSD = 1250’
.5
BH ST-7
BH ST-12
BH ST-13
BH ST-8
MT D.8
Line to be constructed
Profile grade
Existing ground
N PHILLIPS 201(1)
22102210
.5
.0
A 10
A 6
A 3
GR LT
GR RT
STT ST T
T ST ST T
150+00 155+00 160+00 165+00 170+00 175+00 180+00
See sheets G.1 - G.14 Construct new bridge.
Remove existing bridge.
176+52.25 Bridge.
Dodson South Canal
See sheets G.1 - G.14 Construct new bridge.
Remove existing bridge.
176+52.25 Bridge.
See sheet C.4
.5
Subexcavation, type 2
Subexcavation, type 2
See sheet C.4
Cement subgrade stabilization
See sheet C.3
1,440
See sheet D.1 for complete excavation and embankment totals.
Excavation volumes shown do not include conserved topsoil quantities.
CUYD
EXC.
A u g u s t
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D F .D
G N
B
W A
C K
E R
C
V O
E R
M A
N S
C h e c k e d b y
D e s ig n e d b y
PRELIM
IN
ARY
Not for
C on str uc
R N I
R I
I
L I
T Y
,2
.1
-0.3991%
D
R= 1,200.00’
T= 478.36’
L= 910.39’
P C
.2
P T
.6
H
S
-10
S
-9
S T -11
P C
.2
P T
.6
MT D.9
Line to be constructed
Profile grade
Existing ground
No Scale
CONNECTION DETAIL
section
See typical surfacing asphalt
Existing joint @ 15° skew
Sawcut for vertical
S T -11
0.5% max.
PHILLIPS 201(1)
2220 2220
N
180+00 185+00 190+00 195+00 200+00 205+00 210+00
A 10
A 10
A 10
A 10
B
See sheet E.2
Bowdoin Road
Approach 500+00
Mainline 190+86.74 =
76.34 RT
191+50.00
54.28 RT
191+50.00
CP
13603
13604
CP
El. = 2,257.13
E=2,390,646.66
N= 1,506,737.82
206+00.00
MT PHILLIPS 201(1)
BEGIN RESURFACING
END REHABILITATION
See sheet J.1
Roadway obliteration, method 1
See sheet C.3
Cement subgrade stabilization1
Subexcavation, type 3
See sheet C.4 do not disturb
Existing culverts
See sheet D.1 for complete excavation and embankment totals.
Excavation volumes shown do not include conserved topsoil quantities.
CUYD
EXC.
A u g u s t
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D G .D
G N
B
W A
C K
E R
C
V O
E R
M A
N S
C h e c k e d b y
D e s ig n e d b y
PRELIM
IN
ARY
Not for
C on str uc
210+00 TO 270+00
OLD HIGHWAY 2
Line to be constructed
Line to be constructed
See sheet C.4
Subexcavation, type 3
D.10
STATE PROJECT
J u ly
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D H .D
G N
B
W A
C K
E R
C
V O
E R
M A
N S
C h e c k e d b y
D e s ig n e d b y
0PRELIM
IN
ARY
Not for
C on str uc
270+00 TO 314+36.00
OLD HIGHWAY 2
CP
26601
See sheet D.12
Headquarters Access Road
314+36.00
OLD HIGHWAY 2 AND BRIDGE RESTORATION
MT PHILLIPS 201(1)
BEGIN RESURFACING HEADQUARTERS ACCESS ROAD
END RESURFACING OLD HIGHWY 2
D.11
STATE PROJECT
A u g u s t
I n t_ ft h ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D I .D
G N
B
W A
C K
E R
C
V O
E R
M A
N S
C h e c k e d b y
D e s ig n e d b y
PRELIM
IN
ARY
Not for
C on str uc
AND DISPLAY POND PATH
HEADQUARTERS ACCESS ROAD
DISPLAY POND
Display pond path
Headquarters parking area
BRIDGE RESTORATION
OLD HIGHWAY 2 AND
END PROJECT MT PHILLIPS 201(1)
CP
26602
314+36.00
OLD HIGHWAY 2 AND BRIDGE RESTORATION
MT PHILLIPS 201(1)
BEGIN RESURFACING HEADQUARTERS ACCESS ROAD
END RESURFACING OLD HIGHWAY 2
REFUGE HEADQUARTERS
BOWDOIN NATIONAL WILDLIFE
Do not disturb
Wood bollards
Chip seal, type 1C
Fog seal
Access Road
Headquarters
D.12
STATE PROJECT
J u ly
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n P la n a n d P r o fi le m t-
A
D J .D
G N
B
W A
C K
E R
C
V O
E R
M A
N S
C h e c k e d b y
D e s ig n e d b y
CP
26601
Do not disturb
Gate sensor
PRELIM
IN
ARY
Not for
C on str uc
S
G P S
,2
.8
+0.7000% -0.9929%
,2
.7
,2
.4
3 +0.3667%
70’ VC
K = 51
,2
.6
P C
.2
P T
.6
P C
.2
P T
.6
POT 500+00.00
PC 5
00+
49.
P T
.5
D
R= 50.00’
T= 34.64’
L= 60.59’ e= 0.020
Line to be constructed
Profile grade
Existing ground
Bowdoin Road
NOTE:
2220 2220
500+00 505+00
(MAINLINE 190+87 RT)
500+10 TO 502+10
BOWDOIN RD.
N
1. Adjust tie in to match existing field conditions.
CP
13604
CP
13603
El.= 2,259.82
E= 2,389,746.98
N= 1,505,529.29
MAINLINE 190+86.74
500+10.00
BEGIN APPROACH ROAD
El.= 2,258.65
E= 2,389,919.25
N= 1,505,498.14
502+10.00
END APPROACH ROAD
54.28 RT
Mainline 191+50.00
76.34 RT
Mainline 191+50.00
CUYD
EXC.
E.2
J u ly
I n t_ ft
H ig h w a y s F
H W
A
O ld
H ig h w a y D e s ig n A p p r o a c h R o a d s m t-
A
E B .D
G N
B
W A
C K
E R
C
V O
E R
M A
N S
C h e c k e d b y
D e s ig n e d b y
See sheet E.1 for complete excavation and embankment totals.
Excavation volumes shown do not include conserved topsoil quantities.
PRELIM
IN
ARY
Not for
C on str uc
Stationing Mainline x x x x x
C of highway L x x
Length Approach Road
L
APPROACH ROAD DETAILS
C of approach
E.3
STATE PROJECT
J u n
A
M ft p .1
.1
.2 s td p la n m t-
A
E C .D
G N
U
S I n t2
B E e c k e d b y
T H
O M
P S
O s ig n e d b y
C of highway L
C of designed approachL
Mainline xxx+xx =
MINOR APPROACH ROAD LOCATION SYMBOL FULL-DESIGN APPROACH ROAD LOCATION SYMBOL
A
FOOTNOTE:
See sheet E.5.1
1 1 1 1
STATION
MAINLINE
R1 R2 L REMARKSW
APPROACH ROAD TABLE
B
Approach type
Type Approach
TYPE
Approach xxx+xx
A 18 20
1515+18 RT 50
29+31 LT A
A
A
A
A
A
A
44 20 32
Farm field approach
30+30 RT 42 150 10
36+69 RT 32 90 15
39+03 LT 40 2020
A 29
47+03 RT
48+22 RT
49+17 RT
50+21 LT
74+85 LT A 31 Public approach
15 15
35 15
130 10
10 10
75 15
Farm field approach
Private approach
Private approach
Private approach
Private approach
Railroad access approach
Railroad access approach
Railroad access approach
A 10 10 10 10
A 24 30 20 10
A 21 20 20 10
A 20 25 20 18
Farm field approach
113+79 LT Farm field approach
116+95 LT
117+02 RT
Farm field approach
Railroad access approach
1 1 1 1
STATION
MAINLINE
R1 R2 L REMARKSW
APPROACH ROAD TABLE
TYPE
A 13 20 15 10
A
A
A 10
B
30 20
25 20
Private approach
Private approach
A 18 20 15 10204+95 RT Farm field approach
130+99 LT Farm field approach
144+14 LT A 15 15 10 10 Farm field approach
154+29 LT A 10 10 10 10 Farm field approach
Private approach
180+89 LT
181+07 RT 25
186+37 LT
190+87 RT
See sheet E.4.2
4 4 200 Bowdoin Road
50+24 RT A 40 25 35 10 Farm field approach
174+66 LT A Farm field approach
175+35 LT A Canal access approach
3 Adjust to match field conditions as approved by CO.
3 3
See sheet E.2.4
104+01 LT A 22 25 20 10 Farm field approach
84+82 LT
10 10 15 33
10 50 50 68
PRELIM
IN
ARY
Not for
C on str uc
Variable 1:3
1:3Variable
Fill slope stake stake
Cut slope
Clearing Limits
APPROACH ROAD DETAILS
E.4
STATE PROJECT
J u l-
P
M ft p .1
.1
.2 s td p la n m t-
A
E D .D
G N
U
S I n t2
B E e c k e d b y
T H
O M
P S s ig n e d b y
FOOTNOTE:
1’
4-inch depth
Placing conserved topsoil, Turf establishment
2% crown 2% crown
Placing conserved topsoil, 4-inch depth
Turf establishment
2 2
2% Crown 2% Crown 1:3
Traveled Way Traveled Way
13’13’
1:3
Profile grade li m it s
C le a r in g li m it s
C le a r in g
Original ground
4-inch depth
Placing conserved topsoil, Va ria bl e m in
Original ground or existing road surface
3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 2, Va ria ble
1:3
LC
TYPE B APPROACH ROAD SECTION DETAIL
Placing conserved topsoil, 4-inch depth
Turf establishment
See sheet E.1 for locations and quantities.
Construct slopes as shown in the Staking Report.
on the plan and profile curve data.
Superelevate roadway on curves at the rate "e" as indicated
(See FAR 52.236-4).
Construct curve widening as shown in the Staking Report with adjacent roadway construction.
Construct side slopes on approaches to be compatible
Adjust to match field conditions as approved by CO.
See sheet E.3.
4 4
5 5
Tack coat
(between lifts)
Suitable roadway excavation or unclassified borrow
TYPE A APPROACH ROAD SECTION DETAIL
Suitable roadway excavation or unclassified borrow 73-inch compacted depth
Roadway aggregate, method 1, 7-inch compacted depth
Roadway aggregate, method 2, PRELIM
IN
ARY
Not for
C on str uc
C of approachL
C of highwayL
W
R
R
1 1
APPROACH ROAD DETAILS
E.5
STATE PROJECT
J u l-
P
M ft p .1
.1
.2 s td p la n m t-
A
E E .D
G N
U
S I n t2
B E e c k e d b y
T H
O M
P S s ig n e d b y
C of roadway
Point G
10’ chord a 2" depression in a exceed a 3" hump or Vertical curves not to
L c o n s tr u c ti o n
E n d o f a p p r o a c h
Edge of mainline
APPROACH ROAD PROFILE DETAIL
E d g e o f m a in li n e
FOOTNOTE:
APPROACH ROAD PLAN DETAIL
typical section Match mainline
+15% maximum
-15% maximum
L
Designed grade
APPROACH ROAD CONNECTION DETAIL - TYPE A APPROACHES
c o n s tr u c ti o n
E n d o f a p p r o a c h
Edge of mainline
L
APPROACH ROAD CONNECTION DETAIL - TYPE B APPROACHES
approach road profile and superelevation Adjust connection to match existing approach road profile and superelevation Adjust connection to match existing slope Cross
Edge of mainline
Variable
Adjust to match field conditions as approved by CO.
to existing alignment of approach is at an angle.
Continue approach radius as required if connection
See sheet E.3.
3’
Existing approach surface
Existing approach surface
See type B approach road section detail
Road Section Detail See Type A Approach
PRELIM
IN
ARY
Not for
C on str uc
WESTERN FEDERAL LANDS HIGHWAY DIVISION
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
NO. DATE BY REVISIONS
DATE
m t-
A
G A .D
G N
I n t_ ft
D
G.1
STATE PROJECT
A u g
P
M
Q V WS EL.
upstream face of bridge.
Note: Water surface elevations are at
No Scale
PROFILE GRADE DIAGRAM
ELEVATION
HYDRAULIC DATA
Bridge elevations are at profile grade @ layout line
U.S. DEPARTMENT OF TRANSPORTATION
PHILLIPS COUNTY, MT
(Dodson South Canal Bridge)
RG XXXX-A
J. Schlegelmilch 1"= 6'-0" xxxx S. Markwardt J. Schlegelmilch
PLAN & ELEVATION
BRIDGE 176+52.25
Centerline bearing
Low chord El. 2,260.58
Profile grade
BEGIN BRIDGE
El. 2,264.95
STA. 176+04.50
END BRIDGE
El. 2,265.43
STA. 177+00.00
2'-9" Top of curb
Est. Tip El. 2,147.00
Est. Tip El. 2,142.00 op max 350
Q
Q
1.0
0.9
2,258.58
2,258.27
END BRIDGEBEGIN BRIDGE
Rdwy
Bridge @LC
Approach slab
LC
PLAN
8'-0"95'-6" Bridge length8'-0"
Approach slab railing (typ.)
Structure transition
El. 2,264.95
STA. 176+04.50
El. 2,264.67
El. 2,264.67 El. 2,264.71
El. 2,264.71 El. 2,265.19
El. 2,265.19 El. 2,265.23
El. 2,265.23
El. 2,265.43
STA. 177+00.00
95'-6" Bridge length
90'-0"
2'-9"
DESCRIPTION
1:2 1:
2,260
2,270
2,250
N
Abutment 1 Abutment 2
Existing ground @ C of roadwayL
HP 14 x 89 piling (typ.)
+0.5026% grade bulb-tee girders
Prestressed
BRIDGE SHEET
08/2015
BRIDGE SHEET INDEX
NO.
SHEET
SHEET NO.
1:
21:2
Q WS EL. = 2258.58max
Canal Flow
GRADING PLAN & SECTION
REBAR LIST
REBAR LIST
APPROACH RAILING DETAILS
BRIDGE RAILING AND CURB
GIRDER DETAILS
GIRDER SECTIONS
GIRDERS B & C
GIRDERS A & D
APPROACH SLAB
DECK PLAN DETAILS
WING WALL DETAILS
END WALL DETAILS
ABUTMENT CAP
SUBSURFACE INFORMATION
GENERAL NOTES & FOUNDATION PLAN
PLAN & ELEVATION
RG XXXX-Q
RG XXXX-P
RG XXXX-O
RG XXXX-N
RG XXXX-M
RG XXXX-L
RG XXXX-K
RG XXXX-J
RG XXXX-I
RG XXXX-H
RG XXXX-G
RG XXXX-F
RG XXXX-E
RG XXXX-D
RG XXXX-C
RG XXXX-B
RG XXXX-A
,2
.5
+1.630 8%
100' VC
K = 89
SSD = 1007'
,2
.9
+0.5026%
,2
.4
,2
.7
-0.3991%
100' VC
K = 111
SSD = 1250'
.5
PRELIM
IN
ARY
Not for
C on str uc
GENERAL NOTES:
RG XXXX-B
2 of 17 08/2015
G.2
STATE PROJECT
A u g
P
M m t-
A
G B .D
G N
I n t_ ft
D
NOTES:
J. Schlegelmilch 1"= 10'-0" xxxx S. Markwardt J. Schlegelmilch
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PHILLIPS COUNTY, MT
(Dodson South Canal Bridge)
BRIDGE 176+52.25
PLAN
GENERAL NOTES & FOUNDATION
STA. 177+00.00
END BRIDGESTA. 176+04.50
BEGIN BRIDGE
95'-6" Bridge length
2'-9"90'-0"2'-9"
Abutment 1
Abutment 2
1'-5" 1'-5"
2'-10"
Bridge @ RdwyLCLC
Bearing @ pileLC LC Bearing @ pileLC LC
Test pile p il e s p a ty p e q s p a
ST-12
ST-13
F lo w
FOUNDATION PLAN AND BORING LOCATIONS
Test pile
ESTIMATE
ITEM NO. DESCRIPTION UNITQUANTITY NOTES
EACH
SQYD
LNFT
LB
LNFT
CUYD
EACH
LNFT
CUYD
LPSM
FOOTNOTE:
1 Contract quantity.
56401-1000
55901-0000
55601-0900
55401-2000
55302-3700
55201-0200
55104-1000
55101-1900
20801-0000
20304-1000
BRIDGE SHEET SHEET NO.
Bearing device, elastomeric
Membrane waterproofing
Bridge railing, steel
Reinforcing steel, epoxy coated
Precast, prestressed concrete decked bulb tee girder
Structural concrete, class A(AE)
Dynamic pile load test
Steel H pile, 14 x 89, in place
Structure excavation
Removal of structures and obstructions, Dodson South Canal Bridge
SK Geotechnical. See Summary of Subsurface Information on Sheet G.4.
For geotechnical information see Geotechnical Report No. 14-3206G, prepared by
GEOTECHNICAL REPORT:
of the CO.
only. Do not drive piles beyond one foot below estimated tip elevation without approval fitted with driving points. The minimum tip elevation shown is for estimating quantities shall be full cross section pre-qualified groove weld butt joints. Steel H piles shall be
Steel H piles shall conform to ASTM A 572, A 588, or A 690, grade 50. All pile splices
STEEL H PILES:
to ASTM A307 galvanized.
tie connections shall be furnished in black iron finish. Diaphragm anchor bolts shall conform
ASTM A36. All structural metal shall be galvanized after fabrication except girder welded
All structural metal for welded connections, and structural steel shapes shall conform to
MISCELLANEOUS STRUCTURAL METAL:
manufacture and erection.
curb ties, joint filler, bearing devices, and any other details and material required for reinforcing steel (conventional and prestressed), concrete inserts, lifting devices, grouting, Specifications. Detail the precast prestressed girder units, indicating on the plans
Provide smooth finish on the top surface of the girders according to FP-14 Standard
LRFD Bridge Design Specifications, except limit tensile stresses to zero after losses.
Design precast prestressed concrete decked Bulb-Tee Units according to current AASHTO
PRESTRESSED CONCRETE DECKED BULB-TEE UNITS:
relaxation prestressing strand conforming to AASHTO M203 (ASTM A416).
Pretensioned, prestressing steel shall be Grade 270, 0.6-inch Ø, seven-wire, bright low
PRESTRESSING STEEL:
curbs, endwalls, pile cap, wing walls, approach slab, and sleeper beam).
unless shown otherwise on the plans. All reinforcing steel shall be epoxy coated (girders, Grade 60). The minimum concrete covering to the face of any bar shall be 2 inches, All reinforcing steel shall conform to AASHTO M31, Grade 60 deformed (ASTM, A615, REINFORCING STEEL:
expansion joint filler shall meet the requirements of AASHTO M213.
filler shall meet the requriements of ASTM D1056, type 2, Grade 2 or 3. Preformed
", unless shown otherwise on plans. Preformed flexible cellular joint 4 3concrete type II cement. All cement shall be low alkali cement. Chamfer exposed edges of all design compressive strength fc'=4000 psi. All Class A(AE) concrete shall be made with
All cast-in-place concrete shall be structural concrete Class A(AE) with a minimum 28-day
CAST-IN-PLACE:
Vehicle load : HL93: Maximum dynamic load allowance (Impact), IM=33%
LIVE LOAD:
Active lateral earth pressure: Equivalent fluid unit weight of soil, 37 pcf.
Asphalt wearing surface : 140 lb. per cubic foot.
Concrete in Prestressed concrete Units : 155 lb per cubic foot.
Cast-in-place concrete : 150 lb per cubic foot.
DEAD LOAD:
Construction of Roads and Bridges on Federal Highway Projects, FP-14.
CONSTRUCTION: Federal Highway Administration Standard Specifications for
Edition 2014.
DESIGN: AASHTO LRFD Bridge Design Specifications, Customary U.S. Units, 7th
SPECIFICATIONS:
13,892
1,147
SK Geotechnical. See Summary of Subsurface Information on Sheet RGxxxx-C.
For geotechnical information see Geotechnical Report No. 14-3206G, prepared by
GEOTECHNICAL REPORT:
of the CO.
Do not drive piles beyond one foot below estimated tip elevation without approval
The minimum tip elevation shown is for estimating quantities only.
pre-qualified groove weld butt joints. Fit steel H piles with driving points.
Conform to ASTM A 572, A 588, or A 690, grade 50. Splice H piling with full cross section
STEEL H PILES:
with AASHTO M111 or M232.
black iron finish. Diaphragm anchor bolts to conform to ASTM A307 galvanized in accordance shapes. Galvanize all metal after fabrication except girder welded flange-tie connections to be
Conform to ASTM A36 for all structural metal for field welded connections and structural steel
MISCELLANEOUS STRUCTURAL METAL:
shown otherwise on plans.
minus in 10 feet in any direction. Chamfer exposed edges of all concrete 3/4", unless amplitude roughness. Overall tolerance of top surfaces of girders is 1/4" plus or finish except roughen finish under field cast concrete curbs to 1/4” max to 1/8” min f’c=7,000 psi. Minimum f’ci=6,000 psi. Finish top surface of the girders with a smooth
Manufacture as detailed on the plans. Fabricate with Class P(AE) concrete. Minimum
PRESTRESSED CONCRETE DECKED BULB-TEE UNITS:
prestressing strand conforming to AASHTO M203 (ASTM A416).
Comply with Grade 270, 0.6-inch Ø, seven-wire, bright low-relaxation
PRESTRESSING STEEL:
on formed face, unless noted otherwise.
All reinforcing steel to be epoxy coated. Minimum concrete cover 2 inches
Conform to AASHTO M31, Grade 60 deformed (ASTM, A615, Grade 60).
REINFORCING STEEL:
Preformed expansion joint filler: AASHTO M213.
Preformed flexible cellular joint filler: ASTM D1056, Type 2, Grade 2 or 3.
shown otherwise on plans.
Use Type II, low alkali cement. Chamfer exposed edges of all concrete 3/4", unless
Class A(AE) with a minimum 28-day design compressive strength fc'=4000 psi.
CAST-IN-PLACE:
Vehicle load : HL93: Maximum dynamic load allowance (Impact), IM=33%
LIVE LOAD:
At rest lateral earth pressure: Equivalent fluid unit weight of soil, 57 pcf
Active lateral earth pressure: Equivalent fluid unit weight of soil, 37 pcf.
Future wearing surface allowance: 24 psf
At time of construction: 24 psf
Asphalt wearing surface : 140 lb. per cubic foot.
Concrete in Prestressed concrete Units : 155 lb per cubic foot.
Cast-in-place concrete : 150 lb per cubic foot.
DEAD LOAD:
Construction of Roads and Bridges on Federal Highway Projects, FP-14.
CONSTRUCTION: Federal Highway Administration Standard Specifications for
Edition 2014.
DESIGN: AASHTO LRFD Bridge Design Specifications, Customary U.S. Units, 7th
SPECIFICATIONS:
Do not drive any other piling at the abutment during the test pile set-up period.
criteria and the pile tip elevations. See Section 551.
14 day set-up period. Use the dynamic load test results to establish the pile driving abutment. Perform load tests on test pile during initial drive and during re-strike after
Perform dynamic load testing with signal matching on the first pile driven at each
The factored strength 1 limit state axial load per pile = 207 kips.
The required compressive nominal bearing resistance per pile during re-strike = 351 kips.
3.
3.
2.
1.
PRELIM
IN
ARY
Not for
C on str uc
10.4 x 16 60201 -0600
60201 -0800
60201 -0900
60201 -1000
60704 -0000
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
C
LE
A N
IN
G
C U
LV
ER
T
IN
P
LA
C E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD LNFT LNFT LNFT LNFT EACH Lt Rt
13+33 4 5 96 A,AS 4 4 1,2
14+90 4 65 98 A,AS 4 4 1,2
24+09 1 33 46 A,AS 2 2 1,2
29+31 LT 1 17 64 A,AS 2 2 1,2
44+00 5 77 48 A,AS 2 2 1,2
47+03 RT 1 1
48+22 RT 1 1
50+21 LT 1 17 36 A,AS 2 2 1,2
54+19 1 85 46 A,AS 2 2 1,2
75+03 LT 1 32 70 A,AS 2 2 1,2
84+82 LT 1 21 30 A,AS 2 2 1,2
117+01 RT 1 21 46 A,AS 2 2 1,2
134+00 3 70 44 A,AS 2 2 1,2
PROJECT TOTAL 443 246 288 44 46 2
Allowable Pipe Material
NOTE: A Aluminum
1. Aluminized steel pipe culvert minimum wall thickness is the AS Aluminized steel thickness required by the Std. 602-1 fill height table (steel). C Concrete
2. Aluminum pipe culvert minimum wall thickness is the thickness GS Galvanized steel required by the Std. 602-1 fill height table. P Plastic
(blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
H.1
C
F_ dr iv e\
H ig hw ay s\
FH
W A\
_O ld
_H ig hw ay
_2 \D es ig n\ D ra in ag e\
[S ec nH
-J ul
-2
3:
P
M C
V O
ER
M
A N
S 7/
B
W A C K
ER
7/
D es ig ne d by
C he ck ed b y:
NUMBER
SHEET
PHILLIPS 201(1)MT
PRELIM
IN
ARY
Not for
C on str uc
NO SCALE
NOTE:
FOOTNOTE:
2’
2’1:
M ax 1:2 M ax
1:2 M ax 1:
M ax
Downgrade
4’ Min.
D s u rfa c e
R o a d
D it c h li n e
Downgrade
Optional storage
Compacted berm
Ditch dam
Station
RT
LOCATION TABLE
CROSS DRAIN WATER BAR
2D Min.
13+67
Offset (in) diameter (D)
Existing Pipe
PLAN VIEW
CROSS DRAIN WATER BAR
END VIEW
CROSS DRAIN WATER BAR
culvert
Remove existing
3% Minimum road bed
Existing
Existing shoulder slope
Existing fill
Existing ground
NOTE:
road bed
Existing
Excavation
Optional storage compacted berm
Ditch dam and
WATER BAR DETAILS
AND
ROADWAY OBLITERATION
5.
4.
3.
2.
1.
cross drain as approved by the CO.
pipe, or match the existing ditch channel width uptream of the
Construct water bar bottom width 2 times the diameter of the existing
Highway 2 Intersection
J.1
STATE PROJECT
J u l-
P
M ft p .1
.1
.2 s td p la n m t-a J A .d g n
U
S S u r
W A
C K e c k e d b
V O
E R
M A s ig n e d b y
ROADWAY OBLITERATION, METHOD 1
culvert
Remove existing
See Section 211.
upgradient ditch.
create a ditch dam. Do not place excavated material within the
If road has drainage ditch, extend waterbar berm into the ditch to
Station location of the waterbar designates the centerline location.
cut slope and extends across the entire width of the roadbed.
Waterbar begins at the intersection of the roadbed and
Ensure outlet is free flowing.
Slope waterbar flowline to drain towards outside edge of road.
4. See Sheet D.1 for locations and quantities.
3. Do not disturb existing overhead power.
2. Outslope roadbed 3% or to match natural conditions.
1. Excavate outside shoulder to match the natural ground topography.
PRELIM
IN
ARY
Not for
C on str uc
| a1 |
| a2 |
| a3 |
| B.1 |
| B.2 |
| B.3 |
| C1 |
| C2 |
| C3 |
| C4 |
| D1 |
| D2 |
| D3 |
| D4 |
| D5 |
| D6 |
| D7 |
| D8 |
| D9 |
| D10 |
| D11 |
| D12 |
| E1 |
| E2 |
| E3 |
| E4 |
| E5 |
| F1 |
| F2 |
| F3 |
| F4 |
| F5 |
| F6 |
| G Section |
| mt-A2013018GA-Int_ft2D-000 |
| mt-A2013018GB-Int_ft2D-000 |
| mt-A2013018GC-Int_ft2D-000 |
| mt-A2013018GD-Int_ft2D-000 |
| mt-A2013018GE-Int_ft2D-000 |
| mt-A2013018GF-Int_ft2D-000 |
| mt-A2013018GG-Int_ft2D-000 |
| mt-A2013018GH-Int_ft2D-000 |
| mt-A2013018GI-Int_ft2D-000 |
| mt-A2013018GJ-Int_ft2D-000 |
| mt-A2013018GK-Int_ft2D-000 |
| mt-A2013018GL-Int_ft2D-000 |
| mt-A2013018GM-Int_ft2D-000 |
| H1 |
| H2 |
| H3 |
| H4 |
| I1 |
| I2 |
| J1 |
| K1 |
| K2 |
| K3 |
| K4 |
| K5 |
| K6 |
| K7 |
| L1 |
| L2 |
| L3 |
| L4 |
| L5 |
| L6 |
| L7 |
| L8 |