Driskell Park Construction Project Manual - City of Albany, Georgia
This project manual contains construction documents and specifications for the Driskell Park renovation project located at 1021 South McKinley Street in Albany, Georgia, prepared by the City of Albany Parks and Recreation Department. The scope of work includes construction of a new community center, two pavilions, tennis courts, a football field, underground stormwater storage, and a retention pond. Sealed bids were due October 21, 2022, at 2:30 PM, submitted to the City of Albany Procurement Division. The project is designated as Bid No. 23-007 with LOSE Project #20091-1. The general contractor must have completed a minimum of three projects of similar size and complexity within the past five years and must submit project reference forms with their bid. The contract includes two alternates: Alternate #1 for Structure B Pavilion (30'x30') and Alternate #2 for Multi-Purpose Synthetic Turf Field, both submitted as lump sum bids. Work must begin within 10 calendar days after issuance of the Notice to Proceed. The project site is an active City facility requiring coordination with existing park users; the contractor must maintain security fencing and ensure public safety throughout construction.
The general contractor bears responsibility for all project costs including fees, utilities during construction, erosion and sedimentation control, NPDES permit compliance, and subdrainage connections. The contractor assumes all costs associated with temporary and permanent utility service connections and must transfer utility accounts to the City upon project completion. Geotechnical investigation indicates Coastal Plain soils with zones of low-consistency materials that may require undercutting and stabilization; the contractor must conduct proofrolling and subgrade preparation in accordance with engineering recommendations. The contract documents specify Select Soil Fill compaction to 98 percent of Standard Proctor maximum density and require TTL (the geotechnical engineer) to provide full-time observation during fill operations and construction. The City requires the contractor to secure all necessary permits and coordinate with permit officials and emergency services for any temporary facility closures. Pre-engineered structures, playground equipment surfacing, sports lighting systems, and mural installation will be procured by the City through separate third-party contractors, requiring general contractor coordination for scheduling, access, and utility connections.
Text of this file
PROJECT MANUAL
CONSTRUCTION DOCUMENTS AND SPECIFICATIONS
FOR
DRISKELL PARK
1021 SOUTH MCKINLEY STREET
ALBANY, GEORGIA
BID NO. 23-007
September 21, 2022
LOSE PROJECT # 20091-1
Prepared by:
Lose Design 220 West Crogan St.
Lawrenceville, GA 30046
Prepared for:
CITY OF ALBANY, GEORGIA
PARKS AND RECREATION DEPARTMENT
1301 N MONROE ST.
ALBANY, GEORGIA 31701
© 2022 Lose Design
LD# 20091-1 – DRISKELL PARK
TABLE OF CONTENTS
TECHNICAL SPECIFICATIONS
DIVISION 00 – BIDDING REQUIREMENTS & CONTRACT FORMS
BID NO. 23-007
00 00 00 COVER
00 00 00 TABLE OF CONTENTS
00 00 02 INVITATION TO BID
00 00 04 SUPPLEMENTARY CONDITIONS
00 31 32 GEOTECHNICAL INFORMATION AVAILABLE TO BIDDERS
00 31 33 GEOTECHNICAL REPORT (FOR REFERENCE)
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 21 00 ALLOWANCES
01 22 00 UNIT PRICES
01 23 00 ALTERNATES
01 24 00 WEATHER DELAYS
01 25 00 SUBSTITUTION PROCEDURES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 29 00 PAYMENT PROCEDURES
01 31 00 PROJECT MANAGEMENT COORDINATION
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
01 32 33 PHOTOGRAPHIC DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 56 39 TEMPORARY TREE AND PLANT PROTECTION
01 60 00 PRODUCT REQUIREMENTS
01 73 00 EXECUTION
01 73 29 CUTTING AND PATCHING
01 74 19 CONSTRUCTION WASTE MANAGEMENT
01 77 00 CLOSEOUT PROCEDURES
01 78 23 OPERATIONAL AND MAINTENANCE DATA
01 78 39 PROJECT RECORD DOCUMENTS
01 79 00 DEMONSTRATION AND TRAINING
DIVISION 02 – EXISTING CONDITIONS
02 41 16 DEMOLITION
02 41 16-1 STRUCTURE DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 30 01 CAST-IN-PLACE CONCRETE (SITE WORK)
DIVISION 04 - MASONRY
04 05 23 MASONRY REINFORCEMENT AND ACCESSORIES
04 10 00 MORTAR
04 21 00 ARCHITECTURAL CONCRETE MASONRY
04 43 13 ANCHORED BRICK MASONRY VENEER
04 72 00 ARCHITECTURAL PRECAST CONCRETE
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 50 00 METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 GENERAL CARPENTRY
06 13 60 HEAVY TIMBER CONSTRUCTION
06 15 00 TIMBER DECKING
06 16 00 SHEATHING
06 17 53 SHOP FABRICATED WOOD TRUSSES
06 17 54 METAL-PLATE CONNECTED WOOD TRUSSES
06 18 50 GLULAM
06 40 00 MILLWORK
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 19 00 WATER REPELLENT
07 21 00 THERMAL INSULATION
07 41 13 METAL ROOF PANELS
07 46 00 MINERAL FIBER CEMENT BOARD
07 62 00 SHEET METAL FLASHING AND TRIM
07 65 13 LAMINATED SHEET FLASHING
07 72 00 ROOF ACCESSORIES
07 84 13 PENETRATION FIRESTOPPING
07 92 00 JOINT SEALANT
DIVISION 08 - OPENINGS
08 11 00 HOLLOW METAL DOORS AND FRAMES
08 31 10 ACCESS DOOR FRAMES
08 41 13 ALUMINUM FRAMED STOREFRONTS
08 71 00 DOOR HARDWARE
08 71 11 FINISH HARDWARE
08 81 00 GLAZING
08 90 00 LOUVERS AND VENTS
DIVISION 09 - FINISHES
09 29 00 GYPSUM BOARD
09 30 00 TILING
09 61 00 CONCRETE FLOOR SEALER
09 65 13 RESILIENT BASE AND ACCESSORIES
09 65 66 ATHLETIC RUBBER FLOORING
09 84 33 SOUND-ABSOBING WALL UNITS
09 91 13 EXTERIOR PAINTING
09 91 23 INTERIOR PAINTING
DIVISION 10 – SPECIALTIES
10 21 13 TOILET COMPARTMENTS
10 28 00 TOILET ACCESSORIES
10 44 00 SIGNAGE
10 52 00 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 93 00 SITE FURNISHINGS
DIVISION 13 – SPECIAL CONSTRUCTION
13 12 13 PRE-ENGINEERED PAVILIONS
DIVISION 22 - PLUMBING
22 05 00 COMMON WORK RESULTS FOR PLUMBING
22 05 10 PLUMBING SUPPORTS AND ANCHORS
22 13 13 SANITARY SEWERAGE
22 07 00 PLUMBING INSULATION
22 11 16 DOMESTIC WATER, WASTE, AND VENT PIPING
22 11 19 DOMESTIC WATER AND WASTE PIPING SPECIALTIES
22 40 00 PLUMBING FIXTURES
DIVISION 23 - MECHANICAL
23 05 00 COMMON WORK RESULTS FOR HVAC
23 05 10 HVAC SUPPORTS AND ANCHORS
23 05 93 TESTING, ADJUSTING, AND BALANCING
23 07 00 DUCTWORK INSULATION
23 31 00 HVAC DUCTS AND CASINGS
23 33 00 AIR DUCT ACCESSORIES
23 34 23 HVAC POWER VENTILATORS
23 37 13 DIFFUSERS, REGISTERS, AND GRILLES
23 80 00 HEAT PUMP SPLIT SYSTEM UNITS
DIVISION 26 – ELECTRICAL
26 00 00 ELECTRICAL SPECIFICATIONS INDEX
26 05 01 GENERAL PROVISIONS
26 05 19 LOW VOLTAGE POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING
26 05 33 RACEWAYS AND BOXES
26 22 13 LOW VOLTAGE DISTRIBUTION TRANSFORMERS
26 24 16 PANELBOARDS
26 27 26 WIRING DEVICES
26 28 13 OVERCURRENT PROTECTIVE DEVICES
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 43 13 SURGE PROTECTIVE DEVICES
26 50 02 PUBLIC ADDRESS SYSTEMS
26 51 13 LIGHTING
26 56 13 SPORTS LIGHTING POLES
26 56 58 SPORTS LIGHTING
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
31 10 00 SITE CLEARING
31 23 00 EXCAVATION SUPPORT AND PROTECTION
31 23 19 DEWATERING
31 31 16 TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16 ASPHALT PAVING
32 13 13 CONCRETE PAVEMENT
32 13 73 CONCRETE PAVEMENT JOINT SEALANTS
32 18 13 ATHLETIC FIELD SURFACING
32 31 13 CHAIN-LINK FENCES AND GATES
32 31 19 ORNAMENTAL STEEL FENCE SYSTEM
32 31 20 ORNAMENTAL STEEL CANTILEVER GATE SYSTEM
32 84 00 IRRIGATION SYSTEMS
32 92 00 LAWNS AND GRASSES
32 92 50 SPORTSFIELDS
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER SYSTEM
33 41 00 STORM DRAINAGE
33 46 16 SITE SUBDRAINAGE
PROJECT DRAWINGS
Sheet # Description
ARCHITECTURAL
A0.00 COVER SHEET
A0.01 INDEX
A0.02 GENERAL NOTES & ABBREVIATIONS
A0.03 GENERAL NOTES & LEGENDS
A0.04 GENERAL NOTES & WALL TYPES
A0.06 ADA STANDARDS
A0.07 ADA STANDARDS
A0.08 ADA STANDARDS
A0.09 ADA STANDARDS
A0.10 CODE REVIEW
A0.11 LIFE SAFETY PLAN
A0.20 ENERGY COMPLIANCE REPORT
A0.50 PERSPECTIVES
C0.03 SITE MASTER PLAN
A2.01 FLOOR PLAN – DIMENSIONED
A2.02 FLOOR PLAN – NOTES
A3.00 EXTERIOR ELEVATIONS
A3.01 EXTERIOR ELEVATIONS
A3.02 INTERIOR ELEVATIONS
A3.10 BUILDING SECTIONS
A3.11 BUILDING SECTIONS
A3.20 WALL SECTIONS
A3.21 WALL SECTIONS
A3.22 WALL SECTIONS
A3.40 SPECIALITY DETAILS
A3.41 SPECIALITY DETAILS
A3.43 FOUNDATION DETAILS
A3.50 COLUMN/PLAN VIEW DETAILS
A3.90 PLAN VIEW
A4.00 ENLARGED PLANS
A6.00 REFLECTED CEILING PLAN
A6.10 REFLECTED CEILING PLAN – CLERESTORY
A7.00 ROOF PLAN
A7.01 ROOF DETAILS – STANDING SEAM
A7.02 ROOF DETAILS – STANDING SEAM
A7.03 ROOF DETAILS
A7.04 ROOF DETAILS
A7.06 ROOF DETAILS
A8.00 DOOR SCHEDULE & WINDOW INFORMATION
A8.01 LOUVER SCHEDULE
A8.02 DOOR DETAILS
A8.03 WINDOW DETAILS
A9.00 GENERAL NOTES & FINISHES
A9.01 FINISHES
A9.04 FURNITURE LAYOUT PLAN
A9.10 CASEWORK DETAILS
STRUCTURAL
S0.01 GENERAL NOTES
S0.02 GENERAL NOTES
S1.01 FOUNDATION PLAN
S2.01 ROOF FRAMING PLAN
S3.01 SECTIONS AND DETAILS
S3.02 SECTIONS AND DETAILS
S3.03 SECTIONS AND DETAILS
S3.04 SECTIONS AND DETAILS
S3.05 SECTIONS AND DETAILS
S3.06 SECTIONS AND DETAILS
S3.07 SECTIONS AND DETAILS
S4.01 TYPICAL MASONRY DETAILS
S4.02 OMNIBLOCK MASONRY DETAILS
MECHANICAL
M1.00 HVAC FLOOR PLAN
MP1.00 HVAC & PLUMBING DETAILS
MP1.01 HVAC & PLUMBING DETAILS & MECHANICAL COMPLIANCE
MP1.02 HVAC & PLUMBING SCHEDULES & CONTROLS
PLUMBING
P1.00 WATER PLUMBING PLAN
P1.01 WASTE & VENT PLUMBING PLANS
ELECTRICAL
E1.00 ELECTRICAL SITE PLAN
E1.01 ELECTRICAL SITE LIGHTING PLAN
E1.02 SITE PHOTOMETRIC PLAN
E1.03 ELECTRICAL SITE DETAILS
E2.00 COMMUNITY CENTER POWER PLAN
E2.01 COMMUNITY CENTER LIGHTING PLAN
E2.02 COMMUNITY CENTER LIGHTING PLAN
E3.00 ELECTRICAL NOTES AND DETAILS
E4.01 ELECTRICAL NOTES AND DETAILS
SITE WORK
C0.00 COVER SHEET
C0.01 GENERAL NOTES
C0.02 SITE SURVEY
C0.03 SITE MASTERPLAN
C0.04 DEMOLITION PLAN
C0.05 TREE PROTECTION PLAN
C1.00 OVERALL MATERIAL & LAYOUT PLAN
C1.01-1 MATERIAL PLAN
C1.01-2 LAYOUT PLAN
C1.02-1 MATERIAL PLAN
C1.02-2 LAYOUT PLAN
C1.03-1 MATERIAL PLAN ENLARGEMENT
C1.03-2 LAYOUT PLAN ENLARGEMENT
C1.04-1 MATERIAL PLAN ENLARGEMENT
C1.04-2 LAYOUT PLAN ENLARGEMENT
C1.05-1 MATERIAL PLAN ENLARGEMENT
C1.05-2 LAYOUT PLAN ENLARGEMENT
C2.00 GRADING AND DRAINAGE PLAN KEY
C2.01 GRADING AND DRAINAGE PLAN
C2.02 GRADING AND DRAINAGE PLAN
C2.02A GRADING AND DRAINAGE PLAN ENLARGEMENT
C2.02B GRADING AND DRAINAGE PLAN ENLARGEMENT
C2.02C GRADING AND DRAINAGE PLAN ENLARGEMENT
C2.02D TURF ALTERNATE
C2.40 STORM PROFILES
C2.41 STORM PROFILES
C2.42 STORM PIPE CHART
C2.50 STORMWATER DETAILS
C2.51 STORMWATER DETAILS
C2.52 UNDERGROUND DETENTION
C2.53 UNDERGROUND DETENTION
C2.54 UNDERGROUND DETENTION
C2.55 UNDERGROUND DETENTION
C2.56 UNDERGROUND DETENTION
C2.57 UNDERGROUND DETENTION
C2.58 INFILTRATION BASIN DETAILS
C3.00 EPSC OVERALL
C3.01 EPSC NOTES
C3.02 EPSC NOTES
C3.03 EPSC NOTES
C3.10 EPSC PHASE 1 OVERALL
C3.11 ESPC PHASE 1
C3.12 EPSC PHASE 1
C3.20 EPSC PHASE 2 OVERALL
C3.21 EPSC PHASE 2
C3.22 EPSC PHASE 2
C3.30 EPSC PHASE 3 OVERALL
C3.31 EPSC PHASE 3
C3.32 EPCS PHASE 3
C3.41 ESPC DETAILS
C3.42 ESPC DETAILS
C3.43 ESPC DETAILS
C3.44 ESPC DETAILS
C3.45 SEDIMENT BASIN 1
C3.46 SEDIMENT BASIN 2
C4.00 SITE DETAILS
C4.01 SITE DETAILS
C4.02 SITE DETAILS
C4.03 SITE DETAILS
C4.04 SITE DETAILS
C4.05 SITE DETAILS
C4.06 SITE DETAILS
C4.07 SITE DETAILS
C5.00 SITE UTILITY PLAN
C5.10 UTILITY DETAILS
C5.11 UTILITY DETAILS
L1.01 LANDSCAPE SERIES
L1.02 LANDSCAPE SERIES
L1.03 LANDSCAPE SERIES
L1.04 LANDSCAPE SERIES
L1.05 LANDSCAPE SERIES
L1.06 LANDSCAPE SERIES
L1.07 LANDSCAPE SERIES
L1.07A LANDSCAPE SERIES
L1.08 LANDSCAPE NOTES AND SCHEDULES
L1.09 LANDSCAPE DETAILS
L2.00 OVERALL IRRIGATION PLAN
L2.01 IRRIGATION PLAN
L2.02 IRRIGATION PLAN
L2.10 IRRIGATION SCHEDULE AND DETAILS
L2.11 IRRIGATION DETAILS
END OF TABLE OF CONTENTS
DRISKELL PARK 1021 S MCKINLEY CITY OF ALBANY
Bid Reference No. 23-007
*COMPLETE AND SUBMIT*
BID FORM
DRISKELL PARK
1021 S MCKINLEY STREET
CITY OF ALBANY
BID REF. #23-007
Company Name Date
We, the undersigned, do hereby declare that we have carefully examined the site of the proposed construction, all contract documents and project manual. We do hereby agree to furnish all material, transportation, equipment, apparatus systems, labor, and supervision required to do all work in strict accordance with the Contract Documents including any addendums for the lump sum, based on project manual #20091-1 submitted and accepted by the City of Albany dated September 21, 2022.
DRISKELL PARK
1021 S MCKINLEY STREET Total Lump Sum Bid $_________________
Alternate #1 Structure B – Pavilion (30’X30’) Lump Sum Bid $_________________
Alternate #2 Multi-Purpose Synthetic Turf Field Lump Sum Bid $_________________
Bid shall be made on a Lump Sum basis for all specified work. Work shall begin within 10 (ten) calendar days after issuance of Notice to Proceed and shall be completed in accordance with contract time stated herein.
This bid complies with the Instruction to Bidders contained herein, (including all Contract Documents referenced therein, and all Addenda, hereinafter listed and acknowledged as received), which are hereby made a part hereof and which shall govern in all matters of the work hereby proposed. We acknowledge receipt of the following Addenda: (Bidder to list all revisions received, or, if none, state “NONE RECEIVED”)
Addendum # ____, dated _____ Addendum # ____, dated _____ Addendum # ____, dated _____
CERTIFICATION: The undersigned being duly sworn, hereby declares and affirms that they are an authorized representative of the above-named firm and further declares and affirms that the bid provided herein and the statements provided herein are true and correct and are sufficiently complete so as not to be misleading.
Authorized Signature Company Name
Address City State Zip
Tax ID # Telephone # Fax #
Seal (If Incorporated) Email
SUPPLEMENTARY CONDITIONS - SECTION 00 00 04
00 00 04 - 1
SECTION 00 00 04 – SUPPLEMENTARY CONDITIONS
GENERAL
1.) ACTIVE FACILITIES:
Driskell Park is an active City of Albany facility that is currently open for public use. The Owner requires that the following facilities remain open and accessible for public use: Existing Pool Building.
The contractor is responsible for providing security fencing, signage, and any other measures necessary to secure the jobsite and protect the safety of the public utilizing the park. Fencing shall be properly secured using adequate sandbags to anchor the fence and clamps on posts of adjoining panels to secure the fence. The contractor shall keep the work area and adjacent areas clean at all times. Clean up operations shall be conducted on a consistent basis. The contractor shall conduct the construction operations with the appropriate level of care to ensure the safety of the public utilizing the facility. Employees of the contractor and any subcontractors shall be cognizant of the fact that the park is open to the public and conduct themselves in an appropriate manner.
It is understood that portions of the existing park may need to be temporarily closed in order to execute the scope of work provided in the contract documents. Where temporary closures are required, the General Contractor is to submit written notice to the Owner no less than 30 days in advance. The written notice is to specify area(s) of temporary closure, alternative access routes for public access to existing facilities and a specified duration of closure. Where required, the General Contractor is responsible for coordination with emergency service agencies (fire department, police department, etc.) to receive approval for such temporary closures.
2.) FEES:
The General Contractor is responsible for any and all fees associated with construction. The General Contractor is responsible for contacting all applicable utility agencies and permitting agencies to determine applicable project fees for inclusion in the Lump Sum Base Bid. The Owner is not obligated to pay additional funds to the General Contractor for failure to include these costs in the bid.
3.) EROSION, SEDIMENTATION AND POLLUTION CONTROL MAINTENANCE:
The Contractor is solely responsible for installing and maintaining erosion, sedimentation, and pollution controls for the project. No payment will be made for any portion of the project for which temporary erosion, sedimentation and pollution controls are not properly installed and maintained.
Any fines or delays for non-compliance of erosion control measures levied by any agency shall be the responsibility of the Contractor.
The contractor shall sign the NPDES Notice of Intent as the operator for the project. The contractor is solely responsible for compliance with all aspects of the NPDES permit including installation, maintenance, all inspections, storm water sampling and documentation required by the permit.
Copies of all inspections, reports, submittals, etc. shall be provided to the Owner. Any enforcement actions, including fines, issued by regulating authorities for failure to comply with the terms of the permit or due to any other issues related to erosion control are the responsibility of the contractor.
4.) CONTRACT DRAWINGS AND PROJECT MANUAL:
The Contractor will receive an electronic (.PDF) copy of the plans and project manual from the Owner.
The Contractor is responsible for ensuring that any reproductions of the contract drawings are to scale. Hardcopies of wet-stamped permit approved drawings will be provided by the Owner where required by permit officials.
00 00 04 - 2
The General Contractor is responsible for becoming familiar with the requirements of all construction documents, which includes drawings, bid and contract documents, specifications, and all addenda.
Letter prefixes for each drawing sheet indicating the engineering discipline are for convenience only.
Information affecting the scope of work for all trades will be found throughout all documents and is not limited to only those documents with the appropriate letter prefix. The General Contractor is responsible for providing subcontractors all necessary information and drawings.
The drawings and specifications are complementary to each other and what is called for by one shall be as binding as if called for by both. In a discrepancy exists between the drawings and specifications, the higher cost shall be included, and the Owner notified of the discrepancy.
5.) EXPERIENCE REQUIREMENTS FOR GENERAL CONTRACTOR:
The Bidder shall have completed construction of a minimum of three (3) projects of similar size and complexity within the past five (5) years. Contractors are to include project reference forms for no less than three (3) and no more than five (5) in their bid submittal package. Project reference forms will be limited to one page per project and include the following information: project name, project location, summary scope of work, original contract price, final contract price, original contract period, final contract period, and current reference contact information for the project Owner.
6.) EXPERIENCE REQUIREMENTS FOR SPORTSFIELD CONTRACTOR:
The bid submittal package shall include contractor experience information. Refer to Specifications Section 329250 – Sportsfields for contractor experience requirements.
7.) EXPERIENCE REQUIREMENTS FOR ATHLETIC FIELD SURFACING CONTRACTOR:
The bid submittal package shall include contractor experience information. Refer to Specifications Section 31813 – Athletic Field Surfacing for contractor experience requirements.
8.) EXPERIENCE REQUIREMENTS FOR ATHLETIC COURT CONTRACTOR:
The Bidder shall have completed construction of a minimum of three (3) projects of similar size and complexity within the past five (5) years. Contractors are to include project reference forms for no less than three (3) and no more than five (5) in their bid submittal package. Project reference forms will be limited to one page per project and include the following information: project name, project location, summary scope of work, and current reference contact information for the project Owner.
9.) GRASSING:
Establishment of permanent vegetation in accordance with the contract documents must be accomplished at the date of substantial completion. Refer to project specifications Section 329200- Lawns and Grasses for additional requirements.
10.) UTILITIES:
The General Contractor is responsible for coordination with utility providers, temporary and permanent service connections, and verification of sizes and locations of connection points. If required, traffic control is the responsibility of the General Contractor and shall be in compliance with the current edition of the MUTCD and any requirements of local and state officials.
All costs associated with the provision of temporary and permanent service shall be the sole responsibility of the General Contractor. The contractor shall apply for and establish accounts for utilities serving the facilities during construction. Utility costs during construction are to be included in the Contractor’s bid and the Owner shall have no obligation to compensate the Contractor for utility costs during construction. Upon the Owner’s acceptance of buildings and facilities at the time of substantial completion, the accounts shall be transferred to the name of the Owner.
00 00 04 - 3
11.) LOCKSETS:
All locksets, latches, deadbolts, padlocks and cores shall be small format, ICC rated, KABA compliant and in conformance with City Standards and shall be compatible with the City’s keying system. All keyed cylinders shall be provided with temporary construction cores for use during construction.
Removable temporary plastic cares will not be permitted. The General Contractor shall be responsible for furnishing and installing permanent cores prior to substantial completion. Permanent cores shall be the same finish as the lockset finish.
12.) SCHEDULE OF VALUES:
After award of contract, the General Contractor shall submit a Schedule of Values, identifying costs for meaningful areas of the Work, such that progress payments can be easily evaluated, as determined by the Owner. The Schedule of Values shall be broken down in sufficient detail to facilitate a thorough review.
The Schedule of Values shall specifically include any unit prices identified in the contract.
13.) CONSTRUCTION LAYOUT:
The Contractor is responsible for all construction layout and control for the project. Layouts of construction items must consider all elements of the Work adjacent and/or in close proximity; e.g.
catch basins must be located for proper relationships with curb and gutter, etc.
The Contractor shall proceed with construction layout in such a manner that discrepancies between construction items, existing built features and site conditions that are in conflict with the plans may be examined by the Owner’s Representative prior to construction of items in conflict. Failure to notify the Owner’s Representative of conflicts prior to constructing items will result in all remedial actions being paid for by the Contractor including but not limited to additional materials, reinspection fees, professional service fees and survey cost by all parties to the projects.
14.) MULCH MANAGEMENT:
Should the Contractor decide to stockpile mulch derived from the clearing operations on the site, or mulch delivered from off site, he is responsible for managing the stockpiled mulch to prevent combustion of the material. Should the stockpiled mulch materials ignite and/or burn, Contractor shall be responsible for extinguishing the fire and redistributing the stockpile appropriately to prevent future combustion. Repair of or replacement required due to damage to the property or adjacent properties will be the responsibility of the Contractor.
15.) TOPOGRAPHIC MAPPING:
The topographic mapping utilized for the development of these construction documents was compiled via LIDAR survey unless noted otherwise. These surveys were prepared following standard survey practices and standards and are the best available information on the site. It is the belief of the Designer and the Owner that the information is correct, but neither party warrants or implies a level of accuracy beyond standard surveying practices. The contractor shall visit the site to review the site topographic conditions and conduct verification surveys if so desired prior to the bid to verify the accuracy of the information provided. Topographic variations discovered after bidding will not be grounds for additional compensation.
16.) EARTHWORK:
Contractor is responsible for all grading shown on the plans, unless noted otherwise. The Contractor shall conduct his own quantity take off based on the Bid Documents. Earthwork related quantities shown on the plans (if any) are provided for reference only and shall not be utilized for bidding purpose. Any haul-off of excess materials or import of materials needed to complete the grading shall be by the contractor. Should the contractor import materials from any another site, the contractor
00 00 04 - 4 shall provide sample(s) to the materials testing firm for testing and approval. Refer to specifications Section 310000- Earthwork for additional requirements.
The Contractor is here informed that if the Synthetic Turf Alternate is selected by the Owner, haul-off of excess materials are to be included in Synthetic Turf line item with no additional cost to the Owner. Contractor to coordinate with the Owner in the event excess material is needed at a different location up to (5) miles.
17.) GEOTECHNICAL REPORT:
A subsurface investigation has been performed at the site and a report is included in another section.
This investigation was conducted, and the reports obtained, solely for design purposes. The use and interpretation of this information will be entirely the responsibility of the using party. Neither the Owner nor any Designer on the project is responsible for variations in the subsurface conditions. Bidders shall decide for themselves the character of the material to be encountered.
18.) ENGINEERING BY THE CONTRACTOR:
The General Contractor is solely responsible for the design, engineering, permitting and construction of pre-engineered structures, and other improvements, as identified in the contract documents. All drawings must be sealed by a Professional Engineer registered in the State of Georgia. Additionally, all soils and materials testing associated with the design and construction of these elements shall be responsibility of the General Contractor and shall be provided in accordance with the recommendations of the manufacturer and professional engineer. The General Contractor is responsible for ensuring that the design, engineering, and construction considers all existing and proposed conditions.
19.) SPORTS LIGHTING SYSTEMS
The Owner intends to procure labor and materials from a third-party contractor for the installation of sports lighting systems at the multi-purpose field within the park. The general contractor is to coordinate with the Owner and their respective contractor to facilitate scheduling, storage/delivery, access, and powering of these systems. The general contractor is responsible for the provision of all electrical equipment indicated on the contract documents for the powering of these systems, including panels, and conduits with pull strings to within three feet of the proposed pole locations. The third-party contractor will be responsible for the provision of footings, poles, fixtures, wiring, control cabinets and pedestrian lighting fixtures attached to sports light poles.
20.) PLAYGROUND EQUIPMENT AND SURFACING
The Owner intends to procure labor and materials from a third-party contractor for the installation of playground equipment, surfacing and subdrainage at the playground area. The general contractor is to coordinate with the Owner and their respective contractor to facilitate scheduling, storage/delivery, and access. The general contractor is responsible for providing subdrainage connection point as indicated on the drawings.
21.) A/V AND LOW VOLTAGE SYSTEMS
The Owner intends to procure labor and materials from a third-party contractor for the installation of A/V and Low Voltage systems. The general contractor is to coordinate with the Owner and their respective contractor to facilitate scheduling, storage/delivery, and access.
22.) MURAL INSTALLATION COORDINATION
General Contractor shall coordinate with the city-provided contractor/vendor, Chris Johnson, (864) 710-7133, chrisjmfa@gmail.com, or approved equal, for the installation of the Charles Driskell Mural located within the Community Center. The general contractor shall coordinate with the Owner and their respective contractor/vendor to facilitate scheduling, storage/delivery, and installation access.
mailto:chrisjmfa@gmail.com
00 00 04 - 5
23.) SUBMITTALS:
After award of contract, the General Contractor shall submit a Submittal Schedule for review by the Designer and the Owner. The Submittal Schedule shall provide sufficient detail to convey anticipated submittal distribution and return dates, applicable project specification section and a unique identification format for each submittal. The General Contractor is responsible for collecting and submitting project submittals for review in a timely manner to facilitate implementation of the Contractor’s schedule for construction. The Designer reserves the right to review submittals for up to fourteen (14) business days following the receipt of any submittal. Refer to specifications Section 013300- Submittal Procedures for additional requirements.
Submittals by the Contractor shall be compiled in a manner to convey all pertinent information for a product, system or assembly or trade in a single document; e.g., product data, certifications, warranties, samples, shop drawings, etc. for fencing must be submitted together as a single submittal.
24.) CONTRACTOR REQUESTS FOR INFORMATION:
Contractor Requests for Information (RFI) shall contain sufficient detail to convey specific issues/clarifications for consideration by the Owner and the Designer. Requests for Information must contain a reference to specific plan sheet(s) or specification sections and indicate potential impacts to project costs or schedule. Responses to Requests for Information will be returned by the Designer in a timely manner; however, the Designer reserves the right to review the requests for up to seven
(7) business days following the receipt of any RFIs.
25.) AS-BUILT DRAWINGS AND DOCUMENTATION:
The General Contractor is responsible for furnishing and submitting as-built documents as required by permit officials. The Contractor shall contact permit officials to determine their requirements.
Additionally, the Contractor shall provide as-built documents where required in the contract documents. Refer to specifications Section 017839- Project Record Documents for additional information.
26.) CERTIFICATE OF OCCUPANCY:
It shall be the Contractor’s responsibility to ensure all required inspections and submittals are completed in a timely manner in order to receive a Certificate of Occupancy or other required final acceptance documents. The Contractor shall contact and coordinate with local officials and any other authorities to identify all final inspections and submittals required. The Contractor shall obtain a final sign off from the special inspections testing firm and submit it to the Designer for final review and certification. Upon completion of all inspections, submittal, and approval of all required as built documents or any other items required by the City, the Contractor shall obtain the Certificate of Occupancy from and deliver it to the Owner’s representative.
27.) OMISSIONS:
Omissions and Errors from the drawings, and /or specifications, or the mis-description of details of work which are manifestly necessary to carry out the intent of the drawings and/or specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or mis-described details of the work, but they shall be performed as if fully and correctly set forth and described in the drawings and specifications.
END OF SECTION 000004
00 00 04 - 6
THIS PAGE IS INTENTIONALLY BLANK
GEOTECHNICAL INFORMATION AVAILABLE TO BIDDERS - SECTION 00 31 32
SECTION 00 31 32 - GEOTECHNICAL INFORMATION AVAILABLE TO BIDDERS
PART 1 - GENERAL
A. Subsurface investigation has been performed at the site by the Owner. This investigation was conducted, and the reports obtained, solely for design purposes and are not a part of the Contract Documents.
B. The use and interpretation of this information will be entirely the responsibility of the using party.
Neither the Owner nor any Designer on the project is responsible for variations in the subsurface conditions. Bidders shall decide for themselves the character of the material to be encountered.
C. The report(s) of the findings of this investigation follow this section.
PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION (Not used)
END OF SECTION 00 31 32
GEOTECHNICAL INFORMATION AVAILABLE TO BIDDERS - SECTION 00 31 32
THIS PAGE IS LEFT BLANK
GEOTECHNICAL REPORT
Driskell Park Albany, Dougherty County, Georgia
Prepared for:
City of Albany Albany, Georgia 31721
Prepared by:
TTL, Inc.
Albany, Georgia
Project No. 000210603696.00 February 3, 2022
Driskell Park – Albany, GA February 3, 2022 TTL Project No. 000210603696.00 Page 2 of 14
© 2022, TTL, Inc. Purpose | Passion | Principles
EXECUTIVE SUMMARY
1.0 PROJECT INFORMATION
1.1 Project Description
1.2 Authorization
2.0 EXPLORATION FINDINGS
2.1 Site Conditions
2.2 USDA Soil Survey
2.3 Site Geology
2.4 Subsurface Stratigraphy
2.5 Groundwater Conditions
2.6 Hydraulic Conductivity Testing
3.0 GEOTECHNICAL CONSIDERATIONS
3.1 Loose Soils
4.0 EARTHWORK RECOMMENDATIONS
4.1 Subgrade Preparation and Stabilization
4.2 Compacted Fill
4.3 Drainage Considerations
5.0 INFRASTRUCTURE RECOMMENDATIONS
5.1 Utilities
6.0 STRUCTURAL RECOMMENDATIONS
6.1 Seismic Design Parameters
6.2 Shallow Foundations
6.3 Floor Slabs
7.0 Limitations
GBA Informational Document
TTL Project No. 000210603696.00 Page 3 of 14
© 2022, TTL, Inc. Purpose | Passion | Principles
APPENDIX A (ILLUSTRATIONS)
Site Location Map Boring Location Plan Legend Sheet – Soil Boring Logs (8 Borings) Subsurface Profile Laboratory Testing / Data
APPENDIX B (REFERENCE MATERIALS)
Exploration Procedures Laboratory Procedures
TTL Project No. 000210603696.00 Page 4 of 14
© 2022, TTL, Inc. Purpose | Passion | Principles
EXECUTIVE SUMMARY
This Geotechnical Report has been prepared for use by The City of Albany Engineering Department for a planned Project referred to hereinafter as Driskell Park or the Project. The Project site is located at the existing Mary Young Cummings Memorial Park at 1008 South McKinley Street just south of the existing family Literacy Connection facility in Albany, Georgia.
Based on provided project information, we understand the project will consist of constructing a new community center, two pavilions, tennis courts, football field, underground stormwater storage, and a retention pond.
The site predominantly consisted of Coastal Plain soils typical of the local area. The soils include materials described as silty sand, clayey sand, silty-clayey sand, and poorly graded sand with clay (SM, SC, SC-SM, and SP-SC).
Zones of low consistency soils (N values ≤ 9 bpf) were encountered in the majority of the boring locations at depths ranging from 1 to 5 feet below ground surface (bgs). A zone of low consistency soils was deeper in boring B-03 extending to 15 feet bgs. These low consistency soils could be subject to unacceptable displacement and rutting during mass grading operations. We anticipate that plowing and drying (processing) of low consistency soils during a warm and dry period, may help reduce the amount of undercutting needed. Removal of existing underground foundations, slabs, underground utilities, etc. from the construction areas should be anticipated. Care should be taken to properly backfill voids remaining from the removal of existing site features, if any are present in the construction areas
Provided the site is prepared according to the recommendations presented in this report, the proposed buildings can be supported on typical shallow spread foundations bearing on stable in-situ soils or properly compacted fill. Spread foundations can be sized using an allowable net bearing pressure of 2,000 pounds per square foot (psf).
This summary is provided for convenience only. For those individuals and entities that may need more details or technical information from this report for their use, it must be read in its entirety to understand fully the information and recommendations provided for the Project.
TTL Project No. 000210603696.00 Page 5 of 14
© 2022, TTL, Inc. Purpose | Passion | Principles
1.0 PROJECT INFORMATION
Our understanding of the project was based on information provided by Mr. Robert Griffin, with the City of Albany Engineering Department in an email received on December 1, 2021. We received PDF file “20091-1_Driskell Park_Geotech_Plan.pdf”, which contains the conceptual site development plan and shows the client provided requested boring locations. Our understanding of the project is presented in the following table.
1.1 Project Description
Item Description
Project Location The site is located at 1008 South McKinley Street just south of the existing Family Literacy Connection facility in Albany, Georgia
Proposed Construction
TTL understands the proposed development will consist of the following:
• Community Center
• two pavilions
• tennis courts
• football field
• retention pond; and
• underground stormwater storage
Maximum Loads TTL was not provided loading information but we anticipate maximum column loads of 50 kips and typical wall loads to be less than 2 kips per linear foot.
Grading TTL was provided a grading plan and we anticipate nominal cuts/fill of up to 18 inches and excavations for the retention pond of up to 7 feet below ground surface.
Maximum Allowable Settlement
Assumed 1-inch total and ½-inch differential for the new buildings.
If the above information is not correct, please contact us so that we can make the necessary modifications to this document and our evaluations and recommendations, if needed.
1.2 Authorization
This Project was authorized by Mr. Robert Griffin with the City of Albany Engineering Department by acceptance of our Agreement for Services, No. P00210603696.00, dated December 29, 2021.
2.0 EXPLORATION FINDINGS
2.1 Site Conditions
Item Description
Current Ground Cover
The proposed construction areas currently include relatively flat grassed areas in the proposed locations of the buildings, football field, and underground stormwater storage area. A building currently is located in the vicinity of the proposed detention pond and will be demolished.
Existing Topography The site was visually observed to be relatively flat within the existing facility.
TTL Project No. 000210603696.00 Page 6 of 14
© 2022, TTL, Inc. Purpose | Passion | Principles
2.2 USDA Soil Survey
Based on the Natural Resource Conservation Service (NRCS) soil survey for Dougherty County, Georgia, the near surface soils of this site are composed primarily of Red Bay loamy sand soils (RgB2). The published water table upper limits for the Red Bay soils are more than 80 inches below the top of ground surface and has a published natural drainage class of well drained.
2.3 Site Geology
The subject site in Albany, Georgia is situated within the Coastal Plain physiographic province.
The site is initially underlain by alluvium and undifferentiated terrace deposits from the Quaternary geologic age. This strata transitions to Ocala limestone from the Eocene geologic age. The Ocala Limestone of late Eocene age overlies the Lisbon Formation and occurs at from about 70 to 350 feet below land surface. It is a cream to brown, rather pure limestone. The Coastal Plain region in this part of Georgia is comprised of sands, gravels, and clay.
2.4 Subsurface Stratigraphy
Subsurface conditions within the project limits were evaluated by completed drilling operations at eight (8) test boring locations as shown on the Boring Location Plan in Appendix A. The borings were drilled to depths ranging from 10 to 20 feet bgs.
Generally, the soil profile included Coastal Plain soils composed of silty sand, clayey sand, silty, clayey sand, and poorly graded sand with clay (SM, SC, SC-SM, and SP-SC). Generalized information from the soil borings is summarized below.
Stratum Approximate Thickness of
Stratum Material Description Properties1
TOPSOIL 8 inches Topsoil, dark- brown Not Applicable
COASTAL PLAIN 7 feet to 20 feet Clayey Sand (SC USCS)
N-values: 7 bpf to 35 bpf, MC: 8% to 12%
LL: 26 to 28
PI: 15
% Finer No. 200 Sieve: 30.1% to 32.7%
COASTAL PLAIN 12 feet Silty, Clayey Sand (SC-SM
USCS)
N-values: 6 bpf to 10 bpf, MC: 9% to 11%
LL: 24
PI: 7
% Finer No. 200 Sieve: 28.0%
TTL Project No. 000210603696.00 Page 7 of 14
© 2022, TTL, Inc. Purpose | Passion | Principles
Stratum Approximate Thickness of
Stratum Material Description Properties1
COASTAL PLAIN 3 feet to 7 feet Silty Sand (SM USCS)
Poorly Graded Sand with Clay (SP-SC USCS)
N-values: 7 bpf to 16 bpf
(SM) MC: 8%
(SM) LL: NP
(SM) PI:NP
(SM) % Finer No. 200 Sieve: 22.5% 1 Includes N-values of applicable samples that were not affected by gravel or refusal materials. MC = Moisture Content, LL = Liquid Limit, and PI = Plasticity Index of selected soil samples only.
Additional information about the subsurface stratigraphy encountered at the exploratory boring locations is provided on Test Boring logs in Appendix A.
The Test Boring Logs presented in Appendix A represent our interpretation of the subsurface conditions based on tests and observations performed during the drilling operations at the test boring locations, visual examination of the soil samples by a geotechnical engineer, and laboratory tests conducted on the retrieved soil samples. The USCS classifications enclosed in parenthesis indicate a visual classification. The lines designating the interfaces between various strata on the Test Boring Logs represent the approximate strata boundaries, however, the transition between strata may be more gradual than shown, especially where indicated by a broken line. All data should only be considered accurate at the exact test boring location.
2.5 Groundwater Conditions
Subsurface groundwater was not encountered at the time of our drilling procedures. Subsurface groundwater is generally encountered as a continuous water surface that is generally present year-round or as a discontinuous “perched” or temporary water surface. Both groundwater surfaces can be influenced by changes in season, climate, precipitation, vegetation, surface runoff, water levels in nearby water bodies, and other factors. The groundwater level below the site may fluctuate up or down in response to such changes and may be at different levels than indicated on the soil boring logs at times after the exploration. Sometimes shallow temporary subsurface water conditions can develop as a result of above-normal rates of precipitation or surface runoff that exceeded the rate at which infiltration can pass through the subsurface strata.
These temporary water levels are called “perched” or “trapped” water levels, and they can change rapidly over short horizontal distances and short durations of time. It is often not possible to distinguish between a temporary perched water level and the groundwater table based on one-time observations of water levels in open boreholes.
2.6 Hydraulic Conductivity Testing
Field tests were performed in hand auger borings at locations HA-01 (football field), HA-02 (underground stormwater storage), and HA-03 (detention pond) to estimate in-situ saturated
TTL Project No. 000210603696.00 Page 8 of 14
© 2022, TTL, Inc. Purpose | Passion | Principles hydraulic conductivity (Ksat). Tests were performed at depths of 46 inches bgs and 10 feet bgs, respectively, utilizing a Compact Constant Head Permeameter (Amoozemeter) manufactured by Ksat, Inc. The following table presents the Ksat values determined in the field.
Table 1 Field Ksat Values
Test Location Depth (bgs) Ksat (in/hr)
HA-01 46 inches 1.246
HA-02 10 feet 1.241
HA-03 10 feet 1.777
3.0 GEOTECHNICAL CONSIDERATIONS
The following geotechnical consideration have been prepared based on the data collected or developed during this Project and, our experience with similar projects, and our knowledge of sites with similar surface and subsurface conditions.
3.1 Loose Soils
Zones of low consistency soils (N values ≤ 9 bpf) were encountered in the majority of the boring locations at depths ranging from 1 to 5 feet below ground surface (bgs). A zone of low consistency soils was deeper in boring B-03 extending to 15 feet bgs. These low consistency soils could be subject to unacceptable displacement and rutting during mass grading operations, especially during seasonal wet weather conditions. We anticipate that plowing and drying (processing) of existing subgrades, during a warm and dry period, may reduce the amount of undercutting needed.
4.0 EARTHWORK RECOMMENDATIONS
4.1 Subgrade Preparation and Stabilization
Site preparation should initially include removal of organic laden topsoil and existing site features (i.e. underground utilities, concrete sidewalks, etc.) from the construction areas. In general, the construction areas to be cleared should extend at least 5 feet beyond the building footprints.
Following site clearing and stripping, the disturbed subgrade soils in fill or at-grade areas should be evaluated by proofrolling, which consists of systematically traversing the site with overlapping passes of a loaded tandem-axle dump truck at a walking pace. Proofrolling should be performed in the presence of a TTL representative who should mark and document areas which pump or rut excessively. Unstable subgrades should be undercut and backfilled or reworked (scarified and
TTL Project No. 000210603696.00 Page 9 of 14
© 2022, TTL, Inc. Purpose | Passion | Principles recompacted) in-place. We recommend the contract documents establish a unit cost for undercutting and replacing wet or unsuitable soils (per cubic yard in-place).
If construction is performed during seasonal wet weather conditions, areas of rutting or pumping may be more widespread. Additional undercutting can often be required during site grading operations if the work is attempted during, or just after, periods of significant rainfall. Performing site work during seasonal dry weather conditions with wide track-mounted low ground pressure equipment often reduces subgrade undercutting requirements. Traversing wet subgrade soils with heavy rubber-tired equipment often results in subgrade disturbance and the need for subsequent processing/compaction and/or undercutting.
4.2 Compacted Fill
Compacted fill is new fill material placed as backfill in undercut excavations and utility excavations, or placed during mass grading to raise final site grades above existing site grades below pavements and structures. Fill that is placed outside of current or proposed development areas is sometimes called “common fill” or “general fill”. Materials that do not meet compacted fill requirements may sometimes be used in these “common” or “general” fill areas. In addition, materials that meet requirements for compacted fill may also be used in these areas. Soils with debris, garbage, organic strippings, and other deleterious materials (which can decay, rot, or corrode over time) should not be used as fill in any site areas.
Criteria for fill characteristics, compaction procedures, and compaction control are listed in the table below. The near surface on-site SC, SM and SC-SM soils typically meet the criteria for Select Soil Fill below. Fill operations should not begin until representative soil samples are collected from cut areas and proposed off-site borrow sources and tested for plasticity and moisture/density relationship (allow 3 to 4 days for sampling and testing soil). The test results will be used to determine whether or not the proposed borrow material meets project specifications.
Fill placement and compaction should be observed by our representative on a full-time basis.
MATERIAL
TYPE CHARACTERISTICS COMPACTION
PROCEDURES
COMPACTION
CONTROL 1, 2
SELECT
SOIL FILL
Maximum particle size: 3 inches.
Maximum gravel and oversize particle content: 15 percent retained on a ¾-inch sieve.
Percent fines: Between 15 and 50 percent of total material passing the No. 200 sieve
Maximum allowable organic content: 3 percent by weight, but large roots are not allowed.
Liquid Limit: Not more than 45.
Plasticity Index: Not more than 20.
Maximum loose lift thickness:
8 inches.
Compaction requirement:
Compaction should be to at least 98 percent of the Standard Proctor maximum (ASTM D 698) dry density.
Moisture content at time of compaction: within minus 3 to plus 3 percent of the material’s optimum moisture content.
Building Pad Areas: One field density test every 2,500 square feet per lift, with a minimum of two tests per lift.
Utility Trenches: One field density test per structure or one test per every 75 linear feet, per lift.
TTL Project No. 000210603696.00 Page 10 of 14
© 2022, TTL, Inc. Purpose | Passion | Principles
Designation as a SC-SM, SM, or SC, in accordance with the Unified Soil Classification System (USCS).
1For preliminary planning only. Our technician/engineer should determine the actual test frequency.
2 In addition, the fill must be stable under the influence of compaction equipment. Heavy construction traffic should not be allowed to travel on compacted fill areas, except on designated haul roads, to reduce the potential for damaging a previously compacted fill subgrade
If grading occurs during seasonal wet weather conditions, when drying soils is more difficult and time-consuming, the grading contractor may have difficulty achieving suitable moisture conditions for proper compaction of Select Soil Fill. The contractor should be prepared to provide the means and methods to dry soils to provide the required compaction.
If site preparation operations are not continuous from start to finish or a long period of inclement weather interrupts site preparation, the surface receiving fill should be scarified to a depth of 6 inches and re-compacted as recommended in the following paragraph before placement of the fill is started. No material should be placed on surfaces that are muddy, frozen or that contain frost.
It is anticipated that compaction may be accomplished by steel-wheeled rollers. Other equipment suited to the soil being compacted may be necessary depending on off-site fill, if any, selected.
Materials should be moisture conditioned, as necessary, to provide a moisture content that will facilitate obtaining the recommended compaction.
TTL’s soils engineering technician should witness the filling operations and perform in-place density tests to confirm the specified fill compaction is achieved. Areas that fail to achieve the recommended compaction criteria should be reworked and retested prior to proceeding with subsequent phases of construction. Furthermore, select undercut and backfill areas should be tested, although this may contain smaller quantities of fill than specified.
4.3 Drainage Considerations
The performance of a grade-supported slab and foundation systems will not only be dependent upon the quality of construction, but also upon the stability of the moisture content of the underlying soils.
We recommend that site drainage be developed so ponding of surface runoff near the proposed structures and equipment does not occur during or after construction. Further, it will be important for the contractor to maintain the site in a positively drained condition during construction. Ponding of water near structure foundations may cause significant moisture variations in the soils adjacent to the foundation, thus decreasing their stability. Saturation of foundation/slab supporting soils can lead to destress to the structure foundation, floor slab, framing, and cosmetic finishes. Project specifications should clearly detail the contractor’s responsibility to notify the designers and the geotechnical engineer if conditions are encountered in the field that would require remedial treatment or which could affect the integrity of the site or the proposed structures.
TTL Project No. 000210603696.00 Page 11 of 14
© 2022, TTL, Inc. Purpose | Passion | Principles
When establishing the final grade around the structure, we recommend the following be considered:
• Elevation of the ground surface adjacent to shallow perimeter foundations should be at least 6 inches below the finished floor elevation.
• The slope of the ground surface away from the structure should be a minimum of 5 percent for a distance of at least 10 feet, where possible.
• Gutters should be considered to control roof runoff. Gutter downspouts should extend at least 3 feet from the face of the structure or tie into a stormwater buried drainage system.
5.0 INFRASTRUCTURE…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| Award Information | — | |
| BID INSTRUCTIONS | — | |
| Bid Tabulation | — | |
| Award Information | — | |
| Tree Database - 2022 | — | |
| 15-007 Analysis | — | |
| 11-008 Tally | — | |
| Tree Trimming and Removal Serv | — | |
| NOIA | — | |
| Award Information | — | |
| Addendum #1 | — | |
| 15-007 Tally | — | |
| Addendum #2 | — | |
| Addendum 1 | — | |
| Award Information | — | |
| Addendum 4 | — | |
| Addendum 2 | — | |
| Addendum 5 | — | |
| Addendum 3 | — | |
| Award Information | — |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .