Attachment 27 - 232500 fl - HVAC water treatment (pdf)

View the file

Other files

File Type Posted
ATTACHMENT 7 CONTRACTOR'S RELEASE.doc DOC document
Attachment 27 - 232500 fl - HVAC water treatment.pdf PDF
ATTACHMENT 6 SF25A.doc DOC document
SIR/RFO DTFAAC-17-R-00023.pdf PDF
Attachment 22 - Title Sheet.pdf PDF
ATTACHMENT 8 OPERATIONAL CONTROL DOCUMENTS.pdf PDF
Attachment 18 - M4-01 - Hangar 8 Details & Schedules.pdf PDF
Attachment 13 - Addendum 2.pdf PDF
ATTACHMENT 9 DBA WAGE DETERMINATION.pdf PDF
Attachment 20 - Section 237313 - Central Station Air Handling Units.pdf PDF
Attachment 28 - 236514.13 fl - open-circuit, induced-draft, counterflow cooling towers.pdf PDF
Pre-Proposal Conference Sign-In Sheet.pdf PDF
ATTACHMENT 3 DRAWINGS.pdf PDF
ATTACHMENT 4 CHAPTER 33.pdf PDF
Amendment 0001.pdf PDF
Attachment 17 - M2-01 - Hangar 9 Site Plan and First Floor Plan.pdf PDF
ATTACHMENT 12 CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 10 PAST PERFORMANCE EXPERIENCE FORM.pdf PDF
Amendment 000002.pdf PDF
Attachment 23 - Addendum 3.pdf PDF
Attachment 30 - Hangar 9 M Addendum 3.pdf PDF
Attachment 29 - Hangar 9 E Addendum 3.pdf PDF
ATTACHMENT 5 SF25.pdf PDF
ATTACHMENT 2 SPECIFICATIONS.pdf PDF
Attachment 15 - Hangar 8 E Addendum 2.pdf PDF
Attachment 19 - Section 232113-Hydronic Piping.pdf PDF
Amendment 0003.pdf PDF
Attachment 21 - Section 237416.13-Packaged, Large-Capacity, Rooftop Air-Conditioning Units.pdf PDF
Amendment 0004.pdf PDF
Attachment 26 - 232123 FL Hydronic Pumps.pdf PDF
Attachment 14 - 16-044 Addendum #2.pdf PDF
Attachment 16 - Hangar 9 E Addendum 2.pdf PDF
ATTACHMENT 1 SECTION B SUPPLIES OR SERVICES-PRICES.xlsx XLSX spreadsheet
Attachment 24 - 16-044 Addendum #3.pdf PDF
Attachment 25 - 230719 fl - hvac piping insulation.pdf PDF
ATTACHMENT 11 PAST PERFORMANCE SURVEY.pdf PDF
Attachment 13 - Addendum 2.pdf PDF
Attachment 22 - Title Sheet.pdf PDF
ATTACHMENT 6 SF25A.doc DOC document
ATTACHMENT 12 CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 9 DBA WAGE DETERMINATION.pdf PDF
Attachment 25 - 230719 fl - hvac piping insulation.pdf PDF
Attachment 19 - Section 232113-Hydronic Piping.pdf PDF
Attachment 29 - Hangar 9 E Addendum 3.pdf PDF
Attachment 24 - 16-044 Addendum #3.pdf PDF
Attachment 26 - 232123 FL Hydronic Pumps.pdf PDF
ATTACHMENT 5 SF25.pdf PDF
ATTACHMENT 3 DRAWINGS.pdf PDF
Attachment 30 - Hangar 9 M Addendum 3.pdf PDF
ATTACHMENT 8 OPERATIONAL CONTROL DOCUMENTS.pdf PDF
Show 40 more

Latest 50 of 174 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

16.31.001 / FAA Hangars 8 and 9 232500 - 1 HVAC Water Treatment Addm. #3 Dated 8/21/17

SECTION 23 25 00 – HVAC Water Treatment

COOLING TOWER WATER TREATMENT SYSTEM

PART 1 GENERAL

1.1 DESCRIPTION

A. This section specifies cleaning and treatment of circulating HVAC water systems, including the following:

Tower Cooling Water – Open Cooling Water Loop Systems

1.2 RELATED WORK

A. Test requirements and instructions on use of equipment/system: Section 01 00 00, GENERAL REQUIREMENTS

B. General mechanical requirements and items, which are common to more than one section of

Division 23: Section 23 05 11, COMMON WORK RESULTS FOR HVAC AND STEAM

GENERATION

C. Piping and valves: Section 23 21 13, HYDRONIC PIPING and Section 23 22 13, STEAM

AND CONDENSATE HEATING PIPING

1.3 QUALITY ASSURANCE

A. Refer to paragraph, QUALITY ASSURANCE in Section 23 05 11, COMMON WORK

RESULTS FOR HVAC AND STEAM GENERATION.

B. Technical Services: Provide the services of an experienced water treatment specialist, or technical representative, approved by the Water Treatment System Manufacturer to direct flushing, cleaning, pre-treatment, training, debugging, and acceptance testing operations.

The water treatment specialist shall direct and perform chemical limit control during construction period and monitor systems for a period of 12 months after completion and acceptance by owner, including not less than 12 service calls and written status reports.

During this period they shall perform monthly tests of the cooling tower for Heterotrophic

Bacteria and submit reports stating Colony Forming Units per milliliter to the owner/operator and the Water Treatment System Manufacturer.

C. Field Quality Control and Laboratory Reports: During the one year service period, the water treatment specialist shall provide not less than 12 reports based on on-site periodic visits, as stated in paragraph 1.3.B, sample taking and testing. They shall review with facility personnel the state of water treatment control for the previous period. In addition to field tests, the water treatment specialist shall provide water chemistry test reports. These monitoring reports shall assess water treatment instrumentation accuracy, scale formation, fouling and corrosion control, and shall contain instructions for the correction of any out-of-control condition.

D. Log Forms: Provide water treatment test log form in electronic format that can be reproduced by owner for use by plant personal making regular system water tests.

1.4 SUBMITTALS

A. Submit in accordance with Section 01 33 00, SUBMITTAL PROCEDURES.

B. Manufacturer's Literature and Data including:

16.31.001 / FAA Hangars 8 and 9 232500 - 2 HVAC Water Treatment

Electronic Chemical-Free treatment for open loop systems, including installation and operating instructions

Conductivity Controller and Blowdown Valve, including installation and operating instructions

Optional Coupon Rack and other Accessories as required by the contract documents

C. Water analysis verification: Water analysis to include at a minimum the analysis of the following compositions of the Make-up water source:

pH

Specific Conductivity (µS/cm)

Calcium Hardness (as ppm CaCO3)

Total Hardness (as ppm CaCO3)

Total Alkalinity or m-Alkalinity (as ppm CaCO3)

Chloride (as Cl-)

Iron (as Fe)

Phosphate (as PO4)

Silica (as SiO2)

Sulfate (as SO4)

D. Supply Maintenance and operating instructions in accordance with Section 01 00 00, GENERAL REQUIREMENTS suitable for inclusion into a standard 3-ring binder.

PART 2 - PRODUCTS

2.1 GENERAL

A. The Contractor shall furnish and install an Electronic Chemical-free Water Treatment

System as shown and detailed on the contract documents. All components of the system provided will be supplied by a single company and be certified to be functionally compatible, such as the Flow-Tech FTC series manufactured by Flow-Tech HVAC, LLC A

Nevada Limited Liability Company or an approved substitution.

2.2 ELECTRONIC WATER TREATMENT SYSTEM

A. Provide a complete Conducted Propagating Signal Generator System Equal to the Flow-

Tech FTC series manufactured by Flow-Tech HVAC, LLC A Nevada Limited Liability

Company or an approved substitution.

The use of other chemical free technologies including but not limited to pulsed power, wire-wrap, ultrasound, cavitation, magnets, copper/zinc alloys, copper/silver electrodes, electrostatic, electrodynamic coils, and such are not acceptable.

B. System Description

The system shall consist of a Driver Panel with Signal Tags to be installed on the water system piping.

Signal Tag placement shall be as shown and detailed on the contract documents.

a. Installation shall be in the main cooling tower recirculation line after the pump(s).

C. Driver Panel:

16.31.001 / FAA Hangars 8 and 9 232500 - 3 HVAC Water Treatment

Wall mounted IP66 or NEMA 4x enclosure capable of driving two signal tags.

Driver Panel will be UL approved.

An on/off switch will be used to provide safety system shutoff for servicing.

Maximum power required for Electronic Water Treatment System is 50 watts.

Signal must propagate throughout water in piping system. An oscilloscope must be used to confirm propagation in the water channel.

System must be able to operate continuously without water in the pipes. Electrical interlock with water circulation pump is not permitted.

Unit will be equipped with a Class II protected power supply for 100 to 240 VAC input at 47 to 63 Hz.

A clearly defined and randomly generated decaying sine wave signal between 80 Khz and 240 Khz must be confirmed with an oscilloscope.

The weatherproof Signal Cable must be field replaceable to allow for repair or modification. Standard length is 33 feet, with optional lengths available.

Signal Cable shall be 2 core Armored Cable.

LED Indicators indicating power and operation shall be visible externally. The use of incandescent bulbs for indicators is not allowed.

IP66 or NEMA 4x construction for the Driver is required. Powered fan ventilation with inlet air filter is not allowed.

System shall generate a radio frequency signal in the 140khz range that is conducted into the water of the entire plumbing system and creates a diminishing sine wave that randomly switches on and off up to 40,000 times per second. Use of coil wraps, ferrite wraps, or reaction chambers is not allowed.

Signal tags require metal contact on piping or pump flanges. No metal pipes shall be cut for installation.

Electronic Water Treatment must be installed after water is introduced into the system. Shut down of the system is not required for installation.

Signal frequency shall be field adjustable.

D. Conductivity Controller

Conducted Propagating Signal Generator System manufacturer shall furnish a

Conductivity Controller to provide proper automatic conductivity-based blow down control for the cooling tower.

Conductivity controller shall have the following features:

a. NEMA 4x enclosure.

b. Maintenance free Toroidal conductivity sensor. Standard contact type probes will not be acceptable.

c. Large graphical display with easy to read font.

d. Simple four button user interface.

e. Flow Switch input.

f. 4-20 mA isolated analog output.

g. Dry contact alarm output.

Flow sensor to prevent off-cycle blowdown operation.

Sample Valve to be provided for convenient withdrawing of water samples.

Conductivity Controller, Sensor, Sample Valve and Flow Switch will mounted on panel suitable for wall or rack mounting.

Isolation valves will be provided to allow for cleaning probe and flow switch without turning system water flow.

16.31.001 / FAA Hangars 8 and 9 232500 - 4 HVAC Water Treatment

E. Blowdown or Bleed Valve:

Provide motorized capacitor or spring return ball valve with 120 volt, single phase power input.

a. Furnish with appropriate cover, if required, to maintain a minimum rating of

NEMA 3R if installed outdoors.

b. Install bypass line with block valve around blowdown valve for servicing and emergency manual blowdown operation.

c. Do not install strainer(s) in blowdown line.

d. Install throttling valve ahead of the blowdown valve to make adjustments in blowdown volume rate if required.

e. Bleed Valve size to be determined by fifteen minute per hour blowdown rate calculated at maximum tower load for three cycles of concentration

F. Optional Corrosion Test Coupon Assembly:

If required by the contract documents, provide a two-station or four-station corrosion coupon rack constructed of PVC, complete with piping, valves, and mild steel and copper coupons. Locate copper coupon downstream from mild steel coupon in the test coupon assembly. Include isolation and ball valves and a flow control valve to limit velocity to between 3-5 feet per second. Entire assembly shall be mounted on a panel suitable for wall or rack mounting.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify field conditions and suitability for installation according to manufacturer’s published installation data.

3.2 INSTALLATION

A. Installation shall meet or exceed all applicable federal, state and local requirements, referenced standards and conform to codes and ordinances of authorities having jurisdiction.

B. Install equipment per recommendations in the manufacturer's published installation data.

C. Cleaning of piping systems using the Electronic Treatment System (Flow-Tech FTC series):

Immediately after hydrostatic testing of piping, systems shall be cleaned, drained, and flushed with clean water. Any chemical cleaners used in this process shall be thoroughly flushed from the piping system.

Under no circumstance will water be allowed to sit stagnant or circulate without water treatment after initial cleaning and testing.

Proper system layup procedures must be followed anytime the water system is not running.

a. For wet layup: Bulk water must contain concentrated minerals such that bulk water is at CaCO3 saturation. During periods of low or no load, saturated bulk

16.31.001 / FAA Hangars 8 and 9 232500 - 5 HVAC Water Treatment water must be circulated an hour each day to ensure treated water is mixed with bulk water.

b. For dry layup: The system shall be drained of all water. An appropriate vapor type corrosion inhibitor, as determined by the factory trained and certified water treatment specialist, shall be first circulated in the system for a period of time as required by the treatment manufacturer and dictated by the size of the system treated.

c. Immediately prior to putting the Electronic Treatment System (Flow-Tech FTC series) into operation, the system shall be re-filled with clean water.

Consult with Water Treatment System Manufacturer or the local Representative for additional details.

D. CONNECTIONS

Piping installation requirements are specified in other Division 23 Sections.

Drawings indicate general arrangement of piping, fittings, and specialties.

Install piping adjacent to equipment to allow service and maintenance.

Size and install the control loop piping to conductivity, optional sensors, and/or corrosion coupon racks in the size PVC to match fittings provided. Install field provided full port ball valves for isolation of sensors and racks for routine maintenance. Control loop sensors shall not be installed directly in the piping mains.

Control loop shall be piped from the pressure side of the recirculating pump to the suction side of the pump, so that the control loop senses the highest pressure of the fluid system. In the case of Fluid Coolers or Evaporative Condensers, the control loop shall be taken from the pump discharge and the water shall be returned to the sump.

Bleed line should not be attached to the control loop. Install the bleed line downstream of the centrifugal separator or on the pressure side of the recirculating pump, preferably from the side or top of the pipe to prevent plugging of the valve due to accumulated solids, dirt, and debris.

Confirm applicable electrical requirements in Division 26 Sections for connecting electrical equipment.

a. Provide proper electrical ground to the equipment.

b. Tighten electrical connectors and terminals according to manufacturer's published torque-tightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A and UL 486B.

3.3 TESTING

A. Engage a factory-authorized service representative to perform startup service for the

Cooling Tower Water Treatment System.

Inspect field-assembled components and equipment installation, including piping and electrical connections. Report results in writing.

Inspect piping and equipment to determine that systems and equipment have been

16.31.001 / FAA Hangars 8 and 9 232500 - 6 HVAC Water Treatment cleaned, flushed, and filled with water, and are fully operational.

Place HVAC water-treatment system into operation and calibrate controls during the preliminary phase of HVAC systems' startup procedures.

Set up Cooling Tower blowdown system according to the Manufacturer’s recommendations based upon the site water analysis as specified in PART 1.4 C –

Submittal Data of this Section.

The Field Service Technician shall provide an Initial Start-up Service Report to the operator/owner and the Manufacturer.

B. No water system using an Electronic Treatment System (Flow-Tech FTC series) shall be put into operation without the Flow-Tech FTC series being energized and the blowdown system and mechanical filtration systems fully operational. Failure to comply may result in damage to connected heat exchange equipment from scaling and corrosion, or fouling from biological growth.

3.4 ADJUSTING

One year of Cooling Water Treatment Service by a Factory Authorized and Trained

Service Technician or Authorized Water Treater, including remote monitoring, shall be provided with the cost of the Cooling Tower Water Treatment System.

At approximately every 30 days from Initial Start-up Service, the Service Technician shall monitor the performance of the system and make system adjustments as necessary.

A written Service Report shall be provided to the Owner/Operator and to the

Manufacturer.

The monitoring by the Factory Trained and certified Service Technician will include the following:

a. Confirm all water treatment system equipment is functioning properly.

b. Inspect for any evidence of scale formation.

c. Inspect for any evidence of high bacteria levels or biofilm formation.

d. Confirm source of makeup water.

e. Perform required makeup water analysis

1) Conductivity

2) pH

3) Chloride

f. Perform required basin water analysis

1) Conductivity

2) pH

3) Chloride

4) Bacteria analysis by Dipslide or by ASTM D6530 (Kool Kount Assay)

g. Calibrate and adjust conductivity controller and other sensors as required

3.5 TRAINING

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain Cooling Tower Water Treatment Systems and equipment.

16.31.001 / FAA Hangars 8 and 9 232500 - 7 HVAC Water Treatment

B. Train Owner's maintenance personnel on procedures and schedules for starting and stopping, troubleshooting, servicing, and maintaining equipment and schedules.

Schedule at least four (4) hours of training with Owner.

Provide at least seven days' advance notice.

C. Review data in maintenance manuals, especially data on recommended parts inventory and supply sources and on availability of parts and service.

END OF SECTION