Section J2 CDRLs 20161222.pdf
PDF 270 KB Posted
- Solicitation number
- DTFAWA-17-R-00010
About this file
This draft solicitation for the National Airspace System Voice Recorder Program seeks industry feedback. The anticipated 10-year contract includes one 2-year base period and two 2-year and four 1-year option periods. Interested parties should provide any comments on the draft sections to the specified contracting officer by January 20, 2017 in Microsoft Word format. The draft sections cover supplies/services, descriptions/specifications, packaging/marking, inspection/acceptance, deliveries/performance, contract administration, special requirements, clauses, attachments including program requirements, contract line items, data item descriptions, notional order pricing, and past performance questionnaires. Evaluation factors are also included.
Section J2 CDRLs 20161222 (pdf)
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTFAWA-17-R-00010
Page J-2-2
PART III - SECTION J
LIST OF ATTACHMENTS
CONTRACT DATA REQUIREMENTS LISTING
CDRL FORM DESCRIPTION:
Block 1 - LINE NUMBER
This block provides a line number, which uniquely identifies this particular data item.
Block 2 - TITLE (DESCRIPTION OF DATA)
This block gives the title of the data item as it appears on the Data Item Description (DID).
Block 3 - SUBTITLE
This block provides additional title information for the data item if the title differs from the title of the DID or requires further identification.
Block 4 - DID REFERENCE
This block gives the identification number, including revision letter, of the Data Item Description (DID) which specifies the requirements for the data item.
Block 5 - CONTRACT REFERENCE
This block provides a reference to the specific location in the procurement instrument that generates the requirement for the data item. It provides the paragraph number of the contractually cited Statement of Work (SOW), Engineering Production Specification, or other contractually applicable document.
Block 6 - TECHNICAL OFFICE
This block identifies the office responsible for advising on the technical adequacy of the data item.
Abbreviations used are as follows:
FAA - Federal Aviation Administration
Block 7 - INSPECTION/ACCEPTANCE CODE
This block designates the location for performance of Government inspection and acceptance of the data item. The location is indicated by a two-character code as follows:
Code Meaning
CC Inspection and Acceptance requirements are specified elsewhere in the contract
Page J-2-3
DD Both Inspection and Acceptance at Destination DS Inspection at Destination, Acceptance at Source LT Only a Letter of Transmittal required NO No Inspection or Acceptance required SD Inspection at Source, Acceptance at Destination SS Both Inspection and Acceptance at Source Blank No Inspection or Acceptance required
Note: Source is defined as at the Contractor's facility
Block 8 - APPROVAL CODE
This block indicates requirement for Government approval of the data item. Requirements are indicated by a one or two character code as follows:
Code Meaning
A Formal, written approval is required prior to final acceptance of the data item by the
Government. If it is determined that certain of the contractual requirements for this data item are not satisfied, the Government will notify the Contractor of each deficient area and will withhold final acceptance pending corrections of all deficiencies by the Contractor. Any revisions to approved documents shall also require formal written approval. In the event of conflict between the approved document(s) and the contract, including the SOW and all referenced specifications, the contract shall take precedence.
B Written specification from the Government that the data item satisfies the requirements of the contract in terms of format, completeness and level of detail is required prior to final acceptance of the data item. Such certification is not intended to imply Government sanction or approval of the Contractor's design. If it is determined that the contractual requirements for this data item are not satisfied, the Government will notify the Contractor of each deficient area and will withhold final acceptance pending correction of all deficiencies by the Contractor. This code may also be used in instances where a data item does not normally require written acceptance from the Government, depending on the particular DID application. In such instances, clarification is provided in Block 16.
D A distribution list is required.
N A distribution statement is not required.
AD Both approval and a distribution statement are required, per A and D above.
AN Approval is required per Code A above; however, a distribution statement is not required.
Blank Neither approval nor a distribution statement is required.
Page J-2-4
Block 9 - INPUT TO INTEGRATING ASSOCIATE CONTRACTOR (IAC)
An "X" in this block indicates that either the data item is dependent on the integrated result of specific inputs from other participating Contractors or the data item are an input to an Integrating Associate Contractor (IAC).
Block 10 - FREQUENCY
This block specifies the frequency of submittal for the data item. Data of a recurring type shall be submitted at the end of the reporting period established in this field unless otherwise indicated in Block 12, 13, or 16. Codes are as follows:
Code Meaning
Annly Annually AsReq As required (See Block 16) BI-Mo Every two months BI-We Every two weeks CQ/RQ Change pages as required Daily Daily EOM End of month Mthly Monthly n/R N separate submittals and revisions (revision requirements are specified in Block 13 or
16) nTime N separate submittals, where n is a number or 3 or more One One time One/P One time preliminary draft One/R One time and revisions (revisions requirements are specified in Block 13 and 16) Qrtly Quarterly SemiA Every 6 months Weekly Weekly 2Time Two separate submittals
Block 11 - AS OF DATE
For data of a recurring type, this block may be used to indicate the starting date for the required reporting interval.
Block 12 - DATE FOR FIRST SUBMITTAL
This block contains the date that the initial data submission is to be delivered to the Government. This date may be an actual calendar date or keyed to an event. Codes are as follows:
Page J-2-5
CODE MEANING
ARO After Receipt of Order DA Days After DACA Days After Contract Award DACR Days After Completion of Repair DAR Days After Receipt DARC Days After Receipt of Comments DARO Days After Receipt of Order DARP Days After Reporting Period DASA Days After Site Acceptance DASS Days After Site Survey DATC Days After Test Completion DPT Days Prior To DPTFCC Days Prior To First Course Conduct DPTED Days Prior To Equipment Delivery DPTIOC Day Prior Initial Operational Capability (First Operational Site) DPTPC Days Prior To Provisioning Conference DPTT Days Prior To Test/Testing F Final Document LDOT Last Day of Training MACA Months After Contract Award MARO Months After Receipt of Order NLT Not Later Than P Preliminary Document SR System Review UP Updated Preliminary
Numbers used with review abbreviations indicate that the document is due X months after the specified formal review. For example, SSR+30 means that the document is due 30 days after the System Requirements Review.
Block 13 - DATE OF SUBSEQUENT SUBMISSION
For data that is submitted more than once, this block contains the requirements for all submissions after the initial submittal. Codes used are the same as those used for Block 12.
Block 14 - DISTRIBUTION AND ADDRESSES
This block specifies the addresses and the number of copies each addressee is to receive. The number of printed copies required is to the left of the slash. All copies will be of camera ready/reproducible quality, i.e.; reproduced copies are legible and easily readable. The number of copies required on magnetic media is indicated to the right of the slash. Unless otherwise indicated on the CDRL, the magnetic media shall be 3.5-inch floppy disk or compact disk read only memory (CD-ROM), Page J-2-6 compatible with Microsoft Windows/Office Suite of products and as approved by the Government.
The designation "LTO" indicates that only a copy of the Letter of Transmittal is required for that addressee.
Block 15 - TOTAL COPIES
This block specifies the total number of copies required. It should be the sum of the number of copies sent to each addressee.
Block 16 - REMARKS This block contains pertinent data item information not specified elsewhere on the form. It also contains amplification and clarification data for other blocks.
CDRL NAME
ADM001 MEETING AGENDA
ADM002 MEETING MINUTES
CMP001 CONFIGURATION MANAGEMENT PLAN (CMP)
CMP002 CONFIGURATION AUDIT SUMMARY REPORT
DOC001 COMMERCIAL OFF THE SHELF (COTS) NON-
DEVELOPMENTAL (NDI) MANUALS
DOC002 MAINTENANCE MANUAL
EOSH001 EOSH PROGRAM PLAN
IMP001 SITE INSTALLATION MANAGEMENT PLAN (SIMP)
IMP002 SITE ACCEPTANCE REPORT (SAR)
IMP003 SYSTEM PACKING LIST/BILL OF MATERIALS (BOM)
LOG001 INTEGRATED SUPPORT PLAN (ISP)
LOG002 LOGISTICS MANAGEMENT INFORMATION (LMI)
SUMMARIES
LOG003 TOP-DOWN BREAKDOWN STRUCTURE
LOG004 RECOMMENDED SPARE PARTS LIST (RSPL)
LOG005 SYSTEM ASSET IDENTIFICATION REPORT
LOG006 FAILURE SUMMARY AND ANALYSIS REPORT (FSAR)
LOG007 TASK ORDER REPORT
LOG008 DIMINISHING MANUFACTURING SOURCES/MATERIAL
SHORTAGES (DMS/MS)
PGM001 PROGRAM MANAGEMENT PLAN
PGM002 MONTHLY STATUS REPORT (MSR)
PGM003 CONTRACT WORK BREAKDOWN SCHEDULE (CWBS)
PGM004 INTEGRATED MASTER SCHEDULE (IMS)
QSP001 QUALITY SYSTEM PLAN (QSP)
SAF001 SYSTEM SAFETY PROGRAM PLAN (SSPP)
SAF002 SUBSYSTEM HAZARD ANALYSIS (SSHA)
SAF003 SYSTEM HAZARD ANALYSIS (SHA)
Page J-2-7
CDRL NAME
SAF004 OPERATING AND SUPPORT HAZARD ANALYSIS (SSAR)
SAF005 SYSTEM SAFETY ASSESSMENT REPORT SSAR)
SE001 SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP)
SE002 SOFTWARE DEVELOPMENT PLAN (SDP)
SE003 SYSTEM REQUIREMENTS ALLOCATION DOCUMENT (SRAD)
SE004 INTERFACE CONTROL DOCUMENT (ICD)
SE005 ENGINEERING CHANGE PROPOSAL (ECP)
SEC001 SYSTEM CHARACTERIZATION DOCUMENT (SCD)
SEC002 SYSTEM SECURITY PLAN (SSP)
SEC003 NAS SYSTEM CONTINGENCY PLAN (NSCP)
TES001 CONTRACTOR MASTER TEST PLAN (CMTP)
TES002 FORMAL ACCEPTANCE TEST (FAT) PROCEDURES
TES003 PRODUCTION ACCEPTANCE TEST (PAT) PROCEDURES
TES004 SITE ACCEPTANCE TEST (SAT) PROCEDURES
TES005 NOTICE OF INTENT TO CONDUCT TEST
TES006 TEST REPORTS
TRNG001 Not Used
TRNG002 TASK AND SKILLS ANALYSIS (TASA) REPORT
TRNG003 COMMERCIAL OFF THE SHELF (COTS) TRAINING
MATERIALS REPORT
TRNG004 TRAINING DEVELOPMENT PLAN (TDP)
TRNG005 COURSE DESIGN GUIDE (CDG)
TRNG006 STUDENT TESTS
TRNG007 CLASSROOM TRAINING
TRNG008 DISTANCE LEARNING
TRNG009 CONTRACTOR’S PRESENTATION
TRNG010 OPERATIONAL TRYOUT
TRNG011 FIRST COURSE CONDUCT
TRNG012 END OF COURSE (EOC) EVALUATION
TRNG013 CLASS ROSTER
TRNG014 CERTIFICATE OF TRAINING
CDRL DOCUMENTS FOLLOW…
DTFAWA-07-C-00029
Page J-2-8
1.
ADM001
2. MEETING AGENDA
3.
6.
FAA
10.
AsReq
12.
BLK 16
14.
AJM
10/1
4.
ADM001
5. SOW
C.3.0 through C.3.15
7.
DD
8.
AN
9. 11. 13.
BLK 16
AAQ LTO
16. REMARKS:
8. The Agenda shall be subject to Government revision/approval.
12 & 13. Except for technical interchange meetings (TIMs), the Contractor shall deliver the agenda 10 calendar days prior to the beginning of conferences, meetings, formal reviews, and audits. For a TIM the agenda will be included in the written or telephonic notification for the TIM.
15.TOTAL 10/1
ADM002
2. MEETING MINUTES
6.
FAA
10.
AsReq
12.
BLK 16
10/1
ADM002
6. SOW
C.3.0 through C.3.15
DD
8.
AN
9. 11. 13.
BLK 16
AAQ
LTO
16. REMARKS:
12 & 13. The Contractor shall deliver the minutes 7 calendar days after the conclusion of all conferences, meetings, formal reviews, audits, and TIMs.
The total number of copies of the minutes will be dependent upon the number of participants.
15.TOTAL BLK 16
Page J-2-9
PART III - SECTION J
LIST OF ATTACHMENTS
CMP001
2. CONFIGURATION MANAGEMENT PLAN (CMP)
6.
FAA
10.
One/R
12.
BLK 16
0/1
CMP001
5.
SOW C.3.9, C.3.9.1, C.3.13.2
7.
DD
8.
A
9. 11. 13.
BLK 16 AAQ LTO
16. REMARKS:
12. Preliminary: 30 calendar days after contract award (DACA)
13. Final: 30 calendar days after Government approval of the preliminary CMP.
Revisions: As required to reflect major project revisions.
15.TOTAL 0/1
CMP002
2. CONFIGURATION AUDIT SUMMARY REPORT
12.
BLK 16
5/1
CMP002
5.
SOW C.3.2.5, C.3.2.6, C.3.9,
C.3.13.2
7.
DD
8.
A
9. 11. 13.
BLK 16 AAQ
12. Preliminary: 30 calendar days after completion of the FCA.
13. Final: 30 calendar days after receipt of Government comments.
Revisions: As required to reflect major project revisions.
AJW-1731
AML-8000
AAQ-QRO
ANG-E64
(TEST)
1/0
3/0
15. TOTAL 11/1
Page J-2-10
PART III - SECTION J
LIST OF ATTACHMENTS
DOC001
2. COMMERCIAL OFF THE SHELF (COTS)/NON-
DEVELOPMENTAL ITEM (NDI) MANUALS
FAA
10.
One/R
12.
BLK 16
5/1
DOC001
5.
SOW C.3.15.8
7.
LT
8.
A
13. The Contractor shall deliver a COTS/NDI manuals list 30 calendar DARO.
The Contractor shall deliver an updated list with the Preliminary and Final PCA reports, CDRL CMP003 above.
AAQ-QRO
AJW-1731
AML-8000
ANG-E64
(TEST)
1/0
1/1
15.TOTAL 11/2
DOC002
2. MAINTENANCE MANUAL
6.
FAA
10.
One/R
12.
BLK 16
5/0
DOC002
5.
SOW C.3.15.8
7.
LT
8.
A
9. 11.
13.
12. Preliminary draft 120 calendar DARO; Final: 30 calendar days after receipt of Government comments.
Preliminary and Final deliveries to AJW-1731 shall be in paper and electronic copy (CD-ROM) in a software format approved by the Government.
13. Revisions/change pages as required.
14. After Government review and acceptance, approved manuals will be distributed to addressees in Block 14, plus two copies will be distributed to each FAA Service Area and two copies will be delivered with the equipment to each facility.
AML-8000
ANG-E64
(TEST)
AMA-410
1/0
2/1
1/0
1/0
2/0
15. The Total number of TIB (Volume I) required shall be dependent upon the number of sites ordered by the Government. 15.TOTAL BLK 16
Page J-2-11
1. EOSH001
2. EOSH PROGRAM PLAN
6.
FAA
10.
ASREQ
12.
BLK 16
EOSH001
5.
SOW C.3.5
8.
AsReq AAQ
AJI-233
IMP001
2. SITE INSTALLATION MANAGEMENT PLAN (SIMP)
6.
FAA
10.
One/R
12.
BLK 16
4/1
IMP001
5.
SOW C.3.7, C.3.7.1, C.3.13.2
7.
DD
8.
BLK 16 AAQ LTO
16. REMARKS:
12. Preliminary draft 30 calendar DACA; Final 30 calendar days after receipt of Government comment(s).
Preliminary Update and Final deliveries to AJM shall be in paper and electronic copy (CD-ROM) in a software format approved by the Government.
13. Revisions/change pages as required.
14. Regions: 1 copy to the site TOR and 2 copies to the Service Area in which the site is located
15. TOTAL: DEPENDENT UPON THE NUMBER OF SITES ORDERED BY THE GOVERNMENT
AOP-1000
ANG-E64
(TEST)
Service Areas
1/0
1/0
Page J-2-12
IMP002
2. SITE ACCEPTANCE REPORT (SAR)
3. See Block 16
6.
FAA
10.
O ne/R
12.
B
LK 16
IMP002
5.
SOW C.3.7.3.3
7.
DD
8.
BLK
3. The site acceptance report is unique to each location.
12. Final 30 calendar days after Government acceptance of each system. Preliminary and Final deliveries to AJM shall be in paper and electronic copy (CD-ROM), in software format approved by the Government.
13. Revisions/change pages as required.
14. Regions: 1 copy to the site TOR and 2 copies to the Service Area in which the site is located.
15. TOTAL: Dependent upon the number of sites ordered by the Government
AAQ-QRO
AOP-1000
Service Area
1/0
2/0
BLK 16
IMP003
2. SYSTEM PACKING LIST/BILL OF MATERIALS (BOM)
6.
FAA
10.
As Req
12.
BLK 16
IMP003
5.
SOW C.3.7.2.2
7.
DD
8.
A
BLK 16 AAQ LTO
12/13. The Contractor shall deliver to the Government a copy of each site’s packing list/BOM concurrently with the shipment of the equipment to a site.
14. The packing list/BOM shall be delivered in Government approved Contractor format and shall be delivered in hardcopy and in Government approved electronic format (i.e., MS-Excel, MS-Access) on a CD-ROM.
AML-8000 1/1
15.TOTAL 3/1
Page J-2-13
LOG001
2. INTEGRATED SUPPORT PLAN
12.
BLK 16
LOG001
5.
SOW C.3.15.3, C.3.15.5.1
7.
LT
8.
A
12. 15 business days prior to Logistics Guidance Conference.
13. 10 business days following receipt of Government Comments.
14. Electronic copy in Portable Document Format (.pdf) is acceptable in lieu of hard copies.
15. TOTAL 3/0
Page J-2-14
LOG002
2. LOGISTICS MANAGEMENT INFORMATION (LMI)
SUMMARIES
3.
6.
FAA
10.
AsReq
12.
BLK 16
LOG002
5.
SOW C.3.15.5.1, C.3.15.5.4
7.
LT
8.
A
4. The Contractor shall furnish the following information with each incremental delivery:
1. The System End Item Acronym Code (EIAC).
2. The Contractor's corporate name.
3. Increment letter or other designation of data deliverable.
4. The approximate number of records contained on file (CDROM, etc.)
5. Person to contact (including telephone number) for problem resolution.
10. Revisions as changes occur.
12. 30 business days after completing the Provisioning Guidance Conference.
13. 10 business days following receipt of Government comments.
AML-8000
Page J-2-15
LOG003
2. TOP-DOWN BREAKDOWN STRUCTURE
6.
FAA
10.
ONE/R
12.
BLK 16
LOG003
5.
SOW C.3.15.5.2
7.
LT
8.
A
9. 11. 13.
BLOCK
AAQ LTO
10. Revisions as changes occur.
12. 10 business days prior to Provisioning Guidance Conference.
AJW-173
15.TOTAL 0/3
Page J-2-16
LOG004
2. RECOMMENDED SITE SPARE PARTS LIST (RSPL)
6.
FAA
10.
ONE/R
12.
BLK 16
LOG004
5.
SOW C.3.6.1.1, C.3.15.5.4,
C.3.15.6
7.
LT
8.
A
9. 11. 13.
BLOCK
AAQ LTO
12. 10 business days prior to the Provisioning Guidance Conference.
AJW-173
14. Electronic copy in MS Excel is acceptable in lieu of hard copies.
15.TOTAL 0/2
LOG005
2. SYSTEM ASSET IDENTIFICATION REPORT
6.
FAA
10.
One/R
12.
BLK 16
LOG005
5.
SOW C.3.15.7
7.
LT
8.
A
BLK16 AAQ
12. Submit 30 calendar days prior to shipment of the NAS system to site. Submit to FAA/800 Independence Ave. SW, Washington, DC Attn: AFZ-500.
13. Subsequence submissions shall be as required inclusive of Government comments
14. Softcopy shall be in MS Word or MS Excel format, or ASCII text as appropriate.
AAQ-QRO
AFZ-500
1/1
15.TOTAL 5/2
Page J-2-17
PART III - SECTION J
LIST OF ATTACHMENTS
LOG006
2. FAILURE SUMMARY & ANALYSIS REPORT (FSAR)
6.
FAA
10.
QTRLY
12.
BLK 16
LOG006
5.
SOW C.3.15.11, C.3.15.12
7.
LT
8.
A
10. Submissions shall follow government fiscal quarters.
12. 10 business days following the end of first fiscal quarter following delivery of the first system to a Government field site.
13. 10 business days following the end of each fiscal quarter.
LOG007
2. TASK ORDER REPORT (TOR))
6.
FAA
10.
One/R
12.
BLK 16
LOG007
5.
SOW C.3.8
7.
LT
8.
A
12. 10 business days following the end of last revised task order period of performance
13. 10 business days following receipt of Government Comments
Page J-2-18
PART III - SECTION J
LIST OF ATTACHMENTS
LOG008
2. DIMINISHING MANUFACTURING SOURCES/MATERIAL
SHORTAGES (DMS/MS)
3.
6.
FAA
10.
QTRLY
12.
BLK 16
LOG008
5.
SOW C.3.15.13
7.
LT
8.
A
12. 15 business days following the end of first fiscal quarter after contract award
13. 15 business days following the end of each Government fiscal quarter.
PGM001
2. PROGRAM MANAGEMENT PLAN (PMP)
6.
FAA
10.
One/R
12.
BLK 16
PGM001
5.
SOW C.3.0 through C.3.1.1
7.
DD
8.
A
12. Preliminary draft plan: 30 calendar DACA. Final plan 30 calendar DARC from Government.
Preliminary draft and Final PMP shall be delivered to the Government in paper and electronic copy (CD-ROM)
13. Updates as required by the Government to reflect project revisions.
AAQ-
QRO
AML-
Page J-2-19
PART III - SECTION J
LIST OF ATTACHMENTS
PGM002
2. MONTHLY STATUS REPORT (MSR)
6.
FAA
10.
Mthly
12.
BLK 16
14.
AJM
0/1
4.
PGM002
5.
SOW C.3.1. through C.3.1.2
7.
LT
8.
A
12. First submittal no sooner than 30 calendar days after contract award.
13. Subsequent reports due the second Monday of each month.
1. PGM003
2. CONTRACT WORK BREAKDOWN STRUCTURE (CWBS)
6.
FAA
10.
ASREQ
12.
BLK 16
3. PGM003
SOW C.3.1.3
Page J-2-20
1. PGM004
2. INTEGRATED MASTER SCHEDULE
6.
FAA
10.
ASREQ
12.
BLK 16
4. PGM004
SOW C.3.1.4
QSP001
2. QUALITY SYSTEM PLAN (QSP)
6.
FAA
10.
One/R
12.
BLK 16
QSP001
5.
SOW C.3.10
7.
DD
8.
A
12. Preliminary draft plan: 30 working DACA.
Final plan: 30 working DARC from the Government.
13. Revisions as required for system changes.
QRO
Page J-2-21
1. SAF001
2. SYSTEM SAFETY PROGRAM PLAN
6.
FAA
10.
ASREQ
12.
BLK 16
5. SAF001
SOW C.3.12.1
1. SAF002
2. SUB-SYSTEM HAZARD ANALYSIS (SSHA)
6.
FAA
10.
ASREQ
12.
BLK 16
4. SAF002
SOW C.3.12.2
Page J-2-22
1. SAF003
2. SYSTEM HAZARD ANALYSIS (SHA)
6.
FAA
10.
ASREQ
12.
BLK 16
4. SAF003
1. SAF004
2. OPERATING AND SUPPORT HAZARD ANALYSIS
(O&SHA)
FAA
10.
ASREQ
12.
BLK 16
4.SAF004
Page J-2-23
1. SAF005
2. SYSTEM SAFETY ASSESSMENT REPORT (SSAR)
6.
FAA
10.
ASREQ
12.
BLK 16
4. SAF005
SOW C.3.12.3
1. SE001
2. SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP)
6.
FAA
10.
ONCE/R
12.
BLK 16
SE001
5.
SOW C.3.4
Initial 60 DACA Final 15 DARC
Page J-2-24
1. SE002
2. SOFTWARE DEVELOPMENT PLAN (SDP)
6.
FAA
10.
ONCE/R
12.
BLK 16
SEC002
5.
SOW C.3.4
Initial 60 DACA Final 15 DARC
SE003
2. SYSTEMS REQUIREMENTS ALLOCATION
DOCUMENT(SRAD)
FAA
10.
AsReq
12.
BLK 16
SE003
5.
SOW C.3.4.1
7.
DD
8.
A
12. Preliminary schedule: 30 calendar DACA.
10/13. The Contractor shall deliver an updated SRAD 30 DACA.
AJW-1731
ANG-E64
(TEST)
AML-
15.TOTAL 0/5
Page J-2-25
1. SE004
2. INTERFACE CONTROL DOCUMENT
6.
FAA
10.
ASREQ
12.
BLK 16
4.SE004
SOW C.3.4.2
1. SE005
2. ENGINEERING CHANGE PROPOSAL (ECP)
6.
FAA
10.
ASREQ
12.
BLK 16
SE005
5.
SOW C.3.4.3
Page J-2-26
SEC001
2. SYSTEM CHARACTERIZATION DOCUMENT (SCD)
6.
FAA
10.
R/ASR
12.
BLK 16
SEC001
5.
SOW C.3.11.1
7.
DD
8.
A
12. Draft Required 30 days prior to FAT; Final Required 60 days after PCA
13. Annually following initial certification; 30 DARO for annual updates; 90 DARO for triennial updates.
Full SCAP required every three years and annual security assessment required in intervening years.
15.TOTAL 4/1
SEC002
2. SYSTEM SECURITY PLAN (SSP)
6.
FAA
10.
R/ASR
12.
BLK 16
SEC002
5.
SOW C.3.11.1
7.
DD
8.
A
12. Draft Required 30 days prior to FAT; Final Required 60 days after PCA
13. Annually following initial certification; 30 DARO for annual updates; 90 DARO for triennial updates.
Page J-2-27
SEC003
2. NAS SYSTEM CONTINGENCY PLAN (NSCP)
6.
FAA
10.
One/R
12.
BLK 16
SEC003
5.
SOW C.3.11.1
7.
DD
8.
A
12. Draft Required 30 days prior to FAT; Final Required 60 days after PCA
13. Annually following initial certification; 30 DARO for annual updates; 90 DARO for triennial updates.
Page J-2-28
TES001
2. CONTRACTOR MASTER TEST PLAN (CMTP)
6.
FAA
10.
One/R
12.
BLK 16
TES001 (See also Block
16)
5.
SOW C.3.13.1, C.3.13.2, C.3.13.3
7.
DD
8.
A
4. See also FAA-STD-024B
12. Preliminary draft plan: 15 calendar DACA.
Final plan: 15 calendar DARC from the Government.
13. Updates as required by the Government to reflect system changes.
AAQ-
QRO
2/1
15.TOTAL 3/3
Page J-2-29
TES002
2. FORMAL ACCEPTANCE TEST (FAT) PROCEDURES
6.
FAA
10.
One/R
12.
BLK 16
TES002 (See also Block 16)
5.
SOW C.3.2.3, C.3.13.2
7.
DD
8.
A
12. Preliminary draft plan and procedures: 15 calendar DACA.
Final plan and procedures: 15 calendar DARC from the Government.
13. Updates as required by the Government to reflect system changes.
AAQ-
QRO
15.TOTAL 4/2
Page J-2-30
TES003
2. PRODUCTION ACCEPTANCE TEST (PAT) PROCEDURES
6.
FAA
10.
One/R
12.
BLK 16
TES003 (See also Block
16)
5.
SOW C.3.13.2
7.
DD
8.
A
12. Preliminary draft plan and procedures: 30 calendar DACA.
Final plan and procedures: 15 calendar DARC from the Government.
13. Updates as required by the Government to reflect system changes.
AAQ-
QRO
ANG-E64
Page J-2-31
TES004
2. SITE ACCEPTANCE TEST (SAT) PROCEDURES
6.
FAA
10.
One/R
12.
BLK 16
TES004 (See also Block
16)
5.
SOW C.3.7.3.1, C.3.13.2
7.
DD
8.
A
12. Preliminary draft plan and procedures: 30 calendar DACA.
Final plan and procedures: 15 calendar DARC from the Government.
13. Updates as required by the Government to reflect system changes.
AAQ-
QRO
ANG-E64
Page J-2-32
TES005
2. NOTICE OF INTENT TO CONDUCT TEST
6.
FAA
10.
AsReq
12.
BLK 16
TES005
5.
SOW C.3.13.3
7.
LT
8.
A
10/12. For FQT tests: 7 calendar days prior to start of test.
For other test, i.e., PAT, SAT, dry runs: 5 calendar days prior to start of test.
ANG-E64
15.TOTAL 3/4
Page J-2-33
TES006
2. TEST REPORTS
6.
FAA
10.
AsReq
12.
BLK 16
TES006
5.
SOW C.3.13.3
7.
DD
8.
A
10/12/13 Preliminary draft/emerging results report: 15 calendar DATC.
Preliminary draft (full report): 15 calendar DATC Final report: 15 calendar DARC from the Government.
AAQ-
QRO
ANG-E64
15.TOTAL 3/3
TRNG002
2. TASK AND SKILLS ANALYSIS (TASA) REPORT
6.
FAA AJI-233
10.
One/R
12.
BLK 16
TRNG002
5.
SOW C.3.14.1
7.
LT
8.
A
12. As determined at TGC.
13. 10 business days after receipt of Government comments. 30 days prior to First Course Conduct.
Page J-2-34
TRNG003
2. COMMERCIAL OFF THE SHELF (COTS) TRAINING
MATERIALS REPORT
FAA AJI-23
10.
One/R
12.
BLK 16
TRNG003
5.
SOW C.3.14.3
7.
LT
8.
A
9. 11. 13
12. As determined at TGC
13. 10 business days following receipt of Government comments
14. Electronic copy in Portable Document Format (.pdf) and CD-ROM (in MS Office Suite product) is acceptable in lieu of hard copies.
AJI-23
TRNG004
2. TRAINING DEVELOPMENT PLAN (TDP)
6.
FAA AJI-23
10.
One/R
12.
BLK 16
TRNG004
5.
SOW C.3.14.2
7.
LT
8.
A
12. As determined at TGC
13. 10 business days following receipt of Government comments
14. Electronic copy in Portable Document Format (.pdf) and CD-ROM (in MS Office Suite product) is acceptable in lieu of hard copies.
Page J-2-35
TRNG005
2. COURSE DESIGN GUIDE (CDG)
6.
FAA AJI-23
10.
One/R
12.
BLK 16
TRNG005
5.
SOW C.3.14.2
7.
LT
8.
A
10. Revisions as changes occur
12. As determined at TGC
13. 10 business days following receipt of Government comments
14. Electronic copy in Portable Document Format (.pdf) and CD-ROM (in MS Office Suite product) is acceptable in lieu of hard copies
TRNG006
2. STUDENT TESTS
6.
FAA AJI-23
10.
One/R
12.
BLK 16
TRNG-006
5.
SOW C.3.14.2
7.
LT
8.
A
10. Revisions as changes occur
12. As determined at TGC 13. 10 business days following receipt of Government comments
14. Electronic copy in Portable Document Format (.pdf) and CD-ROM (in MS Office Suite product) is acceptable in lieu of hard copies
Page J-2-36
TRNG007
2. CLASSROOM TRAINING
6.
FAA AJI-23
10.
One/R
12.
BLK 16
TRNG007
5.
SOW C.3.14.1.1
7.
LT
8.
A
Need the CDRLinfo
TRNG008
2. DISTANCE LEARNING
6.
FAA AJI-23
10.
One/R
12.
BLK 16
TRNG008
5.
SOW C.3.14.1.2, C.3.14.1.3,
C.3.14.4
7.
LT
8.
A
12. As determined during TGC
13. 15 business days following receipt of Government comments
15. Electronic copy in Portable Document Format (.pdf) and CD-ROM (in MS Office Suite product) is acceptable in lieu of hard copies
Page J-2-37
TRNG009
2. CONTRACTOR’S PRESENTATION
6.
FAA AJI-23
10.
One/R
12.
BLK 16
TRNG009
5.
SOW C.3.14.1.1
7.
LT
8.
A
13. 15 business days following receipt of Government comments
16. Electronic copy in Portable Document Format (.pdf) and CD-ROM (in MS Office Suite product) is acceptable in lieu of hard copies
TRNG010
2. OPERATIONAL TRYOUTS
6.
FAA AJI-23
10.
One/R
12.
BLK 16
TRNG010
5.
SOW C.3.14.1.1
7.
LT
8.
A
13. 15 business days following receipt of Government comments
17. Electronic copy in Portable Document Format (.pdf) and CD-ROM (in MS Office Suite product) is acceptable in lieu of hard copies
Page J-2-38
TRNG011
2. FIRST COURSE CONDUCT
6.
FAA AJI-23
10.
One/R
12.
BLK 16
TRNG011
5.
SOW C.3.14.1.1
7.
LT
8.
A
13. 15 business days following receipt of Government comments
18. Electronic copy in Portable Document Format (.pdf) and CD-ROM (in MS Office Suite product) is acceptable in lieu of hard copies
TRNG012
2. END OF COURSE (EOC) EVALUATION
6. FAA 10.ONE/R 12.BLK 16 14.AJM 0/1
5. 7.
LT
8.
A
BLK16 AAQ
TNG012 SOW C.3.14.1.1, C.3.14.5
10 Revisions as changes occur
12. Concurrent with development of classroom training materials
13 10 days following receipt of Government comments. Deliver completed evaluation forms from contractor-conducted classes to AJI- 23 five business days following the end of the first two months of contractor-conducted classes
14. Electronic copy in Portable Document Format (.pdf) and CD-ROM (in MS Office Suite product) is acceptable in lieu of hard copies
AJI-23 0/1
Page J-2-39
PART III - SECTION J
LIST OF ATTACHMENTS
TRNG013
2. CLASS ROSTER
6.
FAA AJI-233
10.
Bi/Mnthly
12.
BLK 16
TRNG013
LT
8.
A
SOW C.3.14.1.1, C.3.14.5 AJI-233 0/1
16. REMARKS:
12. 5 business days following the end of the first two months of contractor conducted classes
13 Subsequent submissions shall cover contractor conducted classes for the previous two months. Reports due 5 business days following the two month reporting period
14. Electronic copy in Portable Document Format (.pdf) is acceptable in lieu of hard copies
TRNG014
2. CERTIFICATE OF TRAINING
6.
FAA AJI-233
10.
ASREQ
12.
BLK 16
TRNG014
5.
SOW C.3.14.1.1, C.3.14.5
7.
LT
8.
A
12. Concurrent with the end of each course conduct with copies to AJI, COR and CO 5 business days following each course conduct
14. Copies for each student successfully completing course. Electronic copy in Portable Document Format (.pdf) is acceptable in lieu of hard copies.
Page J-2-40
2.
6.
FAA
10.
ASREQ
12.
BLK 16
SOW
| contract data requirements listing |
| CDRL FORM DESCRIPTION: |
| Code Meaning |
File details come from the government source that posted it. Updated .