Past Experience VRLA 24-48 Volt.docx

DOCX document 38 KB Posted

Attached to
GNAS BATTERIES ACQUISITION AND INSTALLATION Federal contract opportunity
Solicitation number
DTFAAC-16-R-00235
Issued by
Department of Transportation Federal Aviation Administration Aeronautical Center

About this file

Past Experience VRLA 24-48 Volt (docx)

View the file

Other files for this federal contract opportunity

Other files attached to GNAS BATTERIES ACQUISITION AND INSTALLATION, newest first.
File Type Posted
VRLA Control Power.xls XLS spreadsheet
Past Experience 360-480 Single-Cell.docx DOCX document
Past Experience FCB 360-480 Volt.docx DOCX document
RFQ example.xlsx XLSX spreadsheet
Exhibit D FCB Control Power NiCd.xls XLS spreadsheet
Past Experience 360-480 Multi.docx DOCX document
VRLA DC BUS.xls XLS spreadsheet
PPQ VRLA 360-480 Volt Single.docx DOCX document
Battery System Equipment.docx DOCX document
PPQ VRLA 24-48 Volt.docx DOCX document
Comp Review.xlsx XLSX spreadsheet
Exhibit B FCB UPS.xls XLS spreadsheet
Exhibit E VRLA VOR.xls XLS spreadsheet
3900 Forms.pdf PDF
Past Experience 360-480 Multi.docx DOCX document
Exhibit A FCB VOR.xls XLS spreadsheet
DIDs.docx DOCX document
VRLA DC BUS.xls XLS spreadsheet
Exhibit I.xls XLS spreadsheet
PPQ FCB NiCd.docx DOCX document
Exhibit E VRLA VOR.xls XLS spreadsheet
SOW.docx DOCX document
PPQ VRLA 360-480 Volt Single.docx DOCX document
VRLA UPS.xls XLS spreadsheet
Sample Client Ltr.docx DOCX document
VRLA Control Power.xls XLS spreadsheet
Past Experience FCB 24-48 Volt.docx DOCX document
Battery System Equipment.docx DOCX document
PPQ FCB NiCd.docx DOCX document
PMR.docx DOCX document
Comp Review.xlsx XLSX spreadsheet
Batttery System Test.docx DOCX document
PPQ FCB 360-480 Volt.docx DOCX document
SOW.docx DOCX document
VRLA UPS.xls XLS spreadsheet
Past Performance FCB NiCd 120 Volt.docx DOCX document
RFQ example.xlsx XLSX spreadsheet
Exhibit D FCB Control Power NiCd.xls XLS spreadsheet
RFQ example.xlsx XLSX spreadsheet
Past Experience VRLA 24-48 Volt.docx DOCX document
Past Experience 360-480 Multi.docx DOCX document
VRLA UPS.xls XLS spreadsheet
3900 Forms.pdf PDF
PPQ FCB 24-48 Volt.docx DOCX document
PMR.docx DOCX document
DIDs.docx DOCX document
Exhibit D FCB Control Power NiCd.xls XLS spreadsheet
CAI.docx DOCX document
Exhibit B FCB UPS.xls XLS spreadsheet
Battery System Equipment.docx DOCX document
Show all 50

GNAS BATTERIES ACQUISITION AND INSTALLATION has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTFACC-16-R-00235

SECTION J ATTACHMENT J.23E Reference CLINs A0500, A0700 A0800 VENDOR’S PAST EXPERIENCE HISTORY on VRLA 24 to 48 Volt Direct Current Applications List the 24 to 48 Volt Valve Regulated Lead Acid (VRLA) Battery projects your company completed in the last 5-years?

Customer NamePhone NumberLocationCompletion Date
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________

Select one project from the above list that best represents your company’s installation experience, then describe the work effort below. Also, complete one Section-J Attachment J.24e Past Performance Questionnaire for this same project.

A.Vendor’s Name: (If this name is a Key Personnel’s previous employer, provide an explanation in Block “I.” below.)
B.Contract Description (Title):
C.Contract Number: (if applicable)
D.Contract Type: (Single project or multi-year)
E.Period of Performance:
F.Original Contract $ Value:
G.Current Contract $ Value: (If current value is more than original value provide explanation.)
H.Customer Specifics:

1. Contracting Agency or Customer:

2. Customer point(s) of contact:

a. Program Manager:

Name:

Address:
Telephone No.:

b. Contracting Officer:

Name:

Address:
Telephone No.:

3. Location(s) of work site(s):

I. Prime Contractor or Subcontractor: Prime Contractor YES , NO Statement of Work (SOW) Attachment J.1, Reference: Paragraph 3.1, 3.1.1, 5.0, and 6.0.

Evaluation Factor Reference, Section-M, Paragraph M.3: Factor 1, Subfactor 1.1.

Provide a description of your Program Management effort as either prime contractor or subcontractor on this contract. Program Management consists of being the single point-of-contact, project coordination with Government program office and government personnel at the installation site. Coordinate: pre-installation; installation, and post-installation work. Deploy qualified installation crews and site project manager. Provide Government program office with monthly cost report. In brief, identify how your company provides turnkey in-house program management services to successfully coordinate multiple battery replacement projects, at geographically dispersed sites, with minimal intervention by, or concern to, the FAA Program Office. Confine description of your Program Management experience to this box.

Program Plan: Provide a copy of your companies Program Plan.

J. Battery String Installation.

Statement of Work (SOW) Attachment J.1, Reference: Paragraph 7.0.

Evaluation Factor Reference, Section-M, Paragraph M.3: Factor 1, Subfactor 1.1.

Battery string installation consist of project coordination with government personnel at the installation site; ensure compliance with NFPA 70E and safety and health checklists; coordinating site surveys, seismic studies, and asbestos work practices; actively pursuing quality installation work; ensure equipment delivery is coordinated with the government site personnel and in sync with the installation crew; ensure timely battery systems installation; coordinate equipment disposal/recycle; coordinate acceptance inspection and clean-up; and, finalize and deliver battery installation documentation Confine description of your Battery String Installation experience to this box.

Demonstrate your experience through a narrative and provide an example of the following Paragraphs K through S, which is applicable to this project:

K. Program Management Cost Reporting. Do you provide your customers with a Program Management cost report? YES , NO If yes proceed to the narrative and example.

Statement of Work (SOW) Attachment J.1, Reference: Paragraph 3.1.2 Evaluation Factor Reference, Section-M, Paragraph M.3: Factor 1, Subfactor 1.1.

1. Narrative: Demonstrate your experience providing customers with periodic cost reports that provide project tracking by delivery orders, completion and cost data on projects. Confine Cost Report description to this box.

2. Program Management Cost Report Document: Provide a copy of a typical Program management cost report completed by your company for your customers, attached document.

L. Site Survey. Was a Site Survey performed on this project? YES , NO If yes proceed to the narrative and example.

Statement of Work (SOW) Attachment J.1, Reference: Paragraph 7.1.1b.

Evaluation Factor Reference, Section-M, Paragraph M.3: Factor 1, Subfactor 1.1

1. Narrative: Explain how a site survey is used to collect information necessary to adequately coordinate and perform battery replacements. See paragraph 7.1.1 of Section-J, Attachment J.1 Statement of Work. Confine Site Survey description to this box.

2. Document: Provide a copy of a Site Survey Report completed by your company or company’s key personnel for this project, attached to this document.

M. Seismic Analysis for Battery Rack. Did this project have a seismic analysis requirement YES , NO If yes proceed to the narrative and example.

Statement of Work (SOW) Attachment J.1, Reference: Paragraph 7.1.1b.viii.

1. Narrative: Explain the process and documentation needed to for a seismic report with calculations and anchoring recommendations. Confine seismic analysis description to this box.

2. Document: Provide a copy of a battery rack seismic report completed by your company or company’s key personnel for this project.

N. Installation Schedule. Did this project have an Installation Schedule YES , NO If yes proceed to the narrative and example.

Statement of Work (SOW) Attachment J.1, Reference: Paragraph 7.1.1b.x. or 7.1.1.g

1. Narrative: Explain your process used to develop an installation schedule that begins with initial customer order to final clean-up and inspection. Confine Installation Schedule description to this box.

2. Document: Provide a copy of an Installation Schedule completed by your company or company’s key personnel for this project, attached to this document.

O. Asbestos Work Practice. Did this project require asbestos work practices? YES , NO If yes proceed to the narrative and example.

Statement of Work (SOW) Attachment J.1, Reference: Paragraph 7.1.1.e.

1. Narrative: Explain your companies work practices, qualifications to work on asbestos containing material, and methods used when battery racks are installed in facilities with mastic or asbestos floor tiles. Confine asbestos work practice description to this box.

2. Document: Provide a copy of a work process used by your company or company’s key personnel during installation of battery racks in mastic or asbestos floor tile.

P. Arc Flash Hazard Analysis. Did this project require arc flash calculations? YES , NO If yes proceed to the narrative and example.

Statement of Work (SOW) Attachment J.1, Reference: Paragraph 7.1.2.s.x.

1. Narrative: Explain the process and documentation needed to calculate Arc Flash energy for this battery installation. Confine Arc Flash Hazard Analysis narrative description to this box.

2. Document: Provide a copy of Arc Flash calculations completed by your company or company’s key personnel for this project.

Q. Battery Testing and Baseline Data. Did this project require battery testing and baseline report? YES , NO If yes proceed to the narrative and example.

Statement of Work (SOW) Attachment J.1, Reference: Paragraph 7.1.2u, and 7.3.1.a and b.

Evaluation Factor Reference, Section-M, Paragraph M.3: Factor 3.

1. Narrative: Explain the procedure used to perform battery baseline testing, Service Testing Runtime calculations. Explain Battery Test Procedure used to verify battery meets manufactures runtime charts. Explain difference between Service Testing and Capacity testing. Confine Battery Testing and Baseline Data description to this box.

2. Document: Provide a copy of Battery Test Procedures, Baseline Battery test data report completed by your company or company’s key personnel for this project.

R. Battery Monitoring System. Did this project require reinstallation of a battery monitoring system? YES , NO If yes proceed to the narrative and example.

Statement of Work (SOW) Attachment J.1, Reference: Paragraph 7.1.2.t.

1. Narrative: Explain the battery monitor installation procedure and battery monitor system commissioning report. Confine Battery Monitor System installation and commissioning description to this box.

2. Document: Provide a copy of Battery Monitor System Commissioning Report.

S. Contractor Acceptance Inspection (CAI), and Site Cleanup and Restoration. Did this project require final inspection and cleanup/restoration? YES , NO If yes proceed to the narrative and example.

Statement of Work (SOW) Attachment J.1, Reference: Paragraph 7.2, and 7.3.

1. Narrative: Explain the procedure used to perform an inspection of the battery installation, battery testing, testing reports, and clean-up with the facility (customer) representative. Confine Contract Acceptance Inspection, cleanup/restoration description to this box.

2. Document: Provide a copy of a CAI Report completed by your company or company’s key personnel for this project.

03/21/16

File details come from the government source that posted it. Updated .