Attachment 29 - Hangar 9 E Addendum 3.pdf

PDF 2 MB Posted

Attached to
CONSTRUCTION: Hangar 08 & 09 Mechanical Upgrades at the Mike Monroney Aeronautical Center, Oklahoma City, OK
Solicitation number
DTFAAC-17-R-00023
Issued by

About this file

Attachment 29 - Hangar 9 E Addendum 3 (pdf)

View the file

Other files

File Type Posted
ATTACHMENT 7 CONTRACTOR'S RELEASE.doc DOC document
Attachment 27 - 232500 fl - HVAC water treatment.pdf PDF
ATTACHMENT 6 SF25A.doc DOC document
SIR/RFO DTFAAC-17-R-00023.pdf PDF
Attachment 22 - Title Sheet.pdf PDF
ATTACHMENT 8 OPERATIONAL CONTROL DOCUMENTS.pdf PDF
Attachment 18 - M4-01 - Hangar 8 Details & Schedules.pdf PDF
Attachment 13 - Addendum 2.pdf PDF
ATTACHMENT 9 DBA WAGE DETERMINATION.pdf PDF
Attachment 20 - Section 237313 - Central Station Air Handling Units.pdf PDF
Attachment 28 - 236514.13 fl - open-circuit, induced-draft, counterflow cooling towers.pdf PDF
Pre-Proposal Conference Sign-In Sheet.pdf PDF
ATTACHMENT 3 DRAWINGS.pdf PDF
ATTACHMENT 4 CHAPTER 33.pdf PDF
Amendment 0001.pdf PDF
Attachment 17 - M2-01 - Hangar 9 Site Plan and First Floor Plan.pdf PDF
ATTACHMENT 12 CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 10 PAST PERFORMANCE EXPERIENCE FORM.pdf PDF
Amendment 000002.pdf PDF
Attachment 23 - Addendum 3.pdf PDF
Attachment 30 - Hangar 9 M Addendum 3.pdf PDF
ATTACHMENT 5 SF25.pdf PDF
ATTACHMENT 2 SPECIFICATIONS.pdf PDF
Attachment 15 - Hangar 8 E Addendum 2.pdf PDF
Attachment 19 - Section 232113-Hydronic Piping.pdf PDF
Amendment 0003.pdf PDF
Attachment 21 - Section 237416.13-Packaged, Large-Capacity, Rooftop Air-Conditioning Units.pdf PDF
Amendment 0004.pdf PDF
Attachment 26 - 232123 FL Hydronic Pumps.pdf PDF
Attachment 14 - 16-044 Addendum #2.pdf PDF
Attachment 16 - Hangar 9 E Addendum 2.pdf PDF
ATTACHMENT 1 SECTION B SUPPLIES OR SERVICES-PRICES.xlsx XLSX spreadsheet
Attachment 24 - 16-044 Addendum #3.pdf PDF
Attachment 25 - 230719 fl - hvac piping insulation.pdf PDF
ATTACHMENT 11 PAST PERFORMANCE SURVEY.pdf PDF
Attachment 13 - Addendum 2.pdf PDF
Attachment 22 - Title Sheet.pdf PDF
ATTACHMENT 6 SF25A.doc DOC document
ATTACHMENT 12 CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 9 DBA WAGE DETERMINATION.pdf PDF
Attachment 25 - 230719 fl - hvac piping insulation.pdf PDF
Attachment 19 - Section 232113-Hydronic Piping.pdf PDF
Attachment 29 - Hangar 9 E Addendum 3.pdf PDF
Attachment 24 - 16-044 Addendum #3.pdf PDF
Attachment 26 - 232123 FL Hydronic Pumps.pdf PDF
ATTACHMENT 5 SF25.pdf PDF
ATTACHMENT 3 DRAWINGS.pdf PDF
Attachment 30 - Hangar 9 M Addendum 3.pdf PDF
ATTACHMENT 8 OPERATIONAL CONTROL DOCUMENTS.pdf PDF
ATTACHMENT 4 CHAPTER 33.pdf PDF
Show 40 more

Latest 50 of 174 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTROL PANEL

FIRE ALARM

SWBD "MS"

(FACE EAST)

EXISTING 2000A, 3P, 4W, 277/480V

MAIN SW. CUBICLE

107A

108 109

112 113

L J

H G

F

1 2 3 4 5 6 7 8 9 10

CH - T1

CH - T2

TEMPORARY COOLING TOWERS

N O

T

FO

R

CONST RUCT ION

NOT FOR CONST R

U C

T I O

N

R E V

IEW

SET

REV

IEW

S

ET

THIS

DOCUMENT IS

PRELIMINARY IN

NATURE AND IS NOT

A FINAL, SIGNED

AND SEALED

DOCUMENT

920 W. Main

Oklahoma City, Oklahoma 73106 phone: 405.232.5700 web: www.adgokc.com

ADG

CA: #6447 Exp. 6/18

3/32" = 1'-0"

1 PARTIAL FIRST FLOOR WEST SIDE POWER PLAN

N O

R

TH

NTS

2 HANGAR 9 SWITCHGEAR - LOOKING WEST

USE SPARE BUCKETS FOR TEMPORARY

COOLING TOWERS.

PROVIDE A 450A BREAKER FOR EACH BUCKET.

FEED EACH TEMPORARY COOLING TOWER

WITH FEEDER B45. REMOVE WIRING WHEN

TEMPORARY COOLING TOWERS ARE NO

LONGER IN USE. LEAVE 450A BREAKERS.

DESIGNED

WORK ORDER NO.

DRAWN

ISSUED BY OFFICE OF: DATE:

PREPARED BY

REV DATE

APPROVED BY

DESCRIPTION APP'DCHECK

OF2014-014040

REVIEWED BY

DRAWING NO.

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FACILITY MANAGEMENT

AMP-400

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

SMALL ARCHITECTS MARK McDANIEL

SENSITIVE SECURITY INFORMATION WARNING:

This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S.

government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.

E2.10

HANGAR 9 FIRST FLOOR POWER PLAN

MAY 12 2017MJN

RJV

MJN

009-H08 & 010-H09

HANGARS 8 & 9

MECHANICAL UPGRADES

0' 5' 10' 20' 40'

SEE DETAIL 4/E2.11 FOR ADDITIONAL

INFORMATION

SEE DETAILS 1/E2.11, 2/E2.11, AND 3/E2.11 FOR

ADDITIONAL INFORMATION

1 8/14/2017 Addendum #2 MJN MJN

2 8/21/2017 Addendum #3 MJN MJN

Sheets
E2.10 - HANGAR 9 FIRST FLOOR POWER PLAN

File details come from the government source that posted it. Updated .