This is Addendum 1 to an Invitation to Bid issued by the City of Albany, Georgia (Central Services Division) for the Driskell Park project (Ref. #23-007) dated October 18, 2022. The addendum revises the original bid documents through updated drawings, specification clarifications, and responses to bidder questions. Key revisions include modifications to site plans reflecting updated grading of the community garden location, new storm inlet A13A with corresponding drainage line callouts, revised ADS Underground Storage Design based on new drainage areas, and updates to architectural and site details including concrete curb walls, water pump pads, and backflow preventer pads. Specification revisions address Section 000004 (Supplementary Conditions) regarding facility closures, Section 096519 (Resilient Tile Flooring), and Section 096816 (Carpeting). The addendum clarifies that the entire park will remain closed during construction and that the existing Pool Building must remain closed and inaccessible to the public throughout the project duration. Bidders were required to acknowledge receipt of this addendum on their bid forms at submission.

The addendum addresses six bidder questions concerning shock pad requirements, GMax ratings for turf systems (not to exceed 165 G's for the entire system and less than 90 G's for the shock pad alone), turf system specifications, resilient flooring and carpet tile specifications, bathroom base material (porcelain tile rather than rubber base per Sheet A9.00), and clarification that "Other Acceptable Manufacturers" products listed do not require architect approval prior to bid day. Supporting documentation including stormwater calculations, updated specifications, and revised drawings are available through the provided Dropbox link. The addendum was issued by Ricky Gladney, Buyer, for the City of Albany's Central Services Division.

Text of this file

C E N T R A L S E R V I C E S

P.O. BOX 447 ALBANY, GA 31702 | PHONE: 229.431.3211 | FAX: 229.431.2184 | www.albanyga.gov

10/18/2022

TO: ALL POTENTIAL BIDDERS

SUBJECT: DRISKELL PARK

Invitation to Bid Ref. #23-007

ADDENDUM NO. 1

The items contained in this addendum are added to and/or deleted from and become part of the specifications and proposal documents for the above-referenced Invitation to Bid.

Bidders must acknowledge receipt of the Addendum on the Bid Form, located in the invitation to bid, when the bids are submitted.

NARRATIVE:

This addendum includes revised drawings, clarifications and responses to questions received prior to issuance of the addenda, and responses to substitution requests received prior to issuance of the addenda.

Clarifications

1. Entire park will be closed during construction.

Project Drawing Revisions

1. General

a. Not applicable.

2. Architectural

a. Sheet A9.00 revised to clarify finish information.

3. Site

a. C1.02-1 revised to include callouts for concrete pads under water pumps and backflow preventers.

b. C1.03-1 callouts for Concrete Curb Wall and Ribbon Curb north of community garden.

c. C2.00 revised to show updated grading of community garden location and new storm inlet A13A.

d. C2.02 revised to show updated grading of community garden location and new storm inlet A13A.

e. C2.02A revised to show updated grading of community garden location and new storm inlet A13A.

f. C2.40 revised to show new storm inlet A13A and corresponding line A13A- A13. Page organization updates.

g. C2.41 revised to show new storm inlet A13A and corresponding line A13A- A13. Page organization updates.

h. C2.42 revised to show new storm inlet A13A and corresponding line A13A- A13 in pipe chart.

i. C2.52 revised to reflect new ADS Underground Storage Design based on new drainage areas from garden.

j. C2.53 revised to reflect new ADS Underground Storage Design based on new drainage areas from garden.

k. C2.57 revised to reflect new ADS Underground Storage Design based on new drainage areas from garden.

l. C3.00 revised to show new storm inlet A13A and corresponding line A13A-

A13.

m. C3.20 revised to show new storm inlet A13A and corresponding line A13A- A13 and relevant EPSC details.

n. C3.21 revised to show new storm inlet A13A and corresponding line A13A- A13 and relevant EPSC details.

o. C3.22 revised to show new storm inlet A13A and corresponding line A13A-

A13 and relevant EPSC details.

p. C3.30 revised to show new storm inlet A13A and corresponding line A13A- A13.

q. C3.31 revised to show new storm inlet A13A and corresponding line A13A- A13.

r. C3.32 revised to show new storm inlet A13A and corresponding line A13A- A13.

s. C4.01 revised to include Detail 7 – Concrete Curb Wall.

t. C5.00 revised to include callouts for concrete pads under water pumps and backflow preventers.

Project Specification Revisions

1. Section 000004: Supplementary Conditions: 1.) ACTIVE FACILITIES

a. Replace in its entirety. “The Owner requires that the following facilities remain closed and NOT accessible for public use: Existing Pool Building. See attachments.

2. Section 096519 – RESILIENT TILE FLOORING

a. Provided in its entirety.

3. Section 096816 – CARPETING

a. Provided in its entirety.

Received Bidder Questions

1. Is a shock pad required to be bid? Yes.

a. Yes.

2. What GMax rating is required to be met? Less than 90 or less than 165?

a. GMax rating not to exceed 165 G's for entire turf system; less than 90 G's for shock pad alone.

3. If a turf system without a pad that meets the GMax rating will it be acceptable?

a. No.

4. Resilient Flooring – Missing Specification for LVT 1 & 2, Carpet Tile 1, and Walk off Mat.

a. Refer to attached 096519-Resilient Tile Flooring and 096816-Carpeting specifications.

5. Please confirm that Rubber Base will be used in bathrooms.

a. Porcelain tile base, see revision Addendum #1 on sheet A9.00 General Notes & Finishes

6. Please confirm that “Other Acceptable Manufacturers” products listed do not need to be approved by architect prior to bid day. In my mind the language below reads that they area already accepted.

a. Other Acceptable Manufacturers products listed do not need to be approved by architect prior to bid day.

Attachments

1. General:

a. Stormwater Calculations and Relevant Appendices

2. Specification Sections:

a. See updated Project Manual

3. Drawings

a. Not applicable

4. Exhibits:

5. CAD Files:

6. Link to documents:

https://www.dropbox.com/scl/fo/qy7u2a3f2qsoy1ztd9v3y/h?dl=0&rlkey=lf5qd3tgg5vimci553d5nyif7

End of Addendum

Ricky Gladney Ricky Gladney, Buyer https://www.dropbox.com/scl/fo/qy7u2a3f2qsoy1ztd9v3y/h?dl=0&rlkey=lf5qd3tgg5vimci553d5nyif7

Other files

File Type Posted
Award Information —
Award Information —
BID INSTRUCTIONS —
Bid Tabulation —
Award Information —
Tree Database - 2022 —
15-007 Analysis —
11-008 Tally —
Tree Trimming and Removal Serv —
NOIA —
Award Information —
Addendum #1 —
15-007 Tally —
Addendum #2 —
Driskell Park 1021 S McKinley —
Award Information —
Addendum 4 —
Addendum 2 —
Addendum 5 —
Addendum 3 —
Award Information —
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .