- MODERNIZE NATCHEZ MAINTENANCE FACILITY
- Solicitation number
- 140P5226R0002
About this file
This document is a comprehensive mechanical design package for the NPS Natchez Maintenance Facility Renovation project (PMIS/PKG No. 323963), prepared by Walker Architects (Gainesville, FL) and Henry Adams LLC (Baltimore, MD), dated March 14, 2024.
The mechanical work encompasses HVAC system design, including demolition and new installation of ductwork, piping, and refrigeration systems across two levels (Level 1 and Mezzanine 113) of the facility. Key equipment includes two Variable Refrigerant Heat Pump (VRF) units (HPU-1 with 37 MBH cooling/19 MBH heating; HPU-2 with 56 MBH cooling/43 MBH heating), three Variable Refrigerant Fan Coil Units (FCU-1.1, FCU-1.2, and FCU-2.1 with capacities ranging from 50 to 275 MBH), one Split System Air Conditioning Unit (ACU-1 for telecom room with 24 MBH capacity), two exhaust fans (EF-1 and EF-2 each rated 140 CFM), and one louvered penthouse (LP-1 with 415 CFM outdoor air intake). The contractor must coordinate all mechanical work with plumbing and electrical trades, locate and preserve existing utilities, relocate existing equipment to new concrete pads, recover and properly handle refrigerants per EPA standards, and ensure all access points for valves, dampers, filters, and controls remain accessible. All drain piping requires minimum 2% grade, and room thermostats must be located 46 inches above finished floor on the same horizontal centerline as light switches. The project includes comprehensive mechanical schedules, ductwork routing details, refrigerant piping specifications, and automatic temperature control sequences for both occupied and unoccupied modes with specific setpoints (cooling at 75°F occupied/85°F unoccupied; heating at 72°F occupied/62°F unoccupied).
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL MECHANICAL NOTES
(APPLICABLE TO ALL MECHANICAL DRAWINGS)
1. ALL PIPING, DUCTWORK, EQUIPMENT, AND MATERIALS SHOWN "LIGHT" ( ) ARE EXISTING TO
REMAIN. DEMOLISH ALL PIPING, DUCTWORK, EQUIPMENT, AND MATERIALS SHOWN "HEAVY AND
DASHED" ( ) ON DEMOLITION DRAWINGS. PROVIDE ALL PIPING, DUCTWORK, EQUIPMENT,
AND MATERIALS SHOWN "HEAVY AND SOLID" ( ) ON NEW WORK DRAWINGS.
2. COORDINATE ALL MECHANICAL WORK WITH PLUMBING WORK, ELECTRICAL WORK, AND WORK OF
OTHER TRADES SHOWN ON OTHER DRAWINGS.
3. THE LOCATION OF EXISTING UTILITIES IS SHOWN IN AN APPROXIMATE WAY ONLY. DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. REPAIR ALL DAMAGES
OCCASIONED BY FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES.
4. RUN ALL DRAIN PIPING WITH 2 PERCENT MINIMUM GRADE UNLESS OTHERWISE NOTED.
5. INSTALL PIPING AND DUCTWORK SO THAT ALL VALVES AND DAMPERS ARE ACCESSIBLE.
6. UNLESS OTHERWISE NOTED, ROUTE ALL PIPING AND DUCTWORK OVERHEAD, TIGHT TO UNDERSIDE
OF LEVEL ABOVE, WITH SPACE FOR INSULATION IF REQUIRED.
7. CERTAIN ITEMS SUCH AS ACCESS DOORS, CLEANOUTS, RISE AND DROPS IN DUCTWORK AND
PIPING, ETC., ARE INDICATED ON THE DRAWINGS FOR CLARITY OR A SPECIFIC LOCATION
REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE EXTENT OF THE REQUIREMENTS FOR
THESE ITEMS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THESE ITEMS AS REQUIRED
ELSEWHERE IN THE CONTRACT DOCUMENTS.
8. WHERE THE INSTALLATION OF NEW SERVICES OR THE EXTENSION OF EXISTING SERVICES
REQUIRES CUTTING OF EXISTING FLOORS, WALLS, PARTITIONS, ETC., CHECK FOR THE PRESENCE
OF EXISTING MECHANICAL, PLUMBING AND ELECTRICAL SERVICES WITHIN OR IMMEDIATELY
BENEATH CONSTRUCTION. EXERCISE NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE
SERVICES OR INJURY TO PERSONNEL DUE TO CONTACT WITH SAME. TEMPORARILY DISCONNECT
SERVICES DURING THE CUTTING OPERATION. SCHEDULE SERVICE OUTAGES IN ADVANCE WITH
THE COR.
9. EXCEPT AS OTHERWISE NOTED, LOCATE ALL ROOM THERMOSTATS 46 INCHES ABOVE FINISHED
FLOOR ON SAME HORIZONTAL CENTERLINE AS LIGHT SWITCH. WHERE LIGHT SWITCH AND
THERMOSTAT ARE ADJACENT TO EACH OTHER, LIGHT SWITCH SHALL BE CLOSEST TO THE DOOR.
COORDINATE WITH ELECTRICAL CONTRACTOR. NOTIFY THE ENGINEER OF ROOMS WHERE THE
ABOVE LOCATION CANNOT BE MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION.
10. RECOVER REFRIGERANTS FROM REFRIGERATION EQUIPMENT IN ACCORDANCE WITH AHRI AND EPA
STANDARDS. PLACE RECOVERED REFRIGERANT IN CONTAINERS LABELED IN ACCORDANCE WITH
ARI AND EPA STANDARDS AND TURNED OVER TO THE COR.
11. RECYCLE MERCURY SWITCH THERMOSTATS THAT ARE REMOVED. DELIVER RECYCLED
THERMOSTATS TO PARTICIPATING WHOLESALERS.
12. INFORMATION SHOWN ON THE MECHANICAL DRAWINGS PERTAINING TO EXISTING CONDITIONS HAS
BEEN OBTAINED FROM AVAILABLE BUILDING DRAWINGS OR GENERAL FIELD OBSERVATIONS AND
MAY NOT INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL OR DIMENSION. EXISTING
CONDITIONS ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DETERMINING THE ACTUAL EXISTING CONDITIONS PRIOR TO DEMOLITION OR
PERFORMANCE OF ANY WORK. SHOULD CONDITIONS BE DISCOVERED THAT PREVENT EXECUTION
OF THE WORK AS INDICATED, OR THERE IS A QUESTION REGARDING SCOPE OF WORK OR LIMITS
OF DISTURBANCE, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR IN WRITING AND
AWAIT WRITTEN DIRECTION BEFORE PROCEEDING WITH THE WORK.
13. REMOVE ALL EXISTING PIPING, DUCTWORK, EQUIPMENT, AND MATERIALS NOT REQUIRED FOR RE- USE OR RE-INSTALLATION (SHOWN OR OTHERWISE). ALL EXISTING MATERIALS AND EQUIPMENT
WHICH ARE REMOVED AND ARE DESIRED BY THE COR, OR ARE INDICATED TO REMAIN THE
PROPERTY OF GOVERNMENT SHALL BE DELIVERED BY THE CONTRACTOR WHERE DIRECTED BY
THE COR. ALL OTHER MATERIALS AND EQUIPMENT WHICH ARE REMOVED SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED BY THE CONTRACTOR FROM THE
PREMISES.
14. DISCONNECT EXISTING PIPING NO LONGER REQUIRED TO REMAIN IN SERVICE (SHOWN OR
OTHERWISE) AND REMOVE PIPING BACK TO SERVICE MAINS UNLESS OTHERWISE INDICATED OR
NOTED ON PLANS. REMOVE EXISTING PIPE HANGERS, SUPPORTS, VALVES, ETC. CAP, PLUG, OR
SEAL EXISTING PIPING INDICATED OR REQUIRED TO REMAIN IN SERVICE OR IN PLACE. NO
EXISTING PIPING SHALL BE LEFT UNSEALED. VALVE ALL TERMINATED PRESSURE PIPE.
15. EXISTING MECHANICAL PIPING, DUCTWORK, EQUIPMENT, AND MATERIALS AFFECTED BY
DEMOLITION OR NEW WORK INSTALLATION AND REQUIRED TO REMAIN IN SERVICE SHALL BE RE- INSTALLED OR SUPPORTED AS REQUIRED IN ACCORDANCE WITH THE SPECIFICATIONS. ALL WORK
SHALL BE COMPLETED TO THE SATISFACTION OF THE COR AND AT NO ADDITIONAL CONTRACT
COST.
16. REMOVE ALL ACCESSORIES, CONTROLS, ENCLOSURES, SUPPORTS, HANGERS, PADS, ETC.
ASSOCIATED WITH ALL EQUIPMENT SHOWN TO BE REMOVED. REPAIR AND PAINT DAMAGED
SURFACES AND ALL SURFACES BEHIND ALL EQUIPMENT SHOWN TO BE DEMOLISHED TO MATCH
EXISTING ADJACENT SURFACES.
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HENRY
ADAMS, LLC.
BALTIMORE, MD
WALKER
ARCHITECTS,
GAINESVILLE, FL
/1
/2
:4
:3
P
M
GPZ
GPZ
03/14/2024
M0.1SRH
MECHANICAL COVER SHEET
NPS - NATCHEZ MAINTENANCE
FACILITY RENOVATION
323963
DESCRIPTIONSYMBOL
DIFFUSER TAG:
TOP- NECK SIZE
CENTER- SPECIFICATION TYPE
BOTTOM- AIRFLOW IN CFM
8x8
D-1
FLEXIBLE CONNECTION
VOLUME DAMPER
MOTOR OPERATED DAMPER
BAROMETRIC BACKDRAFT DAMPER
THERMOSTAT/TEMPERATURE SENSORT
RETURN AIR DUCT
OUTDOOR AIR OR SUPPLY AIR DUCT
EXHAUST AIR DUCT
CAP (PIPE OR DUCT)
PLAN/ SECTION DESIGNATION
TOP - PLAN/ SECTION REFERENCE,
BOTTOM - REFERENCED DRAWING
M1.1
END POINT OF REMOVAL OF EXISTING
CONNECT TO EXISTING
REFRIGERANT SUCTIONRS
REFRIGERANT LIQUIDRL
CONDENSATE DRAIND
(APPLICABLE TO ALL MECHANICAL DRAWINGS)
MECHANICAL LEGENDMECHANICAL ABBREVIATIONS
(APPLICABLE TO ALL MECHANICAL DRAWINGS)
A AMPS
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AVG AVERAGE
B BOTTOM
BDD BACKDRAFT DAMPER
BHP BRAKE HORSEPOWER
BLDG BUILDING
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CLG CEILING / COOLING
COND CONDENSATE
COP COEFFICIENT OF PERFORMANCE
COR CONTRACTING OFFICER REPRESENTATIVE
CX CONNECT TO EXISTING
D DAMPER / DEPTH / DIAMETER / DIFFUSER
DB DRY BULB
DEG DEGREES
DN DOWN
DP DIFFERENTIAL PRESSURE
DWG DRAWING
DWH DOMESTIC WATER HEATER
EA EACH / EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
ELEC ELECTRIC / ELECTRICAL
ESP EXTERNAL STATIC PRESSURE
ETR EXISTING TO REMAIN
EX EXISTING
F FAHRENHEIT
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
FLA FULL LOAD AMPS
FPM FEET PER MINUTE
FT FEET / FOOT
G GAS / GRILLE
H HEIGHT / HIGH
HP HORSEPOWER
HPU HEAT PUMP UNIT
HTG HEATING
HVAC HEATING, VENTILATING AND AIR CONDITIONING
HZ HERTZ
IN INCH / INCHES
KW KILOWATTS
L LENGTH
LAT LEAVING AIR TEMPERATURE
LLS LIQUID LEVEL SENSOR
M MECHANICAL
MBH THOUSAND BTU PER HOUR
MIN MINIMUM
N NORTH
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OUTDOOR AIR
OED OPEN-END DUCT
P PRESSURE / PUMP
PD PRESSURE DROP
PH PHASE
PSI PRESSURE - POUNDS PER SQUARE INCH
PSIG PRESSURE - POUNDS PER SQUARE INCH, GAUGE
R RADIUS / REGISTER
RA RETURN AIR
RAD RADIUS
RH RELATIVE HUMIDITY
RL REFRIGERANT LIQUID
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SENSOR / REFRIGERANT SUCTION
RX REMOVE EXISTING
S SWITCH
SA SUPPLY AIR
SEER SEASONAL ENERGY EFFICIENCY RATIO
SENS SENSIBLE COOLING
SP STATIC PRESSURE
T THERMOSTAT
TYP TYPICAL
V VOLTS
VD VOLUME DAMPER
W WATT / WIDTH
W/ WITH
WB WET BULB
RX ACU
EX T
1 1 1
1 1
RX DUCT UP TO
MEZZANINE, TYP
OF 8
RX ACU
EX DUST
COLLECTION
EXHAUST
RX ACCU RX ACCU
RX FLUE UP
RX OA UP
RX RS/L
RX RS/L
RX RS/L UP
EX RS/L UP
TRAINING ROOM
OFFICE
KITCHEN
RXT
EX
GENERATOR
EX WOOD SHOP ACCU. START AND COMMISSION
THIS SYSTEM FOLLOWING THE RELOCATION OF
THE EXISTING ACCU. ENSURE SYSTEM IS FULLY
FUNCTIONING PRIOR TO AND AFTER RELOCATIION.
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HENRY
ADAMS, LLC.
BALTIMORE, MD
WALKER
ARCHITECTS,
GAINESVILLE, FL
/1
/2
:4
:4
P
M
GPZ
GPZ
03/14/2024
MD1.1SRH
LEVEL 1 - DUCTWORK -
DEMOLITION
NPS - NATCHEZ MAINTENANCE
FACILITY RENOVATION
323963
DRAWING NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
SPECIAL NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
RX AIR DEVICE1
RELOCATE EX DWH TO LOCATION SHOWN ON DWG M1.22
SCALE AMD1.1
1 LEVEL 1 - DUCTWORK - DEMOLITION PLAN
SCALE OF FEET
4 0 4 8
SCALE A
1. CONTRACTOR SHALL IDENTIFY REMOVAL OF ALL MECHANICAL DUCTWORK AND
EQUIPMENT AND REVIEW WITH COR BEFORE REMOVING. WORK REMOVED WITHOUT
PRIOR CONFIMATION THAT WAS NOT INTENDED TO BE REMOVED SHALL BE
REPLACED IN SAME OR BETTER CONDITION AT CONTRACTOR'S COST.
2. PATCH AND SEAL ALL EXISTING OPENINGS IN WALLS AND FLOORS WHERE
DUCTWORK, PIPING, CONDUIT, ETC IS REMOVED.
RELOCATE EX WOOD SHOP ACCU TO NEW CONCRETE PAD.
SEE DWG M1.1 FOR MORE INFORMATION.
CONFIRM EX ACCU IS ASSOCIATED WITH WOOD SHOP AHU4
RX SA
DUCTWORK, TYP
RX AHU
RX RA DUCTWORK, TYP
RX DUCT DN TO AIR
DEVICE, TYP OF 8
RX DWH FLUE UP/DN
RX DWH OA UP/DN
RX AHU FLUE UP
EX AHU
FLUE UP
RX RS/L
EX RS/L
RX RS/L DN
EX RS/L DN
MECHANICAL MEZZANINE
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HENRY
ADAMS, LLC.
BALTIMORE, MD
WALKER
ARCHITECTS,
GAINESVILLE, FL
/1
/2
:4
:4
P
M
GPZ
GPZ
03/14/2024
MD1.2SRH
MEZZANINE - DUCTWORK -
DEMOLITION
NPS - NATCHEZ MAINTENANCE
FACILITY RENOVATION
323963
DRAWING NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
SPECIAL NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
RX AIR DEVICE1
SCALE AMD1.2
1 MEZZANIINE - DUCTWORK - DEMOLITION PLAN
SCALE OF FEET
4 0 4 8
SCALE A
1. CONTRACTOR SHALL IDENTIFY REMOVAL OF ALL MECHANICAL DUCTWORK AND
EQUIPMENT AND REVIEW WITH COR BEFORE REMOVING. WORK REMOVED WITHOUT
PRIOR CONFIMATION THAT WAS NOT INTENDED TO BE REMOVED SHALL BE
REPLACED IN SAME OR BETTER CONDITION AT CONTRACTOR'S COST.
2. PATCH AND SEAL ALL EXISTING OPENINGS IN WALLS AND FLOORS WHERE
DUCTWORK, PIPING, CONDUIT, ETC IS REMOVED.
OFFICE
OFFICE
KITCHEN
UNISEX TOILET
LOCKERS
TRAINING ROOM
TELECOM
TR01
EX ACCU HPU-1 HPU-2
D-1
8ø
D-1
8ø
R-1
8ø
R-1
8ø
8Ø RA UP
8Ø SA UP
8Ø RA UP
8Ø SA UP
D-1
8ø
HOOD-1
D-1
6ø D-2
6ø
R-1
8ø
R-1
8ø
D-1
8ø
R-1
8ø
R-1
8ø
12x8 RA
8x10 SA
D-1
10ø
10Ø SA UP
6x8 SA UP
12x8 RA
12x8 RA UP
8x10 SA UP FCU-2.1T
FCU-1.2T
FCU-1.1T
CORRIDOR
C01
EF-1
EF-2
1 1
EX TEX DUST
COLLECTION
EXHAUST
2 2
EX
GENERATOR
ACCU-1
ACU-1
MOUNT BOTTOM OF
UNIT APPROX 6'-6"
AFF
2 3
TERMINATE 4" Ø DRYER
VENT THROUGH WALL WITH
DRYER VENT CAP. COLOR AS
SELECTED BY ARCHITECT.
ø
E A ø
E A
DRYER
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HENRY
ADAMS, LLC.
BALTIMORE, MD
WALKER
ARCHITECTS,
GAINESVILLE, FL
/1
/2
:4
:4
P
M
GPZ
GPZ
03/14/2024
M1.1SRH
LEVEL 1 - DUCTWORK - NEW
WORK
NPS - NATCHEZ MAINTENANCE
FACILITY RENOVATION
323963
DRAWING NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
1. ALL ITEMS THAT REQUIRE ACCESS FOR OPERATING, CLEANING, SERVICING,
MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE.
EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF
VALVES, FILTERS, STRAINERS, TRANSMITTERS, AND CONTROL DEVICES. PRIOR TO
COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN THIS REQUIREMENT
AND CONTRACT DRAWINGS TO THE COR FOR RESOLUTION. AWAIT WRITTEN
DIRECTION BEFORE PROCEEDING.
2. RUNOUTS TO DIFFUSERS SHALL BE SAME SIZE AS DIFFUSER NECK SIZE UNLESS
OTHERWISE NOTED.
3. PROVIDE FLEXIBLE CONNECTION ON SUPPLY AND RETURN DUCT CONNECTIONS
TO ALL FCU'S.
SPECIAL NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
TERMINATE 8Ø EA WITH WALL CAP1
MOUNT ON 4" HOUSEKEEPING PAD2
SCALE AM1.1
1 LEVEL 1 - DUCTWORK - NEW WORK PLAN
SCALE OF FEET
4 0 4 8
SCALE A
RELOCATE EX ACCU TO THIS LOCATION ON NEW CONCRETE
PAD. REFILL THE SYSTEM WITH REFRIGERANT, START AND
COMMISSION THE SYSTEM.
PROVIDE DRYER VENT WALL BOX WITH 4" OVAL DUCT TO
CEILING ASSEMBLY PENETRATION, TRANSITION TO 4" Ø IN
CEILING.
M3.1
MECHANICAL MEZZANINE
EX 20x20 EX 24x24 EX 18x18EX 18x18
EX AHU
EX AHU
FLUE UP
FCU-1.1
FCU-1.2
8ø RA 8Ø RA DN
10x10 OA
10x10 OA UP
TO LP-1
8ø SA
8Ø SA DN
DWH-1
14x12 SA
FCU-2.1 18x16 SA
18x16 OA x
S A x
S A
D-1
8ø D-1
8ø
D-1
8ø
D-1
8ø
D-1
8ø D-1
8ø
D-1
8ø x
O A
14x14 OA x
O A
R-2
12x12
R-2
12x12
R-2
12x12
8x8 OA
12x12 OA
10ø SA 2 ø
S A
3 7 x
S A
10Ø SA DN
7 4
START AND COMMISSION THIS SYSTEM FOLLOWING
THE RELOCATION OF THE EXISTING ACCU.
ENSURE SYSTEM IS FULLY FUNCTIONING PRIOR
TO AND AFTER RELOCATIION.
8Ø RA DN
4x4 OA
(50 CFM)
(90 CFM)
6x6 OA
(275 CFM)
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HENRY
ADAMS, LLC.
BALTIMORE, MD
WALKER
ARCHITECTS,
GAINESVILLE, FL
/1
/2
:4
:4
P
M
GPZ
GPZ
03/14/2024
M1.2SRH
MEZZANINE - DUCTWORK - NEW
WORK
NPS - NATCHEZ MAINTENANCE
FACILITY RENOVATION
323963
DRAWING NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
SPECIAL NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
MOUNT ABOVE CEILING. SUPPORT FROM ABOVE.1
ROUTE ABOVE CEILING2
SCALE AM1.2
1 MEZZANIINE - DUCTWORK - NEW WORK PLAN
SCALE OF FEET
4 0 4 8
SCALE A
1. ALL ITEMS THAT REQUIRE ACCESS FOR OPERATING, CLEANING, SERVICING,
MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE.
EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF
VALVES, FILTERS, STRAINERS, TRANSMITTERS, AND CONTROL DEVICES. PRIOR TO
COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN THIS REQUIREMENT
AND CONTRACT DRAWINGS TO THE COR FOR RESOLUTION. AWAIT WRITTEN
DIRECTION BEFORE PROCEEDING.
2. RUNOUTS TO DIFFUSERS SHALL BE SAME SIZE AS DIFFUSER NECK SIZE UNLESS
OTHERWISE NOTED.
3. PROVIDE FLEXIBLE CONNECTION ON SUPPLY AND RETURN DUCT CONNECTIONS
TO ALL FCU'S.
4Ø COMBUSTION AIR INTAKE UP THROUGH ROOF3
4Ø FLUE UP THROUGH ROOF4
ROUTE ABOVE OFFICE CEILING, EXPOSED TO TRAINING ROOM5
SUPPORT FROM FLOOR6
TERMINATE WITH GOOSENECK7
OFFICE
OFFICE
KITCHEN
UNISEX TOILET
LOCKERS
TRAINING ROOM
TELECOM
TR01
HPU-1 HPU-2
CORRIDOR
C01
EX RS/L UP
2 PAIRS RS/L UP
EX
GENERATOR
ACCU-1
RS/L
ACU-1
EX WOOD SHOP ACCU. START, RECHARGE, AND
COMMISSION THIS SYSTEM FOLLOWING THE
RELOCATION OF THE EXISTING ACCU. ENSURE
SYSTEM IS FULLY FUNCTIONING PRIOR TO AND
AFTER RELOCATIION.
ROUTE THROUGH
MEZZANINE FLOOR
JOISTS
ROUTE THROUGH
MEZZANINE FLOOR
JOISTS
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HENRY
ADAMS, LLC.
BALTIMORE, MD
WALKER
ARCHITECTS,
GAINESVILLE, FL
/1
/2
:4
:4
P
M
GPZ
GPZ
03/14/2024
M2.1SRH
LEVEL 1 - MECHANICAL PIPING -
NEW WORK
NPS - NATCHEZ MAINTENANCE
FACILITY RENOVATION
323963
DRAWING NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
SPECIAL NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
RELOCATE EX ACCU TO THIS LOCATION ON NEW CONCRETE
PAD
SCALE AM2.1
1 LEVEL 1 - MECHANICAL PIPING - NEW WORK PLAN
SCALE OF FEET
4 0 4 8
SCALE A
1. ALL ITEMS THAT REQUIRE ACCESS FOR OPERATING, CLEANING, SERVICING,
MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE.
EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF
VALVES, FILTERS, STRAINERS, TRANSMITTERS, AND CONTROL DEVICES. PRIOR TO
COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN THIS REQUIREMENT
AND CONTRACT DRAWINGS TO THE COR FOR RESOLUTION. AWAIT WRITTEN
DIRECTION BEFORE PROCEEDING.
2. REFRIGERANT PIPING SHALL BE SIZED BY ASSOCIATED EQUIPMENT
MANUFACTURER.
MECHANICAL MEZZANINE
EX AHU
EX RS/L
EX RS/L DN
FCU-1.1
FCU-1.2
FCU-2.1
2 PAIRS RS/L DN
START AND COMMISSION THIS SYSTEM FOLLOWING
THE RELOCATION OF THE EXISTING ACCU.
ENSURE SYSTEM IS FULLY FUNCTIONING PRIOR
TO AND AFTER RELOCATIION.
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HENRY
ADAMS, LLC.
BALTIMORE, MD
WALKER
ARCHITECTS,
GAINESVILLE, FL
/1
/2
:4
:4
P
M
GPZ
GPZ
03/14/2024
M2.2SRH
MEZZANINE - MECHANICAL
PIPING - NEW WORK
NPS - NATCHEZ MAINTENANCE
FACILITY RENOVATION
323963
DRAWING NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
SPECIAL NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
MOUNT ABOVE CEILING. SUPPORT FROM ABOVE.1
ROUTE ABOVE CEILING2
SCALE AM2.2
1 MEZZANIINE - MECHANICAL PIPING - NEW WORK PLAN
SCALE OF FEET
4 0 4 8
SCALE A
1. ALL ITEMS THAT REQUIRE ACCESS FOR OPERATING, CLEANING, SERVICING,
MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE.
EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF
VALVES, FILTERS, STRAINERS, TRANSMITTERS, AND CONTROL DEVICES. PRIOR TO
COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN THIS REQUIREMENT
AND CONTRACT DRAWINGS TO THE COR FOR RESOLUTION. AWAIT WRITTEN
DIRECTION BEFORE PROCEEDING.
2. REFRIGERANT PIPING SHALL BE SIZED BY ASSOCIATED EQUIPMENT
MANUFACTURER.
LEVEL 1
0' - 0"
MEZZANINE
9' - 4"
ROOF
12' - 0"
MECHANICAL MEZZANINE
LOCKERS
CORRIDOR
C01
OFFICE
FCU-1.2
8x10 SA
FCU-1.1
4x4 OA
8ø RA
8ø RA
8ø SA
8ø SA8x10 SA
12x8 RA 12x8 RA
6x8 SA
10ø SA
6x6 OA
LP-1
DWH-1
4Ø COMBUSTION AIR INTAKE
4Ø FLUE
x
O A
TERMINATE WITH GOOSENECK
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HENRY
ADAMS, LLC.
BALTIMORE, MD
WALKER
ARCHITECTS,
GAINESVILLE, FL
/1
/2
:4
:4
P
M
GPZ
GPZ
03/14/2024
M3.1SRH
MECHANICAL SECTIONS
NPS - NATCHEZ MAINTENANCE
FACILITY RENOVATION
323963
SCALE OF FEET
4 0 4 8
SCALE A
SCALE AM3.1
1 MECHANICAL MEZZANINE- DUCTWORK - NEW WORK SECTION
DRAWING NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
SPECIAL NOTES:
(APPLICABLE TO THIS DRAWING ONLY)
MOUNT ON ROOF CURB.11. ALL ITEMS THAT REQUIRE ACCESS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE.
EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF
VALVES, FILTERS, STRAINERS, TRANSMITTERS, AND CONTROL DEVICES. PRIOR TO
COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN THIS REQUIREMENT
AND CONTRACT DRAWINGS TO THE COR FOR RESOLUTION. AWAIT WRITTEN
DIRECTION BEFORE PROCEEDING.
2. RUNOUTS TO DIFFUSERS SHALL BE SAME SIZE AS DIFFUSER NECK SIZE UNLESS
OTHERWISE NOTED.
3. PROVIDE FLEXIBLE CONNECTION ON SUPPLY AND RETURN DUCT CONNECTIONS
TO ALL FCU'S.
HPU INSTALLATION DETAIL
SPLIT SYSTEM HEAT PUMP
(OUTDOOR UNIT)
PROVIDE KINDORF REFRIGERANT
LINE AND ELECTRICAL DISCONNECT
SUPPORT STAND. SUPPORT STAND
FROM BASE
REFRIGERANT PIPING,
CONTROL WIRING AND
ELECTRIC CONDUIT TO
ASSOCIATED INDOOR UNIT
SECURE UNIT TO SUPPORT BEAMS IN
ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS / REQUIREMENTS
ELECTRICAL DISCONNECT
SUPPORT BEAMS
HOUSEKEEPING PAD
AIR FLOW
CUSHION HEAD (SUPPLY ONLY)
D/2 (MINIMUM 6")
AIR OUTLET CEILINGD
NOTES:
1. AIR FLOW IS REVERSE FOR RETURN AND EXHAUST.
OUTLET LOCATED AT END OF RUN
CUT HOLE IN RECTANGULAR DUCT LARGE ENOUGH SO THAT
ROUGH METAL EDGE DOES NOT PROJECT INTO AIR STREAM.
NOTES:
1. DO NOT USE 45° TAP FITTINGS EXCEPT WHERE TIGHT
CONDITION PREVENTS USE OF OTHER FITTINGS INDICATED.
SPECIAL NOTES:
RECTANGULAR DUCT RECTANGULAR DUCT
AIR FLOW
ROUND DUCT
DO NOT USE
BACKWARD
BENDING MITRE
OR RADIUS
IMMEDIATELY
AFTER TAP
R=D
RECTANGULAR DUCT
CONICAL TEE
FITTING WITH
FLANGE
ROUND DUCT
AIR FLOW
45° TAP
FITTING WITH
FLANGE
MITRED 45° TAP
FITTING WITH
FLANGE.
TAPOFF FROM RECTANGULAR
DUCT TO ROUND DUCT
AIR FLOW
6" MINIMUM
NOTES:
1. SAME FOR RETURN AND EXHAUST DUCTS
EXCEPT AIR FLOW IS REVERSED.
REGISTER OR
DIFFUSER
DIFFUSER OR REGISTER TAPOFF AND TRANSITION
15° MAXIMUM
TAKEOFFS FROM TOP OF RECTANGULAR DUCTS
TOP VIEWTOP VIEW
RADIUS A X B
AIR FLOW
TRANSITION
AFTER TAKEOFF
(IF REQUIRED)
SECTION
AIR FLOW
SECTION
D
B
A
R=D
NOTES:
1. BOTTOM TAKEOFFS SIMILAR.
2. SAME FOR RETURN AND EXHAUST DUCTS EXCEPT
AIR FLOW IS REVERSED.
SPECIAL NOTES:
15° MAXIMUM
45°
45° TAP PERMITTED FOR DUCTWORK RATED 2" W.G.
OR LESS.
TAPOFF AND TRANSITION FROM SIDE OF DUCT
AIR FLOW
D
R=D (6" MINIMUM)
NOTES:
1. SEE SMACNA MANUAL FOR METHODS OF SECURING TAP-OFF
CONNECTION TO MAIN.
2. SAME FOR RETURN AND EXHAUST DUCTS EXCEPT AIR FLOW IS
REVERSED.
SPECIAL NOTES:
45° TAP PERMITTED FOR DUCTWORK RATED 2" W.G. OR LESS.
15° MAXIMUM
AIR FLOW
ROUND DUCT
NOTES:
1. FOR AIR FLOW IN OPPOSITE DIRECTION, TRANSITION COLLAR
SHALL OVERLAP EXTERIOR OR ROUND DUCT.
15° MAXIMUM
RECTANGULAR TO ROUND DUCT TRANSITION
STRUCTURE
ABOVE
ROD
DUCT WITH
INSULATION
ATTACH
PER
SMACNA
ANGLE
PROTECT DUCT
INSULATION
FROM BEING
CRUSHED BY
DUCT SUPPORTS
DUCT WITH INSULATION
DUCT STRAP
MAINTAIN VAPOR BARRIER AT
PENETRATION
ATTACH DUCT STRAP
PER SMACNA
NOTES:
1. REFER TO SMACNA FOR ADDITIONAL HANGERS AND SUPPORTS
DUCT INSULATION SUPPORT DETAIL
NOTES FOR SUPPLY AIR DIFFUSER INSTALLATION:
1. INSULATED FLEXIBLE DUCT SHALL NOT USED TO CHANGE DIRECTION
OF AIR FLOW.
2. MAXIMUM VERTICAL DIFFERENTIAL OF INSULATED FLEXIBLE DUCT
SHALL BE 12".
3. INSULATED FLEXIBLE DUCT CONNECTIONS SHALL BE METAL BANDED,
SEALED AND SUPPORTED TO ALIGN THE CONNECTION BETWEEN THE
INSULATED FLEXIBLE DUCT AND THE SHEETMETAL DUCT.
VD
LAY-IN TILE CEILING
SEAL & TAPE INSULATED JOINTMIN R=DBAND CLAMP (TYP)
STRAIGHT, NO OFFSET
FLEX DUCT ELBOW
SUPPORT
SUPPORT FLEXIBLE DUCT
FROM STRUCTURE ABOVE
TO PREVENT SAGGING
MAXIMUM LENGTH OF
FLEX DUCT = 5'-0"
INSULATED FLEXIBLE DUCT
INSULATED ROUND DUCT
SUPPLY AIR DIFFUSER
(SEE PLANS FOR SIZES
AND DIFFUSER TYPE)
SUPPLY AIR DIFFUSER FLEXIBLE DUCT CONNECTION
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HENRY
ADAMS, LLC.
BALTIMORE, MD
WALKER
ARCHITECTS,
GAINESVILLE, FL
/1
/2
:4
:4
P
M
GPZ
GPZ
03/14/2024
M5.1SRH
MECHANICAL DETAILS
NPS - NATCHEZ MAINTENANCE
FACILITY RENOVATION
323963
FANS-1
OCCUPANCY SENSOR OS
SWITCH
1. FAN IS OPERATED MANUALLY BY S-1 OR AUTOMATICALLY BY OCCUPANCY
SENSOR.
2. OCCUPANCY SENSOR SHALL STOP FAN 10 MINUTES (ADJUSTABLE) AFTER NO
OCCUPANCY IS SENSED.
3. SEE ELECTRICAL LIGHTING PLANS FOR SWITCH AND OCCUPANCY SENSOR
LOCATIONS.
EXHAUST FANS (EF-1 AND 2)
FCURS
RL
FCURS
RL
HPU
RS
RL
TO/FROM
INDOOR UNIT(S)
T-1 SPACE TEMPERATURE
VARIABLE REFRIGERANT HEAT PUMP SYSTEMS
GENERAL:
1. COORDINATE CONTROLS WITH VRF SYSTEM MANUFACTURER.
2. BOTH SYSTEM THERMOSTATS SHALL OPERATE IN EITHER HEATING OR COOLING MODE.
OCCUPIED MODE (0700 TO 1800 ADJUSTABLE):
1. DURING OCCUPIED HOURS, SYSTEM IS STARTED AUTOMATICALLY BY PROGRAMMABLE
THERMOSTAT AND FAN OPERATES CONTINUOUSLY.
2. WALL MOUNTED PROGRAMMABLE THERMOSTAT, T-1 MAINTAINS SPACE TEMPERATURE AT
75 DEGREES F FOR THE COOLING CYCLE AND 72 DEGREES F FOR THE HEATING CYCLE
THROUGH MANUFACTURER'S SUPPLIED CONTROLS.
UNOCCUPIED MODE (1800 TO 0700 ADJUSTABLE):
1. DURING UNOCCUPIED HOURS, SYSTEM CYCLES ON WHEN SPACE TEMPERATURE AT T-1
FALLS BELOW 62 DEGREES F. WHEN SPACE TEMPERATURE AT T-1 RISES TO 65
DEGREES F, SYSTEM CYCLES OFF. WHEN SPACE TEMPERATURE AT T-1 RISES ABOVE 85
DEGREES F, SYSTEM CYCLES ON. WHEN SPACE TEMPERATURE AT T-1 FALLS TO 82
DEGREES F, SYSTEM CYCLES OFF.
HUMIDITY CONTROL:
1. IF SPACE RELATIVE HUMIDITY RISES ABOVE 60% AND SPACE TEMPERATURE AT T-1 IS
ABOVE 75 DEGREES F, SYSTEM COOLING IS ON. WHEN SPACE RELATIVE HUMIDITY FALLS
BELOW 60% OR SPACE TEMPERATURE AT T-1 FALLS BELOW 75 DEGREES F, HUMIDITY
CONTROL CYCLES OFF.
ACURS
RLACCU
RS
RL
TO/FROM
INDOOR UNIT
DX SPLIT SYSTEMS
1. SPACE TEMPERATURE SENSOR T-1 MAINTAINS SPACE TEMPERATURE AT 75 DEGREES F
BASED ON MANUFACTURER'S SUPPLIED CONTROLS.
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HENRY
ADAMS, LLC.
BALTIMORE, MD
WALKER
ARCHITECTS,
GAINESVILLE, FL
/1
/2
:4
:4
P
M
GPZ
GPZ
03/14/2024
M6.1SRH
AUTOMATIC TEMPERATURE
CONTROLS
NPS - NATCHEZ MAINTENANCE
FACILITY RENOVATION
323963
GENERAL NOTES:
UNIT NUMBERS ARE INDICATED WHERE ALL UNITS ARE LISTED AND NUMBERED
INDIVIDUALLY.
UNIT SYMBOLS ARE INDICATED WHERE ALL UNITS ARE NOT LISTED AND NUMBERED
INDIVIDUALLY.
UNIT TYPES ARE DESCRIBED IN THE SPECIFICATIONS.
TEMPERATURE VALUES ARE LISTED IN DEGREES FAHRENHEIT.
AIR PRESSURE VALUES ARE LISTED IN INCHES OF WATER COLUMN.
AIR VELOCITY VALUES ARE LISTED IN FEET PER MINUTE.
DUCT AND PIPE SIZES ARE LISTED IN SINGLE-NUMBER INCHES OF NOMINAL
DIAMETER OR MULTIPLE NUMBER INCHES OF INDICATED PARAMETER. CONNECTION
SIZES ARE BRANCH SIZES FROM MAINS TO UNIT INLETS. SINGLE PIPE SIZE IS
TYPICAL FOR SUPPLY AND RETURN.
(APPLICABLE TO ALL MECHANICAL SCHEDULES)
1.
2.
3.
4.
5.
6.
7.
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HENRY
ADAMS, LLC.
BALTIMORE, MD
WALKER
ARCHITECTS,
GAINESVILLE, FL
/1
/2
:4
:4
P
M
GPZ
GPZ
03/14/2024
M7.1SRH
MECHANICAL SCHEDULES
NPS - NATCHEZ MAINTENANCE
FACILITY RENOVATION
323963
VARIABLE REFRIGERANT HEAT PUMP UNITS
UNIT NO LOCATION
CAPACITY ELECTRICAL CONNECTION
MIN EER MIN COP NOTES
COOLING HEATING
COOLING
INPUT KW
HEATING
INPUT KW VOLTAGE PHASETOTAL MBH CONDENSER EAT
TOTAL
MBH CONDENSER EAT
HPU-1 OUTDOORS 37 96 19 23 4.85 4.00 240 1 9.4 -
HPU-2 OUTDOORS 56 96 43 23 5.82 4.18 240 1 9.2 -
VARIABLE REFRIGERANT FAN COIL UNITS
UNIT NO ASSOCIATED HPU LOCATION ROOMS SERVED UNIT TYPE
SUPPLY FAN
OUTDOOR
AIR CFM
COOLING COIL HEATING COIL ELECTRICAL CONNECTION
NOTESCFM ESP (IN WC)
TOTAL
COOLING
(MBH)
SENSIBLE
COOLING
(MBH)
EAT TOTAL
HEATING
(MBH) EAT DB MCA MOCP VOLTAGE PHASEDB WB
FCU-1.1 HPU-1 114 STORAGE 101, 105 HORIZONTAL DUCTED 500 0.5 50 14 12 76.7 64.0 5.3 66.2 1.6 15 240 1
FCU-1.2 HPU-1 115 MECHANICAL C01, 102, 105, 106 HORIZONTAL DUCTED 815 0.5 90 24 20 77.3 64.5 14 64.8 2.8 15 240 1
FCU-2.1 HPU-2 107 TRAINING ROOM 107 MULTIPOSITION 1765 0.5 275 56 45 62.7 48.7 43 62.7 8.6 15 240 1
FANS
UNIT NO TYPE LOCATION SERVICE CFM CLASS TSP
MOTOR HP
(WATTS) NOTES
EF-1 M 105 UNISEX TOILET EXHAUST 140 I 0.6 (130)
EF-2 M 106 LOCKERS EXHAUST 140 I 0.6 (130)
LOUVERED PENTHOUSES
UNIT NO LOCATION SERVICE CFM
APPROX THROAT
AREA (SF)
STATIC
PRESSURE
APROX THROAT
SIZE (WxL) BASIS OF DESIGN NOTES
LP-1 ROOF OUTDOOR AIR 415 0.82 0.04 12x12 GREENHECK GRSI
SPLIT SYSTEM AIR CONDITIONING UNITS
UNIT NO LOCATION SERVICE
EVAPORATOR CONDENSER ELECTRICAL
MIN EER MIN COP NOTES
COOLING HEATING
UNIT NO LOCATION COOLING MBH HEATING MBH OA (SUMMER) OA (WINTER) VOLTAGE PHASEEAT (DB) EAT (WB) TOTAL MBH SENS MBH EAT MBH
ACU-1 TR01 TELECOM 80 67 24 22 70 0.7 ACCU-1 OUTDOORS 24 0.7 96 23 240 1 12.2 3.45
NOTES FOR VARIABLE REFRIGERANT HEAT PUMP UNITS:
R-410A REFRIGERANT
REFRIGERANT PIPE SIZES AND ROUTING, REFRIGERANT CHARGE, ETC., SHALL BE PROVIDED BY THE MANUFACTURER.
CAPACITY INDICATED IS MINIMUM REQUIRED CAPACITY AFTER CORRECTIONS FOR DESIGN CONDITIONS, REFRIGERANT PIPE SIZES AND LENGTHS, AND
OTHER CORRECTIONS HAVE BEEN TAKEN INTO ACCOUNT.
1 2
NOTES FOR VARIABLE REFRIGERANT FAN COIL UNITS:
R-410A REFRIGERANT
REFRIGERANT PIPE SIZES AND ROUTING, REFRIGERANT CHARGE, ETC., SHALL BE PROVIDED BY THE MANUFACTURER.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL MATERIALS, SENSORS, CONDENSATE PIPING, ETC., DUE TO ANY DEVIATION OR ALTERNATIVE
MANUFACTURER FROM THAT SPECIFIED.
1 2 3
1 2 3
NOTES FOR SPLIT SYSTEM AIR CONDITIONING UNITS:
R-410A REFRIGERANT
REFRIGERANT PIPE SIZES AND ROUTING, REFRIGERANT CHARGE, ETC., SHALL BE PROVIDED BY THE MANUFACTURER.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL MATERIALS, SENSORS, CONDENSATE PIPING, ETC., DUE TO ANY DEVIATION OR ALTERNATIVE
MANUFACTURER FROM THAT SPECIFIED.
| M0-1 - MECHANICAL COVER SHEET |
| Sheets |
| M0.1 - MECHANICAL COVER SHEET |
| M1.1 - LEVEL 1 - DUCTWORK - NEW WORK |
| M1.2 - MEZZANINE - DUCTWORK - NEW WORK |
| M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK |
| M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK |
| M3.1 - MECHANICAL SECTIONS |
| M5.1 - MECHANICAL DETAILS |
| M6.1 - AUTOMATIC TEMPERATURE CONTROLS |
| M7.1 - MECHANICAL SCHEDULES |
| MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION |
| MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION |
| P0.1 - PLUMBING COVER SHEET |
| P1.0 - FOUNDATION - PLUMBING - NEW WORK |
| P1.1 - LEVEL 1 - PLUMBING - NEW WORK |
| P1.2 - MEZZANINE - PLUMBING - NEW WORK |
| P5.1 - PLUMBING DETAILS |
| P6.1 - PLUMBING RISER DIAGRAMS |
| P7.1 - PLUMBING SCHEDULES |
| PD1.0 - FOUNDATION - PLUMBING - DEMOLITION |
| PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION |
| PD1.2 - MEZZANINE - PLUMBING - DEMOLITION |
| MD1-1 - LEVEL 1 - DUCTWORK - DEMOLITION |
| Sheets |
| M0.1 - MECHANICAL COVER SHEET |
| M1.1 - LEVEL 1 - DUCTWORK - NEW WORK |
| M1.2 - MEZZANINE - DUCTWORK - NEW WORK |
| M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK |
| M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK |
| M3.1 - MECHANICAL SECTIONS |
| M5.1 - MECHANICAL DETAILS |
| M6.1 - AUTOMATIC TEMPERATURE CONTROLS |
| M7.1 - MECHANICAL SCHEDULES |
| MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION |
| MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION |
| P0.1 - PLUMBING COVER SHEET |
| P1.0 - FOUNDATION - PLUMBING - NEW WORK |
| P1.1 - LEVEL 1 - PLUMBING - NEW WORK |
| P1.2 - MEZZANINE - PLUMBING - NEW WORK |
| P5.1 - PLUMBING DETAILS |
| P6.1 - PLUMBING RISER DIAGRAMS |
| P7.1 - PLUMBING SCHEDULES |
| PD1.0 - FOUNDATION - PLUMBING - DEMOLITION |
| PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION |
| PD1.2 - MEZZANINE - PLUMBING - DEMOLITION |
| MD1-2 - MEZZANINE - DUCTWORK - DEMOLITION |
| Sheets |
| M0.1 - MECHANICAL COVER SHEET |
| M1.1 - LEVEL 1 - DUCTWORK - NEW WORK |
| M1.2 - MEZZANINE - DUCTWORK - NEW WORK |
| M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK |
| M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK |
| M3.1 - MECHANICAL SECTIONS |
| M5.1 - MECHANICAL DETAILS |
| M6.1 - AUTOMATIC TEMPERATURE CONTROLS |
| M7.1 - MECHANICAL SCHEDULES |
| MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION |
| MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION |
| P0.1 - PLUMBING COVER SHEET |
| P1.0 - FOUNDATION - PLUMBING - NEW WORK |
| P1.1 - LEVEL 1 - PLUMBING - NEW WORK |
| P1.2 - MEZZANINE - PLUMBING - NEW WORK |
| P5.1 - PLUMBING DETAILS |
| P6.1 - PLUMBING RISER DIAGRAMS |
| P7.1 - PLUMBING SCHEDULES |
| PD1.0 - FOUNDATION - PLUMBING - DEMOLITION |
| PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION |
| PD1.2 - MEZZANINE - PLUMBING - DEMOLITION |
| M1-1 - LEVEL 1 - DUCTWORK - NEW WORK |
| Sheets |
| M0.1 - MECHANICAL COVER SHEET |
| M1.1 - LEVEL 1 - DUCTWORK - NEW WORK |
| M1.2 - MEZZANINE - DUCTWORK - NEW WORK |
| M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK |
| M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK |
| M3.1 - MECHANICAL SECTIONS |
| M5.1 - MECHANICAL DETAILS |
| M6.1 - AUTOMATIC TEMPERATURE CONTROLS |
| M7.1 - MECHANICAL SCHEDULES |
| MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION |
| MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION |
| P0.1 - PLUMBING COVER SHEET |
| P1.0 - FOUNDATION - PLUMBING - NEW WORK |
| P1.1 - LEVEL 1 - PLUMBING - NEW WORK |
| P1.2 - MEZZANINE - PLUMBING - NEW WORK |
| P5.1 - PLUMBING DETAILS |
| P6.1 - PLUMBING RISER DIAGRAMS |
| P7.1 - PLUMBING SCHEDULES |
| PD1.0 - FOUNDATION - PLUMBING - DEMOLITION |
| PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION |
| PD1.2 - MEZZANINE - PLUMBING - DEMOLITION |
| M1-2 - MEZZANINE - DUCTWORK - NEW WORK |
| Sheets |
| M0.1 - MECHANICAL COVER SHEET |
| M1.1 - LEVEL 1 - DUCTWORK - NEW WORK |
| M1.2 - MEZZANINE - DUCTWORK - NEW WORK |
| M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK |
| M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK |
| M3.1 - MECHANICAL SECTIONS |
| M5.1 - MECHANICAL DETAILS |
| M6.1 - AUTOMATIC TEMPERATURE CONTROLS |
| M7.1 - MECHANICAL SCHEDULES |
| MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION |
| MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION |
| P0.1 - PLUMBING COVER SHEET |
| P1.0 - FOUNDATION - PLUMBING - NEW WORK |
| P1.1 - LEVEL 1 - PLUMBING - NEW WORK |
| P1.2 - MEZZANINE - PLUMBING - NEW WORK |
| P5.1 - PLUMBING DETAILS |
| P6.1 - PLUMBING RISER DIAGRAMS |
| P7.1 - PLUMBING SCHEDULES |
| PD1.0 - FOUNDATION - PLUMBING - DEMOLITION |
| PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION |
| PD1.2 - MEZZANINE - PLUMBING - DEMOLITION |
| M2-1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK |
| Sheets |
| M0.1 - MECHANICAL COVER SHEET |
| M1.1 - LEVEL 1 - DUCTWORK - NEW WORK |
| M1.2 - MEZZANINE - DUCTWORK - NEW WORK |
| M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK |
| M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK |
| M3.1 - MECHANICAL SECTIONS |
| M5.1 - MECHANICAL DETAILS |
| M6.1 - AUTOMATIC TEMPERATURE CONTROLS |
| M7.1 - MECHANICAL SCHEDULES |
| MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION |
| MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION |
| P0.1 - PLUMBING COVER SHEET |
| P1.0 - FOUNDATION - PLUMBING - NEW WORK |
| P1.1 - LEVEL 1 - PLUMBING - NEW WORK |
| P1.2 - MEZZANINE - PLUMBING - NEW WORK |
| P5.1 - PLUMBING DETAILS |
| P6.1 - PLUMBING RISER DIAGRAMS |
| P7.1 - PLUMBING SCHEDULES |
| PD1.0 - FOUNDATION - PLUMBING - DEMOLITION |
| PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION |
| PD1.2 - MEZZANINE - PLUMBING - DEMOLITION |
| M2-2 - MEZZANINE - MECHANICAL PIPING - NEW WORK |
| Sheets |
| M0.1 - MECHANICAL COVER SHEET |
| M1.1 - LEVEL 1 - DUCTWORK - NEW WORK |
| M1.2 - MEZZANINE - DUCTWORK - NEW WORK |
| M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK |
| M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK |
| M3.1 - MECHANICAL SECTIONS |
| M5.1 - MECHANICAL DETAILS |
| M6.1 - AUTOMATIC TEMPERATURE CONTROLS |
| M7.1 - MECHANICAL SCHEDULES |
| MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION |
| MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION |
| P0.1 - PLUMBING COVER SHEET |
| P1.0 - FOUNDATION - PLUMBING - NEW WORK |
| P1.1 - LEVEL 1 - PLUMBING - NEW WORK |
| P1.2 - MEZZANINE - PLUMBING - NEW WORK |
| P5.1 - PLUMBING DETAILS |
| P6.1 - PLUMBING RISER DIAGRAMS |
| P7.1 - PLUMBING SCHEDULES |
| PD1.0 - FOUNDATION - PLUMBING - DEMOLITION |
| PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION |
| PD1.2 - MEZZANINE - PLUMBING - DEMOLITION |
| M3-1 - MECHANICAL SECTIONS |
| Sheets |
| M0.1 - MECHANICAL COVER SHEET |
| M1.1 - LEVEL 1 - DUCTWORK - NEW WORK |
| M1.2 - MEZZANINE - DUCTWORK - NEW WORK |
| M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK |
| M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK |
| M3.1 - MECHANICAL SECTIONS |
| M5.1 - MECHANICAL DETAILS |
| M6.1 - AUTOMATIC TEMPERATURE CONTROLS |
| M7.1 - MECHANICAL SCHEDULES |
| MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION |
| MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION |
| P0.1 - PLUMBING COVER SHEET |
| P1.0 - FOUNDATION - PLUMBING - NEW WORK |
| P1.1 - LEVEL 1 - PLUMBING - NEW WORK |
| P1.2 - MEZZANINE - PLUMBING - NEW WORK |
| P5.1 - PLUMBING DETAILS |
| P6.1 - PLUMBING RISER DIAGRAMS |
| P7.1 - PLUMBING SCHEDULES |
| PD1.0 - FOUNDATION - PLUMBING - DEMOLITION |
| PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION |
| PD1.2 - MEZZANINE - PLUMBING - DEMOLITION |
| M5-1 - MECHANICAL DETAILS |
| Sheets |
| M0.1 - MECHANICAL COVER SHEET |
| M1.1 - LEVEL 1 - DUCTWORK - NEW WORK |
| M1.2 - MEZZANINE - DUCTWORK - NEW WORK |
| M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK |
| M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK |
| M3.1 - MECHANICAL SECTIONS |
| M5.1 - MECHANICAL DETAILS |
| M6.1 - AUTOMATIC TEMPERATURE CONTROLS |
| M7.1 - MECHANICAL SCHEDULES |
| MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION |
| MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION |
| P0.1 - PLUMBING COVER SHEET |
| P1.0 - FOUNDATION - PLUMBING - NEW WORK |
| P1.1 - LEVEL 1 - PLUMBING - NEW WORK |
| P1.2 - MEZZANINE - PLUMBING - NEW WORK |
| P5.1 - PLUMBING DETAILS |
| P6.1 - PLUMBING RISER DIAGRAMS |
| P7.1 - PLUMBING SCHEDULES |
| PD1.0 - FOUNDATION - PLUMBING - DEMOLITION |
| PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION |
| PD1.2 - MEZZANINE - PLUMBING - DEMOLITION |
| M6-1 - AUTOMATIC TEMPERATURE CONTROLS |
| Sheets |
| M0.1 - MECHANICAL COVER SHEET |
| M1.1 - LEVEL 1 - DUCTWORK - NEW WORK |
| M1.2 - MEZZANINE - DUCTWORK - NEW WORK |
| M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK |
| M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK |
| M3.1 - MECHANICAL SECTIONS |
| M5.1 - MECHANICAL DETAILS |
| M6.1 - AUTOMATIC TEMPERATURE CONTROLS |
| M7.1 - MECHANICAL SCHEDULES |
| MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION |
| MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION |
| P0.1 - PLUMBING COVER SHEET |
| P1.0 - FOUNDATION - PLUMBING - NEW WORK |
| P1.1 - LEVEL 1 - PLUMBING - NEW WORK |
| P1.2 - MEZZANINE - PLUMBING - NEW WORK |
| P5.1 - PLUMBING DETAILS |
| P6.1 - PLUMBING RISER DIAGRAMS |
| P7.1 - PLUMBING SCHEDULES |
| PD1.0 - FOUNDATION - PLUMBING - DEMOLITION |
| PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION |
| PD1.2 - MEZZANINE - PLUMBING - DEMOLITION |
| M7-1 - MECHANICAL SCHEDULES |
| Sheets |
| M0.1 - MECHANICAL COVER SHEET |
| M1.1 - LEVEL 1 - DUCTWORK - NEW WORK |
| M1.2 - MEZZANINE - DUCTWORK - NEW WORK |
| M2.1 - LEVEL 1 - MECHANICAL PIPING - NEW WORK |
| M2.2 - MEZZANINE - MECHANICAL PIPING - NEW WORK |
| M3.1 - MECHANICAL SECTIONS |
| M5.1 - MECHANICAL DETAILS |
| M6.1 - AUTOMATIC TEMPERATURE CONTROLS |
| M7.1 - MECHANICAL SCHEDULES |
| MD1.1 - LEVEL 1 - DUCTWORK - DEMOLITION |
| MD1.2 - MEZZANINE - DUCTWORK - DEMOLITION |
| P0.1 - PLUMBING COVER SHEET |
| P1.0 - FOUNDATION - PLUMBING - NEW WORK |
| P1.1 - LEVEL 1 - PLUMBING - NEW WORK |
| P1.2 - MEZZANINE - PLUMBING - NEW WORK |
| P5.1 - PLUMBING DETAILS |
| P6.1 - PLUMBING RISER DIAGRAMS |
| P7.1 - PLUMBING SCHEDULES |
| PD1.0 - FOUNDATION - PLUMBING - DEMOLITION |
| PD1.1 - LEVEL 1 - PLUMBING - DEMOLITION |
| PD1.2 - MEZZANINE - PLUMBING - DEMOLITION |