CONSTRUCTION: Hangar 08 & 09 Mechanical Upgrades at the Mike Monroney Aeronautical Center, Oklahoma City, OK
Solicitation number
DTFAAC-17-R-00023
Issued by

About this file

ATTACHMENT 1 SECTION B SUPPLIES OR SERVICES-PRICES (xlsx)

View the file

Other files

File Type Posted
ATTACHMENT 7 CONTRACTOR'S RELEASE.doc DOC document
Attachment 27 - 232500 fl - HVAC water treatment.pdf PDF
ATTACHMENT 6 SF25A.doc DOC document
SIR/RFO DTFAAC-17-R-00023.pdf PDF
Attachment 22 - Title Sheet.pdf PDF
ATTACHMENT 8 OPERATIONAL CONTROL DOCUMENTS.pdf PDF
Attachment 18 - M4-01 - Hangar 8 Details & Schedules.pdf PDF
Attachment 13 - Addendum 2.pdf PDF
ATTACHMENT 9 DBA WAGE DETERMINATION.pdf PDF
Attachment 20 - Section 237313 - Central Station Air Handling Units.pdf PDF
Attachment 28 - 236514.13 fl - open-circuit, induced-draft, counterflow cooling towers.pdf PDF
Pre-Proposal Conference Sign-In Sheet.pdf PDF
ATTACHMENT 3 DRAWINGS.pdf PDF
ATTACHMENT 4 CHAPTER 33.pdf PDF
Amendment 0001.pdf PDF
Attachment 17 - M2-01 - Hangar 9 Site Plan and First Floor Plan.pdf PDF
ATTACHMENT 12 CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 10 PAST PERFORMANCE EXPERIENCE FORM.pdf PDF
Amendment 000002.pdf PDF
Attachment 23 - Addendum 3.pdf PDF
Attachment 30 - Hangar 9 M Addendum 3.pdf PDF
Attachment 29 - Hangar 9 E Addendum 3.pdf PDF
ATTACHMENT 5 SF25.pdf PDF
ATTACHMENT 2 SPECIFICATIONS.pdf PDF
Attachment 15 - Hangar 8 E Addendum 2.pdf PDF
Attachment 19 - Section 232113-Hydronic Piping.pdf PDF
Amendment 0003.pdf PDF
Attachment 21 - Section 237416.13-Packaged, Large-Capacity, Rooftop Air-Conditioning Units.pdf PDF
Amendment 0004.pdf PDF
Attachment 26 - 232123 FL Hydronic Pumps.pdf PDF
Attachment 14 - 16-044 Addendum #2.pdf PDF
Attachment 16 - Hangar 9 E Addendum 2.pdf PDF
Attachment 24 - 16-044 Addendum #3.pdf PDF
Attachment 25 - 230719 fl - hvac piping insulation.pdf PDF
ATTACHMENT 11 PAST PERFORMANCE SURVEY.pdf PDF
Attachment 13 - Addendum 2.pdf PDF
Attachment 22 - Title Sheet.pdf PDF
ATTACHMENT 6 SF25A.doc DOC document
ATTACHMENT 12 CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 9 DBA WAGE DETERMINATION.pdf PDF
Attachment 25 - 230719 fl - hvac piping insulation.pdf PDF
Attachment 19 - Section 232113-Hydronic Piping.pdf PDF
Attachment 29 - Hangar 9 E Addendum 3.pdf PDF
Attachment 24 - 16-044 Addendum #3.pdf PDF
Attachment 26 - 232123 FL Hydronic Pumps.pdf PDF
ATTACHMENT 5 SF25.pdf PDF
ATTACHMENT 3 DRAWINGS.pdf PDF
Attachment 30 - Hangar 9 M Addendum 3.pdf PDF
ATTACHMENT 8 OPERATIONAL CONTROL DOCUMENTS.pdf PDF
ATTACHMENT 4 CHAPTER 33.pdf PDF
Show 40 more

Latest 50 of 174 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 The contractor shall furnish all labor, tools, materials, equipment, and supplies necessary to accomplish the construction project; Hangar 08 and Hangar 09 Mechanical Upgrades, at the Mike Monroney Aeronautical Center, Oklahoma City, OK set forth below in accordance with the attached project manual, drawings, and the other terms, conditions, and provisions set forth herein.

CLINDescriptionTotal Amount
BASE OFFER
0001Base Offer: Hangar 9 Replacement of the existing cooling tower on the roof with a new two-cell, cooling tower.$
OPTIONAL ITEMS
0002Option No. 1: Hangar 8: Replace four existing air handling units (AHU) with new units on the roof and replacement of one existing AHU with a new unit located in a first floor mechanical room of Hangar 8.$
TOTAL ESTIMATED POTENTIAL VALUE$