This document provides details for a federal contract opportunity for infrastructure upgrades at the VA Medical Center in Prescott, Arizona. The solicitation number is 36C77624B0008 and is seeking proposals for Y1DA--EHRM Infrastructure Upgrades - Tier 2 at the Prescott VA facility. The opportunity is being issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The description indicates the opportunity is for infrastructure upgrades but provides no further details about the specific products, services, or systems required. The response date and potential award date are not included.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 NORTH HIGHWAY 89
PRESCOTT, ARIZONA 86313
SHEET LIST
SHEET NO. SHEET DESCRIPTION DWG OF DWG
GENERAL
G-001 COVER SHEET 1 5
G-002 GENERAL INFORMATION 2 5
G-003 ICRA INFORMATION AND DETAILS 3 5
G-100 SITE PLAN 4 5
GL101 FIRST FLOOR LIFE SAFETY PLAN - BUILDING 166 5 5
CIVIL
CE100 CIVIL EXISTING CONDITIONS 1 8
CD100 DEMOLITION & STORMWATER MANAGEMENT PLAN 2 8
CD101 DEMOLITION & STORMWATER MANAGEMENT PLAN 3 8
CS100 SITE PLAN 4 8
CG100 GRADING PLAN 5 8
CU100 UTILITY PLAN 6 8
CU101 UTILITY PLAN 7 8
DT100 DETAILS 8 8
STRUCTURE
S-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS & ABBREVIATIONS 1 9
S-002 QA TABLES AND NOTES 2 9
S-101 FIRST FLOOR FRAMING PLAN 3 9
S-102 SNOW LOAD PLAN & ROOF FRAMING PLAN 4 9
S-201 WALL ELEVATIONS 5 9
S-301 TYPICAL CONCRETE DETAILS 6 9
S-302 TYPICAL CONCRETE DETAILS 7 9
S-401 TYPICAL MASONRY DETAILS 8 9
S-501 TYPICAL STEEL DETAILS 9 9
ARCHITECTURAL
A-101 FIRST FLOOR PLAN - BUILDING 166 1 10
A-102 ROOF PLAN - BUILDING 166 2 10
A-111 FIRST FLOOR REFLECTED CEILING PLAN 3 10
A-201 EXTERIOR ELEVATIONS 4 10
A-301 BUILDING SECTIONS 5 10
A-501 WALL SECTIONS 6 10
A-502 WALL SECTIONS 7 10
A-503 SECTION, ELEVATION DETAILS 8 10
A-504 PARTITION TYPES 9 10
A-601 DOOR, ROOM FINISH SCHEDULE, NOTES, ELEVATIONS AND DETAILS 10 10
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 4
FX101 FIRST FLOOR FIRE SUPPRESSION PLAN AND FIRE SUPPRESSION SECTION 2 4
FX102 FIRST FLOOR FIRE SUPPRESSION REFLECTED CEILING PLAN 3 4
FX501 CLEAN AGENT FIRE SUPPRESSION SYSTEM SCHEMATIC AND SEQUENCE OF
OPERATION
4 4
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 6
PW101 FIRST FLOOR DRAIN, WASTE, AND VENT PLAN & SANITARY PIPE RISERS 2 6
PP101 FIRST FLOOR DOMESTIC WATER PLAN & DOMESTIC WATER PIPE RISERS 3 6
PP102 ROOF PLUMBING PLAN 4 6
P-501 PLUMBING DETAILS 5 6
P-502 PLUMBING DETAILS 6 6
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 5
MH101 FIRST FLOOR MECHANICAL PLAN AND SECTION VIEW OF DUCT ABOVE SERVER 2 5
MH104 ROOF MECHANICAL PLAN 3 5
M-501 MECHANICAL DETAILS 4 5
M-601 MECHANICAL SCHEDULES 5 5
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 9
ES101 ELECTRICAL SITE PLAN 2 9
EP101 FIRST FLOOR POWER PLAN 3 9
EL101 FIRST FLOOR LIGHTING PLAN 4 9
EP102 ELECTRICAL ROOF PLAN 5 9
E-501 ELECTRICAL DETAILS 6 9
E-502 ELECTRICAL DETAILS 7 9
E-601 SINGLE LINE DIAGRAM 8 9
E-602 ELECTRICAL SCHEDULES 9 9
TECHNOLOGY
T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 10
TS101 OVERALL TECHNOLOGY SITE PLAN 2 10
TS102 TECHNOLOGY SITE PLAN 3 10
T-101 FIRST FLOOR TECHNOLOGY PLAN 4 10
T-501 TECHNOLOGY DETAILS 5 10
T-502 TECHNOLOGY DETAILS 6 10
T-503 TECHNOLOGY DETAILS 7 10
T-504 TECHNOLOGY DETAILS 8 10
T-505 TECHNOLOGY DETAILS 9 10
T-601 FIBER RISER SITE PLAN 10 10
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 2
FA101 FIRST FLOOR FIRE ALARM PLAN 2 2
Engineers Architects Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/2
/2
:0
:5
P
M C
U s e rs
\d c o rd o n
\D o c u m e n ts \R e v it l o c a l\ A
-1
V A
P re s c o tt
-E H
R M
D C d c o rd o n a c g -p a .c o m
.r v t
G-001
COVER SHEET
1 5DGC
EHRM INFRASTRUCTURE UPGRADE
- DATA CENTER
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 NORTH HIGHWAY 89
PRESCOTT, ARIZONA 86313 AUGUST 31, 2023
100% BID DOCUMENTS
649-22-70122-117
EHRM INFRASTRUCTURE UPGRADE - DATA
CENTER
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 NORTH HIGHWAY 89
PRESCOTT, ARIZONA 86313
VA PROJECT #: 649-22-701
TJM
DocuSign Envelope ID: B31D0F67-82F1-4D97-915C-5055058C7071
8/29/2023
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
EXPOSED
PLUMBING AT
BARRIER
FREE
LAVATORIES
SHALL BE
INSULATED.
LEVER OPERATING
CONTROLLED
SOAP DISPENSER
NOTE: SINKS IN COUNTERS TO BE
MOUNTED WITH RIM NO MORE
THAN 2'-10" HIGH AND WITH AT
LEAST 2'-3" KNEE CLEARANCE.
CLEAR
TYPICAL ACCESSIBLE
CLEARANCE AT LAVATORY
TYPICAL ACCESSIBLE
LAVATORY AND MIRROR
1'-3" 1'-3"
M
IN
M A
X
M
A X
M
A X6
A
.F .F
MIN
8"
MAX
6"
M
IN9
M
IN
M
IN
M A
X
17" MIN
T O
B O
T T
O M
O F
R
E F
L E
C T
IV
S
U R
F A
C E
O F
M
IR
R
O R
O .C
O.C.
39" - 41"
3'-6" 1'-0"
9" O.C.
2'-0"
/2
M
IN
T O
T O
P
6" 3'-0"
ACCESSIBLE TOILET
WALL MOUNTED
1-1/2"
DIAMETER
GRAB BAR
SANITARY NAPKIN
DISPOSAL
TOILET TISSUE
DISPENSER
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO
PARTICIPATE IN VOLUNTARY STANDARD BODIES.
GENERAL - BASED ON THE VA PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES, THIS PROJECT HAS BEEN DESIGNED TO, AND CONSTRUCTION SHALL COMPLY WITH THE FOLLOWING CODES AND GUIDELINES:
1. VA Sustainable Design Manual, August 2017
2. VA Site Development Design Manual February 2013
3. VA VHA Directive 1061, February 2021
4. VA Fire Protection Design Manual, 2021
5. VA Plumbing Design Manual, May 2021
6. VA HVAC Design Manual, March 2022
7. VA Physical Security and Resiliency Design Manual, 2020
8. VA Lighting Design Manual, December 2022
9. VA Electrical Design Manual, December 2019
10. VA Interior Design Manual, November 2020
11. VA Office of Information & Technology Design Guide, February 2019
12. VA Infrastructure Standard for Telecommunications Spaces, v3.1, July 2021
13. PG 18-13 VA Barrier Free Design Standard, February 2022
14. PG 18-4 VA Standard Details and Specifications
15. NFPA 101, Life Safety Code, 2021
16. NFPA 90A, Installation of Air Conditioning and Ventilating Systems, 2021
17. NFPA 72, National Fire Alarm Code, 2022
18. NFPA 70, National Electrical Code, 2020
19. NFPA 75 Fire Protection of IT Equipment, 2020
20. NFPA 76 Standards for Fire Protection of Telecommunications Facilities
21. NFPA 13, Installation of Sprinkler Systems, 2022
22. NFPA 10, Standards for Portable Fire Extinguishers, 2022
23. NFPA 2001 Clean Agent Fire Extinguisher Systems, 2022
24. ADA Standards for Accessible Design 2010,
25. International Building Code, 2021
26. International Mechanical Code, 2021
27. International Plumbing Code, 2021
28. Illuminating Engineering Society (IES) Lighting Handbook, 10th Edition
29. BICSI, Telecommunications Distribution Methods Manual, 2014
30. Facilities Guidelines Institute: Guidelines for the Design and Construction of Hospitals 2022
31. ASME B31.9, Building Services Piping
32. ASHRAE Standard 170, Ventilation for Health Care Facilities, 2021
33. ASHRAE Handbooks, 2017 Fundamentals, 2019 HVAC Applications, 2020 HVAC Systems and Equipment
34. ASHRAE 90.1 – 2019 Energy Standard for Buildings Except Low-Rise Residential Buildings
35. SMACNA, HVAC Duct Construction Standards, Metal and Flexible
36. SMACNA, HVAC Air Duct Leakage Test Manual
37. ANSI/TIA/EIA 568-2019 Commercial Building Cabling Standards
38. ANSI/TIA/EIA 569-C-2015 Commercial Building Standards for Telecommunications Pathways and Spaces
39. ANSI/TIA-1179-2017, Telecommunications Spaces for Healthcare Facilities
40. BICSI, Telecommunications Distribution Methods Manual, 2014
41. Federal Information Processing Standards-FIBS-201-1: Personal Identity Verification (PIV) of Federal Employees and Contractors
42. VA Master Specifications PG-18-1
43. VA VHA Program Guide PG-18-3, July 2021
44. VA National CAD Standards and Details PG-18-4
45. VA Construction Standards H-18-3
46. VA Directive 7512, 3 August 2017
47. Site Design Manuals PG-18-10
48. Design Submission Requirements PG-18-15C
49. VA H-18-8 Seismic Design Requirements, 1 November 2019, revised May 1, 2020
50. VA Design Submission Requirements PG-18-15C
51. ACI 318-19, Building Code Requirements for Reinforced Concrete
52. ACI 360R-10, Specifications Guide to Design of Slabs-On-Ground
53. ASCE 7-16 Minimum Design Loads for Building and Other Structures
54. AISC 360-16, American Institute of Steel Construction Inc
55. AISC 325-17, Steel Construction Manual, 15th Edition
56. AWS D1.1, Structural Welding Code – Steel
57. TMS 402/602-16, Building Code Requirements and Specifications for Masonry Structures
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION
FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY
HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT PORTRAY
FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
3. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOTION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.) REPAIR OR
REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
4. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
5. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.
6. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
7. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
8. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT ARE NOT IDENTIFIED, SHALL BE
REPORTED TO THE COR.
9. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY CONFLICTS
PRIOR TO PROCEEDING WITH DEMOLITION.
10. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE OWNER WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE OWNER OR DESIGNATED ON THE DRAWINGS, ARE TO BE RELOCATED OR REINSTALLED FROM THE SITE BY
CONTRACTOR IN APPROVED MANNER.
11. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO
MATCH EXISTING.
12. COORDINATE WITH COR FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA. COORDINATE WITH COR FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR USE OF FREIGHT
ELEVATOR (AS REQUIRED).
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT. PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR
PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE.
THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED
WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE
CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED
CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS PROJECT.
11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING
STUDS, JACK STUDS, AND CRIPPLE STUDS, AS REQUIRED FOR COMPLETION OF THE WORK.
12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED FACE OF EXISTING WALL SURFACE.
13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
DEMOLITION KEYNOTE
WINDOW TYPE
TOILET ACCESSORY
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1 #
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
C.I.P CAST IN PLACE
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
ES EXPOSED TO STUCTURE
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ICRA INFECTION CONTROL RISK
ASSESSMENT
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
Engineers Architects Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:0
:0
P
M C
U s e rs
\d c o rd o n
\D o c u m e n ts \R e v it l o c a l\ A
-1
V A
P re s c o tt
-E H
R M
D C d c o rd o n a c g -p a .c o m
.r v t
G-002
GENERAL INFORMATION
2 5DGC
EHRM INFRASTRUCTURE UPGRADE
- DATA CENTER
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 NORTH HIGHWAY 89
PRESCOTT, ARIZONA 86313 AUGUST 31, 2023
100% BID DOCUMENTS
649-22-70122-117
TJM
GENERAL SYMBOL LEGEND
STANDARD MOUNTING HEIGHTS
CODE STANDARDS AND EXECUTIVE ORDERS
DEMOLITION NOTES
GENERAL NOTES
ARCHITECTURAL SYMBOL LEGEND
GENERAL ARCHITECTURE ABBREVIATIONS
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY MATS
(CHANGED END OF
SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
ISOLATE AND COVER ALL
SUPPLY DIFFUSERS NOT
IN OPERATION DURING
PROJECT - COORDINATE
W/ COR
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL STATION
WITH AUDIO /
VISUAL
EXISTING WALL
BARRIER
NOTE:
A. TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL VERIFY
LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM
EXHAUST. VERIFY LOCAL JURISDICATION CODE AND VA REQUIREMENTS
FOR DISTANCE PRIOR TO STARTING WORK.
EXHAUST LOCATION
- SEE NOTE A
G-003
_____3
G-003
G-003
FLEX DUCT
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
[INSERT PROJECT NAME HERE]
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS
PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL
ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON
THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK
AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.
2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE
A STAGING AREA FOR HAZMAT SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES -
CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA
AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE
MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL
BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON
COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED
CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE
TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
[AFTER EACH PHASE, PERFORM TASKS STATED IN CONTAMINATION OF PATIENT ROOMS,
SUPPLIES, EQUIPMENT AND RELATED AREAS NOTE 2.
3. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER ENTRANCE SPACES
(CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT
THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS
PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING
SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER
THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE
CONSTRUCTION AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT
OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED
BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE USE OF
ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.
DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE
USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN
NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF
THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-
CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY
ADJACENT EXCAVATION DEBRIS.
6. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL BE COVERED AND
PROTECTED PRIOR STARTING EACH CONSTRUCTION PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE
CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE
ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR
MUST FLOW FROM CLEAN TO DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE
WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF
ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE
TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-
CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST
TO PREVENT CONTAMINATION OF THE DUCTS.
3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH NON-FLANGE
HANGER HUNG FROM CEILING ABOVE, BOTTOM OF DUCT SHALL BE A MINIMUM OF 7'-2" A.F.F.
4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY
AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS
1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL
AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT
WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE
USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR
CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT,
TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE
MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL
CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL
CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE
CLEANING.
ICRA BARRIER TYPES
1. THE CONTRACTOR CAN USE TEMPORARY BARRIES (EX. STARKWALL) OR SOFT BARRIER
SYSTEMS (EX. SIMPSON) TO PROVIDE TEMPORORAY, NON RATED BARRIERS FOR EHRM IN
EXISTNG FACILITES.
NOTE: FIBER ROUTING THROUGH BUILDINGS, REQUIRES MEANS TO ISOLATE WORK AREAS, ICRA.
ICRA NOTES
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:
1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.
2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.
4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
A
.F .F
A P
P R
O X
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
HEPA NEGATIVE
AIR UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
E X
IS
T
IN
G
W A
L L
FLOOR SLAB ABOVE
CEILING
PLASTIC
WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L
H
IG
H T
HEPA NEGATIVE
AIR UNIT
EXISTING
WALL
EXISTING
CEILING
FLEX DUCT
Engineers Architects Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:0
:0
P
M C
U s e rs
\d c o rd o n
\D o c u m e n ts \R e v it l o c a l\ A
-1
V A
P re s c o tt
-E H
R M
D C d c o rd o n a c g -p a .c o m
.r v t
G-003
ICRA INFORMATION AND DETAILS
3 5Author
EHRM INFRASTRUCTURE UPGRADE
- DATA CENTER
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 NORTH HIGHWAY 89
PRESCOTT, ARIZONA 86313 AUGUST 31, 2023
100% BID DOCUMENTS
649-22-70122-117
TJM
Scale: 1/4" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: 1/4" = 1'-0"
ICRA ROOM ELEVATION
Scale: 1/4" = 1'-0"
CROSS SECTION "A"
Scale: 1/4" = 1'-0"
ICRA MOBILE CONTAINMENT CART
BUILDING
BUILDING
BUILDING
BUILDING
COL. HOLMBERG RD.
PARKING LOT C
BUILDING
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:0
:0
P
M C
U s e rs
\d c o rd o n
\D o c u m e n ts \R e v it l o c a l\ A
-1
V A
P re s c o tt
-E H
R M
D C d c o rd o n a c g -p a .c o m
.r v t
G-100
SITE PLAN
4 5DGC
EHRM INFRASTRUCTURE UPGRADE
- DATA CENTER
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 NORTH HIGHWAY 89
PRESCOTT, ARIZONA 86313 AUGUST 31, 2023
100% BID DOCUMENTS
649-22-70122-117
TJM
A. CONTRACTOR RESPONSIBLE FOR ALL BARRIER,
SIGNAGE, PROTECTIVE MEASURES FOR ALL SITE
EQUIPMENT, LAY DOWN AREAS, CRANE ACCESS
POINTS (IF REQUIRED), ETC. PROVIDE SITE
EQUIPMENT PLAN TO COR PRIOR TO
COMMENCING WORK.
B. CONTRACTOR REQUIRED TO PROVIDE
DUMPSTER FOR ALL CONSTRUCTION DEBRIS. DO
NOT USE CAMPUS/FACILITY DUMPSTER FOR
CONSTRUCTION DEBRIS.
C. CONTRACTOR SHALL PROVIDE SCAFFOLDING AS
REQUIRED FOR PERFORMANCE OF WORK, ALL
SCAFFOLDING SHALL COMPLY WITH OSHA
REQUIREMENTS.
D. CONTRACTOR SHALL COORDINATE WITH THE
COR PRIOR TO COMMENCEMENT OF
CONSTRUCTION THE LOCATION OF MATERIAL
LAYDOWN AREA, STORAGE AND DUMPSTER.
E. SEE CIVIL DRAWINGS FOR EXACT BUILDING
LOCATION AND ALL SITE ELEMENTS,
TOPOGRAPHY, UTILITIES, BOLLARD LAYOUT, ETC.
F. SEE TECHNOLOGY DRAWINGS FOR THE FIBER
CONNECTIONS ON SITE AND ALL LOCATIONS THE
NEW FIBER IS TO BE ROUTED.
G. CONTRACTOR SHALL PREPARE AND SUBMIT A
CRANE LIFT PLAN TO THE COR FOR REVIEW
PRIOR TO ANY CRANE OPERATION ON SITE.
H. CONTRACTOR TO COORDINATE WITH COR THE
REQUIRED CONDTIONS FOR LAY DOWN AREA,
EQUIPMENT STORAGE, DUMPSTERS, AND
CONTRACTOR VEHICLE PARKING PRIOR TO
COMMENCEMENT OF WORK.
1 FIRE DEPARTMENT FIRE TRUCK ACCESS LANE TO
BUILDING.
2 FDC - FIRE DEPARTMENT CONNECTION LOCATION.
3 LOCATION OF BUILDING SIGNAGE SEE DETAILS ON
A-503
NORTH
0 8 16 32
Scale: 1/16" = 1'-0"
SITE PLAN
W
1.0
B
3.0 4.0
A
2.0
C
194 SF
STORAGE
126 SF
VESTIBULE
69 SF
TOILET
1071 SF
DATA
CENTER
898 SF
SERVICE YARD
A
102B
T R
A V
E L D
IS
T
TRAVEL DIST
TRAVEL DIST
FEC
65 SF
SECURE
STORAGE
31'-1"
'-2
FEC
38'-4"
TRAVEL DIST
33'-1"
T R
A V
E L D
IS
T
T R
A V
E L D
IS
T
T R
A V
E L D
IS
T
FEC
F A
C P
1'-6"
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
FIRE EXTINGUISHER CABINET
EXIT LIGHT/SIGN
FIRE ALARM CONTROL PANEL
XXX
XXX
FEC
FACP
COMMON PATH OF TRAVEL
(NFPA 101 - 40.2.5.1)
MAX TRAVEL DISTANCE
(NFPA 40.2.6.1)
TOTAL SQUARE FOOTAGE
OCCUPANCY LOAD NFPA101
(TABLE 7.3.1.2)
REQUIRED # OF EGRESS
NFPA101 (7.4.2)
EGRESS REQUIRED WIDTH -
CAPACITY FACTOR
NFPA 101(TABLE 7.3.3.1)
100' (NFPA 101 - 40.2.5.1)
400' PROTECTED
(NFPA 101 - 40.2.6.1)
1,760 SF
INDUSTRIAL (SPECIAL
PURPOSE) OCCUPANCY
N/A
ACTUAL 2 PEOPLE
2 EXITS REQUIRED
2 EXITS PROVIDED
2 PEOPLE @…