About this file

Attachment 23 - Addendum 3 (pdf)

View the file

Other files

File Type Posted
ATTACHMENT 7 CONTRACTOR'S RELEASE.doc DOC document
Attachment 27 - 232500 fl - HVAC water treatment.pdf PDF
ATTACHMENT 6 SF25A.doc DOC document
SIR/RFO DTFAAC-17-R-00023.pdf PDF
Attachment 22 - Title Sheet.pdf PDF
ATTACHMENT 8 OPERATIONAL CONTROL DOCUMENTS.pdf PDF
Attachment 18 - M4-01 - Hangar 8 Details & Schedules.pdf PDF
Attachment 13 - Addendum 2.pdf PDF
ATTACHMENT 9 DBA WAGE DETERMINATION.pdf PDF
Attachment 20 - Section 237313 - Central Station Air Handling Units.pdf PDF
Attachment 28 - 236514.13 fl - open-circuit, induced-draft, counterflow cooling towers.pdf PDF
Pre-Proposal Conference Sign-In Sheet.pdf PDF
ATTACHMENT 3 DRAWINGS.pdf PDF
ATTACHMENT 4 CHAPTER 33.pdf PDF
Amendment 0001.pdf PDF
Attachment 17 - M2-01 - Hangar 9 Site Plan and First Floor Plan.pdf PDF
ATTACHMENT 12 CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 10 PAST PERFORMANCE EXPERIENCE FORM.pdf PDF
Amendment 000002.pdf PDF
Attachment 23 - Addendum 3.pdf PDF
Attachment 30 - Hangar 9 M Addendum 3.pdf PDF
Attachment 29 - Hangar 9 E Addendum 3.pdf PDF
ATTACHMENT 5 SF25.pdf PDF
ATTACHMENT 2 SPECIFICATIONS.pdf PDF
Attachment 15 - Hangar 8 E Addendum 2.pdf PDF
Attachment 19 - Section 232113-Hydronic Piping.pdf PDF
Amendment 0003.pdf PDF
Attachment 21 - Section 237416.13-Packaged, Large-Capacity, Rooftop Air-Conditioning Units.pdf PDF
Amendment 0004.pdf PDF
Attachment 26 - 232123 FL Hydronic Pumps.pdf PDF
Attachment 14 - 16-044 Addendum #2.pdf PDF
Attachment 16 - Hangar 9 E Addendum 2.pdf PDF
ATTACHMENT 1 SECTION B SUPPLIES OR SERVICES-PRICES.xlsx XLSX spreadsheet
Attachment 24 - 16-044 Addendum #3.pdf PDF
Attachment 25 - 230719 fl - hvac piping insulation.pdf PDF
ATTACHMENT 11 PAST PERFORMANCE SURVEY.pdf PDF
Attachment 13 - Addendum 2.pdf PDF
Attachment 22 - Title Sheet.pdf PDF
ATTACHMENT 6 SF25A.doc DOC document
ATTACHMENT 12 CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 9 DBA WAGE DETERMINATION.pdf PDF
Attachment 25 - 230719 fl - hvac piping insulation.pdf PDF
Attachment 19 - Section 232113-Hydronic Piping.pdf PDF
Attachment 29 - Hangar 9 E Addendum 3.pdf PDF
Attachment 24 - 16-044 Addendum #3.pdf PDF
Attachment 26 - 232123 FL Hydronic Pumps.pdf PDF
ATTACHMENT 5 SF25.pdf PDF
ATTACHMENT 3 DRAWINGS.pdf PDF
Attachment 30 - Hangar 9 M Addendum 3.pdf PDF
ATTACHMENT 8 OPERATIONAL CONTROL DOCUMENTS.pdf PDF
Show 40 more

Latest 50 of 174 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 3 FAA Hangar 08 & 09 Mechanical Upgrades

SIR/RFO DTFAAC-17-R-00023 August 22, 2017

Work Order 2014-014040

Attachment 23

Addendum No. 3 forms a part of the Contract Documents and modifies the original bid documents. Items in this

Addendum take precedence over the original documents. Addendum No. 3 consists of the following:

1. Requests for Substitution(s) will be considered only after the contract is awarded. Proposals should be based upon the Contract Documents.

2. QUESTION: The schedule refers to “split coupled vertical In-Line (series 4300) pumps, yet the specs refer to “close coupled end suction” pumps. What type of pumps are to be used?

ANSWER: Schedule has been updated to match specifications.

3. QUESTION: Clarification of the cooling tower flow requirements: Schedule references 930 gpm, however per the original selection and the combined flow of the pumps equal 1050 gpm.

ANSWER: Chillers designed for 480 gpm each and tower shall match. Pumps shall turn down to 960.

4. QUESTION: Clarification on gear drive vs belt drive (cooling tower): Specs indicate belt drive; however the schedule notes indicate a “motor outside the airstream” configuration which requires the tower to be a gear drive.

ANSWER: Specifications have been updated to gear drive.

5. QUESTION: Schedule calls for sweeper piping; however there is no schedule or spec for the associated filter. Additionally, there are no specs for the “Pulse Water Treatment Equipment”.

ANSWER: Water filtration language has been added.

6. QUESTION: Plan M3.02 shows ‘1” DCW to new chemical water treatment system as detailed in specifications’. There is no specification for this system, and what is this new system?

ANSWER: Provide chemical treatment system as necessary to meet specification 232113.

7. QUESTION: Specification 232113 3.7D states ‘Add initial chemical treatment and maintain water quality in ranges noted above for the first year of operation’. Is this referring to only the condenser water system?

ANSWER: Included in Addendum #2.

8. QUESTION: Specification 232113 3.7E states ‘Fill heating water and chilled water piping with <insert number> percent ethylene glycol’. What is the percentage of glycol needed? Or, do these systems even have glycol in them?

ANSWER: Included in Addendum #2.