Drawings_Mechanical_Sheet_26_-_36.pdf

PDF 725 KB Posted

Attached to
MODERNIZE NATCHEZ MAINTENANCE FACILITY
Solicitation number
140P5226R0002
Issued by

About this file

This document is a comprehensive mechanical design package for the NPS Natchez Maintenance Facility Renovation project (PMIS/PKG No. 323963), prepared by Walker Architects (Gainesville, FL) and Henry Adams LLC (Baltimore, MD), dated March 14, 2024.

The mechanical work encompasses HVAC system design, including demolition and new installation of ductwork, piping, and refrigeration systems across two levels (Level 1 and Mezzanine 113) of the facility. Key equipment includes two Variable Refrigerant Heat Pump (VRF) units (HPU-1 with 37 MBH cooling/19 MBH heating; HPU-2 with 56 MBH cooling/43 MBH heating), three Variable Refrigerant Fan Coil Units (FCU-1.1, FCU-1.2, and FCU-2.1 with capacities ranging from 50 to 275 MBH), one Split System Air Conditioning Unit (ACU-1 for telecom room with 24 MBH capacity), two exhaust fans (EF-1 and EF-2 each rated 140 CFM), and one louvered penthouse (LP-1 with 415 CFM outdoor air intake). The contractor must coordinate all mechanical work with plumbing and electrical trades, locate and preserve existing utilities, relocate existing equipment to new concrete pads, recover and properly handle refrigerants per EPA standards, and ensure all access points for valves, dampers, filters, and controls remain accessible. All drain piping requires minimum 2% grade, and room thermostats must be located 46 inches above finished floor on the same horizontal centerline as light switches. The project includes comprehensive mechanical schedules, ductwork routing details, refrigerant piping specifications, and automatic temperature control sequences for both occupied and unoccupied modes with specific setpoints (cooling at 75°F occupied/85°F unoccupied; heating at 72°F occupied/62°F unoccupied).

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL MECHANICAL NOTES

(APPLICABLE TO ALL MECHANICAL DRAWINGS)

1. ALL PIPING, DUCTWORK, EQUIPMENT, AND MATERIALS SHOWN "LIGHT" ( ) ARE EXISTING TO

REMAIN. DEMOLISH ALL PIPING, DUCTWORK, EQUIPMENT, AND MATERIALS SHOWN "HEAVY AND

DASHED" ( ) ON DEMOLITION DRAWINGS. PROVIDE ALL PIPING, DUCTWORK, EQUIPMENT,

AND MATERIALS SHOWN "HEAVY AND SOLID" ( ) ON NEW WORK DRAWINGS.

2. COORDINATE ALL MECHANICAL WORK WITH PLUMBING WORK, ELECTRICAL WORK, AND WORK OF

OTHER TRADES SHOWN ON OTHER DRAWINGS.

3. THE LOCATION OF EXISTING UTILITIES IS SHOWN IN AN APPROXIMATE WAY ONLY. DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. REPAIR ALL DAMAGES

OCCASIONED BY FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES.

4. RUN ALL DRAIN PIPING WITH 2 PERCENT MINIMUM GRADE UNLESS OTHERWISE NOTED.

5. INSTALL PIPING AND DUCTWORK SO THAT ALL VALVES AND DAMPERS ARE ACCESSIBLE.

6. UNLESS OTHERWISE NOTED, ROUTE ALL PIPING AND DUCTWORK OVERHEAD, TIGHT TO UNDERSIDE

OF LEVEL ABOVE, WITH SPACE FOR INSULATION IF REQUIRED.

7. CERTAIN ITEMS SUCH AS ACCESS DOORS, CLEANOUTS, RISE AND DROPS IN DUCTWORK AND

PIPING, ETC., ARE INDICATED ON THE DRAWINGS FOR CLARITY OR A SPECIFIC LOCATION

REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE EXTENT OF THE REQUIREMENTS FOR

THESE ITEMS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THESE ITEMS AS REQUIRED

ELSEWHERE IN THE CONTRACT DOCUMENTS.

8. WHERE THE INSTALLATION OF NEW SERVICES OR THE EXTENSION OF EXISTING SERVICES

REQUIRES CUTTING OF EXISTING FLOORS, WALLS, PARTITIONS, ETC., CHECK FOR THE PRESENCE

OF EXISTING MECHANICAL, PLUMBING AND ELECTRICAL SERVICES WITHIN OR IMMEDIATELY

BENEATH CONSTRUCTION. EXERCISE NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE

SERVICES OR INJURY TO PERSONNEL DUE TO CONTACT WITH SAME. TEMPORARILY DISCONNECT

SERVICES DURING THE CUTTING OPERATION. SCHEDULE SERVICE OUTAGES IN ADVANCE WITH

THE COR.

9. EXCEPT AS OTHERWISE NOTED, LOCATE ALL ROOM THERMOSTATS 46 INCHES ABOVE FINISHED

FLOOR ON SAME HORIZONTAL CENTERLINE AS LIGHT SWITCH. WHERE LIGHT SWITCH AND

THERMOSTAT ARE ADJACENT TO EACH OTHER, LIGHT SWITCH SHALL BE CLOSEST TO THE DOOR.

COORDINATE WITH ELECTRICAL CONTRACTOR. NOTIFY THE ENGINEER OF ROOMS WHERE THE

ABOVE LOCATION CANNOT BE MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION.

10. RECOVER REFRIGERANTS FROM REFRIGERATION EQUIPMENT IN ACCORDANCE WITH AHRI AND EPA

STANDARDS. PLACE RECOVERED REFRIGERANT IN CONTAINERS LABELED IN ACCORDANCE WITH

ARI AND EPA STANDARDS AND TURNED OVER TO THE COR.

11. RECYCLE MERCURY SWITCH THERMOSTATS THAT ARE REMOVED. DELIVER RECYCLED

THERMOSTATS TO PARTICIPATING WHOLESALERS.

12. INFORMATION SHOWN ON THE MECHANICAL DRAWINGS PERTAINING TO EXISTING CONDITIONS HAS

BEEN OBTAINED FROM AVAILABLE BUILDING DRAWINGS OR GENERAL FIELD OBSERVATIONS AND

MAY NOT INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL OR DIMENSION. EXISTING

CONDITIONS ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR DETERMINING THE ACTUAL EXISTING CONDITIONS PRIOR TO DEMOLITION OR

PERFORMANCE OF ANY WORK. SHOULD CONDITIONS BE DISCOVERED THAT PREVENT EXECUTION

OF THE WORK AS INDICATED, OR THERE IS A QUESTION REGARDING SCOPE OF WORK OR LIMITS

OF DISTURBANCE, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR IN WRITING AND

AWAIT WRITTEN DIRECTION BEFORE PROCEEDING WITH THE WORK.

13. REMOVE ALL EXISTING PIPING, DUCTWORK, EQUIPMENT, AND MATERIALS NOT REQUIRED FOR RE- USE OR RE-INSTALLATION (SHOWN OR OTHERWISE). ALL EXISTING MATERIALS AND EQUIPMENT

WHICH ARE REMOVED AND ARE DESIRED BY THE COR, OR ARE INDICATED TO REMAIN THE

PROPERTY OF GOVERNMENT SHALL BE DELIVERED BY THE CONTRACTOR WHERE DIRECTED BY

THE COR. ALL OTHER MATERIALS AND EQUIPMENT WHICH ARE REMOVED SHALL BECOME THE

PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED BY THE CONTRACTOR FROM THE

PREMISES.

14. DISCONNECT EXISTING PIPING NO LONGER REQUIRED TO REMAIN IN SERVICE (SHOWN OR

OTHERWISE) AND REMOVE PIPING BACK TO SERVICE MAINS UNLESS OTHERWISE INDICATED OR

NOTED ON PLANS. REMOVE EXISTING PIPE HANGERS, SUPPORTS, VALVES, ETC. CAP, PLUG, OR

SEAL EXISTING PIPING INDICATED OR REQUIRED TO REMAIN IN SERVICE OR IN PLACE. NO

EXISTING PIPING SHALL BE LEFT UNSEALED. VALVE ALL TERMINATED PRESSURE PIPE.

15. EXISTING MECHANICAL PIPING, DUCTWORK, EQUIPMENT, AND MATERIALS AFFECTED BY

DEMOLITION OR NEW WORK INSTALLATION AND REQUIRED TO REMAIN IN SERVICE SHALL BE RE- INSTALLED OR SUPPORTED AS REQUIRED IN ACCORDANCE WITH THE SPECIFICATIONS. ALL WORK

SHALL BE COMPLETED TO THE SATISFACTION OF THE COR AND AT NO ADDITIONAL CONTRACT

COST.

16. REMOVE ALL ACCESSORIES, CONTROLS, ENCLOSURES, SUPPORTS, HANGERS, PADS, ETC.

ASSOCIATED WITH ALL EQUIPMENT SHOWN TO BE REMOVED. REPAIR AND PAINT DAMAGED

SURFACES AND ALL SURFACES BEHIND ALL EQUIPMENT SHOWN TO BE DEMOLISHED TO MATCH

EXISTING ADJACENT SURFACES.

DESIGNED:

CADD:

TECH REVIEW:

DATE:

SUB SHEET NO: TITLE OF SHEET: DRAWING NO.

PMIS/PKG NO.

OF

A/E FIRM:

PRIME:

SHEET

SUB:

HENRY

ADAMS, LLC.

BALTIMORE, MD

WALKER

ARCHITECTS,

GAINESVILLE, FL

/1

/2

:4

:3

P

M

GPZ

GPZ

03/14/2024

M0.1SRH

MECHANICAL COVER SHEET

NPS - NATCHEZ MAINTENANCE

FACILITY RENOVATION

323963

DESCRIPTIONSYMBOL

DIFFUSER TAG:

TOP- NECK SIZE

CENTER- SPECIFICATION TYPE

BOTTOM- AIRFLOW IN CFM

8x8

D-1

FLEXIBLE CONNECTION

VOLUME DAMPER

MOTOR OPERATED DAMPER

BAROMETRIC BACKDRAFT DAMPER

THERMOSTAT/TEMPERATURE SENSORT

RETURN AIR DUCT

OUTDOOR AIR OR SUPPLY AIR DUCT

EXHAUST AIR DUCT

CAP (PIPE OR DUCT)

PLAN/ SECTION DESIGNATION

TOP - PLAN/ SECTION REFERENCE,

BOTTOM - REFERENCED DRAWING

M1.1

END POINT OF REMOVAL OF EXISTING

CONNECT TO EXISTING

REFRIGERANT SUCTIONRS

REFRIGERANT LIQUIDRL

CONDENSATE DRAIND

(APPLICABLE TO ALL MECHANICAL DRAWINGS)

MECHANICAL LEGENDMECHANICAL ABBREVIATIONS

(APPLICABLE TO ALL MECHANICAL DRAWINGS)

A AMPS

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AVG AVERAGE

B BOTTOM

BDD BACKDRAFT DAMPER

BHP BRAKE HORSEPOWER

BLDG BUILDING

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

CC COOLING COIL

CFM CUBIC FEET PER MINUTE

CLG CEILING / COOLING

COND CONDENSATE

COP COEFFICIENT OF PERFORMANCE

COR CONTRACTING OFFICER REPRESENTATIVE

CX CONNECT TO EXISTING

D DAMPER / DEPTH / DIAMETER / DIFFUSER

DB DRY BULB

DEG DEGREES

DN DOWN

DP DIFFERENTIAL PRESSURE

DWG DRAWING

DWH DOMESTIC WATER HEATER

EA EACH / EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

ELEC ELECTRIC / ELECTRICAL

ESP EXTERNAL STATIC PRESSURE

ETR EXISTING TO REMAIN

EX EXISTING

F FAHRENHEIT

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT

FLA FULL LOAD AMPS

FPM FEET PER MINUTE

FT FEET / FOOT

G GAS / GRILLE

H HEIGHT / HIGH

HP HORSEPOWER

HPU HEAT PUMP UNIT

HTG HEATING

HVAC HEATING, VENTILATING AND AIR CONDITIONING

HZ HERTZ

IN INCH / INCHES

KW KILOWATTS

L LENGTH

LAT LEAVING AIR TEMPERATURE

LLS LIQUID LEVEL SENSOR

M MECHANICAL

MBH THOUSAND BTU PER HOUR

MIN MINIMUM

N NORTH

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OUTDOOR AIR

OED OPEN-END DUCT

P PRESSURE / PUMP

PD PRESSURE DROP

PH PHASE

PSI PRESSURE - POUNDS PER SQUARE INCH

PSIG PRESSURE - POUNDS PER SQUARE INCH, GAUGE

R RADIUS / REGISTER

RA RETURN AIR

RAD RADIUS

RH RELATIVE HUMIDITY

RL REFRIGERANT LIQUID

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SENSOR / REFRIGERANT SUCTION

RX REMOVE EXISTING

S SWITCH

SA SUPPLY AIR

SEER SEASONAL ENERGY EFFICIENCY RATIO

SENS SENSIBLE COOLING

SP STATIC PRESSURE

T THERMOSTAT

TYP TYPICAL

V VOLTS

VD VOLUME DAMPER

W WATT / WIDTH

W/ WITH

WB WET BULB

RX ACU

EX T

1 1 1

1 1

RX DUCT UP TO

MEZZANINE, TYP

OF 8

RX ACU

EX DUST

COLLECTION

EXHAUST

RX ACCU RX ACCU

RX FLUE UP

RX OA UP

RX RS/L

RX RS/L

RX RS/L UP

EX RS/L UP

TRAINING ROOM

OFFICE

KITCHEN

RXT

EX

GENERATOR

EX WOOD SHOP ACCU. START AND COMMISSION

THIS SYSTEM FOLLOWING THE RELOCATION OF

THE EXISTING ACCU. ENSURE SYSTEM IS FULLY

FUNCTIONING PRIOR TO AND AFTER RELOCATIION.

DESIGNED:

CADD:

TECH REVIEW:

DATE:

SUB SHEET NO: TITLE OF SHEET: DRAWING NO.

PMIS/PKG NO.

OF

A/E FIRM:

PRIME:

SHEET

SUB:

HENRY

ADAMS, LLC.

BALTIMORE, MD

WALKER

ARCHITECTS,

GAINESVILLE, FL

/1

/2

:4

:4

P

M

GPZ

GPZ

03/14/2024

MD1.1SRH

LEVEL 1 - DUCTWORK -

DEMOLITION

NPS - NATCHEZ MAINTENANCE

FACILITY RENOVATION

323963

DRAWING NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

SPECIAL NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

RX AIR DEVICE1

RELOCATE EX DWH TO LOCATION SHOWN ON DWG M1.22

SCALE AMD1.1

1 LEVEL 1 - DUCTWORK - DEMOLITION PLAN

SCALE OF FEET

4 0 4 8

SCALE A

1. CONTRACTOR SHALL IDENTIFY REMOVAL OF ALL MECHANICAL DUCTWORK AND

EQUIPMENT AND REVIEW WITH COR BEFORE REMOVING. WORK REMOVED WITHOUT

PRIOR CONFIMATION THAT WAS NOT INTENDED TO BE REMOVED SHALL BE

REPLACED IN SAME OR BETTER CONDITION AT CONTRACTOR'S COST.

2. PATCH AND SEAL ALL EXISTING OPENINGS IN WALLS AND FLOORS WHERE

DUCTWORK, PIPING, CONDUIT, ETC IS REMOVED.

RELOCATE EX WOOD SHOP ACCU TO NEW CONCRETE PAD.

SEE DWG M1.1 FOR MORE INFORMATION.

CONFIRM EX ACCU IS ASSOCIATED WITH WOOD SHOP AHU4

RX SA

DUCTWORK, TYP

RX AHU

RX RA DUCTWORK, TYP

RX DUCT DN TO AIR

DEVICE, TYP OF 8

RX DWH FLUE UP/DN

RX DWH OA UP/DN

RX AHU FLUE UP

EX AHU

FLUE UP

RX RS/L

EX RS/L

RX RS/L DN

EX RS/L DN

MECHANICAL MEZZANINE

DESIGNED:

CADD:

TECH REVIEW:

DATE:

SUB SHEET NO: TITLE OF SHEET: DRAWING NO.

PMIS/PKG NO.

OF

A/E FIRM:

PRIME:

SHEET

SUB:

HENRY

ADAMS, LLC.

BALTIMORE, MD

WALKER

ARCHITECTS,

GAINESVILLE, FL

/1

/2

:4

:4

P

M

GPZ

GPZ

03/14/2024

MD1.2SRH

MEZZANINE - DUCTWORK -

DEMOLITION

NPS - NATCHEZ MAINTENANCE

FACILITY RENOVATION

323963

DRAWING NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

SPECIAL NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

RX AIR DEVICE1

SCALE AMD1.2

1 MEZZANIINE - DUCTWORK - DEMOLITION PLAN

SCALE OF FEET

4 0 4 8

SCALE A

1. CONTRACTOR SHALL IDENTIFY REMOVAL OF ALL MECHANICAL DUCTWORK AND

EQUIPMENT AND REVIEW WITH COR BEFORE REMOVING. WORK REMOVED WITHOUT

PRIOR CONFIMATION THAT WAS NOT INTENDED TO BE REMOVED SHALL BE

REPLACED IN SAME OR BETTER CONDITION AT CONTRACTOR'S COST.

2. PATCH AND SEAL ALL EXISTING OPENINGS IN WALLS AND FLOORS WHERE

DUCTWORK, PIPING, CONDUIT, ETC IS REMOVED.

OFFICE

OFFICE

KITCHEN

UNISEX TOILET

LOCKERS

TRAINING ROOM

TELECOM

TR01

EX ACCU HPU-1 HPU-2

D-1

8ø

D-1

8ø

R-1

8ø

R-1

8ø

8Ø RA UP

8Ø SA UP

8Ø RA UP

8Ø SA UP

D-1

8ø

HOOD-1

D-1

6ø D-2

6ø

R-1

8ø

R-1

8ø

D-1

8ø

R-1

8ø

R-1

8ø

12x8 RA

8x10 SA

D-1

10ø

10Ø SA UP

6x8 SA UP

12x8 RA

12x8 RA UP

8x10 SA UP FCU-2.1T

FCU-1.2T

FCU-1.1T

CORRIDOR

C01

EF-1

EF-2

1 1

EX TEX DUST

COLLECTION

EXHAUST

2 2

EX

GENERATOR

ACCU-1

ACU-1

MOUNT BOTTOM OF

UNIT APPROX 6'-6"

AFF

2 3

TERMINATE 4" Ø DRYER

VENT THROUGH WALL WITH

DRYER VENT CAP. COLOR AS

SELECTED BY ARCHITECT.

ø

E A ø

E A

DRYER

DESIGNED:

CADD:

TECH REVIEW:

DATE:

SUB SHEET NO: TITLE OF SHEET: DRAWING NO.

PMIS/PKG NO.

OF

A/E FIRM:

PRIME:

SHEET

SUB:

HENRY

ADAMS, LLC.

BALTIMORE, MD

WALKER

ARCHITECTS,

GAINESVILLE, FL

/1

/2

:4

:4

P

M

GPZ

GPZ

03/14/2024

M1.1SRH

LEVEL 1 - DUCTWORK - NEW

WORK

NPS - NATCHEZ MAINTENANCE

FACILITY RENOVATION

323963

DRAWING NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

1. ALL ITEMS THAT REQUIRE ACCESS FOR OPERATING, CLEANING, SERVICING,

MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE.

EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF

VALVES, FILTERS, STRAINERS, TRANSMITTERS, AND CONTROL DEVICES. PRIOR TO

COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN THIS REQUIREMENT

AND CONTRACT DRAWINGS TO THE COR FOR RESOLUTION. AWAIT WRITTEN

DIRECTION BEFORE PROCEEDING.

2. RUNOUTS TO DIFFUSERS SHALL BE SAME SIZE AS DIFFUSER NECK SIZE UNLESS

OTHERWISE NOTED.

3. PROVIDE FLEXIBLE CONNECTION ON SUPPLY AND RETURN DUCT CONNECTIONS

TO ALL FCU'S.

SPECIAL NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

TERMINATE 8Ø EA WITH WALL CAP1

MOUNT ON 4" HOUSEKEEPING PAD2

SCALE AM1.1

1 LEVEL 1 - DUCTWORK - NEW WORK PLAN

SCALE OF FEET

4 0 4 8

SCALE A

RELOCATE EX ACCU TO THIS LOCATION ON NEW CONCRETE

PAD. REFILL THE SYSTEM WITH REFRIGERANT, START AND

COMMISSION THE SYSTEM.

PROVIDE DRYER VENT WALL BOX WITH 4" OVAL DUCT TO

CEILING ASSEMBLY PENETRATION, TRANSITION TO 4" Ø IN

CEILING.

M3.1

MECHANICAL MEZZANINE

EX 20x20 EX 24x24 EX 18x18EX 18x18

EX AHU

EX AHU

FLUE UP

FCU-1.1

FCU-1.2

8ø RA 8Ø RA DN

10x10 OA

10x10 OA UP

TO LP-1

8ø SA

8Ø SA DN

DWH-1

14x12 SA

FCU-2.1 18x16 SA

18x16 OA x

S A x

S A

D-1

8ø D-1

8ø

D-1

8ø

D-1

8ø

D-1

8ø D-1

8ø

D-1

8ø x

O A

14x14 OA x

O A

R-2

12x12

R-2

12x12

R-2

12x12

8x8 OA

12x12 OA

10ø SA 2 ø

S A

3 7 x

S A

10Ø SA DN

7 4

START AND COMMISSION THIS SYSTEM FOLLOWING

THE RELOCATION OF THE EXISTING ACCU.

ENSURE SYSTEM IS FULLY FUNCTIONING PRIOR

TO AND AFTER RELOCATIION.

8Ø RA DN

4x4 OA

(50 CFM)

(90 CFM)

6x6 OA

(275 CFM)

DESIGNED:

CADD:

TECH REVIEW:

DATE:

SUB SHEET NO: TITLE OF SHEET: DRAWING NO.

PMIS/PKG NO.

OF

A/E FIRM:

PRIME:

SHEET

SUB:

HENRY

ADAMS, LLC.

BALTIMORE, MD

WALKER

ARCHITECTS,

GAINESVILLE, FL

/1

/2

:4

:4

P

M

GPZ

GPZ

03/14/2024

M1.2SRH

MEZZANINE - DUCTWORK - NEW

WORK

NPS - NATCHEZ MAINTENANCE

FACILITY RENOVATION

323963

DRAWING NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

SPECIAL NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

MOUNT ABOVE CEILING. SUPPORT FROM ABOVE.1

ROUTE ABOVE CEILING2

SCALE AM1.2

1 MEZZANIINE - DUCTWORK - NEW WORK PLAN

SCALE OF FEET

4 0 4 8

SCALE A

1. ALL ITEMS THAT REQUIRE ACCESS FOR OPERATING, CLEANING, SERVICING,

MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE.

EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF

VALVES, FILTERS, STRAINERS, TRANSMITTERS, AND CONTROL DEVICES. PRIOR TO

COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN THIS REQUIREMENT

AND CONTRACT DRAWINGS TO THE COR FOR RESOLUTION. AWAIT WRITTEN

DIRECTION BEFORE PROCEEDING.

2. RUNOUTS TO DIFFUSERS SHALL BE SAME SIZE AS DIFFUSER NECK SIZE UNLESS

OTHERWISE NOTED.

3. PROVIDE FLEXIBLE CONNECTION ON SUPPLY AND RETURN DUCT CONNECTIONS

TO ALL FCU'S.

4Ø COMBUSTION AIR INTAKE UP THROUGH ROOF3

4Ø FLUE UP THROUGH ROOF4

ROUTE ABOVE OFFICE CEILING, EXPOSED TO TRAINING ROOM5

SUPPORT FROM FLOOR6

TERMINATE WITH GOOSENECK7

OFFICE

OFFICE

KITCHEN

UNISEX TOILET

LOCKERS

TRAINING ROOM

TELECOM

TR01

HPU-1 HPU-2

CORRIDOR

C01

EX RS/L UP

2 PAIRS RS/L UP

EX

GENERATOR

ACCU-1

RS/L

ACU-1

EX WOOD SHOP ACCU. START, RECHARGE, AND

COMMISSION THIS SYSTEM FOLLOWING THE

RELOCATION OF THE EXISTING ACCU. ENSURE

SYSTEM IS FULLY FUNCTIONING PRIOR TO AND

AFTER RELOCATIION.

ROUTE THROUGH

MEZZANINE FLOOR

JOISTS

ROUTE THROUGH

MEZZANINE FLOOR

JOISTS

DESIGNED:

CADD:

TECH REVIEW:

DATE:

SUB SHEET NO: TITLE OF SHEET: DRAWING NO.

PMIS/PKG NO.

OF

A/E FIRM:

PRIME:

SHEET

SUB:

HENRY

ADAMS, LLC.

BALTIMORE, MD

WALKER

ARCHITECTS,

GAINESVILLE, FL

/1

/2

:4

:4

P

M

GPZ

GPZ

03/14/2024

M2.1SRH

LEVEL 1 - MECHANICAL PIPING -

NEW WORK

NPS - NATCHEZ MAINTENANCE

FACILITY RENOVATION

323963

DRAWING NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

SPECIAL NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

RELOCATE EX ACCU TO THIS LOCATION ON NEW CONCRETE

PAD

SCALE AM2.1

1 LEVEL 1 - MECHANICAL PIPING - NEW WORK PLAN

SCALE OF FEET

4 0 4 8

SCALE A

1. ALL ITEMS THAT REQUIRE ACCESS FOR OPERATING, CLEANING, SERVICING,

MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE.

EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF

VALVES, FILTERS, STRAINERS, TRANSMITTERS, AND CONTROL DEVICES. PRIOR TO

COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN THIS REQUIREMENT

AND CONTRACT DRAWINGS TO THE COR FOR RESOLUTION. AWAIT WRITTEN

DIRECTION BEFORE PROCEEDING.

2. REFRIGERANT PIPING SHALL BE SIZED BY ASSOCIATED EQUIPMENT

MANUFACTURER.

MECHANICAL MEZZANINE

EX AHU

EX RS/L

EX RS/L DN

FCU-1.1

FCU-1.2

FCU-2.1

2 PAIRS RS/L DN

START AND COMMISSION THIS SYSTEM FOLLOWING

THE RELOCATION OF THE EXISTING ACCU.

ENSURE SYSTEM IS FULLY FUNCTIONING PRIOR

TO AND AFTER RELOCATIION.

DESIGNED:

CADD:

TECH REVIEW:

DATE:

SUB SHEET NO: TITLE OF SHEET: DRAWING NO.

PMIS/PKG NO.

OF

A/E FIRM:

PRIME:

SHEET

SUB:

HENRY

ADAMS, LLC.

BALTIMORE, MD

WALKER

ARCHITECTS,

GAINESVILLE, FL

/1

/2

:4

:4

P

M

GPZ

GPZ

03/14/2024

M2.2SRH

MEZZANINE - MECHANICAL

PIPING - NEW WORK

NPS - NATCHEZ MAINTENANCE

FACILITY RENOVATION

323963

DRAWING NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

SPECIAL NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

MOUNT ABOVE CEILING. SUPPORT FROM ABOVE.1

ROUTE ABOVE CEILING2

SCALE AM2.2

1 MEZZANIINE - MECHANICAL PIPING - NEW WORK PLAN

SCALE OF FEET

4 0 4 8

SCALE A

1. ALL ITEMS THAT REQUIRE ACCESS FOR OPERATING, CLEANING, SERVICING,

MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE.

EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF

VALVES, FILTERS, STRAINERS, TRANSMITTERS, AND CONTROL DEVICES. PRIOR TO

COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN THIS REQUIREMENT

AND CONTRACT DRAWINGS TO THE COR FOR RESOLUTION. AWAIT WRITTEN

DIRECTION BEFORE PROCEEDING.

2. REFRIGERANT PIPING SHALL BE SIZED BY ASSOCIATED EQUIPMENT

MANUFACTURER.

LEVEL 1

0' - 0"

MEZZANINE

9' - 4"

ROOF

12' - 0"

MECHANICAL MEZZANINE

LOCKERS

CORRIDOR

C01

OFFICE

FCU-1.2

8x10 SA

FCU-1.1

4x4 OA

8ø RA

8ø RA

8ø SA

8ø SA8x10 SA

12x8 RA 12x8 RA

6x8 SA

10ø SA

6x6 OA

LP-1

DWH-1

4Ø COMBUSTION AIR INTAKE

4Ø FLUE

x

O A

TERMINATE WITH GOOSENECK

DESIGNED:

CADD:

TECH REVIEW:

DATE:

SUB SHEET NO: TITLE OF SHEET: DRAWING NO.

PMIS/PKG NO.

OF

A/E FIRM:

PRIME:

SHEET

SUB:

HENRY

ADAMS, LLC.

BALTIMORE, MD

WALKER

ARCHITECTS,

GAINESVILLE, FL

/1

/2

:4

:4

P

M

GPZ

GPZ

03/14/2024

M3.1SRH

MECHANICAL SECTIONS

NPS - NATCHEZ MAINTENANCE

FACILITY RENOVATION

323963

SCALE OF FEET

4 0 4 8

SCALE A

SCALE AM3.1

1 MECHANICAL MEZZANINE- DUCTWORK - NEW WORK SECTION

DRAWING NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

SPECIAL NOTES:

(APPLICABLE TO THIS DRAWING ONLY)

MOUNT ON ROOF CURB.11. ALL ITEMS THAT REQUIRE ACCESS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE.

EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF

VALVES, FILTERS, STRAINERS, TRANSMITTERS, AND CONTROL DEVICES. PRIOR TO

COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN THIS REQUIREMENT

AND CONTRACT DRAWINGS TO THE COR FOR RESOLUTION. AWAIT WRITTEN

DIRECTION BEFORE PROCEEDING.

2. RUNOUTS TO DIFFUSERS SHALL BE SAME SIZE AS DIFFUSER NECK SIZE UNLESS

OTHERWISE NOTED.

3. PROVIDE FLEXIBLE CONNECTION ON SUPPLY AND RETURN DUCT CONNECTIONS

TO ALL FCU'S.

HPU INSTALLATION DETAIL

SPLIT SYSTEM HEAT PUMP

(OUTDOOR UNIT)

PROVIDE KINDORF REFRIGERANT

LINE AND ELECTRICAL DISCONNECT

SUPPORT STAND. SUPPORT STAND

FROM BASE

REFRIGERANT PIPING,

CONTROL WIRING AND

ELECTRIC CONDUIT TO

ASSOCIATED INDOOR UNIT

SECURE UNIT TO SUPPORT BEAMS IN

ACCORDANCE WITH MANUFACTURER'S

RECOMMENDATIONS / REQUIREMENTS

ELECTRICAL DISCONNECT

SUPPORT BEAMS

HOUSEKEEPING PAD

AIR FLOW

CUSHION HEAD (SUPPLY ONLY)

D/2 (MINIMUM 6")

AIR OUTLET CEILINGD

NOTES:

1. AIR FLOW IS REVERSE FOR RETURN AND EXHAUST.

OUTLET LOCATED AT END OF RUN

CUT HOLE IN RECTANGULAR DUCT LARGE ENOUGH SO THAT

ROUGH METAL EDGE DOES NOT PROJECT INTO AIR STREAM.

NOTES:

1. DO NOT USE 45° TAP FITTINGS EXCEPT WHERE TIGHT

CONDITION PREVENTS USE OF OTHER FITTINGS INDICATED.

SPECIAL NOTES:

RECTANGULAR DUCT RECTANGULAR DUCT

AIR FLOW

ROUND DUCT

DO NOT USE

BACKWARD

BENDING MITRE

OR RADIUS

IMMEDIATELY

AFTER TAP

R=D

RECTANGULAR DUCT

CONICAL TEE

FITTING WITH

FLANGE

ROUND DUCT

AIR FLOW

45° TAP

FITTING WITH

FLANGE

MITRED 45° TAP

FITTING WITH

FLANGE.

TAPOFF FROM RECTANGULAR

DUCT TO ROUND DUCT

AIR FLOW

6" MINIMUM

NOTES:

1. SAME FOR RETURN AND EXHAUST DUCTS

EXCEPT AIR FLOW IS REVERSED.

REGISTER OR

DIFFUSER

DIFFUSER OR REGISTER TAPOFF AND TRANSITION

15° MAXIMUM

TAKEOFFS FROM TOP OF RECTANGULAR DUCTS

TOP VIEWTOP VIEW

RADIUS A X B

AIR FLOW

TRANSITION

AFTER TAKEOFF

(IF REQUIRED)

SECTION

AIR FLOW

SECTION

D

B

A

R=D

NOTES:

1. BOTTOM TAKEOFFS SIMILAR.

2. SAME FOR RETURN AND EXHAUST DUCTS EXCEPT

AIR FLOW IS REVERSED.

SPECIAL NOTES:

15° MAXIMUM

45°

45° TAP PERMITTED FOR DUCTWORK RATED 2" W.G.

OR LESS.

TAPOFF AND TRANSITION FROM SIDE OF DUCT

AIR FLOW

D

R=D (6" MINIMUM)

NOTES:

1. SEE SMACNA MANUAL FOR METHODS OF SECURING TAP-OFF

CONNECTION TO MAIN.

2. SAME FOR RETURN AND EXHAUST DUCTS EXCEPT AIR FLOW IS

REVERSED.

SPECIAL NOTES:

45° TAP PERMITTED FOR DUCTWORK RATED 2" W.G. OR LESS.

15° MAXIMUM

AIR FLOW

ROUND DUCT

NOTES:

1. FOR AIR FLOW IN OPPOSITE DIRECTION, TRANSITION COLLAR

SHALL OVERLAP EXTERIOR OR ROUND DUCT.

15° MAXIMUM

RECTANGULAR TO ROUND DUCT TRANSITION

STRUCTURE

ABOVE

ROD

DUCT WITH

INSULATION

ATTACH

PER

SMACNA

ANGLE

PROTECT DUCT

INSULATION

FROM BEING

CRUSHED BY

DUCT SUPPORTS

DUCT WITH INSULATION

DUCT STRAP

MAINTAIN VAPOR BARRIER AT

PENETRATION

ATTACH DUCT STRAP

PER SMACNA

NOTES:

1. REFER TO SMACNA FOR ADDITIONAL HANGERS AND SUPPORTS

DUCT INSULATION SUPPORT DETAIL

NOTES FOR SUPPLY AIR DIFFUSER INSTALLATION:

1. INSULATED FLEXIBLE DUCT SHALL NOT USED TO CHANGE DIRECTION

OF AIR FLOW.

2. MAXIMUM VERTICAL DIFFERENTIAL OF INSULATED FLEXIBLE DUCT

SHALL BE 12".

3. INSULATED FLEXIBLE DUCT CONNECTIONS SHALL BE METAL BANDED,

SEALED AND SUPPORTED TO ALIGN THE CONNECTION BETWEEN THE

INSULATED FLEXIBLE DUCT AND THE SHEETMETAL DUCT.

VD

LAY-IN TILE CEILING

SEAL & TAPE INSULATED JOINTMIN R=DBAND CLAMP (TYP)

STRAIGHT, NO OFFSET

FLEX DUCT ELBOW

SUPPORT

SUPPORT FLEXIBLE DUCT

FROM STRUCTURE ABOVE

TO PREVENT SAGGING

MAXIMUM LENGTH OF

FLEX DUCT = 5'-0"

INSULATED FLEXIBLE DUCT

INSULATED ROUND DUCT

SUPPLY AIR DIFFUSER

(SEE PLANS FOR SIZES

AND DIFFUSER TYPE)

SUPPLY AIR DIFFUSER FLEXIBLE DUCT CONNECTION

DESIGNED:

CADD:

TECH REVIEW:

DATE:

SUB SHEET NO: TITLE OF SHEET: DRAWING NO.

PMIS/PKG NO.

OF

A/E FIRM:

PRIME:

SHEET

SUB:

HENRY

ADAMS, LLC.

BALTIMORE, MD

WALKER

ARCHITECTS,

GAINESVILLE, FL

/1

/2

:4

:4

P

M

GPZ

GPZ

03/14/2024

M5.1SRH

MECHANICAL DETAILS

NPS - NATCHEZ MAINTENANCE

FACILITY RENOVATION

323963

FANS-1

OCCUPANCY SENSOR OS

SWITCH

1. FAN IS OPERATED MANUALLY BY S-1 OR AUTOMATICALLY BY OCCUPANCY

SENSOR.

2. OCCUPANCY SENSOR SHALL STOP FAN 10 MINUTES (ADJUSTABLE) AFTER NO

OCCUPANCY IS SENSED.

3. SEE ELECTRICAL LIGHTING PLANS FOR SWITCH AND OCCUPANCY SENSOR

LOCATIONS.

EXHAUST FANS (EF-1 AND 2)

FCURS

RL

FCURS

RL

HPU

RS

RL

TO/FROM

INDOOR UNIT(S)

T-1 SPACE TEMPERATURE

VARIABLE REFRIGERANT HEAT PUMP SYSTEMS

GENERAL:

1. COORDINATE CONTROLS WITH VRF SYSTEM MANUFACTURER.

2. BOTH SYSTEM THERMOSTATS SHALL OPERATE IN EITHER HEATING OR COOLING MODE.

OCCUPIED MODE (0700 TO 1800 ADJUSTABLE):

1. DURING OCCUPIED HOURS, SYSTEM IS STARTED AUTOMATICALLY BY PROGRAMMABLE

THERMOSTAT AND FAN OPERATES CONTINUOUSLY.

2. WALL MOUNTED PROGRAMMABLE THERMOSTAT, T-1 MAINTAINS SPACE TEMPERATURE AT

75 DEGREES F FOR THE COOLING CYCLE AND 72 DEGREES F FOR THE HEATING CYCLE

THROUGH MANUFACTURER'S SUPPLIED CONTROLS.

UNOCCUPIED MODE (1800 TO 0700 ADJUSTABLE):

1. DURING UNOCCUPIED HOURS, SYSTEM CYCLES ON WHEN SPACE TEMPERATURE AT T-1

FALLS BELOW 62 DEGREES F. WHEN SPACE TEMPERATURE AT T-1 RISES TO 65

DEGREES F, SYSTEM CYCLES OFF. WHEN SPACE TEMPERATURE AT T-1 RISES ABOVE 85

DEGREES F, SYSTEM CYCLES ON. WHEN SPACE TEMPERATURE AT T-1 FALLS TO 82

DEGREES F, SYSTEM CYCLES OFF.

HUMIDITY CONTROL:

1. IF SPACE RELATIVE HUMIDITY RISES ABOVE 60% AND SPACE TEMPERATURE AT T-1 IS

ABOVE 75 DEGREES F, SYSTEM COOLING IS ON. WHEN SPACE RELATIVE HUMIDITY FALLS

BELOW 60% OR SPACE TEMPERATURE AT T-1 FALLS BELOW 75 DEGREES F, HUMIDITY

CONTROL CYCLES OFF.

ACURS

RLACCU

RS

RL

TO/FROM

INDOOR UNIT

DX SPLIT SYSTEMS

1. SPACE TEMPERATURE SENSOR T-1 MAINTAINS SPACE TEMPERATURE AT 75 DEGREES F

BASED ON MANUFACTURER'S SUPPLIED CONTROLS.

DESIGNED:

CADD:

TECH REVIEW:

DATE:

SUB SHEET NO: TITLE OF SHEET: DRAWING NO.

PMIS/PKG NO.

OF

A/E FIRM:

PRIME:

SHEET

SUB:

HENRY

ADAMS, LLC.

BALTIMORE, MD

WALKER

ARCHITECTS,

GAINESVILLE, FL

/1

/2

:4

:4

P

M

GPZ

GPZ

03/14/2024

M6.1SRH

AUTOMATIC TEMPERATURE

CONTROLS

NPS - NATCHEZ MAINTENANCE

FACILITY RENOVATION

323963

GENERAL NOTES:

UNIT NUMBERS ARE INDICATED WHERE ALL UNITS ARE LISTED AND NUMBERED

INDIVIDUALLY.

UNIT SYMBOLS ARE INDICATED WHERE ALL UNITS ARE NOT LISTED AND NUMBERED

INDIVIDUALLY.

UNIT TYPES ARE DESCRIBED IN THE SPECIFICATIONS.

TEMPERATURE VALUES ARE LISTED IN DEGREES FAHRENHEIT.

AIR PRESSURE VALUES ARE LISTED IN INCHES OF WATER COLUMN.

AIR VELOCITY VALUES ARE LISTED IN FEET PER MINUTE.

DUCT AND PIPE SIZES ARE LISTED IN SINGLE-NUMBER INCHES OF NOMINAL

DIAMETER OR MULTIPLE NUMBER INCHES OF INDICATED PARAMETER. CONNECTION

SIZES ARE BRANCH SIZES FROM MAINS TO UNIT INLETS. SINGLE PIPE SIZE IS

TYPICAL FOR SUPPLY AND RETURN.

(APPLICABLE TO ALL MECHANICAL SCHEDULES)

1.

2.

3.

4.

5.

6.

7.

DESIGNED:

CADD:

TECH REVIEW:

DATE:

SUB SHEET NO: TITLE OF SHEET: DRAWING NO.

PMIS/PKG NO.

OF

A/E FIRM:

PRIME:

SHEET

SUB:

HENRY

ADAMS, LLC.

BALTIMORE, MD

WALKER

ARCHITECTS,

GAINESVILLE, FL

/1

/2

:4

:4

P

M

GPZ

GPZ

03/14/2024

M7.1SRH

MECHANICAL SCHEDULES

NPS - NATCHEZ MAINTENANCE

FACILITY RENOVATION

323963

VARIABLE REFRIGERANT HEAT PUMP UNITS

UNIT NO LOCATION

CAPACITY ELECTRICAL CONNECTION

MIN EER MIN COP NOTES

COOLING HEATING

COOLING

INPUT KW

HEATING

INPUT KW VOLTAGE PHASETOTAL MBH CONDENSER EAT

TOTAL

MBH CONDENSER EAT

HPU-1 OUTDOORS 37 96 19 23 4.85 4.00 240 1 9.4 -

HPU-2 OUTDOORS 56 96 43 23 5.82 4.18 240 1 9.2 -

VARIABLE REFRIGERANT FAN COIL UNITS

UNIT NO ASSOCIATED HPU LOCATION ROOMS SERVED UNIT TYPE

SUPPLY FAN

OUTDOOR

AIR CFM

COOLING COIL HEATING COIL ELECTRICAL CONNECTION

NOTESCFM ESP (IN WC)

TOTAL

COOLING

(MBH)

SENSIBLE

COOLING

(MBH)

EAT TOTAL

HEATING

(MBH) EAT DB MCA MOCP VOLTAGE PHASEDB WB

FCU-1.1 HPU-1 114 STORAGE 101, 105 HORIZONTAL DUCTED 500 0.5 50 14 12 76.7 64.0 5.3 66.2 1.6 15 240 1

FCU-1.2 HPU-1 115 MECHANICAL C01, 102, 105, 106 HORIZONTAL DUCTED 815 0.5 90 24 20 77.3 64.5 14 64.8 2.8 15 240 1

FCU-2.1 HPU-2 107 TRAINING ROOM 107 MULTIPOSITION 1765 0.5 275 56 45 62.7 48.7 43 62.7 8.6 15 240 1

FANS

UNIT NO TYPE LOCATION SERVICE CFM CLASS TSP

MOTOR HP

(WATTS) NOTES

EF-1 M 105 UNISEX TOILET EXHAUST 140 I 0.6 (130)

EF-2 M 106 LOCKERS EXHAUST 140 I 0.6 (130)

LOUVERED PENTHOUSES

UNIT NO LOCATION SERVICE CFM

APPROX THROAT

AREA (SF)

STATIC

PRESSURE

APROX THROAT

SIZE (WxL) BASIS OF DESIGN NOTES

LP-1 ROOF OUTDOOR AIR 415 0.82 0.04 12x12 GREENHECK GRSI

SPLIT SYSTEM AIR CONDITIONING UNITS

UNIT NO LOCATION SERVICE

EVAPORATOR CONDENSER ELECTRICAL

MIN EER MIN COP NOTES

COOLING HEATING

UNIT NO LOCATION COOLING MBH HEATING MBH OA (SUMMER) OA (WINTER) VOLTAGE PHASEEAT (DB) EAT (WB) TOTAL MBH SENS MBH EAT MBH

ACU-1 TR01 TELECOM 80 67 24 22 70 0.7 ACCU-1 OUTDOORS 24 0.7 96 23 240 1 12.2 3.45

NOTES FOR VARIABLE REFRIGERANT HEAT PUMP UNITS:

R-410A REFRIGERANT

REFRIGERANT PIPE SIZES AND ROUTING, REFRIGERANT CHARGE, ETC., SHALL BE PROVIDED BY THE MANUFACTURER.

CAPACITY INDICATED IS MINIMUM REQUIRED CAPACITY AFTER CORRECTIONS FOR DESIGN CONDITIONS, REFRIGERANT PIPE SIZES AND LENGTHS, AND

OTHER CORRECTIONS HAVE BEEN TAKEN INTO ACCOUNT.

1 2

NOTES FOR VARIABLE REFRIGERANT FAN COIL UNITS:

R-410A REFRIGERANT

REFRIGERANT PIPE SIZES AND ROUTING, REFRIGERANT CHARGE, ETC., SHALL BE PROVIDED BY THE MANUFACTURER.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL MATERIALS, SENSORS, CONDENSATE PIPING, ETC., DUE TO ANY DEVIATION OR ALTERNATIVE

MANUFACTURER FROM THAT SPECIFIED.

1 2 3

1 2 3

NOTES FOR SPLIT SYSTEM AIR CONDITIONING UNITS:

R-410A REFRIGERANT

REFRIGERANT PIPE SIZES AND ROUTING, REFRIGERANT CHARGE, ETC., SHALL BE PROVIDED BY THE MANUFACTURER.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL MATERIALS, SENSORS, CONDENSATE PIPING, ETC., DUE TO ANY DEVIATION OR ALTERNATIVE

MANUFACTURER FROM THAT SPECIFIED.

M0-1 - MECHANICAL COVER SHEET
Sheets
M0.1 - MECHANICAL COVER SHEET
M1.1 - LEVEL 1 - DUCTWORK - NEW WORK
M1.2 - MEZZANINE - DUCTWORK - NEW WORK
M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK
M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK
M3.1 - MECHANICAL SECTIONS
M5.1 - MECHANICAL DETAILS
M6.1 - AUTOMATIC TEMPERATURE CONTROLS
M7.1 - MECHANICAL SCHEDULES
MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION
MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION
P0.1 - PLUMBING COVER SHEET
P1.0 - FOUNDATION - PLUMBING - NEW WORK
P1.1 - LEVEL 1 - PLUMBING - NEW WORK
P1.2 - MEZZANINE - PLUMBING - NEW WORK
P5.1 - PLUMBING DETAILS
P6.1 - PLUMBING RISER DIAGRAMS
P7.1 - PLUMBING SCHEDULES
PD1.0 - FOUNDATION - PLUMBING - DEMOLITION
PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION
PD1.2 - MEZZANINE - PLUMBING - DEMOLITION
MD1-1 - LEVEL 1 - DUCTWORK - DEMOLITION
Sheets
M0.1 - MECHANICAL COVER SHEET
M1.1 - LEVEL 1 - DUCTWORK - NEW WORK
M1.2 - MEZZANINE - DUCTWORK - NEW WORK
M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK
M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK
M3.1 - MECHANICAL SECTIONS
M5.1 - MECHANICAL DETAILS
M6.1 - AUTOMATIC TEMPERATURE CONTROLS
M7.1 - MECHANICAL SCHEDULES
MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION
MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION
P0.1 - PLUMBING COVER SHEET
P1.0 - FOUNDATION - PLUMBING - NEW WORK
P1.1 - LEVEL 1 - PLUMBING - NEW WORK
P1.2 - MEZZANINE - PLUMBING - NEW WORK
P5.1 - PLUMBING DETAILS
P6.1 - PLUMBING RISER DIAGRAMS
P7.1 - PLUMBING SCHEDULES
PD1.0 - FOUNDATION - PLUMBING - DEMOLITION
PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION
PD1.2 - MEZZANINE - PLUMBING - DEMOLITION
MD1-2 - MEZZANINE - DUCTWORK - DEMOLITION
Sheets
M0.1 - MECHANICAL COVER SHEET
M1.1 - LEVEL 1 - DUCTWORK - NEW WORK
M1.2 - MEZZANINE - DUCTWORK - NEW WORK
M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK
M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK
M3.1 - MECHANICAL SECTIONS
M5.1 - MECHANICAL DETAILS
M6.1 - AUTOMATIC TEMPERATURE CONTROLS
M7.1 - MECHANICAL SCHEDULES
MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION
MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION
P0.1 - PLUMBING COVER SHEET
P1.0 - FOUNDATION - PLUMBING - NEW WORK
P1.1 - LEVEL 1 - PLUMBING - NEW WORK
P1.2 - MEZZANINE - PLUMBING - NEW WORK
P5.1 - PLUMBING DETAILS
P6.1 - PLUMBING RISER DIAGRAMS
P7.1 - PLUMBING SCHEDULES
PD1.0 - FOUNDATION - PLUMBING - DEMOLITION
PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION
PD1.2 - MEZZANINE - PLUMBING - DEMOLITION
M1-1 - LEVEL 1 - DUCTWORK - NEW WORK
Sheets
M0.1 - MECHANICAL COVER SHEET
M1.1 - LEVEL 1 - DUCTWORK - NEW WORK
M1.2 - MEZZANINE - DUCTWORK - NEW WORK
M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK
M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK
M3.1 - MECHANICAL SECTIONS
M5.1 - MECHANICAL DETAILS
M6.1 - AUTOMATIC TEMPERATURE CONTROLS
M7.1 - MECHANICAL SCHEDULES
MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION
MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION
P0.1 - PLUMBING COVER SHEET
P1.0 - FOUNDATION - PLUMBING - NEW WORK
P1.1 - LEVEL 1 - PLUMBING - NEW WORK
P1.2 - MEZZANINE - PLUMBING - NEW WORK
P5.1 - PLUMBING DETAILS
P6.1 - PLUMBING RISER DIAGRAMS
P7.1 - PLUMBING SCHEDULES
PD1.0 - FOUNDATION - PLUMBING - DEMOLITION
PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION
PD1.2 - MEZZANINE - PLUMBING - DEMOLITION
M1-2 - MEZZANINE - DUCTWORK - NEW WORK
Sheets
M0.1 - MECHANICAL COVER SHEET
M1.1 - LEVEL 1 - DUCTWORK - NEW WORK
M1.2 - MEZZANINE - DUCTWORK - NEW WORK
M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK
M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK
M3.1 - MECHANICAL SECTIONS
M5.1 - MECHANICAL DETAILS
M6.1 - AUTOMATIC TEMPERATURE CONTROLS
M7.1 - MECHANICAL SCHEDULES
MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION
MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION
P0.1 - PLUMBING COVER SHEET
P1.0 - FOUNDATION - PLUMBING - NEW WORK
P1.1 - LEVEL 1 - PLUMBING - NEW WORK
P1.2 - MEZZANINE - PLUMBING - NEW WORK
P5.1 - PLUMBING DETAILS
P6.1 - PLUMBING RISER DIAGRAMS
P7.1 - PLUMBING SCHEDULES
PD1.0 - FOUNDATION - PLUMBING - DEMOLITION
PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION
PD1.2 - MEZZANINE - PLUMBING - DEMOLITION
M2-1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK
Sheets
M0.1 - MECHANICAL COVER SHEET
M1.1 - LEVEL 1 - DUCTWORK - NEW WORK
M1.2 - MEZZANINE - DUCTWORK - NEW WORK
M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK
M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK
M3.1 - MECHANICAL SECTIONS
M5.1 - MECHANICAL DETAILS
M6.1 - AUTOMATIC TEMPERATURE CONTROLS
M7.1 - MECHANICAL SCHEDULES
MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION
MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION
P0.1 - PLUMBING COVER SHEET
P1.0 - FOUNDATION - PLUMBING - NEW WORK
P1.1 - LEVEL 1 - PLUMBING - NEW WORK
P1.2 - MEZZANINE - PLUMBING - NEW WORK
P5.1 - PLUMBING DETAILS
P6.1 - PLUMBING RISER DIAGRAMS
P7.1 - PLUMBING SCHEDULES
PD1.0 - FOUNDATION - PLUMBING - DEMOLITION
PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION
PD1.2 - MEZZANINE - PLUMBING - DEMOLITION
M2-2 - MEZZANINE - MECHANICAL PIPING - NEW WORK
Sheets
M0.1 - MECHANICAL COVER SHEET
M1.1 - LEVEL 1 - DUCTWORK - NEW WORK
M1.2 - MEZZANINE - DUCTWORK - NEW WORK
M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK
M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK
M3.1 - MECHANICAL SECTIONS
M5.1 - MECHANICAL DETAILS
M6.1 - AUTOMATIC TEMPERATURE CONTROLS
M7.1 - MECHANICAL SCHEDULES
MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION
MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION
P0.1 - PLUMBING COVER SHEET
P1.0 - FOUNDATION - PLUMBING - NEW WORK
P1.1 - LEVEL 1 - PLUMBING - NEW WORK
P1.2 - MEZZANINE - PLUMBING - NEW WORK
P5.1 - PLUMBING DETAILS
P6.1 - PLUMBING RISER DIAGRAMS
P7.1 - PLUMBING SCHEDULES
PD1.0 - FOUNDATION - PLUMBING - DEMOLITION
PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION
PD1.2 - MEZZANINE - PLUMBING - DEMOLITION
M3-1 - MECHANICAL SECTIONS
Sheets
M0.1 - MECHANICAL COVER SHEET
M1.1 - LEVEL 1 - DUCTWORK - NEW WORK
M1.2 - MEZZANINE - DUCTWORK - NEW WORK
M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK
M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK
M3.1 - MECHANICAL SECTIONS
M5.1 - MECHANICAL DETAILS
M6.1 - AUTOMATIC TEMPERATURE CONTROLS
M7.1 - MECHANICAL SCHEDULES
MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION
MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION
P0.1 - PLUMBING COVER SHEET
P1.0 - FOUNDATION - PLUMBING - NEW WORK
P1.1 - LEVEL 1 - PLUMBING - NEW WORK
P1.2 - MEZZANINE - PLUMBING - NEW WORK
P5.1 - PLUMBING DETAILS
P6.1 - PLUMBING RISER DIAGRAMS
P7.1 - PLUMBING SCHEDULES
PD1.0 - FOUNDATION - PLUMBING - DEMOLITION
PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION
PD1.2 - MEZZANINE - PLUMBING - DEMOLITION
M5-1 - MECHANICAL DETAILS
Sheets
M0.1 - MECHANICAL COVER SHEET
M1.1 - LEVEL 1 - DUCTWORK - NEW WORK
M1.2 - MEZZANINE - DUCTWORK - NEW WORK
M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK
M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK
M3.1 - MECHANICAL SECTIONS
M5.1 - MECHANICAL DETAILS
M6.1 - AUTOMATIC TEMPERATURE CONTROLS
M7.1 - MECHANICAL SCHEDULES
MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION
MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION
P0.1 - PLUMBING COVER SHEET
P1.0 - FOUNDATION - PLUMBING - NEW WORK
P1.1 - LEVEL 1 - PLUMBING - NEW WORK
P1.2 - MEZZANINE - PLUMBING - NEW WORK
P5.1 - PLUMBING DETAILS
P6.1 - PLUMBING RISER DIAGRAMS
P7.1 - PLUMBING SCHEDULES
PD1.0 - FOUNDATION - PLUMBING - DEMOLITION
PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION
PD1.2 - MEZZANINE - PLUMBING - DEMOLITION
M6-1 - AUTOMATIC TEMPERATURE CONTROLS
Sheets
M0.1 - MECHANICAL COVER SHEET
M1.1 - LEVEL 1 - DUCTWORK - NEW WORK
M1.2 - MEZZANINE - DUCTWORK - NEW WORK
M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK
M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK
M3.1 - MECHANICAL SECTIONS
M5.1 - MECHANICAL DETAILS
M6.1 - AUTOMATIC TEMPERATURE CONTROLS
M7.1 - MECHANICAL SCHEDULES
MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION
MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION
P0.1 - PLUMBING COVER SHEET
P1.0 - FOUNDATION - PLUMBING - NEW WORK
P1.1 - LEVEL 1 - PLUMBING - NEW WORK
P1.2 - MEZZANINE - PLUMBING - NEW WORK
P5.1 - PLUMBING DETAILS
P6.1 - PLUMBING RISER DIAGRAMS
P7.1 - PLUMBING SCHEDULES
PD1.0 - FOUNDATION - PLUMBING - DEMOLITION
PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION
PD1.2 - MEZZANINE - PLUMBING - DEMOLITION
M7-1 - MECHANICAL SCHEDULES
Sheets
M0.1 - MECHANICAL COVER SHEET
M1.1 - LEVEL 1 - DUCTWORK - NEW WORK
M1.2 - MEZZANINE - DUCTWORK - NEW WORK
M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK
M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK
M3.1 - MECHANICAL SECTIONS
M5.1 - MECHANICAL DETAILS
M6.1 - AUTOMATIC TEMPERATURE CONTROLS
M7.1 - MECHANICAL SCHEDULES
MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION
MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION
P0.1 - PLUMBING COVER SHEET
P1.0 - FOUNDATION - PLUMBING - NEW WORK
P1.1 - LEVEL 1 - PLUMBING - NEW WORK
P1.2 - MEZZANINE - PLUMBING - NEW WORK
P5.1 - PLUMBING DETAILS
P6.1 - PLUMBING RISER DIAGRAMS
P7.1 - PLUMBING SCHEDULES
PD1.0 - FOUNDATION - PLUMBING - DEMOLITION
PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION
PD1.2 - MEZZANINE - PLUMBING - DEMOLITION

File details come from the government source that posted it. Updated .