Attachment 19 - Section 232113-Hydronic Piping.pdf

PDF 136 KB Posted

Attached to
CONSTRUCTION: Hangar 08 & 09 Mechanical Upgrades at the Mike Monroney Aeronautical Center, Oklahoma City, OK
Solicitation number
DTFAAC-17-R-00023
Issued by

About this file

Attachment 19 - Section 232113-Hydronic Piping (pdf)

View the file

Other files

File Type Posted
ATTACHMENT 7 CONTRACTOR'S RELEASE.doc DOC document
Attachment 27 - 232500 fl - HVAC water treatment.pdf PDF
ATTACHMENT 6 SF25A.doc DOC document
SIR/RFO DTFAAC-17-R-00023.pdf PDF
Attachment 22 - Title Sheet.pdf PDF
ATTACHMENT 8 OPERATIONAL CONTROL DOCUMENTS.pdf PDF
Attachment 18 - M4-01 - Hangar 8 Details & Schedules.pdf PDF
Attachment 13 - Addendum 2.pdf PDF
ATTACHMENT 9 DBA WAGE DETERMINATION.pdf PDF
Attachment 20 - Section 237313 - Central Station Air Handling Units.pdf PDF
Attachment 28 - 236514.13 fl - open-circuit, induced-draft, counterflow cooling towers.pdf PDF
Pre-Proposal Conference Sign-In Sheet.pdf PDF
ATTACHMENT 3 DRAWINGS.pdf PDF
ATTACHMENT 4 CHAPTER 33.pdf PDF
Amendment 0001.pdf PDF
Attachment 17 - M2-01 - Hangar 9 Site Plan and First Floor Plan.pdf PDF
ATTACHMENT 12 CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 10 PAST PERFORMANCE EXPERIENCE FORM.pdf PDF
Amendment 000002.pdf PDF
Attachment 23 - Addendum 3.pdf PDF
Attachment 30 - Hangar 9 M Addendum 3.pdf PDF
Attachment 29 - Hangar 9 E Addendum 3.pdf PDF
ATTACHMENT 5 SF25.pdf PDF
ATTACHMENT 2 SPECIFICATIONS.pdf PDF
Attachment 15 - Hangar 8 E Addendum 2.pdf PDF
Amendment 0003.pdf PDF
Attachment 21 - Section 237416.13-Packaged, Large-Capacity, Rooftop Air-Conditioning Units.pdf PDF
Amendment 0004.pdf PDF
Attachment 26 - 232123 FL Hydronic Pumps.pdf PDF
Attachment 14 - 16-044 Addendum #2.pdf PDF
Attachment 16 - Hangar 9 E Addendum 2.pdf PDF
ATTACHMENT 1 SECTION B SUPPLIES OR SERVICES-PRICES.xlsx XLSX spreadsheet
Attachment 24 - 16-044 Addendum #3.pdf PDF
Attachment 25 - 230719 fl - hvac piping insulation.pdf PDF
ATTACHMENT 11 PAST PERFORMANCE SURVEY.pdf PDF
Attachment 13 - Addendum 2.pdf PDF
Attachment 22 - Title Sheet.pdf PDF
ATTACHMENT 6 SF25A.doc DOC document
ATTACHMENT 12 CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 9 DBA WAGE DETERMINATION.pdf PDF
Attachment 25 - 230719 fl - hvac piping insulation.pdf PDF
Attachment 19 - Section 232113-Hydronic Piping.pdf PDF
Attachment 29 - Hangar 9 E Addendum 3.pdf PDF
Attachment 24 - 16-044 Addendum #3.pdf PDF
Attachment 26 - 232123 FL Hydronic Pumps.pdf PDF
ATTACHMENT 5 SF25.pdf PDF
ATTACHMENT 3 DRAWINGS.pdf PDF
Attachment 30 - Hangar 9 M Addendum 3.pdf PDF
ATTACHMENT 8 OPERATIONAL CONTROL DOCUMENTS.pdf PDF
ATTACHMENT 4 CHAPTER 33.pdf PDF
Show 40 more

Latest 50 of 174 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

16.31.001 / FAA Hangers 8 and 9 232113 - 1 HYDRONIC PIPING Addm. #2 Dated 8/14/17

SECTION 232113 - HYDRONIC PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes pipe and fitting materials and joining methods for the following:

1. Copper tube and fittings.

2. Steel pipe and fittings.

3. Transition fittings.

4. Dielectric fittings.

5. Bypass chemical feeder.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of the following:

1. Pipe.

2. Fittings.

3. Joining materials.

4. Bypass chemical feeder.

B. Delegated-Design Submittal:

1. Design calculations and detailed fabrication and assembly of pipe anchors and alignment guides, hangers and supports for multiple pipes, expansion joints and loops, and attachments of the same to the building structure.

2. Locations of pipe anchors and alignment guides and expansion joints and loops.

3. Locations of and details for penetrations, including sleeves and sleeve seals for exterior walls, floors, basement, and foundation walls.

4. Locations of and details for penetration and firestopping for fire- and smoke-rated wall and floor and ceiling assemblies.

1.4 INFORMATIONAL SUBMITTALS

A. Coordination Drawings: Piping layout, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of the items involved:

1. Suspended ceiling components.

2. Other building services.

16.31.001 / FAA Hangers 8 and 9 232113 - 2 HYDRONIC PIPING

3. Structural members.

B. Qualification Data: For Installer.

C. Welding certificates.

D. Field quality-control reports.

E. Preconstruction Test Reports:

1. Water Analysis: Submit a copy of the water analysis to illustrate water quality available at Project site.

1.5 QUALITY ASSURANCE

A. Steel Support Welding: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."

B. Pipe Welding: Qualify procedures and operators according to ASME Boiler and Pressure Vessel

Code: Section IX.

1. Comply with ASME B31.9, "Building Services Piping," for materials, products, and installation.

2. Certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current.

1.6 PRECONSTRUCTION TESTING

A. Preconstruction Testing Service: Engage a qualified testing agency to perform preconstruction testing on water quality.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Hydronic piping components and installation shall be capable of withstanding the following minimum working pressure and temperature unless otherwise indicated:

1. Hot-Water Heating Piping: [100 psigat 200 deg F (93 deg C).

2. Chilled-Water Piping: 150 psig (1034 kPa) at 73 deg F (22 deg C).

3. Condenser-Water Piping: 150 psig (1034 kPa) at 73 deg F (66 deg C).

4. Makeup-Water Piping: 80 psig (552 kPa) at 73 deg F (22 deg C).

5. Condensate-Drain Piping: 150 deg F (66 deg C).

6. Air-Vent Piping: 180 deg F (82 deg C).

7. Safety-Valve-Inlet and -Outlet Piping: Equal to the pressure of the piping system to which it is attached.

16.31.001 / FAA Hangers 8 and 9 232113 - 3 HYDRONIC PIPING

2.2 COPPER TUBE AND FITTINGS

A. Drawn-Temper Copper Tubing: ASTM B 88, Type L (ASTM B 88M, Type B).

B. DWV Copper Tubing: ASTM B 306, Type DWV.

C. Grooved, Mechanical-Joint, Wrought-Copper Fittings: ASME B16.22.

1. Grooved-End Copper Fittings: ASTM B 75 (ASTM B 75M), copper tube or

ASTM B 584, bronze casting.

2. Grooved-End-Tube Couplings: Rigid pattern unless otherwise indicated; gasketed fitting.

Ductile-iron housing with keys matching pipe and fitting grooves, prelubricated EPDM gasket rated for minimum 230 deg F (110 deg C) for use with housing, and steel bolts and nuts.

D. Wrought-Copper Unions: ASME B16.22.

2.3 STEEL PIPE AND FITTINGS

A. Cast-Iron Threaded Fittings: ASME B16.4; Classes 125 and 250 as indicated in "Piping

Applications" Article.

B. Cast-Iron Pipe Flanges and Flanged Fittings: ASME B16.1, Classes 25, 125, and 250; raised ground face, and bolt holes spot faced as indicated in "Piping Applications" Article.

C. Grooved Mechanical-Joint Fittings and Couplings:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Anvil International.

b. Central Sprinkler Company.

c. Grinnell Mechanical Products.

d. National Fittings, Inc.

e. Nexus Valve, Inc.

f. S. P. Fittings.

g. Smith-Cooper International.

h. Star Pipe Products.

2. Joint Fittings: ASTM A 536, Grade 65-45-12 ductile iron; ASTM A 47/A 47M, Grade 32510 malleable iron; ASTM A 53/A 53M, Type F, E, or S, Grade B fabricated steel; or ASTM A 106/A 106M, Grade B steel fittings with grooves or shoulders constructed to accept grooved-end couplings; with nuts, bolts, locking pin, locking toggle, or lugs to secure grooved pipe and fittings.

3. Couplings: Ductile- or malleable-iron housing and EPDM or nitrile gasket of central cavity pressure-responsive design; with nuts, bolts, locking pin, locking toggle, or lugs to secure grooved pipe and fittings.

16.31.001 / FAA Hangers 8 and 9 232113 - 4 HYDRONIC PIPING

2.4 JOINING MATERIALS

A. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents.

1. ASME B16.21, nonmetallic, flat, asbestos free, 1/8-inch (3.2-mm) maximum thickness unless otherwise indicated.

a. Full-Face Type: For flat-face, Class 125, cast-iron and cast-bronze flanges.

b. Narrow-Face Type: For raised-face, Class 250, cast-iron and steel flanges.

B. Flange Bolts and Nuts: ASME B18.2.1, carbon steel, unless otherwise indicated.

C. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to

ASTM B 813.

D. Brazing Filler Metals: AWS A5.8/A5.8M, BCuP Series, copper-phosphorus alloys for joining copper with copper; or BAg-1, silver alloy for joining copper with bronze or steel.

E. Welding Filler Metals: Comply with AWS D10.12M/D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.

2.5 DIELECTRIC FITTINGS

A. General Requirements: Assembly of copper alloy and ferrous materials with separating nonconductive insulating material. Include end connections compatible with pipes to be joined.

B. Dielectric Unions:

1. Description:

a. Standard: ASSE 1079.

b. Pressure Rating: 125 psig (860 kPa) minimum at 180 deg F (82 deg C) 150 psig

(1035 kPa).

c. End Connections: Solder-joint copper alloy and threaded ferrous.

C. Dielectric Flanges:

1.

2. Description:

a. Standard: ASSE 1079.

b. Factory-fabricated, bolted, companion-flange assembly.

c. Pressure Rating: 125 psig (860 kPa) minimum at 180 deg F (82 deg C) 150 psig

(1035 kPa).

d. End Connections: Solder-joint copper alloy and threaded ferrous; threaded solder-joint copper alloy and threaded ferrous.

D. Dielectric-Flange Insulating Kits:

1. Description:

a. Nonconducting materials for field assembly of companion flanges.

16.31.001 / FAA Hangers 8 and 9 232113 - 5 HYDRONIC PIPING

b. Pressure Rating: 150 psig (1035 kPa).

c. Gasket: Neoprene or phenolic.

d. Bolt Sleeves: Phenolic or polyethylene.

e. Washers: Phenolic with steel backing washers.

E. Dielectric Nipples:

1. Description:

a. Standard: IAPMO PS 66.

b. Electroplated steel nipple, complying with ASTM F 1545.

c. Pressure Rating: 300 psig (2070 kPa) at 225 deg F (107 deg C).

d. End Connections: Male threaded or grooved.

e. Lining: Inert and noncorrosive, propylene.

2.6 BYPASS CHEMICAL FEEDER

A. Description: Welded steel construction; 125-psig (860-kPa) working pressure; 5-gal. (19-L) capacity; with fill funnel and inlet, outlet, and drain valves.

1. Chemicals: Specially formulated, based on analysis of makeup water, to prevent accumulation of scale and corrosion in piping and connected equipment.

PART 3 - EXECUTION

3.1 PIPING APPLICATIONS

A. Hot-water heating piping, aboveground, NPS 2 (DN 50) and smaller, shall be any of the following:

1. Type L (Type B), drawn-temper copper tubing, wrought-copper fittings, and soldered joints.

2. Schedule 40, Grade B, Type 96 steel pipe; Class 125, cast-iron fittings; cast-iron flanges and flange fittings; and threaded joints.

B. Hot-water heating piping, aboveground, NPS 2-1/2 (DN 65) and larger, shall be any of the following:

1. Schedule 40 steel pipe, wrought-steel fittings and wrought-cast or forged-steel flanges and flange fittings, and welded and flanged joints.

2. Schedule 40 steel pipe; grooved, mechanical joint coupling and fittings; and grooved, mechanical joints.

C. Chilled-water piping, aboveground, NPS 2 (DN 50) and smaller, shall be any of the following:

1. Type L (Type B), drawn-temper copper tubing, wrought-copper fittings, and soldered joints.

2. Schedule 40 steel pipe; Class 125, cast-ironfittings; cast-iron flanges and flange fittings;

and threaded joints.

3. Schedule 5 steel pipe; steel, pressure-seal couplings and fittings; and pressure-seal joints.

16.31.001 / FAA Hangers 8 and 9 232113 - 6 HYDRONIC PIPING

4.

D. Chilled-water piping, aboveground, NPS 2-1/2 (DN 65) and larger, shall be any of the following:

1.

2. Schedule 40 steel pipe, wrought-steel fittings and wrought-cast or forged-steel flanges and flange fittings, and welded and flanged joints.

3. Schedule 40 steel pipe; grooved, mechanical joint coupling and fittings; and grooved, mechanical joints.

E. Condenser-water piping, aboveground, NPS 2 (DN 50) and smaller, shall be any of the following:

1. Type L (Type B), drawn-temper copper tubing, wrought-copper fittings, and soldered joints.

2. Schedule 40 steel pipe; Class 125, cast-iron fittings; cast-iron flanges and flange fittings;

and threaded joints.

F. Condenser-water piping, aboveground, NPS 2-1/2 (DN 65) and larger, shall be any of the following:

1. Type L (Type B), drawn-temper copper tubing, wrought-copper fittings, and soldered joints.

2. Schedule 40] steel pipe, wrought-steel fittings and wrought-cast or forged-steel flanges and flange fittings, and welded and flanged joints.

3. Schedule 40 steel pipe; grooved, mechanical joint coupling and fittings; and grooved, mechanical joints.

G. Makeup-water piping installed aboveground shall be the following:

1. Type L (Type B), drawn-temper copper tubing, wrought-copper fittings, and soldered joints.

2.

H. Condensate-Drain Piping: Type M (Type C) Type DWV, drawn-temper copper tubing, wrought-copper fittings, and soldered joints.

I. Air-Vent Piping:

1. Inlet: Same as service where installed with metal-to-plastic transition fittings for plastic piping systems according to piping manufacturer's written instructions.

2. Outlet: Type K (Type A), annealed-temper copper tubing with soldered or flared joints.

J. Safety-Valve-Inlet and -Outlet Piping for Hot-Water Piping: Same materials and joining methods as for piping specified for the service in which safety valve is installed with metal-to-plastic transition fittings for plastic piping systems according to piping manufacturer's written instructions.

16.31.001 / FAA Hangers 8 and 9 232113 - 7 HYDRONIC PIPING

3.2 PIPING INSTALLATIONS

A. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Install piping as indicated unless deviations to layout are approved on Coordination

Drawings.

B. Install piping in concealed locations unless otherwise indicated and except in equipment rooms and service areas.

C. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.

D. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.

E. Install piping to permit valve servicing.

F. Install piping at indicated slopes.

G. Install piping free of sags and bends.

H. Install fittings for changes in direction and branch connections.

I. Install piping to allow application of insulation.

J. Select system components with pressure rating equal to or greater than system operating pressure.

K. Install groups of pipes parallel to each other, spaced to permit applying insulation and servicing of valves.

L. Install drains, consisting of a tee fitting, NPS 3/4 (DN 20) ball valve, and short NPS 3/4

(DN 20) threaded nipple with cap, at low points in piping system mains and elsewhere as required for system drainage.

M. Install piping at a uniform grade of 0.2 percent upward in direction of flow.

N. Reduce pipe sizes using eccentric reducer fitting installed with level side up.

O. Install branch connections to mains using [mechanically formed ]tee fittings in main pipe, with the branch connected to the bottom of the main pipe. For up-feed risers, connect the branch to the top of the main pipe.

P. Install valves according to the following:

1. Section 230523.12 "Ball Valves for HVAC Piping."

2. Section 230523.13 "Butterfly Valves for HVAC Piping."

3. Section 230523.14 "Check Valves for HVAC Piping."

Q. Install unions in piping, NPS 2 (DN 50) and smaller, adjacent to valves, at final connections of equipment, and elsewhere as indicated.

16.31.001 / FAA Hangers 8 and 9 232113 - 8 HYDRONIC PIPING

R. Install flanges in piping, NPS 2-1/2 (DN 65) and larger, at final connections of equipment and elsewhere as indicated.

S. Install shutoff valve immediately upstream of each dielectric fitting.

T. Comply with requirements in Section 230553 "Identification for HVAC Piping and Equipment" for identifying piping.

U. Install sleeves for piping penetrations of walls, ceilings, and floors. Comply with requirements for sleeves specified in Section 230517 "Sleeves and Sleeve Seals for HVAC Piping."

V. Install escutcheons for piping penetrations of walls, ceilings, and floors. Comply with requirements for escutcheons specified in Section 230518 "Escutcheons for HVAC Piping."

3.3 DIELECTRIC FITTING INSTALLATION

A. Install dielectric fittings in piping at connections of dissimilar metal piping and tubing.

B. Dielectric Fittings for NPS 2 (DN 50) and Smaller: Use dielectric nipples.

C. Dielectric Fittings for NPS 2-1/2 to NPS 4 (DN 65 to DN 100): Use dielectric nipples.

D. Dielectric Fittings for NPS 5 (DN 125) and Larger: Use dielectric flange kits.

3.4 HANGERS AND SUPPORTS

A. Comply with requirements in Section 230529 "Hangers and Supports for HVAC Piping and

Equipment" for hanger, support, and anchor devices. Comply with the following requirements for maximum spacing of supports.

B. Install the following pipe attachments:

1. Adjustable steel clevis hangers for individual horizontal piping less than 20 feet (6 m) long.

2. Adjustable roller hangers and spring hangers for individual horizontal piping 20 feet

(6 m) or longer.

3. Pipe Roller: MSS SP-58, Type 44 for multiple horizontal piping 20 feet (6 m) or longer, supported on a trapeze.

4. Spring hangers to support vertical runs.

5. Provide copper-clad hangers and supports for hangers and supports in direct contact with copper pipe.

6. On plastic pipe, install pads or cushions on bearing surfaces to prevent hanger from scratching pipe.

C. Install hangers for steel piping with the following maximum spacing and minimum rod sizes:

1. NPS 3/4 (DN 20): Maximum span, 7 feet (2.1 m).

2. NPS 1 (DN 25): Maximum span, 7 feet (2.1 m).

3. NPS 1-1/2 (DN 40): Maximum span, 9 feet (2.7 m).

4. NPS 2 (DN 50): Maximum span, 10 feet (3 m).

16.31.001 / FAA Hangers 8 and 9 232113 - 9 HYDRONIC PIPING

5. NPS 2-1/2 (DN 65): Maximum span, 11 feet (3.4 m).

6. NPS 3 (DN 80) and Larger: Maximum span, 12 feet (3.7 m).

D. Install hangers for drawn-temper copper piping with the following maximum spacing and minimum rod sizes:

1. NPS 3/4 (DN 20): Maximum span, 5 feet (1.5 m); minimum rod size, 1/4 inch (6.4 mm).

2. NPS 1 (DN 25): Maximum span, 6 feet (1.8 m); minimum rod size, 1/4 inch (6.4 mm).

3. NPS 1-1/4 (DN 32):Maximum span, 7 feet (2.1 m); minimum rod size, 3/8 inch (10 mm).

4. NPS 1-1/2 (DN 40): Maximum span, 8 feet (2.4 m); minimum rod size, 3/8 inch (10 mm).

5. NPS 2 (DN 50): Maximum span, 8 feet (2.4 m); minimum rod size, 3/8 inch (10 mm).

6. NPS 2-1/2 (DN 65): Maximum span, 9 feet (2.7 m); minimum rod size, 3/8 inch (10 mm).

7. NPS 3 (DN 80) and Larger: Maximum span, 10 feet (3 m); minimum rod size, 3/8 inch

(10 mm).

E. Support vertical runs at roof, at each floor, and at 10-foot (3-m) intervals between floors.

3.5 PIPE JOINT CONSTRUCTION

A. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

B. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

C. Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to tube end. Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," using lead-free solder alloy complying with ASTM B 32.

D. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube"

Chapter, using copper-phosphorus brazing filler metal complying with AWS A5.8/A5.8M.

E. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.

2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.

F. Welded Joints: Construct joints according to AWS D10.12M/D10.12, using qualified processes and welding operators according to "Quality Assurance" Article.

G. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. Use suitable lubricants on bolt threads.

16.31.001 / FAA Hangers 8 and 9 232113 - 10 HYDRONIC PIPING

H. Grooved Joints: Assemble joints with coupling and gasket, lubricant, and bolts. Cut or roll grooves in ends of pipe based on pipe and coupling manufacturer's written instructions for pipe wall thickness. Use grooved-end fittings and rigid, grooved-end-pipe couplings.

I. Mechanically Formed, Copper-Tube-Outlet Joints: Use manufacturer-recommended tool and procedure, and brazed joints.

3.6 TERMINAL EQUIPMENT CONNECTIONS

A. Sizes for supply and return piping connections shall be the same as or larger than equipment connections.

B. Install control valves in accessible locations close to connected equipment.

C. Install bypass piping with globe valve around control valve. If parallel control valves are installed, only one bypass is required.

D. Install ports for pressure gages and thermometers at coil inlet and outlet connections. Comply with requirements in Section 230519 "Meters and Gages for HVAC Piping."

3.7 CHEMICAL TREATMENT

A. Perform an analysis of makeup water to determine type and quantities of chemical treatment needed to keep system free of scale, corrosion, and fouling, and to sustain the following water characteristics:

1. pH: 9.0 to 10.5.

2. "P" Alkalinity: 100 to 500 ppm.

3. Boron: 100 to 200 ppm.

4. Chemical Oxygen Demand: Maximum of 100 ppm. Revise this value if closed system contains glycol. (Addm. #2)

5. Corrosion Inhibitor:

a. Sodium Nitrate: 1000 to 1500 ppm.

b. Molybdate: 200 to 300 ppm.

c. Chromate: 200 to 300 ppm.

d. Sodium Nitrate Plus Molybdate: 100 to 200 ppm each.

e. Chromate Plus Molybdate: 50 to 100 ppm each.

6. Soluble Copper: Maximum of 0.20 ppm.

7. Tolyiriazole Copper and Yellow Metal Corrosion Inhibitor: Minimum of 10 ppm.

8. Total Suspended Solids: Maximum of 10 ppm.

9. Ammonia: Maximum of 20 ppm.

10. Free Caustic Alkalinity: Maximum of 20 ppm.

11. Microbiological Limits:

a. Total Aerobic Plate Count: Maximum of 1000 organisms/mL.

b. Total Anaerobic Plate Count: Maximum of 100 organisms/mL.

c. Nitrate Reducers: 100 organisms/mL.

16.31.001 / FAA Hangers 8 and 9 232113 - 11 HYDRONIC PIPING

d. Sulfate Reducers: Maximum of zero organisms/mL.

e. Iron Bacteria: Maximum of zero organisms/mL.

12. .

B. Install bypass chemical feeders in each hydronic system where indicated.

1. Install in upright position with top of funnel not more than 48 inches (1200 mm) above the floor.

2. Install feeder in minimum NPS 3/4 (DN 20) bypass line, from main with full-size, full-port, ball valve in the main between bypass connections.

3. Install NPS 3/4 (DN 20) pipe from chemical feeder drain to nearest equipment drain and include a full-size, full-port, ball valve.

C. Fill system with fresh water and add liquid alkaline compound with emulsifying agents and detergents to remove grease and petroleum products from piping. Circulate solution for a minimum of 24 hours, drain, clean strainer screens, and refill with fresh water.

D. Add initial chemical treatment and maintain water quality in ranges noted above for the first year of operation.

E. Fill systems that have antifreeze or glycol solutions with the following concentrations:

1. Hot-Water Heating Piping: Minimum of <Insert number> percent ethylene glycol.

2. Chilled-Water Piping: Minimum of <Insert number> percent ethylene glycol. (Addm.

#2)

3.8 FIELD QUALITY CONTROL

A. Prepare hydronic piping according to ASME B31.9 and as follows:

1. Leave joints, including welds, uninsulated and exposed for examination during test.

2. Provide temporary restraints for expansion joints that cannot sustain reactions due to test pressure. If temporary restraints are impractical, isolate expansion joints from testing.

3. Flush hydronic piping systems with clean water; then remove and clean or replace strainer screens.

4. Isolate equipment from piping. If a valve is used to isolate equipment, its closure shall be capable of sealing against test pressure without damage to valve. Install blinds in flanged joints to isolate equipment.

5. Install safety valve, set at a pressure no more than one-third higher than test pressure, to protect against damage by expanding liquid or other source of overpressure during test.

B. Perform the following tests on hydronic piping:

1. Use ambient temperature water as a testing medium unless there is risk of damage due to freezing. Another liquid that is safe for workers and compatible with piping may be used.

2. While filling system, use vents installed at high points of system to release air. Use drains installed at low points for complete draining of test liquid.

3. Isolate expansion tanks and determine that hydronic system is full of water.

16.31.001 / FAA Hangers 8 and 9 232113 - 12 HYDRONIC PIPING

4. Subject piping system to hydrostatic test pressure that is not less than 1.5 times the system's working pressure. Test pressure shall not exceed maximum pressure for any vessel, pump, valve, or other component in system under test. Verify that stress due to pressure at bottom of vertical runs does not exceed 90 percent of specified minimum yield strength or 1.7 times the "SE" value in Appendix A in ASME B31.9, "Building

Services Piping."

5. After hydrostatic test pressure has been applied for at least 10 minutes, examine piping, joints, and connections for leakage. Eliminate leaks by tightening, repairing, or replacing components, and repeat hydrostatic test until there are no leaks.

6. Prepare written report of testing.

C. Perform the following before operating the system:

1. Open manual valves fully.

2. Inspect pumps for proper rotation.

3. Set makeup pressure-reducing valves for required system pressure.

4. Inspect air vents at high points of system and determine if all are installed and operating freely (automatic type), or bleed air completely (manual type).

5. Set temperature controls so all coils are calling for full flow.

6. Inspect and set operating temperatures of hydronic equipment, such as boilers, chillers, cooling towers, to specified values.

7. Verify lubrication of motors and bearings.

END OF SECTION 232113