Attachment 17 - M2-01 - Hangar 9 Site Plan and First Floor Plan.pdf
PDF 235 KB Posted
- Attached to
- CONSTRUCTION: Hangar 08 & 09 Mechanical Upgrades at the Mike Monroney Aeronautical Center, Oklahoma City, OK
- Solicitation number
- DTFAAC-17-R-00023
About this file
Attachment 17 - M2-01 - Hangar 9 Site Plan and First Floor Plan (pdf)
View the file
Other files
Show 40 more
Latest 50 of 174 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CH-T1
CH-T2
K
J
L
H
G
F
6 7 8 9 10
REFER TO DETAIL 1 SHEET M3.02
FOR ENLARGED MECH ROOM
AND COOLING TOWER PLAN
PIPING RISER ALONG THE FACE OF THE
BUILDING. OFFSET TO MISS THE
ARCHITECTURAL BRICK FEATURE ON THE
EXTERIOR FACE FO THE BUILDING.
CONTRACTOR IS RESPONISBLE FOR
ENSURING THE GROUND, SIDEWALK,
OR PARKING LOT IS PROTECTED
FROM DAMAGE BY THE TEMPORARY
CHILLER SUPPORT/TRAILOR.
TEMPORARY CWS
TEMPORARY CWR
CT-1
REFER TO STRUCTURAL DRAWINGS FOR
DETAILS REGARDING PIPING SUPPORT
TO/FROM ROOF.
REFER TO STRUCTURAL DRAWINGS
FOR DETAILS REGARDING
VERTICAL PIPING SUPPORTS.
PROVIDE PIPING SUPPORTS FOR
TEMPORARY CHILLED WATER
PIPING. REFER TO DETAIL 2 THIS
SHEET.
CONTRACTOR IS RESPONSIBLE FOR
FROST PROTECTION OF TEMPORARY
CHILLED WATER AND CONDENSER
WATER PIPING.
CADMIUM PLATED NUTS,
WASHERS, HANGER RODS.
PIPE HANGER GRINNELL
FIG. 181 FOR 2 1/2" AND
LARGER
COMPOSITE "FEET"
CLIP ANGLE (TYP.)
PIPE HANGAR
GRINNELL FIG. 171
FOR 2" AND SMALLER
SLOTTED CHANNEL
RUBBER PAD AS
REQUIRED
NOTES:
ROOF PIPE SUPPORTS AND HANGERS: (BASIS OF DESIGN IS PORTABLE PIPE HANGERS INC.)
1. BASES: INJECTION MOLDED AND PRESSED, PLASTIC AND RUBBER. BASES SHALL BE SIZED FOR WEIGHT OF PIPES
TO BE SUPPORTED, WITH INSERTS FOR SQUARE TUBING OR THREADED RODS AS REQUIRED.
2. FRAMING: B-LINE 15/8 B 22th OR 1 7/8 BTS 22th, FABRICATED OF STEEL CONFORMING TO ASTM A 570, GRADE
33. FRAMING SHALL BE ROLL FORMED OF 12 GAGE STEEL INTO THREE SIDED OR TUBULAR SHAPE. TUBING SHALL
BE PERFORATED WITH 9/16" HOLES AT 1 7/8" CENTERS ON THREE SIDES
3. PIPE SUPPORTS AND HANGERS: SUPPORTS AND HANGERS SHALL BE FABRICATED OF CARBON STEEL.
4. ACCESSORIES: PROVIDE ALL CLAMPS, BOLTS, NUTS, WASHER, AND OTHER DEVICES AS REQUIRED FOR A
COMPLETE SYSTEM.
SCALE: 3/16" = 1'-0"1
SITE PLAN AND FIRST FLOOR
920 W. Main
Oklahoma City, Oklahoma 73106 phone: 405.232.5700 web: www.adgokc.com
ADG
DESIGNED
WORK ORDER NO.
DRAWN
ISSUED BY OFFICE OF: DATE:
PREPARED BY
REV DATE
APPROVED BY
DESCRIPTION APP'DCHECK
OF2014-014040
REVIEWED BY
DRAWING NO.
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FACILITY MANAGEMENT
AMP-400
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
SMALL ARCHITECTS MARK McDANIEL
SENSITIVE SECURITY INFORMATION WARNING:
This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S.
government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
1 8/14/2017 Addendum #2
M2.01
HANGAR 9 SITE PLAN AND FIRST FLOOR PLAN
MAY 11, 2017CSC
LSF
JBS
009-H08 & 010-H09
HANGARS 8 & 9
MECHANICAL UPGRADES
JBS JBS
NORTH
MECHANICAL KEYNOTE LEGEND
2 LOCATE TEMPORARY CHILLERS AND SUPPLY SINGLE DISTRIBUTION LINES UP BUILDING. SUPPORT TEMPORARY SUPPLY WITH SCAFFOLDING. POWER TEMPORARY CHILLERS FROM SPARE 800 A BRAKERS IN MAIN SWITCH GEAR.
0' 5' 10' 15' 30'
NTS
PIPE SUPPORT ON ROOF AND TEMPORARY PIPING
ON GROUND
N O
T
FO
R
CONST RUCT ION
NOT FOR CONST RU
C
T I O
N
R E V
IEW
SET
REV
IEW
S
ET
THIS
DOCUMENT IS
PRELIMINARY IN
NATURE AND IS NOT
A FINAL, SIGNED
AND SEALED
DOCUMENT
CA: #6447 Exp. 6/18
| Sheets |
| M2.01 - HANGAR 9 SITE PLAN AND FIRST FLOOR PLAN |
File details come from the government source that posted it. Updated .