Attachment 14 - 16-044 Addendum #2.pdf

PDF 130 KB Posted

Attached to
CONSTRUCTION: Hangar 08 & 09 Mechanical Upgrades at the Mike Monroney Aeronautical Center, Oklahoma City, OK
Solicitation number
DTFAAC-17-R-00023
Issued by

About this file

Attachment 14 - 16-044 Addendum #2 (pdf)

View the file

Other files

File Type Posted
ATTACHMENT 7 CONTRACTOR'S RELEASE.doc DOC document
Attachment 27 - 232500 fl - HVAC water treatment.pdf PDF
ATTACHMENT 6 SF25A.doc DOC document
SIR/RFO DTFAAC-17-R-00023.pdf PDF
Attachment 22 - Title Sheet.pdf PDF
ATTACHMENT 8 OPERATIONAL CONTROL DOCUMENTS.pdf PDF
Attachment 18 - M4-01 - Hangar 8 Details & Schedules.pdf PDF
Attachment 13 - Addendum 2.pdf PDF
ATTACHMENT 9 DBA WAGE DETERMINATION.pdf PDF
Attachment 20 - Section 237313 - Central Station Air Handling Units.pdf PDF
Attachment 28 - 236514.13 fl - open-circuit, induced-draft, counterflow cooling towers.pdf PDF
Pre-Proposal Conference Sign-In Sheet.pdf PDF
ATTACHMENT 3 DRAWINGS.pdf PDF
ATTACHMENT 4 CHAPTER 33.pdf PDF
Amendment 0001.pdf PDF
Attachment 17 - M2-01 - Hangar 9 Site Plan and First Floor Plan.pdf PDF
ATTACHMENT 12 CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 10 PAST PERFORMANCE EXPERIENCE FORM.pdf PDF
Amendment 000002.pdf PDF
Attachment 23 - Addendum 3.pdf PDF
Attachment 30 - Hangar 9 M Addendum 3.pdf PDF
Attachment 29 - Hangar 9 E Addendum 3.pdf PDF
ATTACHMENT 5 SF25.pdf PDF
ATTACHMENT 2 SPECIFICATIONS.pdf PDF
Attachment 15 - Hangar 8 E Addendum 2.pdf PDF
Attachment 19 - Section 232113-Hydronic Piping.pdf PDF
Amendment 0003.pdf PDF
Attachment 21 - Section 237416.13-Packaged, Large-Capacity, Rooftop Air-Conditioning Units.pdf PDF
Amendment 0004.pdf PDF
Attachment 26 - 232123 FL Hydronic Pumps.pdf PDF
Attachment 16 - Hangar 9 E Addendum 2.pdf PDF
ATTACHMENT 1 SECTION B SUPPLIES OR SERVICES-PRICES.xlsx XLSX spreadsheet
Attachment 24 - 16-044 Addendum #3.pdf PDF
Attachment 25 - 230719 fl - hvac piping insulation.pdf PDF
ATTACHMENT 11 PAST PERFORMANCE SURVEY.pdf PDF
Attachment 13 - Addendum 2.pdf PDF
Attachment 22 - Title Sheet.pdf PDF
ATTACHMENT 6 SF25A.doc DOC document
ATTACHMENT 12 CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 9 DBA WAGE DETERMINATION.pdf PDF
Attachment 25 - 230719 fl - hvac piping insulation.pdf PDF
Attachment 19 - Section 232113-Hydronic Piping.pdf PDF
Attachment 29 - Hangar 9 E Addendum 3.pdf PDF
Attachment 24 - 16-044 Addendum #3.pdf PDF
Attachment 26 - 232123 FL Hydronic Pumps.pdf PDF
ATTACHMENT 5 SF25.pdf PDF
ATTACHMENT 3 DRAWINGS.pdf PDF
Attachment 30 - Hangar 9 M Addendum 3.pdf PDF
ATTACHMENT 8 OPERATIONAL CONTROL DOCUMENTS.pdf PDF
ATTACHMENT 4 CHAPTER 33.pdf PDF
Show 40 more

Latest 50 of 174 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT: FAA HANGAR 8 & 9 MECH UPGRADES DATE: 8/14/2017

ADDENDUM NO. 16-044 PAGE 1 OF 1

END OF ATTACHMENT - ADDENDUM NO. 2

ADDENDUM NO. 2

DATE: 8/14/2017

PROJECT: 009-H08 & 010-H09 HANGARS 8 & 9 MECHANICAL UPGRADES

PROJECT NO: 16-044

To the Prospective Bidders of the Work titled above:

This Addendum is to be incorporated into the Contract Documents and modifies the original

Contract Documents dated 8/14/2017 for the above referenced Project. The scheduled information for Air Handling Units 3W and 4 was corrected. Specifications for the FANWALL arrays were clarified to provide one VFD per motor from the manufacture. Glycol references removed from Hydronic Piping specification. Frost protection for temporary chilled water piping and condenser water piping. Clarification of electrical wire size. Information provided for existing switchgear.

ATTACHMENT INDEX

SHEET OR

SECTION

NUMBER

TITLE DATE SIZE

NO. OF

PAGES OR

SHEETS

G0.01 TITLE SHEET 5/11/17 22X34 1

M4.01 HANGAR 8 DETAILS & SCHEDULES 5/11/17 22X34 1

M2.01 HANGAR 9 SITE AND FIRST FLOOR PLAN 5/11/17 22X34 1

E0.00 ELECTRICAL LEGENDS, ABBREVIATIONS, AND INDEX 5/11/17 22X34 1

E2.10 HANGAR 9 FIRST FLOOR POWER PLAN 5/11/17 22X34 1

E2.11 HANGAR 9 SWITCHGEAR INFORMATION 5/11/17 22X34 1

E2.20 HANGAR 9 PENTHOUSE TO ROOF ELECTRICAL PLAN 5/11/17 22X34 1

237313 CENTRAL-STATION INDOOR AIR-HANDLING UNITS 5/11/17 8.5x11 15

237416.13

PACKAGED, LARGE-CAPACITY, ROOFTOP AIR-

CONDITIONING UNITS

5/11/17 8.5x11 14

232113 HYDRONIC PIPING 5/11/17 8.5x11 12

File details come from the government source that posted it. Updated .