| File | Type | Posted |
|---|---|---|
| Option_X.pdf | ||
| Schedule_C.pdf | ||
| Schedule_B.pdf | ||
| Option_Y.pdf | ||
| Option_Z.pdf | ||
| Schedule_A.pdf | ||
| Bid_Opening_Summary.pdf | ||
| A004.pdf | ||
| A003.pdf | ||
| Q&A.pdf | ||
| A001.pdf | ||
| Pavements_Report.pdf | ||
| DTFH6816B00035.pdf | ||
| Cross_Sections.pdf | ||
| Plans.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
U.S. CUSTOMARY
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment curve delta centerline jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
Wattle
Temporary Inlet Protection
Stabilized Construction Entrance
Silt Fence
Sediment Log
EROSION & SEDIMENT CONTROL SYMBOLS
Riprap
Erosion Control Mat
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\ s y m .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
NPS PMIS NO.: 144760, 144791, 144792 DRAWING NO.: 138-134017
Amendment A002
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
U.S. CUSTOMARY
Sheet 2 of 2
A3
Subexcavation
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
MISCELLANEOUS SYMBOLS
See Note 4 4
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\ s y m .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
Created Control Sheet 07/20/11 KLW
LISTING
CONTROL POINT
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
C T
L
A R
C H .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
IMR UT
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
A4 A20
La Sal Mountains Viewpoint
18 Miles from junction of and
To and Crescent Junction
Rock Balanced
MOAB
ARCHES NATIONAL PARK
PARK HEADQUARTERS
VISITOR CENTER
C O
LO
R A D
O
R
IV
E R
ViewPoint Delicate Arch
Overlook Salt Valley
TOWERS
COURTHOUSE
Viewpoint and Trailhead
Park Avenue
DUNES
PETRIFIED
FURNACE
FIERY
Trailhead Devils Garden
Overlook
Fiery Furnace
500+00
300+00
500+00
600+00
800+00
850+00
900+00
950+00
100+00
150+00
200+00 S a lt W a s h
W ash
Salt
W a s h
S a lt V a ll e y
NO SCALE
Point Panorama
Balanced Rock Boneyard
Proposed Staging Area.
Proposed Staging Area
Park Boundary
A5
550+00
1000+00
SITE MAP
77 Miles
Park, Needles District
To Canyonlands National
55 Miles
Monticello:To
2000'1000'0
Scale in Feet junction of and
To and Cisco 45 miles from junction of and
To Castle Valley 16 miles from from 21 miles junction of and
Island in the Sky district
To Canyonlands National Park
19 miles from junction of and
To Dead Horse Point State Park
Schedule B
Main Entrance Road
Project UT FTNP 10(2)
Begin Rehabilitation
550+00
Schedule A
Entrance Channel
1+00 to 3+75.00
Schedule B
Salt Valley Overlook Road
Project UT FTNP206(1)
End Rehabilitation
313+56.18
Schedule B
Salt Valley Overlook Road
Project UT FTNP 206(1)
Begin Rehabilitation
300+00
Schedule B
Devils Garden Loop Road
Project UT FTNP 501(1)
End Rehabilitation
1006+65.89
Schedule B
Devils Garden Turnaround Road
Project UT FTNP 501(1)
Rehabilitation
1200+00 TO 1200+98.65
Schedule B
Devils Garden Loop Road
Project UT FTNP 501(1)
Begin Rehabilitation
962+54.58
Schedule B
Main Entrance Road
Project UT FTNP 10(2)
End Rehabilitation
962+54.58
Schedule B
Fiery Furnace Road
Project UT FTNP 207(1)
Rehabilitation
400+00 TO 416+71.01
150+00
200+00
250+00
350+00
400+00
450+00
250+00
650+00
Option Y
Residence Road
Project UT FTNP 403(1)
Rehabilitation
1300+00 TO 1305+56.26
Schedule A
Maintenance Road
Project UT FTNP 401(1)
Rehabilitation
600+00 to 612+33
Schedule A
Roundabout
Project UT FTNP 10(2)
Rehabilitation
50+00 to 55+00
Option X
Maintenance Road
Project UT FTNP 401(1)
Rehabilitation
612+33 to 618+33.07
Option Z
Devil's Garden Campground Road
Project UT FTNP 208(1)
Rehabilitation
600+00 TO 641+49.33
Schedule C
Windows Road
Project UT FTNP 11(1)
Begin Rehabilitation
100+00
Schedule C
Windows Road
Project UT FTNP 11(1)
End Rehabilitation
210+88.43
Schedule C
Main Entrance Road
Project UT FTNP 10(2)
End Rehabilitation
550+00
Schedule C
La Sal Mountain View Road
Project UT FTNP 200(1)
Rehabilitation
800+00 to 812+67.31
Schedule C
Garden of Eden Overlook Road
Project UT FTNP 204(1)
Rehabilitation
700+00 to 708+73.99
Schedule C
Main Entrance Road
Project UT FTNP 10(2)
Begin Rehabilitation
55+00 Schedule C
Windows Loop Road
Project UT FTNP 500(1)
Rehabilitation
210+88.43 to 245+63.85
Schedule A
Courthouse Wash Bridge
Project UT FTNP 10(2)
Rehabilitation
290+00 to 300+00
Schedule A
Entrance Road Widening
Project UT FTNP 10(2)
Construction
13+11.58 TO 36+79.88
Schedule C
Delicate Arch Road
Project UT FTNP 100(2)
Begin Rehabilitation
500+00
Schedule C
Delicate Arch Road
Project UT FTNP 100(2)
End Rehabilitation
550+00
Schedule C
Windows Loop Turnaround Road
Project UT FTNP 500(1)
New Construction
1400+00 to 1403+57.72
Schedule B
Panorama Point Overlook Road
Project UT FTNP 205(1)
Rehabilitation
200+00 to 21671.85
Option X
Maintenance Yard
Project UT FTNP 10(2)
Rehabilitation
Area
Proposed Staging
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
U T
S it e P ln .d
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
NOTE:
24'
Average Existing Width
Station to Station
TOTAL (mi)
(ft)
Roadway
* Road Inventory Program data shown for information only
TOTAL (ft)
A6
LENGTH OF ENTRANCE WIDENING
SCHEDULE A
ENTRANCE ROAD WIDENING
TYPICAL SECTION
0.44
0.50 to 0.64 (NEEDS UPDATE)
Placed in two lifts
3" HACP
1:2 .5 max
Pvmt_CL_Layer2
Curb_Face_Top_L
Curb_Flowline_R
Pvmt_CL_Layer3
Curb_Back_Top_L
Pvmt_ETW_LayerTop_L
Curb_Flowline_Btm_L
Curb_Face_Top_R
Slope_Stake_Fill_L
Pvmt_ETW_Layer1_L
Curb_Back_Top_R
Curb_Face_Btm_L
Pvmt_ETW_Layer2_L
Pvmt_BOC_Layer3_L
Pvmt_ETW_Layer3_L
Pvmt_ETW_LayerTop_R
Curb_Back_Btm_L
Parkway Back_L
Curb_Flowline_Btm_R
Curb_Flowline_L
Slope_Stake_Fill_R
Pvmt_ETW_Layer1_R
Pvmt_BOC_Layer3_R
Curb_Face_Btm_R
Pvmt_ETW_Layer2_R
Pvmt_CL_LayerTop
Pvmt_ETW_Layer3_R
Parkway Back_R
Curb_Back_Btm_R
Pvmt_CL_Layer1
Exterior Boundary
Exterior Boundary
Pvmt_CL_Layer2
Curb_Face_Top_L
Curb_Flowline_R
Pvmt_CL_Layer3
Curb_Back_Top_L
Pvmt_ETW_LayerTop_L
Curb_Flowline_Btm_L
Curb_Face_Top_R
Slope_Stake_Fill_L
Pvmt_ETW_Layer1_L
Curb_Back_Top_R
Curb_Face_Btm_L
Pvmt_ETW_Layer2_L
Pvmt_BOC_Layer3_L
Pvmt_ETW_Layer3_L
Pvmt_ETW_LayerTop_R
Curb_Back_Btm_L
Parkway Back_L
Curb_Flowline_Btm_R
Curb_Flowline_L
Slope_Stake_Fill_R
Pvmt_ETW_Layer1_R
Pvmt_BOC_Layer3_R
Curb_Face_Btm_R
Pvmt_ETW_Layer2_R
Pvmt_CL_LayerTop
Pvmt_ETW_Layer3_R
Parkway Back_R
Curb_Back_Btm_R
Pvmt_CL_Layer1
Exterior Boundary
Exterior Boundary
Existing Ground
1' Shoulder 11' 11' 11' 1' Shoulder
Traveled WayTraveled Way Rt. Turn Lane
Tack Coat cut edge)
(between lifts and along saw
Tack Coat
Fog Seal pavement and base course
6" Pulverize existing
1' (min.)
13+11.58 TO 32+85.04
MAIN ENTRANCE ROAD WIDENING
TYPICAL SECTION
32+85.04 TO 36+79.88
MAIN ENTRANCE ROAD WIDENING
TYPICAL SECTION
Existing Ground
Fog Seal cut edge)
(between lifts and along saw
Tack Coat
Tack Coat
Placed in two lifts
3" HACP
1' Shoulder 11' 11' 11' 1' Shoulder
Traveled Way Traveled Way Rt. Turn Lane pavement and base course
6" Pulverize existing
2% 2%
2% 2%
Rt. Curb and Gutter
Remove Existing
Rt. Curb and Gutter
Remove Existing
Old Centerline
Old Centerline
1:
m ax
1:2 max material
Method 2 or pulverized
6" Roadway Aggregate, material
Method 2 or pulverized
6" Roadway Aggregate, Lt. Curb and Gutter
Remove Existing
Lt. Curb and Gutter
Remove Existing
Limits of Pulverization
Limits of Pulverization
See Special 609-A curb and gutter
15" colored concrete
See Special 609-A curb and gutter
15" colored concrete See Special 609-A curb and gutter
15" colored concrete
See Special 609-A curb and gutter
15" colored concrete
Slope Stake Limits
Slope Stake Limits
Slope Stake Limits
Slope Stake Limits
Clearing and Construction Limits
Clearing and Construction Limits
Data (Cycle 4)*
Road Inventory Program Milepost
13+11.58 to 36+79.88 2368.3
2368.3 directed by the CO.
Construct a 1:2.5 fill slope behind curb and gutter unless otherwise to the first lift prior to placing the second lift.
Place asphalt concrete pavement in two lifts. Apply tack coat cross section. Dimensions may be varied by the CO.
Dimensions shown are approximate and represent the typical
3.
2.
1.
13+11.58 TO 36+79.88
MAIN ENTRANCE ROAD
TYPICAL EXISTING SECTION
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P
E n tr a n c e
W id e n in g .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
Station to Station
TOTAL (mi)
(ft)
Roadway
NO SCALE
* Road Inventory Program data shown for information only
41,254.58
41,254.58 — from 2.5" to 6.25".
Existing asphalt pavement depth varies
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
Shldr
1'
Shldr
1'
11'11'
9.77 to 17.58
Milepost Data (Cycle 4)*
Road Inventory Program
550+00 to 962+54.58
MAIN ENTRANCE ROAD
EXISTING TYPICAL SECTION
asphalt
Edge of existing
VariableExisting Slope
3.
prior to paving )
(Applies to both sides
Shoulder Widening Section
DETAIL B
Widening
Proposed
P a v e m e n t
P r o p o s e d E d g e o f method 2 aggregate, Placed roadway
Construction Limits
32' Average Bench Width
21-30'
Average Existing Width (22')
See Details A & B
A7
TOTAL (ft)
5. 5.
Tack coat
Clear Zone
5' Minimum
Clear Zone
5' Minimum
LENGTH OF MAIN ENTRANCE ROAD
roadway aggregate material prior to placing
Windrow or move existing shoulder
550+00 to 962+54.58
MAIN ENTRANCE ROAD
TYPICAL SECTION
550+00 to 962+54.58
7.81
SCHEDULE B
MAIN ENTRANCE ROAD
TYPICAL SECTIONS
Placed in equal lifts
3" HACP pavement and between lifts)
(on recycled base
Tack coat recycled asphalt base course
3" Continuous cold
Fog seal 7.
DETAIL A
Construct 30° - 35° pavement edge (safety edge) for structural section details
See Mainline Typical Section drainage and appearance.
pavement. Shape and compact as necessary for
(pay item 30802-2000) after placement of asphalt and Roadway Aggregate, Method 2
Shoulder up with existing shoulder material recycled asphalt base course
3" Continuous cold
Apply fog seal according to Section 409 and as directed by the CO
Profile grade equals existing ground plus 3" to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:4 foreslope unless otherwise directed by the CO.
Aggregate, Method 2 .
stability. This work is subsidiary to pay item 30802-2000, Roadway material. Shape material to ensure adequate drainage and material and shouldering up with existing shoulder
Shoulder Widening includes windrowing existing shoulder across the pulverized material.
edge of pavement at a depth of 6". Maintain a consistent slope a depth of 6 inches. Spread pulverized material to the proposed placed roadway aggregate with existing asphalt. Pulverize to
Place roadway aggregate along existing pavement. Pulverize
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
7.
6.
5.
4.
3.
2.
1.
6.
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P
M a in .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
Average Existing Width
* Road Inventory Program data shown for information only
14'
Variable
Existing Slope Variable
Existing Slope
Traveled Way
Match existing Match existing
Shldr
1'
Shldr
1'
Fog seal
Tack coat (between lifts) pavement and base course
6" Pulverize existing
17.58 to 18.42
Milepost Data (Cycle 4)*
Road Inventory Program from 2.5" to 3.5".
Existing asphalt pavement depth varies
962+54.58 TO 1006+65.89
DEVIL'S GARDEN LOOP ROAD
TYPICAL SECTION
962+54.58 to 1006+65.89 4,411.31
0.84
4,411.31
12'
Limits of Pulverizing
A8
962+54.58 to 1006+65.89
DEVIL'S GARDEN LOOP ROAD
EXISTING TYPICAL SECTION
TOTAL (ft)
Placed in two lifts
3" HACP pavement
Construction Limits
4.
4.
LENGTH OF DEVIL'S GARDEN LOOP ROAD
to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:4 foreslope unless otherwise directed by the CO.
Pulverize to a depth of 6".
Pulverize the existing paved width or as directed by the CO.
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
4.
3.
2.
1.
Shoulder
Pulverized Width
Traveled way structural section details
See mainline typical section for
Foreslope
(safety edge) pavement edge
30° - 35°
Construct drainage and appearance.
pavement. Shape and compact as necessary for
(pay item 30802-2000) after placement of asphalt section. Shoulder up with Roadway Aggregate, Method 2
Incorporate pulverized material into the mainline base
Remove all pulverized asphalt material from this section.
1'
Vari es4.
2' min.
See Detail A
Clear Zone
5' Minimum
Clear Zone
5' Minimum
(Applies to both sides)
Pavement Edge Section
DETAIL A
Tack coat
SCHEDULE B
DEVIL'S GARDEN LOOP ROAD
TYPICAL SECTIONS
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P
D e v il
L o o p .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
Average Existing Width
* Road Inventory Program data shown for information only
20' from 2.75" to 3.25".
Existing asphalt pavement depth varies
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
Fog seal
Tack coat (between lifts) pavement and base course
6" Pulverize existing
11'11'
Construction Limits
0.00 to 0.31
Milepost Data (Cycle 4)*
Road Inventory Program
200+00 to 216+71.85
Roadway
(ft)
1,671.85
Description
Panorama Point
300+00 to 313+56.18
400+00 to 416+71.01
Salt Valley
Fiery Furnace
1,356.18
1,671.01 0.00 to 0.31
0.00 to 0.25
4699.04
0.89
Shldr
1'
Zone Clear Average
Shldr
1'
Zone Clear Average
Limits of Pulverization 3.
25' Average Bench Width
NOTE:
Placed in two lifts
3" HACP Pavement
TOTAL (ft)
LENGTH OF LOOP ROADS
See mainline typical section for
Foreslope
(safety edge) pavement edge
30° - 35°
Construct drainage and appearance.
pavement. Shape and compact as necessary for
(pay item 30802-2000) after placement of asphalt section. Shoulder up with Roadway Aggregate, Method 2
Incorporate pulverized material into the mainline base
Remove all pulverized asphalt material from this section.
1' asphalt
Edge of existing
VariableExisting Slope
3.
prior to paving )
(Applies to both sides
Shoulder Widening Section
DETAIL B
with placed roadway aggregate
6" Pulverize existing pavement
Widening
Proposed
P a v e m e n t
P r o p o s e d E d g e o f method 2 aggregate, Placed roadway
Vari es5.
2' min.
See Detail A & B
5.
4.
3.
2.
1.
Tack coat
(Applies to both sides)
Pavement Edge Section
DETAIL A
5. 5.
roadway aggregate material prior to placing
Windrow or move existing shoulder to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:4 foreslope unless otherwise directed by the CO.
Aggregate, Method 2 .
stability. This work is subsidiary to pay item 30802-2000, Roadway material. Shape material to ensure adequate drainage and material and shouldering up with existing shoulder
Shoulder Widening includes windrowing existing shoulder across the pulverized material.
edge of pavement at a depth of 6". Maintain a consistent slope a depth of 6 inches. Spread pulverized material to the proposed placed roadway aggregate with existing asphalt. Pulverize to
Place roadway aggregate along existing pavement. Pulverize
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
FIERY FURNACE ROAD 400+00 to 416+71.01
SALT VALLEY OVERLOOK ROAD 300+00 to 313+56.18
PANORAMA POINT OVERLOOK ROAD 200+00 to 216+71.85
EXISTING TYPICAL SECTION
FIERY FURNACE ROAD 400+00 to 416+71.01
SALT VALLEY OVERLOOK ROAD 300+00 to 313+56.18
PANORAMA POINT OVERLOOK ROAD 200+00 to 216+71.85
TYPICAL SECTION
SCHEDULE B
FIERY FURNACE ROAD
SALT VALLEY OVERLOOK ROAD
PANORAMA POINT OVERLOOK
TYPICAL SECTIONS
A9
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P P a n o r o a m a S a lt F ie r y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
* Road Inventory Program data shown for information only from 2.5" to 6.25".
Existing asphalt pavement depth varies
Milepost Data (Cycle 4)*
Road Inventory Program asphalt
Edge of existing
VariableExisting Slope prior to paving )
(Applies to both sides
Shoulder Widening Section
DETAIL B
Widening
Proposed
P a v e m e n t
P r o p o s e d E d g e o f
21-30'
Average Existing Width (22')
TOTAL (ft)
LENGTH OF MAIN ENTRANCE ROAD
roadway aggregate material prior to placing
Windrow or move existing shoulder
9.38
SCHEDULE C
MAIN ENTRANCE ROAD
TYPICAL SECTIONS
55+00 to 550+00
MAIN ENTRANCE ROAD
EXISTING TYPICAL SECTION
55+00 to 550+00 49,500
49,500
.74 to 9.77
A10
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
Shldr
1'
Shldr
1'
11'11'
Construction Limits
32' Average Bench Width
See Details A & B
5. 5.
Tack coat
Clear Zone
5' Minimum
Clear Zone
5' Minimum
Placed in equal lifts
3" HACP pavement and between lifts)
(on recycled base
Tack coat recycled asphalt base course
3" Continuous cold
Fog seal 7.
DETAIL A
Construct 30° - 35° pavement edge (safety edge) for structural section details
See Mainline Typical Section drainage and appearance.
pavement. Shape and compact as necessary for
(pay item 30802-2000) after placement of asphalt and Roadway Aggregate, Method 2
Shoulder up with existing shoulder material
55+00 to 550+00
MAIN ENTRANCE ROAD
TYPICAL SECTION
recycled asphalt base course
3" Continuous cold method 2 aggregate, Placed roadway
3.
Apply fog seal according to Section 409 and as directed by the CO
Profile grade equals existing ground plus 3" to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:4 foreslope unless otherwise directed by the CO.
Aggregate, Method 2 .
stability. This work is subsidiary to pay item 30802-2000, Roadway material. Shape material to ensure adequate drainage and material and shouldering up with existing shoulder
Shoulder Widening includes windrowing existing shoulder across the pulverized material.
edge of pavement at a depth of 6". Maintain a consistent slope a depth of 6 inches. Spread pulverized material to the proposed placed roadway aggregate with existing asphalt. Pulverize to
Place roadway aggregate along existing pavement. Pulverize
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
7.
6.
5.
4.
3.
2.
1.
6.
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P
M a in
S c h e d u le
C .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
* Road Inventory Program data shown for information only
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
Tack coat (between lifts)
11'11'
Milepost Data (Cycle 4)*
Road Inventory Program
100+00 to 210+88.43
WINDOWS ROAD
TYPICAL SECTION
100+00 to 210+88.43 11,088.43
2.76
0.00 to 2.14 from 3.5" to 4".
Existing asphalt pavement depth varies
Shldr
1'
Shldr
1'
Zone
Clear
5' Min.
Construction Limits
27' Average Bench Width
Average Existing Width 20'
TOTAL (ft)
WINDOWS LOOP ROAD 210+88.43 to 245+63.85
WINDOWS ROAD 100+00 to 210+88.43
EXISTING TYPICAL SECTION
14,563.85 —
210+88.43 to 245+63.85 3,475.42 2.14 to 2.73
Tack coat
Zone
Clear
5' Min.
asphalt
Edge of existing
VariableExisting Slope
3.
prior to paving )
(Applies to both sides
Shoulder Widening Section
DETAIL B
Widening
Proposed
P a v e m e n t
P r o p o s e d E d g e o f method 2 aggregate, Placed roadway
5.5.
roadway aggregate pavement with placed
6" Pulverize existing
See Details A & B
AND WINDOWS LOOP ROAD
LENGTH OF WINDOWS ROAD
roadway aggregate material prior to placing
Windrow or move existing shoulder
A11 recycled asphalt base course
3" Continuous cold Placed in two lifts
3" asphalt pavement
Fog seal 7.6.
DETAIL A
Construct 30° - 35° pavement edge (safety edge) for structural section details
See Mainline Typical Section drainage and appearance.
pavement. Shape and compact as necessary for
(pay item 30802-2000) after placement of asphalt and Roadway Aggregate, Method 2
Shoulder up with existing shoulder material
19-31'
SCHEDULE C
WINDOWS ROAD
TYPICAL SECTIONS
as directed by the CO.
Apply fog seal according to Section 409 and
Profile grade equals existing ground plus 3".
to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:4 foreslope unless otherwise directed by the CO.
Aggregate, Method 2 .
stability. This work is subsidiary to pay item 30802-2000, Roadway material. Shape material to ensure adequate drainage and material and shouldering up with existing shoulder
Shoulder Widening includes windrowing existing shoulder across the pulverized material.
edge of pavement at a depth of 6". Maintain a consistent slope a depth of 6 inches. Spread pulverized material to the proposed placed roadway aggregate with existing asphalt. Pulverize to
Place roadway aggregate along existing pavement. Pulverize
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
7.
6.
5.
4.
3.
2.
1.
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P
W in d o w .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
Variable
Existing Slope
Variable
Existing Slope
Traveled Way
Match existing
Tack coat (between lifts)
Match Exisiting
Clear Zone
Average pavement and base course
6" Pulverize existing
Existing Sidewalk to remain
Construction Limits
210+88.43 to 245+63.85
WINDOWS LOOP ROAD
TYPICAL SECTION
Match existing
TOTAL (mi)
(ft)
Roadway
* Road Inventory Program data shown for information only
Milepost Data (Cycle 4)*
Road Inventory Program
0.07
TOTAL (ft)
1400+00 to 1403+57.72 357.72
357.72
See Detail on sheet T13
15" colored concrete curb.
Tack coat
See mainline typical section for
Foreslope
(safety edge) pavement edge
30° - 35°
Construct drainage and appearance.
pavement. Shape and compact as necessary for
(pay item 30802-2000) after placement of asphalt section. Shoulder up with Roadway Aggregate, Method 2
Incorporate pulverized material into the mainline base
Remove all pulverized asphalt material from this section.
1'
Vari es5.
2' min.
Fog seal
4.
See Detail A
TURNAROUND ROAD
LENGTH OF WINDOWS LOOP
(Applies to both sides)
Pavement Edge Section
DETAIL A
A12
Limits of Pulverizing
Placed in two lifts
3" HACP pavement
Variable Existing Slope
Variable Existing Slope
Fog seal
Clear Zone
Average
Construction Limits
1' Shldr
1400+00 TO 1403+57.72
WINDOWS LOOP TURNAROUND ROAD
TYPICAL SECTION
Varies Varies
1:41:4
1:4
1' Shldr
Average Clear Zone16' Traveled Way
Tack coat (between lifts) flatter
1:3 or
8'8' method 2 aggregate, 6" Roadway
See Detail B
2.
2.
Tack Coat
1:4 concrete pavement
Superpave asphalt base
Aggregate sides of roadway)
(Detail applies to both right and left
Shoulder up with aggregate base
Construct 30° - 35° pavement edge (safety edge)
(Applies to both sides)
Pavement Edge Section
DETAIL B
2.
Placed in two lifts
3" HACP pavement to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:4 foreslope unless otherwise directed by the CO.
paid under Bid Item 30306-3000, Pulverizing, 6-inch Depth.
stability. All work associated with shoulder widening will be material. Shape material to ensure adequate drainage and material and shouldering up with existing shoulder
Shoulder Widening includes windrowing existing shoulder to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:4 foreslope unless otherwise directed by the CO.
Dimensions shown are approximate and may be varied by the CO.
4.
3.
2.
1.
SCHEDULE C
TURNAROUND ROAD
AND WINDOWS LOOP
WINDOWS LOOP ROAD
TYPICAL SECTIONS
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P
W in d o w .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
* Road Inventory Program data shown for information only
20' from 2.75" to 3.25".
Existing asphalt pavement depth varies
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
Tack coat (between lifts) pavement and base course
6" Pulverize existing
11'11'
Construction Limits
Milepost Data (Cycle 4)*
Road Inventory ProgramRoadway
(ft) Description
1,267.31
.24
Shldr
1'
Zone Clear Average
Shldr
1'
Zone Clear Average
Limits of Pulverization 3.
25' Average Bench Width
NOTE:
Placed in two lifts
3" HACP Pavement
800+00 to 812+67.31 0.00 to 0.24La Sal Mountain 1,267.31
TOTAL (ft)
A13
LENGTH OF LOOP ROADS
See mainline typical section for
Foreslope
(safety edge) pavement edge
30° - 35°
Construct drainage and appearance.
pavement. Shape and compact as necessary for
(pay item 30802-2000) after placement of asphalt section. Shoulder up with Roadway Aggregate, Method 2
Incorporate pulverized material into the mainline base
Remove all pulverized asphalt material from this section.
1' asphalt
Edge of existing
VariableExisting Slope
3.
prior to paving )
(Applies to both sides
Shoulder Widening Section
DETAIL B
with placed roadway aggregate
6" Pulverize existing pavement
Widening
Proposed
P a v e m e n t
P r o p o s e d E d g e o f method 2 aggregate, Placed roadway
Vari es5.
2' min.
See Detail A & B
Tack coat
(Applies to both sides)
Pavement Edge Section
DETAIL A
5. 5.
roadway aggregate material prior to placing
Windrow or move existing shoulder
LA SAL MOUNTAIN VIEW ROAD 800+00 to 812+67.31
TYPICAL SECTION
SCHEDULE C
LA SAL MOUNTAIN VIEW ROAD
TYPICAL SECTIONS
LA SAL MOUNTAIN VIEW ROAD 800+00 to 812+67.31
EXISTING TYPICAL SECTION
6.
Apply fog seal according to Section 409 and as directed by the CO
Profile grade equals existing ground plus 3" to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:4 foreslope unless otherwise directed by the CO.
Aggregate, Method 2 .
stability. This work is subsidiary to pay item 30802-2000, Roadway material. Shape material to ensure adequate drainage and material and shouldering up with existing shoulder
Shoulder Widening includes windrowing existing shoulder across the pulverized material.
edge of pavement at a depth of 6". Maintain a consistent slope a depth of 6 inches. Spread pulverized material to the proposed placed roadway aggregate with existing asphalt. Pulverize to
Place roadway aggregate along existing pavement. Pulverize
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
7.
6.
5.
4.
3.
2.
1.
Fog seal 7.
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P
L a S a l_
E d e n .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
See Detail A
See mainline typical section for
Foreslope
1:4 or fl atte r
(safety edge) pavement edge
30° - 35°
Construct for drainage and appearance.
concrete pavement. Shape and compact as necessary
(pay item 30202-2000) after placement of asphalt section. Shoulder up with Roadway Aggregate, Method 2
Incorporate pulverized material into the mainline base
Remove all pulverized asphalt material from this section.
Fog seal
Tack coat (between lifts) pavement and base course
6" Pulverize existing pavement placed in two lifts
3" HACP asphalt concrete
NOTE:
2' Minimum
(Applies to both sides)
Pavement Edge Section
DETAIL A
Clear Zone Average
Clear Zone Average
Construction Limits
20' varies.
Existing aggregate base depth varies.
Existing asphalt pavement depth
10'10'
700+00 to 708+73.99
GARDEN OF EDEN OVERLOOK ROAD
EXISTING TYPICAL SECTION
700+00 to 708+73.99
GARDEN OF EDEN OVERLOOK ROAD
TYPICAL SECTION
A14
SCHEDULE C
OVERLOOK ROAD
GARDEN OF EDEN
TYPICAL SECTION
Station to Station
TOTAL (mi)
(ft)
Roadway
* Road Inventory Program data shown for information only
—0.17
Milepost Data (Cycle 4)*
Road Inventory Program
TOTAL (ft)
873.99
873.99
700+00 to 708+73.99
LENGTH OF GARDEN OF EDEN OVERLOOK ROAD
6. Profile grade equals existing ground plus 3" to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2,
5. Construct a 1:4 foreslope unless otherwise directed by the CO.
Apply tack coat to the first lift prior to placing the second lift.
4. Place asphalt concrete pavement in two lifts.
Pulverize to a depth of 6".
3. Pulverize the existing paved width or as directed by the CO.
2. Dimensions shown are approximate and may be varied by the CO.
1. Existing superelevated and widened sections are not shown
6.
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P
G a r d e n o f_
E d e n .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
* Road Inventory Program data shown for information only
26'
Existing aggregate base depth of 8".
from 2.75" to 4.5".
Existing asphalt pavement depth varies
0.00 to 0.95
0.95
Milepost Data (Cycle 4)*
Road Inventory Program
Average Existing Width
TOTAL (ft)
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
Shldr
1'
Shldr
1'
Construction Limits
12'12'
LENGTH OF DELICATE ARCH ROAD
Zone 5' Min. Clear
5' Min. Clear Zone
Tack coat
A15
5. 5.
SCHEDULE C
DELICATE ARCH ROAD
TYPICAL SECTIONS
500+00 to 550+00
DELICATE ARCH ROAD TYPICAL SECTION
500+00 to 550+00
DELICATE ARCH ROAD
EXISTING TYPICAL SECTION
recycled asphalt base course
3" Continuous cold and between lifts)
(on recycled base
Tack coat
Placed in two lifts
3" HACP pavement asphalt
Edge of existing
VariableExisting Slope prior to paving )
(Applies to both sides
Shoulder Widening Section
DETAIL B
Widening
Proposed
P a v e m e n t
P r o p o s e d E d g e o f roadway aggregate material prior to placing
Windrow or move existing shoulder
DETAIL A
Construct 30° - 35° pavement edge (safety edge) for structural section details
See Mainline Typical Section recycled asphalt base course
3" Continuous cold method 2 aggregate, Placed roadway
3.
drainage and appearance.
pavement. Shape and compact as necessary for
(pay item 30802-2000) after placement of asphalt and Roadway Aggregate, Method 2
Shoulder up with existing shoulder material
See Detail A & B
Fog seal 7.6.
34' Average Bench Width
500+00 to 550+00 5,000
5,000
Apply fog seal according to Section 409 and as directed by the CO
Profile grade equals existing ground plus 3" to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:4 foreslope unless otherwise directed by the CO.
Aggregate, Method 2 .
stability. This work is subsidiary to pay item 30802-2000, Roadway material. Shape material to ensure adequate drainage and material and shouldering up with existing shoulder
Shoulder Widening includes windrowing existing shoulder across the pulverized material.
edge of pavement at a depth of 6". Maintain a consistent slope a depth of 6 inches. Spread pulverized material to the proposed placed roadway aggregate with existing asphalt. Pulverize to
Place roadway aggregate along existing pavement. Pulverize
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
7.
6.
5.
4.
3.
2.
1.
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P
D e li c a te .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
LENGTH OF MAINTENANCE ROAD
TOTAL (mi)
* Road Inventory Program data shown for information only
18'
Existing asphalt pavement depth varies
1833.07
0.35
Milepost Data (Cycle 4)*
Road Inventory Program
.49 to .72
TOTAL (ft)
A16
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
See Detail A pavement and base course
6" Pulverize existing
NO SCALE
Construction Limits
Tack coat (between lifts)
Tack coat Fog seal
9'9'
Placed in equal lifts
3" HACP pavement
Clear Zone 5' Min.
Clear Zone
5' Min.
NOTE:
See mainline typical section for
Foreslope
(safety edge) pavement edge
30° - 35°
Construct drainage and appearance.
pavement. Shape and compact as necessary for
(pay item 30802-2000) after placement of asphalt section. Shoulder up with Roadway Aggregate, Method 2
Incorporate pulverized material into the mainline base
Remove all pulverized asphalt material from this section.
4.
2' min. 1'
3" HACP
method 2
6" Roadway aggregate, Reconstruction Section
Unclassified Borrow
(Applies to both sides)
Pavement Edge Section
DETAIL A
4. 4.
OPTION X
SCHEDULE A
MAINTENANCE ROAD
TYPICAL SECTION
612+33 TO 618.33.07 OPTION X
600+00 to 612+33 SCHEDULE A
MAINTENANCE ROAD
EXISTING TYPICAL SECTION
612+33 TO 618.33.07 OPTION X
600+00 to 612+33 SCHEDULE A
MAINTENANCE ROAD
TYPICAL SECTION
Profile grade equals existing ground plus 3" to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:4 foreslope unless otherwise directed by the CO.
Pulverize paved width as directed by the CO. Pulverize to a depth of 6".
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
5.
4.
3.
2.
1.
5.
612+33 to 618+33.07 .72 to .84
600+00 to 612+33
633.07
1,233.00
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P
M a in t.
d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
Var iab le
Exi stin g S lop e Variable
Existing Slope
Traveled WayTraveled Way
Match existing Match existing pavement and base course
6" Pulverize existing
Construction Limits
Tack coat (between lifts)
Fog seal
Pulverizing Limits
NOTE:
1300+00 to 1305+56.26
RESIDENCE ROAD
TYPICAL SECTION
NO SCALE
Clear Zone Average
Clear Zone Average from 2.5" to 3.5".
Existing asphalt pavement depth varies
16.5'
Station to Station
TOTAL (mi)
(ft)
Roadway
* Road Inventory Program data shown for information only
Milepost Data (Cycle 4)*
Road Inventory Program
0.11
TOTAL (ft)
1300+00 to 1305+56.26 556.26
556.26 —
1300+00 to 1305+56.26
RESIDENCE ROAD
EXISTING TYPICAL SECTION
0.27
A17 on sheet A5
See Detail A
Placed in two lifts
3" HACP pavement
LENGTH OF RESIDENCE ROAD
Tack coat
Match Exisiting Match Exisiting
See mainline typical section for
Foreslope
(safety edge) pavement edge
30° - 35°
Construct drainage and appearance.
pavement. Shape and compact as necessary for
(pay item 30802-2000) after placement of asphalt section. Shoulder up with Roadway Aggregate, Method 2
Incorporate pulverized material into the mainline base
Remove all pulverized asphalt material from this section.
1'2' min.
(Applies to both sides)
Pavement Edge Section
DETAIL A
3. 3.
OPTION Y
RESIDENCE ROAD
TYPICAL SECTION
3.
Profile grade equals existing ground plus 3" to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:4 foreslope unless otherwise directed by the CO.
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
4.
3.
2.
1.
4.
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P
R E S .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
600+00 to 641+49.33
DEVIL'S GARDEN CAMPGROUND ROAD
EXISTING TYPICAL SECTION
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
See Detail A
See mainline typical section for
Foreslope
1:4 or fl atte r
(safety edge) pavement edge
30° - 35°
Construct for drainage and appearance.
concrete pavement. Shape and compact as necessary
(pay item 30202-2000) after placement of asphalt section. Shoulder up with Roadway Aggregate, Method 2
Incorporate pulverized material into the mainline base
Remove all pulverized asphalt material from this section.
Fog seal
Tack coat (between lifts) pavement and base course
6" Pulverize existing pavement placed in two lifts
3" HACP asphalt concrete
600+00 to 641+49.33
DEVIL'S GARDEN CAMPGROUND ROAD
TYPICAL SECTION
NOTE:
2' Minimum
(Applies to both sides)
Pavement Edge Section
DETAIL A
Clear Zone Average
Clear Zone Average
Construction Limits
18' varies.
Existing aggregate base depth varies.
Existing asphalt pavement depth
9'9'
A18
OPTION Z
CAMPGROUND ROAD
DEVIL'S GARDEN
TYPICAL SECTIONS
Station to Station
TOTAL (mi)
(ft)
Roadway
* Road Inventory Program data shown for information only
—0.79
Milepost Data (Cycle 4)*
Road Inventory Program
TOTAL (ft)
600+00 to 641+49.33 4,149.33
4,149.33
LENGTH OF DEVIL'S GARDEN CAMPGROUND ROAD
6. Profile grade equals existing ground plus 3" to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2,
5. Construct a 1:4 foreslope unless otherwise directed by the CO.
Apply tack coat to the first lift prior to placing the second lift.
4. Place asphalt concrete pavement in two lifts.
Pulverize to a depth of 6".
3. Pulverize the existing paved width or as directed by the CO.
2. Dimensions shown are approximate and may be varied by the CO.
1. Existing superelevated and widened sections are not shown
6.
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P
C a m p g r o u n d .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
STATION
CLASS
TYPE1.
(ft)
LENGTH
PAVED
(ft)
LENGTH
TOTAL
x = 15' Minimum for type 2 approach x = 0' for type 1 approach
(ft)
R
(ft)
R
(ft)
W 1 2
Standard Drawing 602-9).
roadway, use safety end sections (see placed within the clear zone of the mainline mainline recovery area. When a culvert must be radius to provide a flatter foreslope and increased
Place culverts at the end of the approach road
Variable
W
Variable
3' minimum
16'x
20' desired
15' min.
APPROACH ROADS
TYPICAL SECTIONS
widths greater than 15 feet.
Apply the normal crown to approach roads with
CLASSTYPE
APPLICATION
SAMPLE
Paved apron
ADT ≥ 200
100 ≤ ADT < 199
25 ≤ ADT < 100
ADT < 25
Minimum 2-Way Use
Logging Truck Use
Farm Equipment
Minimum 1-Way Use
Field Access
A
E
D
C
B
A
D
C
B
A
* Match existing
(ft)
W
WIDTH
MIN.
(ft)
R
RADIUS
MIN.
N/A
A19
922+62 Lt. 2A 43 43 18 33 53 MAIN ENTRANCE ROAD
A
B
A
B
M a in li e
Mainline
±2%
TYPICAL PROFILE
Shoulder edge
A
V a ria b le
(1:6 desi rable )1:4 o r flat ter
TYPICAL SYMBOL
grade (optional)
Typical maximum design
SECTION A-A
b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k e d
NOTE:Paved length
(1:6 desirable)
1:4 or flatter base edge
Aggregate pavement edge
Hot asphalt concrete thicknesses and foreslopes.
Refer to mainline typical sections for structural section
Approach Road
TYPICAL PLAN
TYPES 1 & 2
APPROACH ROAD
REMARKS
APPROACH ROAD SUMMARY
Flatten slope road connection on plan and profile sheet
Example of symbol showing standard approach shown may be varied ±20°.
Under special conditions, the approach road angle 8.
4.
3.
8.
2.
1.
6.
2.
6.
2.
6.
7.
Subgrade edge
Subgrade edge
Aggregate base edge
End Section A-A
Type
Class
Mainline stationing
Typical maximum grade ±10%VPI
VPC
90°
Typical culvert location edge subgrade
Normal
R
Total length
R1
WW
with mainline roadway construction.
Construct cut and fill slopes for approach roads to match locations to be field verified.
Stations shown are approximate locations. Actual
8.
7.
6.
5.
4.
3.
2.
1.
maximum.
0% to -2% grade. Under special conditions, use 6% grades within ±2%. In snowy regions restrict this to a
Construct approach roads with landing areas having approach road centerline.
existing radii or widths. R is on the left side of the
Vary radii to fit unusual field conditions. Do not reduce
5. 5.
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\ ty p a p .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
Existing Slope
Traveled WayTraveled Way
Match existing Match existing
Shldr
1'
Tack coat (between lifts)
11' 11'
Shldr
1'
1:4 or flatter
Existing Slope
Variable
Varies
14' Paved Pullout
11' Traveled Way
11' Traveled Way
Match roadway
NO SCALE
6" Roadway aggregate, method 2
Face of Curb
Radius 35'
Face of Curb
Radius 35'
TYPICAL SECTION
PROPOSED PULLOUT
A20
TYPICAL SECTION
PLAN
42'Varies42'
1' Shoulder
1' Shoulder
Pullout Area
14' pavement thickness)
(See Roadway Typical Section for
HACP pavement placed in two lifts for details)
(See Sheet T13
Taper curb
Fog seal and compact shoulder material.
concrete curb. Level, scarify, water, material after placement of
Shoulder up with existing
NOTE:
Back of curb
Tack coat
Face of Curb
Radius 35'
Face of Curb
Radius 35' pulverization to the face of curb.
For existing pullouts continue
For new pullouts only.
2.
1.
(See Special 609-A)
15" Colored Concrete Curb
609-A for details)
(See Special
Taper curb
(See Special 609-A)
15" Colored Concrete Curb pulverization or cold-in-place recycle
See Roadway Typical section for
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N U
T a r c h R o a d w a y s h e e ts A G e n s h t\
T Y P P u ll
O ff .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r e r in .j e s s e e
UTIMR A20
MAIN ENTRANCE ROAD
UT FTNP ARCH 10(2)
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| Amendment AA01 NV FTNP LAKE 114(1) Plan Sheets.pdf |
| A01_TTL w-DDR-006.pdf |
| A05_TYP_01-001.pdf |
| A06_TYP_02-002.pdf |
| A07_TYP_03-003.pdf |
| A08_TYP_04-004.pdf |
| A09_TYP_05-005.pdf |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 20 |
| Text3: |
| 0: A002 |
| 1: 1/3/2017 |
| 2: |
| 0: |
| 1: UT FTNP ARCH 10(2) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: RYAN PHILLIPS
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH6816B00035 |
| 1: 12/14/2016 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 14 Below |
| Text13: PLANS |
Insert attached A2 – A20 plan sheets into previously provided Plans.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .