Attachment 30 - Hangar 9 M Addendum 3.pdf
PDF 259 KB Posted
- Attached to
- CONSTRUCTION: Hangar 08 & 09 Mechanical Upgrades at the Mike Monroney Aeronautical Center, Oklahoma City, OK
- Solicitation number
- DTFAAC-17-R-00023
About this file
Attachment 30 - Hangar 9 M Addendum 3 (pdf)
View the file
Other files
Show 40 more
Latest 50 of 174 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6" CS
6" CR
6" CS
P1
P-2
P-3
CH-1CH-2
CT-1
6" CR
K
J
L
H
G
F
6 7 8 9 10
PWT-2
PWT-1
6" CWS
6" CWR
5" CWS
8" CWR
6" CWR
6" CWS
5" CS
5" CR
6" CWR 6" CWS
5" CWS
6" CWR
5" CR
5" CR
5" CS
5" CR
P-4
5" CS
8" CWR
6" CWR
5" CS
P-5
PULSE WATER TREATMENT
CONTROL PANEL
3/4" DCW
FPHB
6" CWR
6" CWR
NEW EQUIPMENT PAD
EXISTING CAST IRON PIPE SUPPORTS
TO REMAIN. REMOVE EXISTING PAINT
AND RUST PRIOR TO RE-PAINTING
PIPING SUPPORTS.
1" DCW
CONNECT NEW 1" DOMESTIC
COLD WATER (DCW) WITH
NEW BACKFLOW PREVENTER
TO EXISTING DCW PIPING AT
THIS APPROXIMATE LOCATION.
EXTEND 1" DCW TO NEW
CHEMICAL WATER
TREATMENT SYSTEM
PROVIDE NEW CHEMICAL
WATER TREATMENT SYSTEM TO
MEED SPECIFICATION 232113.
1" MAKE-UP WATER TO
COOLING TOWER
PROVIDE PIPE SUPPORTS FOR
TEMPORARY CHILLED WATER
PIPING PER DETAIL 2/M2.05.
PROVIDE HEAT TRACING FOR PIPING
EXPOSED TO THE ELEMENTS. RAYCHEM
KTV OR EQUAL (APPROXIMATELY 5
WATTS PER LINEAR FOOT).
MOTORIZED BY-PASS
CONTROL VALVES
5" CR
5" CS
SCALE: 1/4" = 1'-0"1
ROOF AND MECHANICAL ROOM FLOOR PLAN
N O
T
FO
R
CONST RUCT ION
NOT FOR CONST RU
C
T I O
N
R E V
IEW
SET
REV
IEW
S
ET
THIS
DOCUMENT IS
PRELIMINARY IN
NATURE AND IS NOT
A FINAL, SIGNED
AND SEALED
DOCUMENT
920 W. Main
Oklahoma City, Oklahoma 73106 phone: 405.232.5700 web: www.adgokc.com
ADG
CA: #6447 Exp. 6/18
MECHANICAL KEYNOTE LEGEND
1 CUT IN "T" CONNECTIONS WITH DEAD END RATED BUTTERFLY VALVES AND CONNECTION FLANGE FOR TEMPORARY CHILLERS.
3 PROVIDE AND INSTALL FREEZE PROOF HOSE BIBB (FPHB) IN WALL SIMILAR TO WOODFORD MODEL 65, ANTI-SIPHON FREEZELESS WALL HYDRANT.
7 THE EXISTING ROOF IS STILL UNDER WARRANTY. ANY WORK DONE ON THE EXISTING ROOF SHALL NOT VOID THE EXISTING WARRANTY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH THE EXISTING MANUFACTURER’S RECOMMENDATIONS AND REPAIR DIRECTIONS. THE CONTRACTOR SHALL SEND ANY ROOF MODIFICATIONS TO OCAT’S WARRANTY HOLDER FOR APPROVAL. ROOF WORK WILL NEED TO BE PERFORMED BY A CERTIFIED ROOF APPLICATOR FOR
THIS SYSTEM AS TO NOT VOID THE EXISTING WARRANTY.
8 SEAL PENETRATIONS THROUGH EXISTING WALL. PROVIDE INSULATED METAL PANEL INSIDE MECHANICAL ROOM AT PENETRATIONS.
10 CUT-IN MOTORIZED VALVES AND BYPASS DAMPER TO ISOLATE CHILLER DURING PULSE WATER TREATMENT CLEANING IF CHILLERS ARE NOT OPERATIONAL.
DESIGNED
WORK ORDER NO.
DRAWN
ISSUED BY OFFICE OF: DATE:
PREPARED BY
REV DATE
APPROVED BY
DESCRIPTION APP'DCHECK
OF2014-014040
REVIEWED BY
DRAWING NO.
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FACILITY MANAGEMENT
AMP-400
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
SMALL ARCHITECTS MARK McDANIEL
SENSITIVE SECURITY INFORMATION WARNING:
This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S.
government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
1 8/21/2017 Addendum #3
M3.02
HANGAR 9 ROOF AND MECH FLOOR PLAN
MAY 11, 2017CSC
LSF
JBS
009-H08 & 010-H09
HANGARS 8 & 9
MECHANICAL UPGRADES
JBS JBS
NORTH
0' 2' 4' 8' 16' ccossey Snapshot
CH-1
95°F 85°F
1920000 BTU/H
160 TONS
351.4 GPM
(50%)
44°F 54.9°F
CH-2
95°F 85°F
1920000 BTU/H
160 TONS
351.4 GPM
(50%)
44°F 54.9°F
CT-1
4800000 BTU/H
965.4 GPM
95°F
85°F
P-5
482.7 GPM
44 FT
(50%)
P-4
482.7 GPM
44 FT
(50%)
P-3
351.4 GPM
75 FT
(50%)
P-2
351.4 GPM
75 FT
(50%)
P-1
351.4 GPM
75 FT
(50%)
HANGAR LOAD
54.9°F44°F
3840000 BTU/H
702.7 GPM
54.9°F
44°F
CH-T2
160 TONS
351.4 GPM
(50%)
TEMP CHILLER PUMP
351.4 GPM
90.9 FT
54.9°F
44°F
CH-T1
1920000 BTU/H
160 TONS
351.4 GPM
(50%)
TEMP CHILLER PUMP
351.4 GPM
90.9 FT
C W R
CWR
8"
CWR
CHWS CHWS
CHWR
CWS
C H W S
CHWS
6"
5"
CHWR
C H W R
6"
NAME: HANGAR 9
LOCATION: FAA - OKC
EXISTING
TEMPORARY
NEW
N O
T
FO
R
CONST RUCT ION
NOT FOR CONST RU
C
T I O
N
R E V
IEW
SET
REV
IEW
S
ET
THIS
DOCUMENT IS
PRELIMINARY IN
NATURE AND IS NOT
A FINAL, SIGNED
AND SEALED
DOCUMENT
920 W. Main
Oklahoma City, Oklahoma 73106 phone: 405.232.5700 web: www.adgokc.com
ADG
CA: #6447 Exp. 6/18
NTS
1 NEW / EXISTING CHILLED WATER FLOW DIAGRAM
COOLING TOWER SCHEDULE
MARK DESCRIPTION
AMBIENT
WET BULB
(°F)
TOWER
CAPACITY
(MBH)
WATER FANS ELECTRICAL
BASIS OF DESIGN
(MANUFACTURER/ MODEL) NOTES
FLOW
(GPM)
EWT
(°F)
LWT
(°F)
INLET PD
(FT WC) TYPE
NUMBER
OF FANS
NUMBER
OF
MOTORS
MOTOR
HP
BASIN
HEATER
(KW) V/PH/HZ
CT-1 FORCED DRAFT CROSSFLOW 78 3840 960 95 85 2 FC 2 2 2 @ 15 2 @ 12 460/3/60 MARLEY / NC8402PAN ALL LISTED
NOTES:
1. STANDARD ACCESSORIES PLUS THE FOLLOWING (REFER TO SPECIFICATION FOR ADDITIONAL REQUIREMENTS):
2. MAXIMUM DRIFT LOSS SHALL BE 0.002% OF CONDENSER WATER FLOW
3. CASING, STRUCTURE, COLLECTION AND DISTRIBUTION BASIN SHALL ALL BE STAINLESS STEEL SERIES 300
4. LOW SOUND FAN WITH ALUMINUM BLADES, 12" CYLINDER EXTENSION AND STEEL FAN GUARD
5. (2) 6" DIA. DEPRESSED SIDE SUMP OUTLETS WITH TRASH SCREENS
6. STAINLESS STEEL INTERCONNECTING FLUMES FOR WATER FLOW AND EQUILIZATION BETWEEN CELLS
7. INTERCONNECTING FLUME WEIR PLATES FOR CELL ISOLATION
8. 4" DIA. COMBINATION DRAIN AND OVERFLOW AND ADDITIONAL 4" DRAIN WITH PLUG IN EACH CELL
9. (2) 1" WATER MAKE-UP FLOAT VALVES
10. (2) SLOW CLOSING 1" DIA. SOLENOID VALVES
11. (2) 6" DIA. TOP INLET CONN AND HORIZONTAL FLOW CONTROL VALVES PER CELL
12. VARIABLE FLOW NOZZLES
13. MOTOR MOUNTED OUTSIDE MOIST AIR STREAM
14. ELECTRIC BASIN HEATER (0°F AMBIENT)
15. CONTRACTOR WITH TRANSFORMER AND DISCONNECT FOR HEATER PACKAGE
16. 3 PROBE ELECTRIC WATER LEVEL SENSOR WITH THE FOLLOWING EVENTS: MAKE-UP, LOW-ALARM, HIGH-ALARM, LOW-CUTOFF, HIGH-CUTOFF, INTEGRATED INTO CONTROL SYSTEM
17. BYPASS CONNECTION (6 INCH)
18. VIBRATION SWITCH
19. ALUMINUM LADDER WITH SAFETY CAGE AND SELF CLOSING SAFETY GATE, EXTEND LADDER OR PLATFORM ACCESS TO ROOF, SEE STRUCTURAL DRAWINGS FOR SUPPORT HEIGHTS, ACCESS PLATFORM
AT EACH DOOR, PERIMETER GUARDRAIL, KNEERAIL, AND TOEBOARD, STAINLESS STEEL PLENUM WALKWAY IN EACH CELL. LADDERS AND PLATFORMS LOCATED ON SIDE OF COOLING TOWER (EACH
CELL)
20. PIPING CONNECTION CONFIGURATION TO MATCH PLANS
21. PROVIDE DAVIT CRANE WITH HAND WINCH PER CELL
TEMPORARY AIR-COOLED CHILLER SCHEDULE
MARK DESCRIPTION
EVAPORATOR DATA ELECTRICAL
BASIS OF DESIGN
(MANUFACTURER/ MODEL) NOTES
MIN REQ'D FULL
LOAD CAPACITY
(TONS)
FLOW
(GPM) FLUID TYPE
EWT
(°F)
LWT
(°F)
MAX PD
(FT WC) MOCP MCA V/PH/HZ
CH-T1 ROTARY SCREW - R134a 160 351.4 WATER 54 44 10 450 346 460/3/60 TRANE RTAC170 ALL LISTED
CH-T2 ROTARY SCREW - R134a 160 351.4 WATER 54 44 10 450 346 460/3/60 TRANE RTAC170 ALL LISTED
NOTES:
1. SITE ELEVATION IS 1300 FT ABOVE SEA LEVEL
2. AMBIENT TEMPERATURE USED FOR EQUIPMENT SELECTION SHALL BE 105°F
3. SINGLE POINT ELECTRICAL CONNECTION WITH DISCONNECT WITH DISCONNECT AND CONVENIENCE OUTLET PER CHILLER
4. PROVIDE INTEGRAL PUMP CAPABLE OF SUPPLYING DESIGN FLOW AT 90 FT OF HEAD TOTAL
PULSE WATER TREATMENT EQUIPMENT SCHEDULE
MARK DESCRIPTION
ELECTRICAL TREATMENT MODULE
BASIS OF DESIGN
(MANUFACTURER/MODEL) NOTESVOLTAGE WATTS
NOM. PIPE
SIZE (IN)
UMBILICAL
CABLE (FT)
PWT-1 PULSED WATER TREATMENT 115/1/60 15 6 33 FLOW-TECH / FTC-600 ALL LISTED
PWT-2 PULSED WATER TREATMENT 115/1/60 15 6 33 FLOW-TECH / FTC-600 ALL LISTED
NOTES:
1. SITE ELEVATION IS 1300 FT ABOVE SEA LEVEL
2. AMBIENT TEMPERATURE USED FOR EQUIPMENT SELECTION SHALL BE 105°F
3. PROVIDE WITH WEATHER GUARD FOR EXTERIOR INSTALLATION
4. PROVIDE WITH MOTORIZED BLOWDOWN VALVE
PUMP SCHEDULE
MARK LOCATION TYPE SERVICE FLUID
CAPACITY
(GPM)
TDH
(FT. H20)
MOTOR DATA BASIS OF DESIGN
MANUFACTURER / MODEL NOTESHP RPM V/Ø/HZ
P-4 MECHANICAL ROOM SPLIT COUPLED VERTICAL IN-LINE COND WATER WATER 525 45 10 1770 460/3/60 ARMSTRONG/4300 ALL LISTED
P-5 MECHANICAL ROOM SPLIT COUPLED VERTICAL IN-LINE COND WATER WATER 525 45 10 1770 460/3/60 ARMSTRONG/4300 ALL LISTED
NOTES:
1. PROVIDE W/SUCTION GUIDE SIZED FOR PUMP AND SYSTEM PIPING.
2. PROVIDE WITH SEPARATE VARIABLE FREQUENCY DRIVE WITH MANUAL BYPASS.
3. PROVIDE FLEXIBLE CONNECTION, CHECK VALVE AND BUTTERFLY VALVES AS DETAILED AND SPECIFIED.
4. PUMPS SHALL TURN DOWN TO 480 GPM.
DESIGNED
WORK ORDER NO.
DRAWN
ISSUED BY OFFICE OF: DATE:
PREPARED BY
REV DATE
APPROVED BY
DESCRIPTION APP'DCHECK
OF2014-014040
REVIEWED BY
DRAWING NO.
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FACILITY MANAGEMENT
AMP-400
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
SMALL ARCHITECTS MARK McDANIEL
SENSITIVE SECURITY INFORMATION WARNING:
This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S.
government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
1 8/21/2017 Addendum #3
M4.02
HANGAR 9 COOLING TOWER FLOW DIAGRAM AND SCHEDULES
MAY 11, 2017CSC
LSF
JBS
009-H08 & 010-H09
HANGARS 8 & 9
MECHANICAL UPGRADES
JBS JBS
ccossey Snapshot
| Sheets |
| M3.02 - HANGAR 9 ROOF AND MECH FLOOR PLAN |
| M4.02 - HANGAR 9 COOLING TOWER FLOW DIAGRAM AND SCHEDULES |
File details come from the government source that posted it. Updated .