Schedule_B.pdf
PDF 49 KB Posted
- Solicitation number
- DTFH6816B00035
About this file
Schedule B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Option_X.pdf | ||
| Schedule_C.pdf | ||
| Option_Y.pdf | ||
| Option_Z.pdf | ||
| Schedule_A.pdf | ||
| Bid_Opening_Summary.pdf | ||
| A004.pdf | ||
| A003.pdf | ||
| Q&A.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| Pavements_Report.pdf | ||
| DTFH6816B00035.pdf | ||
| Cross_Sections.pdf | ||
| Plans.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T A B U L A T I O N O F B I D S
Schedule B Total of Bid Items: 9,324,640.00$ 27.6% 11,901,235.00$ -27.5% 6,760,410.00$ -6.8% 8,686,062.00$ -14.6% 7,961,679.20$ -9.7% 8,420,170.70$ Project No: UT FTNP ARCH 10(2)
Project Name: MAIN ENTRANCE ROAD CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000 Line B0020 ALL LPSM 900,000.00$ 900,000.00$ 1,990,000.00$ 550,000.00$ 835,000.00$ 815,000.00$ 1,415,000.00$
15201-0000 Line B0040 ALL LPSM 6,500.00$ 6,500.00$ 12,500.00$ 22,000.00$ 36,000.00$ 107,000.00$ 34,320.00$
15206-0000 Line B0060 32.000 STA 400.00$ 12,800.00$ 2,880.00$ 4,000.00$ 3,840.00$ 2,496.00$ 3,520.00$
15210-3000 Line B0080 518.000 STA 100.00$ 51,800.00$ 15,540.00$ 18,130.00$ 31,080.00$ 11,396.00$ 28,490.00$
15215-3000 Line B0100 7 EACH 430.00$ 3,010.00$ 5,600.00$ 4,340.00$ 6,650.00$ 6,846.00$ 6,237.00$
15216-2000 Line B0120 56.000 STA 100.00$ 5,600.00$ 3,920.00$ 3,080.00$ 6,720.00$ 3,528.00$ 6,160.00$
15301-0000 Line B0140 ALL LPSM 300,000.00$ 300,000.00$ 310,000.00$ 99,000.00$ 175,000.00$ 110,000.00$ 270,600.00$
15401-0000 Line B0160 ALL LPSM 300,000.00$ 300,000.00$ 240,000.00$ 126,500.00$ 102,000.00$ 110,000.00$ 146,300.00$
15501-0000 Line B0180 ALL LPSM 35,000.00$ 35,000.00$ 14,000.00$ 4,000.00$ 12,000.00$ 10,000.00$ 4,999.00$
15705-1500 Line B0200 3,900 LNFT 6.00$ 23,400.00$ 35,100.00$ 19,500.00$ 23,400.00$ 7,800.00$ 8,775.00$
15802-0000 Line B0220 ALL LPSM 125,000.00$ 125,000.00$ 132,000.00$ 95,000.00$ 16,000.00$ 125,000.00$ 25,990.00$
20101-0000 Line B0240 3.0 ACRE 10,000.00$ 30,000.00$ 42,000.00$ 30,000.00$ 9,000.00$ 6,300.00$ 5,130.00$
20301-0100 Line B0260 140 EACH 50.00$ 7,000.00$ 22,400.00$ 2,800.00$ 7,000.00$ 3,360.00$ 13,160.00$
20301-1200 Line B0280 1 EACH 1,200.00$ 1,200.00$ 3,000.00$ 1,950.00$ 2,100.00$ 550.00$ 1,650.00$
20301-1400 Line B0300 3 EACH 650.00$ 1,950.00$ 9,000.00$ 3,300.00$ 8,400.00$ 1,650.00$ 2,220.00$
20301-1900 Line B0320 4 EACH 1,250.00$ 5,000.00$ 16,000.00$ 5,200.00$ 8,400.00$ 1,780.00$ 3,776.00$
20301-2400 Line B0340 1 EACH 120.00$ 120.00$ 500.00$ 75.00$ 110.00$ 400.00$ 200.00$
20301-3400 Line B0360 25 EACH 40.00$ 1,000.00$ 1,750.00$ 500.00$ 1,050.00$ 1,300.00$ 2,321.25$
20302-0150 Line B0380 434 LNFT (CQ) 20.00$ 8,680.00$ 21,700.00$ 47,740.00$ 56,420.00$ 12,152.00$ 7,942.20$
20302-0300 Line B0400 6,400 LNFT 8.00$ 51,200.00$ 140,800.00$ 32,000.00$ 38,400.00$ 34,560.00$ 40,640.00$
20302-0400 Line B0420 15,100 LNFT 5.25$ 79,275.00$ 241,600.00$ 7,550.00$ 30,200.00$ 34,730.00$ 25,670.00$
20303-0300 Line B0440 76 SQYD 50.00$ 3,800.00$ 3,040.00$ 456.00$ 1,368.00$ 3,040.00$ 1,748.00$
20303-1600 Line B0460 1,050 SQYD 10.00$ 10,500.00$ 25,200.00$ 3,150.00$ 21,000.00$ 44,100.00$ 9,765.00$
20402-0000 Line B0480 1,000 CUYD 45.00$ 45,000.00$ 90,000.00$ 50,000.00$ 72,000.00$ 78,000.00$ 57,500.00$
20420-0000 Line B0500 5,300 CUYD 82.00$ 434,600.00$ 212,000.00$ 116,600.00$ 159,000.00$ 307,400.00$ 169,600.00$
20426-1000 Line B0520 116 CUYD 20.00$ 2,320.00$ 5,800.00$ 1,740.00$ 3,944.00$ 5,452.00$ 1,960.40$
21101-1000 Line B0540 5,000 SQYD 10.00$ 50,000.00$ 350,000.00$ 72,500.00$ 115,000.00$ 115,000.00$ 63,750.00$
25101-1000 Line B0560 50 CUYD 150.00$ 7,500.00$ 10,000.00$ 6,000.00$ 9,000.00$ 6,800.00$ 6,315.00$
25101-4000 Line B0580 489 CUYD 250.00$ 122,250.00$ 117,360.00$ 68,460.00$ 88,020.00$ 77,262.00$ 31,858.35$
30306-3000 Line B0600 45,050 SQYD 3.00$ 135,150.00$ 270,300.00$ 157,675.00$ 112,625.00$ 82,892.00$ 50,456.00$
30802-2000 Line B0620 6,150 TON 25.00$ 153,750.00$ 246,000.00$ 153,750.00$ 215,250.00$ 190,650.00$ 196,185.00$
40101-5600 Line B0640 29,400 TON 95.00$ 2,793,000.00$ 3,939,600.00$ 2,205,000.00$ 3,292,800.00$ 2,851,800.00$ 2,738,610.00$
40105-3000 Line B0660 300 TON 225.00$ 67,500.00$ 60,000.00$ 91,500.00$ 130,500.00$ 300.00$ 91,620.00$
Engineer's Estimate
200.00$ 305.00$ 435.00$ 1.00$ 305.40$
134.00$ 75.00$ 112.00$ 97.00$ 93.15$
40.00$ 25.00$ 35.00$ 31.00$ 31.90$
6.00$ 3.50$ 2.50$ 1.84$ 1.12$
240.00$ 140.00$ 180.00$ 158.00$ 65.15$
200.00$ 120.00$ 180.00$ 136.00$ 126.30$
70.00$ 14.50$ 23.00$ 23.00$ 12.75$
50.00$ 15.00$ 34.00$ 47.00$ 16.90$
40.00$ 22.00$ 30.00$ 58.00$ 32.00$
90.00$ 50.00$ 72.00$ 78.00$ 57.50$
24.00$ 3.00$ 20.00$ 42.00$ 9.30$
40.00$ 6.00$ 18.00$ 40.00$ 23.00$
16.00$ 0.50$ 2.00$ 2.30$ 1.70$
22.00$ 5.00$ 6.00$ 5.40$ 6.35$
50.00$ 110.00$ 130.00$ 28.00$ 18.30$
70.00$ 20.00$ 42.00$ 52.00$ 92.85$
500.00$ 75.00$ 110.00$ 400.00$ 200.00$
4,000.00$ 1,300.00$ 2,100.00$ 445.00$ 944.00$
3,000.00$ 1,100.00$ 2,800.00$ 550.00$ 740.00$
3,000.00$ 1,950.00$ 2,100.00$ 550.00$ 1,650.00$
160.00$ 20.00$ 50.00$ 24.00$ 94.00$
14,000.00$ 10,000.00$ 3,000.00$ 2,100.00$ 1,710.00$
132,000.00$ 95,000.00$ 16,000.00$ 125,000.00$ 25,990.00$
9.00$ 5.00$ 6.00$ 2.00$ 2.25$
14,000.00$ 4,000.00$ 12,000.00$ 10,000.00$ 4,999.00$
240,000.00$ 126,500.00$ 102,000.00$ 110,000.00$ 146,300.00$
310,000.00$ 99,000.00$ 175,000.00$ 110,000.00$ 270,600.00$
70.00$ 55.00$ 120.00$ 63.00$ 110.00$
800.00$ 620.00$ 950.00$ 978.00$ 891.00$
1,415,000.00$
22,000.00$ 36,000.00$ 107,000.00$ 34,320.00$
90.00$ 125.00$ 120.00$ 78.00$ 110.00$
A&S Construction Co. LeGrand Johnson Construction Co. Fann Contracting, Inc. W.W. Clyde & Co. Nielson Construction
12,500.00$
1,990,000.00$ 550,000.00$ 835,000.00$ 815,000.00$
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
REMOVAL OF PIPE CULVERT
REMOVAL OF SIGN
REMOVAL OF WHEELSTOP
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SEDIMENT WATTLE
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
EMBANKMENT CONSTRUCTION
DITCH, EXCAVATION
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, CLASS 1
PLACED RIPRAP, CLASS 4
REMOVAL OF BRIDGE RAILING
REMOVAL OF CURB AND GUTTER, CONCRETE
REMOVAL OF CURB, ASPHALT
REMOVAL OF CONCRETE
REMOVAL OF PAVEMENT, ASPHALT
SUBEXCAVATION
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, GRADE FINISHING STAKES
REMOVAL OF BOLLARD
REMOVAL OF HEADWALL
REMOVAL OF INLET
CENTERLINE, VERIFICATION AND STAKING
30.00$ 35.00$ 60.00$ 22.00$ 55.00$
PULVERIZING, 6-INCH DEPTH
ROADWAY AGGREGATE, METHOD 2
SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
ANTISTRIP ADDITIVE, TYPE 3
Schedule B Total of Bid Items: 9,324,640.00$ 27.6% 11,901,235.00$ -27.5% 6,760,410.00$ -6.8% 8,686,062.00$ -14.6% 7,961,679.20$ -9.7% 8,420,170.70$ Project No: UT FTNP ARCH 10(2)
Project Name: MAIN ENTRANCE ROAD CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate A&S Construction Co. LeGrand Johnson Construction Co. Fann Contracting, Inc. W.W. Clyde & Co. Nielson Construction
40920-1000 Line B0680 80 TON 600.00$ 48,000.00$ 35,200.00$ 30,400.00$ 52,800.00$ 32,400.00$ 26,400.00$
41105-0000 Line B0700 260 TON 25.00$ 6,500.00$ 15,600.00$ 13,000.00$ 11,700.00$ 20,020.00$ 14,378.00$
41201-1000 Line B0720 150 TON 700.00$ 105,000.00$ 75,000.00$ 57,000.00$ 108,750.00$ 52,950.00$ 49,500.00$
41601-1000 Line B0740 415.000 STA 1,150.00$ 477,250.00$ 373,500.00$ 352,750.00$ 394,250.00$ 353,580.00$ 372,400.25$
41605-2000 Line B0760 550 TON 500.00$ 275,000.00$ 330,000.00$ 255,750.00$ 302,500.00$ 287,650.00$ 277,695.00$
55221-0000 Line B0780 ALL LPSM 10,000.00$ 10,000.00$ 6,000.00$ 8,000.00$ 4,700.00$ 5,300.00$ 5,500.00$
55601-1100 Line B0800 424 LNFT (CQ) 150.00$ 63,600.00$ 84,800.00$ 67,840.00$ 78,440.00$ 63,600.00$ 85,436.00$
60102-0000 Line B0820 185 SQYD 160.00$ 29,600.00$ 18,500.00$ 15,725.00$ 22,200.00$ 26,640.00$ 20,720.00$
60103-0220 Line B0840 2 EACH 13,000.00$ 26,000.00$ 34,000.00$ 24,400.00$ 20,000.00$ 44,000.00$ 35,150.00$
60201-0600 Line B0860 30 LNFT 65.00$ 1,950.00$ 6,000.00$ 1,440.00$ 3,600.00$ 12,360.00$ 4,665.00$
60201-0800 Line B0880 250 LNFT 120.00$ 30,000.00$ 52,500.00$ 12,500.00$ 31,750.00$ 57,500.00$ 33,225.00$
60201-1200 Line B0900 69 LNFT 170.00$ 11,730.00$ 27,600.00$ 5,934.00$ 15,180.00$ 30,498.00$ 13,869.00$
60202-0500 Line B0920 10 LNFT 80.00$ 800.00$ 3,800.00$ 1,250.00$ 1,700.00$ 3,670.00$ 1,948.00$
60210-0800 Line B0940 4 EACH 400.00$ 1,600.00$ 3,600.00$ 2,140.00$ 1,920.00$ 2,128.00$ 1,263.20$
60211-0900 Line B0960 2 EACH 530.00$ 1,060.00$ 2,000.00$ 1,630.00$ 1,540.00$ 1,698.00$ 1,398.20$
60403-0000 Line B0980 4 EACH 4,000.00$ 16,000.00$ 20,000.00$ 33,400.00$ 24,000.00$ 15,200.00$ 23,340.00$
60415-0000 Line B1000 3 EACH 3,000.00$ 9,000.00$ 54,000.00$ 52,200.00$ 33,000.00$ 30,000.00$ 61,200.00$
60704-0000 Line B1020 1 EACH 2,400.00$ 2,400.00$ 5,000.00$ 2,200.00$ 2,800.00$ 6,000.00$ 2,341.00$
60802-0400 Line B1040 90 LNFT 40.00$ 3,600.00$ 5,400.00$ 6,750.00$ 5,850.00$ 4,050.00$ 16,200.00$
60811-0000 Line B1060 1 EACH 2,500.00$ 2,500.00$ 2,000.00$ 725.00$ 800.00$ 3,900.00$ 781.20$
60901-0000 Line B1080 220 LNFT 50.00$ 11,000.00$ 11,000.00$ 10,560.00$ 6,820.00$ 4,400.00$ 10,120.00$
60901-1300 Line B1100 6,700 LNFT 35.00$ 234,500.00$ 261,300.00$ 207,700.00$ 241,200.00$ 201,000.00$ 214,400.00$
60901-2300 Line B1120 17,500 LNFT 15.00$ 262,500.00$ 175,000.00$ 192,500.00$ 175,000.00$ 157,500.00$ 221,375.00$
60902-1300 Line B1140 5,600 LNFT 30.00$ 168,000.00$ 224,000.00$ 186,480.00$ 190,400.00$ 246,400.00$ 181,440.00$
60908-1000 Line B1160 11,800 SQYD 50.00$ 590,000.00$ 448,400.00$ 354,000.00$ 424,800.00$ 354,000.00$ 354,000.00$
60920-0000 Line B1180 100 EACH 40.00$ 4,000.00$ 9,000.00$ 10,000.00$ 7,200.00$ 1,500.00$ 10,720.00$
61501-0200 Line B1200 350 SQYD 150.00$ 52,500.00$ 35,000.00$ 31,500.00$ 41,300.00$ 38,500.00$ 29,312.50$
61502-1000 Line B1220 420 SQYD 160.00$ 67,200.00$ 50,400.00$ 42,000.00$ 52,500.00$ 46,200.00$ 46,704.00$
61505-1000 Line B1240 1 EACH 1,200.00$ 1,200.00$ 3,600.00$ 3,975.00$ 10,000.00$ 4,000.00$ 3,600.00$
61701-1950 Line B1260 275 LNFT 35.00$ 9,625.00$ 11,000.00$ 9,625.00$ 11,000.00$ 7,700.00$ 7,521.25$
61702-0800 Line B1280 4 EACH 3,000.00$ 12,000.00$ 16,000.00$ 16,000.00$ 18,000.00$ 16,000.00$ 23,872.00$
61707-0000 Line B1300 84 LNFT (CQ) 125.00$ 10,500.00$ 9,240.00$ 7,980.00$ 9,240.00$ 10,584.00$ 10,248.00$
61921-1000 Line B1320 120 LNFT 25.00$ 3,000.00$ 2,760.00$ 2,400.00$ 4,200.00$ 2,760.00$ 10,710.00$
120.00$ 100.00$ 125.00$ 110.00$ 111.20$
100.00$ 90.00$ 118.00$ 110.00$ 83.75$
90.00$ 100.00$ 72.00$ 15.00$ 107.20$
38.00$ 30.00$ 36.00$ 30.00$ 30.00$
40.00$ 33.30$ 34.00$ 44.00$ 32.40$
10.00$ 11.00$ 10.00$ 9.00$ 12.65$
39.00$ 31.00$ 36.00$ 30.00$ 32.00$
50.00$ 48.00$ 31.00$ 20.00$ 46.00$
2,000.00$ 725.00$ 800.00$ 3,900.00$ 781.20$
60.00$ 75.00$ 65.00$ 45.00$ 180.00$
5,000.00$ 2,200.00$ 2,800.00$ 6,000.00$ 2,341.00$
18,000.00$ 17,400.00$ 11,000.00$ 10,000.00$ 20,400.00$
5,000.00$ 8,350.00$ 6,000.00$ 3,800.00$ 5,835.00$
1,000.00$ 815.00$ 770.00$ 849.00$ 699.10$
900.00$ 535.00$ 480.00$ 532.00$ 315.80$
380.00$ 125.00$ 170.00$ 367.00$ 194.80$
400.00$ 86.00$ 220.00$ 442.00$ 201.00$
210.00$ 50.00$ 127.00$ 230.00$ 132.90$
200.00$ 48.00$ 120.00$ 412.00$ 155.50$
17,000.00$ 12,200.00$ 10,000.00$ 22,000.00$ 17,575.00$
100.00$ 85.00$ 120.00$ 144.00$ 112.00$
200.00$ 160.00$ 185.00$ 150.00$ 201.50$
6,000.00$ 8,000.00$ 4,700.00$ 5,300.00$ 5,500.00$
600.00$ 465.00$ 550.00$ 523.00$ 504.90$
900.00$ 850.00$ 950.00$ 852.00$ 897.35$
500.00$ 380.00$ 725.00$ 353.00$ 330.00$
60.00$ 50.00$ 45.00$ 77.00$ 55.30$
440.00$ 380.00$ 660.00$ 405.00$ 330.00$
REMOVE AND RESET FENCE
CURB, CONCRETE, 15-INCH DEPTH
CURB, ASPHALT, 6-INCH DEPTH
CURB AND GUTTER, CONCRETE, 15-INCH DEPTH
PAVED DITCH, ASPHALT
RESET WHEELSTOP
SIDEWALK, COLORED CONCRETE
INLET
TRENCH DRAIN
CLEANING CULVERT IN PLACE
PAVED WATERWAY, TYPE 4
DRAINAGE CHUTE
CURB, CONCRETE
18-INCH PIPE CULVERT
24-INCH PIPE CULVERT
48-INCH PIPE CULVERT
30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
END SECTION FOR 30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
DRIVE PAD, CONCRETE
ACCESSIBILITY RAMP, CONCRETE
GUARDRAIL SYSTEM G4, TYPE 4, CLASS B STEEL POSTS
TERMINAL SECTION TYPE TANGENT
STRUCTURE TRANSITION RAILING
3,600.00$ 3,975.00$ 10,000.00$ 4,000.00$ 3,600.00$
CONTINUOUS COLD RECYCLED ASPHALT BASE COURSE TYPE A
EMULSIFIED BINDER AGENT GRADE HFMS-2SP(HFMS-2SP, or CSS Engineered Emulsion, or PASS R)
EXPANSION JOINT REPAIR
BRIDGE RAILING, STEEL, TWO RAIL
CONCRETE
CONCRETE, HEADWALL FOR 48-INCH PIPE CULVERT
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
BLOTTER
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
4,000.00$ 4,000.00$ 4,500.00$ 4,000.00$ 5,968.00$
40.00$ 35.00$ 40.00$ 28.00$ 27.35$
23.00$ 20.00$ 35.00$ 23.00$ 89.25$
110.00$ 95.00$ 110.00$ 126.00$ 122.00$
Schedule B Total of Bid Items: 9,324,640.00$ 27.6% 11,901,235.00$ -27.5% 6,760,410.00$ -6.8% 8,686,062.00$ -14.6% 7,961,679.20$ -9.7% 8,420,170.70$ Project No: UT FTNP ARCH 10(2)
Project Name: MAIN ENTRANCE ROAD CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate A&S Construction Co. LeGrand Johnson Construction Co. Fann Contracting, Inc. W.W. Clyde & Co. Nielson Construction
62201-0200 Line B1340 40 HOUR 100.00$ 4,000.00$ 4,000.00$ 4,200.00$ 3,600.00$ 3,960.00$ 3,740.00$
62201-0350 Line B1360 40 HOUR 120.00$ 4,800.00$ 5,600.00$ 5,000.00$ 3,800.00$ 4,800.00$ 3,848.00$
62201-1100 Line B1380 40 HOUR 160.00$ 6,400.00$ 6,400.00$ 6,000.00$ 5,600.00$ 5,760.00$ 4,692.00$
62201-2850 Line B1400 40 HOUR 140.00$ 5,600.00$ 5,600.00$ 6,000.00$ 4,600.00$ 6,840.00$ 5,416.00$
62201-3000 Line B1420 40 HOUR 160.00$ 6,400.00$ 8,000.00$ 5,200.00$ 6,400.00$ 6,640.00$ 3,614.00$
62301-0000 Line B1440 80 HOUR 50.00$ 4,000.00$ 4,000.00$ 4,000.00$ 2,560.00$ 4,160.00$ 2,648.00$
62302-1000 Line B1460 40 HOUR 90.00$ 3,600.00$ 4,800.00$ 6,600.00$ 7,000.00$ 4,800.00$ 4,180.00$
62302-1100 Line B1480 40 HOUR 160.00$ 6,400.00$ 6,000.00$ 6,600.00$ 7,000.00$ 12,000.00$ 6,600.00$
62405-0400 Line B1500 6,000 SQYD 8.00$ 48,000.00$ 126,000.00$ 15,900.00$ 24,000.00$ 13,800.00$ 24,600.00$
63301-0000 Line B1520 20 EACH 400.00$ 8,000.00$ 12,000.00$ 5,000.00$ 7,000.00$ 12,560.00$ 5,212.00$
63309-0100 Line B1540 190 EACH 75.00$ 14,250.00$ 19,000.00$ 11,400.00$ 14,250.00$ 6,460.00$ 11,979.50$
63316-1000 Line B1560 8 EACH 425.00$ 3,400.00$ 4,800.00$ 1,640.00$ 1,520.00$ 3,648.00$ 1,200.80$
63402-0300 Line B1580 80.0 MILE 1,320.00$ 105,600.00$ 56,000.00$ 28,000.00$ 32,000.00$ 31,280.00$ 109,600.00$
63405-0850 Line B1600 12 EACH 300.00$ 3,600.00$ 960.00$ 960.00$ 3,000.00$ 1,032.00$ 1,016.40$
63501-000 Line B1620 ALL LPSM 180,000.00$ 180,000.00$ 35,000.00$ 1,000.00$ 140,000.00$ 106,000.00$ 3,500.00$
63501-1000 Line B1640 ALL LPSM 150,000.00$ 150,000.00$ 240,000.00$ 170,000.00$ 75,000.00$ 104,000.00$ 78,365.00$
63502-0700 Line B1660 500 EACH 20.00$ 10,000.00$ 5,500.00$ 15,250.00$ 9,500.00$ 5,500.00$ 9,000.00$
63502-1300 Line B1680 500 EACH 50.00$ 25,000.00$ 8,000.00$ 55,000.00$ 72,500.00$ 8,500.00$ 28,200.00$
63502-2000 Line B1700 3 EACH 8,000.00$ 24,000.00$ 24,000.00$ 16,500.00$ 12,600.00$ 22,200.00$ 52,800.00$
63502-3100 Line B1720 1 EACH 50,000.00$ 50,000.00$ 18,000.00$ 51,800.00$ 32,000.00$ 10,250.00$ 17,600.00$
63503-0300 Line B1740 100 LNFT 43.00$ 4,300.00$ 2,000.00$ 5,000.00$ 4,700.00$ 1,700.00$ 29,960.00$
63503-0400 Line B1760 1,000 LNFT 50.00$ 50,000.00$ 60,000.00$ 75,000.00$ 47,000.00$ 27,000.00$ 70,000.00$
63504-1000 Line B1780 735 SQFT 30.00$ 22,050.00$ 11,025.00$ 22,050.00$ 18,375.00$ 16,170.00$ 18,375.00$
63505-1000 Line B1800 31.6 MILE 1,700.00$ 53,720.00$ 34,760.00$ 11,060.00$ 12,640.00$ 12,387.20$ 38,773.20$
63506-0500 Line B1820 6,000 HOUR 30.00$ 180,000.00$ 174,000.00$ 183,000.00$ 180,000.00$ 192,000.00$ 212,700.00$
63506-0600 Line B1840 500 HOUR 60.00$ 30,000.00$ 25,000.00$ 25,000.00$ 21,000.00$ 26,000.00$ 28,650.00$
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
PAVEMENT MARKINGS, TYPE B
PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
TEMPORARY TRAFFIC CONTROL
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL, 6-INCH DEPTH
SIGN SYSTEM
DELINEATOR, TYPE 1
REMOVE AND RESET SIGN
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
BACKHOE
WHEEL LOADER, 6 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR
GENERAL LABOR
140.00$ 125.00$ 95.00$ 120.00$ 96.20$
100.00$ 105.00$ 90.00$ 99.00$ 93.50$
140.00$ 150.00$ 115.00$ 171.00$ 135.40$
160.00$ 150.00$ 140.00$ 144.00$ 117.30$
50.00$ 50.00$ 32.00$ 52.00$ 33.10$
200.00$ 130.00$ 160.00$ 166.00$ 90.35$
150.00$ 165.00$ 175.00$ 300.00$ 165.00$
120.00$ 165.00$ 175.00$ 120.00$ 104.50$
600.00$ 250.00$ 350.00$ 628.00$ 260.60$
21.00$ 2.65$ 4.00$ 2.30$ 4.10$
600.00$ 205.00$ 190.00$ 456.00$ 150.10$
100.00$ 60.00$ 75.00$ 34.00$ 63.05$
80.00$ 80.00$ 250.00$ 86.00$ 84.70$
700.00$ 350.00$ 400.00$ 391.00$ 1,370.00$
240,000.00$ 170,000.00$ 75,000.00$ 104,000.00$ 78,365.00$
35,000.00$ 1,000.00$ 140,000.00$ 106,000.00$ 3,500.00$
16.00$ 110.00$ 145.00$ 17.00$ 56.40$
11.00$ 30.50$ 19.00$ 11.00$ 18.00$
18,000.00$ 51,800.00$ 32,000.00$ 10,250.00$ 17,600.00$
8,000.00$ 5,500.00$ 4,200.00$ 7,400.00$ 17,600.00$
60.00$ 75.00$ 47.00$ 27.00$ 70.00$
20.00$ 50.00$ 47.00$ 17.00$ 299.60$
1,100.00$ 350.00$ 400.00$ 392.00$ 1,227.00$
15.00$ 30.00$ 25.00$ 22.00$ 25.00$
50.00$ 50.00$ 42.00$ 52.00$ 57.30$
29.00$ 30.50$ 30.00$ 32.00$ 35.45$