Attachment 18 - M4-01 - Hangar 8 Details & Schedules.pdf
PDF 89 KB Posted
- Attached to
- CONSTRUCTION: Hangar 08 & 09 Mechanical Upgrades at the Mike Monroney Aeronautical Center, Oklahoma City, OK
- Solicitation number
- DTFAAC-17-R-00023
About this file
Attachment 18 - M4-01 - Hangar 8 Details & Schedules (pdf)
View the file
Other files
Show 40 more
Latest 50 of 174 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENTER OF PIPE
U N
IN
S U
LA
TE
D P
IP
E
IN
S U
LA
TE
D P
IP
E
3/8" 3/8"
1/4"
PIPE
ESCUTCHEON
INTERIOR SIDE OF
EXTERIOR WALL
PIPE SLEEVE
BACKUP
MATERIAL
SEALANT
INSULATION
3/8" O.D. COPPER TUBING
TO FLOOR DRAIN OR TO
ACCESSIBLE POINT FOR
DISCHARGE INTO A
CONTAINER
NOTE: VENT ALL HIGH POINTS AS INDICATED ABOVE.
REDUCER
3/4" BALL VALVE
3/4" X 4" NIPPLE
CIRCULATING
WATER PIPING
WATER COIL UNION
TEST PLUG
UNION
FLOW CONTROL VALVE
BALL OR BUTTERFLY VALVE
SIZE SHOWN ON DRAWINGS
DRAIN PAN
STRAINER
3-WAY MODULATING CONTROL VALVE
2" TRAP
1" O.D. DRAIN MIN.
WATER COIL UNION
TEST PLUG
UNION
FLOW CONTROL VALVE
BALL OR BUTTERFLY VALVE
SIZE SHOWN ON DRAWINGS
DRAIN PAN
STRAINER
2-WAY MODULATING CONTROL VALVE
2" TRAP
1" O.D. DRAIN MIN.
DESIGNED
WORK ORDER NO.
DRAWN
ISSUED BY OFFICE OF: DATE:
PREPARED BY
REV DATE
APPROVED BY
DESCRIPTION APP'DCHECK
OF2014-014040
REVIEWED BY
DRAWING NO.
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FACILITY MANAGEMENT
AMP-400
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
SMALL ARCHITECTS MARK McDANIEL
SENSITIVE SECURITY INFORMATION WARNING:
This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S.
government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
1 8/14/2017 Addendum #2
M4.01
HANGAR 8 DETAILS & SCHEDULES
MAY 11, 2017CSC
LSF
JBS
009-H08 & 010-H09
HANGARS 8 & 9
MECHANICAL UPGRADES
JBS JBS
920 W. Main
Oklahoma City, Oklahoma 73106 phone: 405.232.5700 web: www.adgokc.com
ADG
MISCELLANEOUS EQUIPMENT
TAG EQUIPMENT DESCRIPTION
FM PROVIDE FLOW METER WITH DIRECT READING DISPLAY EQUAL TO ONICON F-3100
SERIES.
NOTES:
1. SELECTIONS BASED ON ELEVATION OF 1280 FT ASL
2. PROVIDE DOUBLE WALL UNIT WITH 3 INCH FULLY INSULATED WALL PANELS AND SOLID INNER WALL
3. UNIT CONFIGURATION SHALL BE (FRONT TO BACK): SUPPLY PLENUM, OOLING COIL, HEATING COIL, ACCESS SECTION, FANWALL & VFD SECTION, UV LIGHT/FILTER SECTION, R/A & O/A MIXING BOX
4. CHILLED WATER AND HEATING WATER BOTH ARE 30% PRO;YLENE GLYCOL
5. MERV 8 FOUR INCH DISPOSABLE FILTERS
6. BLADE SEALS AND EDGE SEALS ON OUTDOOR AIR DAMPER. OUTSIDE AIR INTAKES SHALL BE SIZED FOR 100% OUTSIDE AIR.
7. PROVIDE WITH UV LIGHT SECTION
8. VFD BASIS OF DESIGN: YASKAWA DRIVES WITH MAGNESENSE
9. BASIS OF DESIGN: TEMTROL CUSTOM AIR HANDLING UNITS
10. PROVIDE WITH DUCT SMOKE DETECTORS IN BOTH SUPPLY AND RETURN DUCTS.
AIR HANDLING UNIT SCHEDULE
AHU
MARK SERVES
FAN DATA COOLING COIL DATA PREHEAT COIL DATA
NOTES
MAX
CFM
MIN
CFM O/A
E.S.P.
/T.S.P. (IN.
W.C.)
FAN RPM
(MAX)
MOTOR HP
(MIN)
MOTOR
(V/PH)
COIL
CFM
ENTERING AIR
DB/WB (°F)
LEAVING AIR
DB/WB (°F)
SENSIBLE
MBH
TOTAL
MBH
COIL
GPM
MIN
ROW
S
MAX AIR
DP ("WC)
MAX
WATER DP
(FT)
COIL
CFM
ENTERING
DB (°F)
LEAVING
DB (°F)
TOTAL
MBH
COIL
GPM
MAX AIR
PD
("WC)
MAX
WATER
PD (FT)
AHU-01 NORTHEAST 7470 2240 7470 3.2/6.0 3862 2 @ 4 460/3/60 7470 85.0/66.6 53.2/53.0 237.9 289.1 75 2 0.47 12.33 7470 60.0 96.5 287.5 30.2 0.06 2.34 ALL LISTED
AHU-02 SOUTHEAST 8810 2645 8810 3.2/6.0 3521 2 @ 5 460/3/60 8810 85.0/66.6 54.2/53.8 272.3 322.1 79 2 0.59 13.51 8810 60.0 94.0 316.0 33.2 0.08 2.78 ALL LISTED
AHU-03 NORTHWEST 5000 1500 5000 3.2/6.0 3965 3 @ 6 460/3/60 5000 96.6/67.8 57.7/54.4 191.1 191.1 52 2 0.35 6.84 5000 61.8 97.7 188.5 19.8 0.07 3.33 ALL LISTED
AHU-3W WEST 3370 1015 3370 3.2/6.0 3965 2 @ 1 460/3/60 3370 75.2/61.5 49.1/48.9 89.6 111.4 22.2 1 0.46 6.49 3370 67.1 104.8 132.3 13.5 0.06 2.43 ALL LISTED
AHU-04 SOUTHWEST 6220 1865 6220 0.5/2.5 3862 3 @ 6 460/3/60 6220 88.2/69.1 54.8/54.6 206.9 265.4 60 2 0.36 9.61 6220 55.5 91.8 240.2 25.2 .04 3.73 ALL LISTED
SCALE: 12" = 1'-0"1
PIPE PENETRATION THRU WALL DETAIL
SCALE: 12" = 1'-0"2
AIR VENT DETAIL
SCALE: 12" = 1'-0"3
THREE WAY VALVE AT COIL PIPING DETAIL @ AHU 4
SCALE: 12" = 1'-0"4
TWO WAY VALVE AT COIL PIPING DETAIL @ AHU 1-3
| Sheets |
| M4.01 - HANGAR 8 DETAILS & SCHEDULES |