This document is a technical specification for a Thermoplastic Polyolefin (TPO) roofing system. It outlines the requirements for the installation of a TPO roofing membrane adhered to the roof deck, including related materials such as flashing, adhesives, and fasteners. Key details include:

The roofing system must meet specific performance requirements for load resistance, energy efficiency (minimum Solar Reflectance Index of 78), and sustainability (low VOC emissions). The TPO membrane must be 60 mils thick, internally reinforced, and white in color. Detailed installation instructions are provided, including requirements for roof deck preparation, temporary protection, membrane application, and flashing installation. Quality control testing, including fastener pullout tests and seam inspections, is also specified. The roofing work is to be performed in accordance with the manufacturer's instructions and the National Roofing Contractors Association (NRCA) guidelines.

This specification is related to a federal contract opportunity from the Department of Veterans Affairs for infrastructure upgrades at a facility in Prescott, Arizona, but no further details about the solicitation are provided in the document.

View the file

Other files

File Type Posted
Award Notice 36C77624C0136_1 Final.docx DOCX document
Attachment ELEC-A.pdf PDF
013526 Sfty Requirements.pdf PDF
22-117 ELEC_ET ADD NO-1_Rev.pdf PDF
Prescott AZ Data Center_2024-04-26_Signed.pdf PDF
22-117 MECH ADD NO-1_Rev.pdf PDF
Amendment 5 - 36C77624B0008 0005.docx DOCX document
649-22-701 Pre-Bids RFI RESPONSES FINAL_5.22.2024.pdf PDF
090600 Sched of Finishes.pdf PDF
22-117-Q31-Addendum 1-20240429.pdf PDF
22-117 A-503 ADD NO-1_Rev.pdf PDF
22-117 G-001 ADD NO-1_Rev.pdf PDF
Attachment ENV-A.pdf PDF
22-117 PLUMB ADD NO-1_Rev.pdf PDF
087100 Door Hardware.pdf PDF
014500 QualityControl.pdf PDF
Amendment 4 - 36C77624B0008 0004.docx DOCX document
36C77624B0008 0003.docx DOCX document
36C77624B0008 0002.docx DOCX document
36C77624B0008 - Prebid Walk Sign-in for 3.22.2024.pdf PDF
S04 - Site Visit Meeting Minutes - IFB.doc DOC document
Amendment 1 - 36C77624B0008_1.docx DOCX document
SPECIAL NOTE - BID TAXES - AFTER FAR 52.229-3.docx DOCX document
Specs.pdf PDF
36C77624B0008_1 - Final.docx DOCX document
Drawings.pdf PDF
Attachment - Limitations on Subcontracting - Construction.docx DOCX document
DBA Wage Determination - Prescott AZ - 1.19.2024.pdf PDF
SOW.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01-01-21

07 54 23 - 1

SECTION 07 54 23

THERMOPLASTIC POLYOLEFIN (TPO) ROOFING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Thermoplastic Polyolefin (TPO) sheet roofing adhered to roof deck.

1.2 RELATED WORK

A. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS: Non-Flooring

Adhesives and Sealants VOC Limits.

B. Treated wood framing, blocking, and nailers: Section 06 10 00, ROUGH

CARPENTRY

C. Section 07 22 00, ROOF AND DECK INSULATION: Roof Insulation.

D. Miscellaneous items: Section 07 71 00, ROOF SPECIALTIES.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. American National Standards Institute/Single-Ply Roofing Institute

(ANSI/SPRI):

FX-1-16.................Standard Field Test Procedure for Determining the Withdrawal Resistance of Roofing Fasteners.

C. American Society of Civil Engineers/Structural Engineering Institute

(ASCE/SEI):

7-16....................Minimum Design Loads for Buildings and Other

Structures.

D. American Society of Heating, Refrigerating and Air-Conditioning

Engineers, Inc. (ASHRAE):

90.1-13.................Energy Standard for Buildings Except Low-Rise

Residential Buildings.

E. ASTM International (ASTM):

C67-20..................Sampling and Testing Brick and Structural Clay

Tile.

C140/C140M-20a..........Sampling and Testing Concrete Masonry Units and

Related Units.

C1371-15................Determination of Emittance of Materials Near

Room Temperature Using Portable Emissometers.

C1549-16................Determination of Solar Reflectance Near Ambient

Temperature Using a Portable Solar

Reflectometer.

D1876-08(2015) e1.......Peel Resistance of Adhesives (T-Peel Test).

07 54 23 - 2

D4263-83(2018)..........Indicating Moisture in Concrete by the Plastic

Sheet Method.

D4434/D4434M-15.........Poly (Vinyl Chloride) Sheet Roofing.

D6878/D6878M-13.........Thermoplastic Polyolefin Based Sheet Roofing.

E408-13.................Total Normal Emittance of Surfaces Using

Inspection-Meter Techniques.

E1918-16................Measuring Solar Reflectance of Horizontal and

Low-Sloped Surfaces in the Field.

E1980-11(2019)..........Calculating Solar Reflectance Index of

Horizontal and Low-Sloped Opaque Surfaces.

F. Cool Roof Rating Council (CRRC):

1-20....................Product Rating Program.

G. National Roofing Contractors Association (NRCA):

Manual-19...............The NRCA Roofing Manual: Membrane Roofing

Systems.

H. U.S. Department of Agriculture (USDA):

BioPreferred® Program Catalog.

I. UL LLC (UL):

580-06..................Tests for Uplift Resistance of Roof Assemblies.

1897-20.................Uplift Tests for Roof Covering Systems.

J. U.S. Department of Commerce National Institute of Standards and

Technology (NIST):

DOC PS 1-19.............Structural Plywood.

DOC PS 2-18.............Performance Standard for Wood-Based

Structural-Use Panels.

K. U.S. Environmental Protection Agency (EPA):

Energy Star.............ENERGY STAR Program Requirements for Roof

Products Version 3.0.

1.4 PREINSTALLATION MEETINGS

A. Conduct pre-installation meeting at project site minimum 30 days before beginning Work of this section.

1. Required Participants:

a. Contracting Officer's Representative.

b. Inspection and Testing Agency.

c. Contractor.

d. Installer.

e. Manufacturer's field representative.

07 54 23 - 3

f. Other installers responsible for adjacent and intersecting work, including roof deck, flashings, roof penetrations, roof accessories, utility penetrations, rooftop curbs and equipment.

2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.

a. Installation schedule.

b. Installation sequence.

c. Preparatory work.

d. Protection before, during, and after installation.

e. Installation.

f. Terminations.

g. Transitions and connections to other work.

h. Inspecting and testing.

i. Other items affecting successful completion.

j. Pullout test of fasteners.

k. Material storage, including roof deck load limitations.

3. Document and distribute meeting minutes to participants to record decisions affecting installation.

1.5 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings:

1. Roof membrane layout.

2. Roofing membrane fastener pattern and spacing.

3. Roofing membrane seaming and joint details.

4. Roof membrane penetration details.

C. Manufacturer's Literature and Data:

1. Description of each product.

2. Minimum fastener pullout resistance.

3. Installation instructions.

4. Vapor barrier

5. Cover Board – Gypsum board with glass matt layer on both sides.

6. Warranty.

D. Samples:

1. Roofing Membrane: 150 mm (6 inch) square.

2. Base Flashing: 150 mm (6 inch) square.

3. Fasteners: Each type.

07 54 23 - 4

4. Roofing Membrane Seam: 300 mm (12 inches) square.

E. Sustainable Construction Submittals:

1. Solar Reflectance Index (SRI) for roofing membrane.

2. Biobased Content:

a. Show type and quantity for each product.

3. Low Pollutant-Emitting Materials:

a. Show volatile organic compound types and quantities.

4. Energy Star label for roofing membrane.

F. Certificates: Certify products comply with specifications.

1. Fire and windstorm classification.

2. Energy performance requirements.

G. Qualifications: Substantiate qualifications comply with specifications.

1. Installer, including supervisors with project experience list.

2. Manufacturer's field representative with project experience list.

H. Field quality control reports.

I. Temporary protection plan. Include list of proposed temporary materials.

J. Operation and Maintenance Data:

1. Maintenance instructions.

1.6 QUALITY ASSURANCE

A. Installer Qualifications:

1. Approved by roofing system manufacturer as installer for roofing system with specified warranty.

2. Regularly installs specified products.

3. Installed specified products with satisfactory service on five similar installations for minimum five years.

a. Project Experience List: Provide contact names and addresses for completed projects.

4. Employs full-time supervisors experienced installing specified system and able to communicate with Contracting Officer's Representative and installer's personnel.

B. Manufacturer's Field Representative:

1. Manufacturer's full-time technical employee or independent roofing inspector.

2. Individual certified by Roof Consultants Institute as Registered Roof

Observer.

07 54 23 - 5

1.7 DELIVERY

A. Deliver products in manufacturer's original sealed packaging.

B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, and manufacture date.

C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

1.8 STORAGE AND HANDLING

A. Comply with NRCA Manual storage and handling requirements.

B. Store products indoors in dry, weathertight facility.

C. Store adhesives according to manufacturer's instructions.

D. Protect products from damage during handling and construction operations.

E. Products stored on the roof deck must not cause permanent deck deflection.

1.9 FIELD CONDITIONS

A. Environment:

1. Product Temperature: Minimum 4 degrees C (40 degrees F) for minimum

48 hours before installation.

2. Weather Limitations: Install roofing only during dry current and forecasted weather conditions.

1.10 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

B. Manufacturer's Warranty: Warrant roofing system against material and manufacturing defects and agree to repair any leak caused by a defect in the roofing system materials or workmanship of the installer.

1. Warranty Period: 10 years.

PART 2 - PRODUCTS

2.1 SYSTEM DESCRIPTION

A. Roofing System: Thermoplastic Polyolefin (TPO) sheet roofing adhered to roof deck.

B. Roof system including insulation, cover board, vapor retarder, underlayment, etc. to be installed pe r the roof manufacturers roof system instructions and the approved submittals.

2.2 SYSTEM PERFORMANCE

A. Design roofing system complying with specified performance:

07 54 23 - 6

1. Load Resistance: ASCE/SEI 7; Design criteria: as indicated on

Structural Drawings.

2. Energy Performance:

a. EPA Energy Star Listed for low-slope roof products.

b. ASTM E1980; Minimum 78 Solar Reflectance Index (SRI).

c. CRRC-1; Minimum 0.70 initial solar reflectance and minimum 0.75 emissivity.

d. Three-Year Aged Performance: Minimum 0.55 solar reflectance tested in according to ASTM C1549 or ASTM E1918, and minimum 0.75 thermal emittance tested in according to ASTM C1371 or ASTM E408.

1) Where tested aged values are not available:

a) Calculate compliance adjusting initial solar reflectance according to ASHRAE 90.1.

b) Provide roofing system with minimum 64 three-year aged

Solar Reflectance Index calculated according to

ASTM E1980 with 12 W/square meter/degree K

(2.1 BTU/hour/square foot) convection coefficient.

2.3 PRODUCTS - GENERAL

A. Provide roof system components from one manufacturer.

B. Sustainable Construction Requirements:

1. Solar Reflectance Index: 78 minimum.

2. Low Pollutant-Emitting Materials: Comply with VOC limits specified in

Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:

a. Non-flooring adhesives and sealants.

2.4 TPO ROOFING MEMBRANE

1. TPO Sheet: ASTM D6878/D6878M, internally fabric or scrim reinforced,

1.5 mm (60 mils) thick, with fabric backing.

a. Color: White.

2.5 MEMBRANE ACCESSORY MATERIALS

A. Sheet Flashing: Manufacturer's standard sheet flashing of same material, type, reinforcement, thickness, and color as TPO sheet membrane.

B. Factory Formed Flashings: Inside and outside corners, pipe boots, and other special flashing shapes to minimize field fabrication.

C. Bonding Adhesive: Manufacturer's standard, water based.

07 54 23 - 7

D. Metal Termination Bars: Manufacturer's standard, stainless-steel or aluminum, 25 mm wide by 3 mm thick (1-inch wide by 1/8 inch thick) factory drilled for fasteners.

E. Battens: Manufacturer's standard, galvannealed or galvanized steel sheet, 25 mm wide by 1.3 mm thick (1-inch wide by 0.05 inch thick), factory punched for fasteners.

F. Fasteners: Manufacturer's standard coated steel with metal or plastic plates, to suit application.

G. Primers, Sealers, T-Joint Covers, Lap Sealants, and Termination

Reglets: As specified by roof membrane manufacturer.

H. Adhesive and sealant materials recommended by roofing system manufacturer for intended use, identical to materials utilized in approved listed roofing system, and compatible with roofing membrane.

2.6 ACCESSORIES

A. Temporary Protection Materials:

1. Expanded Polystyrene (EPS) Insulation: ASTM C578.

2. Plywood: NIST DOC PS 1, Grade CD Exposure 1.

3. Cover board, 1/2” gypsum board with glass matt layer both sides, for above insulation installation.

4. Underlayment board, 5/8” gypsum board with glass matt layer both sides, for on roof deck installation.

5. Vapor retarder per manufacturer’s requirements for the roof system being installed.

6. Oriented Strand Board (OSB): NIST DOC PS 2, Exposure 1.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine and verify substrate suitability with roofing Installer and roofing inspector present.

1. Verify roof penetrations are complete, secured against movement, and firestopped.

2. Verify roof deck is adequately secured to resist wind uplift.

3. Verify roof deck is clean, dry, and in-plane ready to receive roofing system.

B. Correct unsatisfactory conditions before beginning roofing work.

3.2 PREPARATION

A. Complete roof deck construction before beginning roofing work:

07 54 23 - 8

1. Curbs, blocking, edge strips, nailers, cants, and other components to which insulation, roofing, and base flashing is attached in place ready to receive insulation and roofing.

2. Coordinate roofing membrane installation with flashing work and roof insulation work so insulation and flashing are installed concurrently to permit continuous roofing operations.

3. Complete installation of flashing, insulation, and roofing in same day except for the area where temporary protection is required when work is stopped for inclement weather or end of workday.

B. Dry out surfaces including roof deck flutes, that become wet from any cause during progress of the work before roofing work is resumed. Apply materials to dry substrates, only.

C. Broom clean roof decks. Remove dust, dirt and debris.

D. Remove projections capable of damaging roofing materials.

3.3 TEMPORARY PROTECTION

A. Install temporary protection consisting of a temporary seal and water cut-offs at the end of each day's work and when work is halted for an indefinite period or work is stopped when precipitation is imminent.

B. Install temporary cap flashing over top of base flashings where permanent flashings are not in place to protect against water intrusion into roofing system. Securely anchor in place to prevent blow off and damage by construction activities.

C. Temporarily seal exposed insulation surfaces within roofing membrane.

1. Apply temporary seal and water cut off by extending roofing membrane beyond insulation and securely embedding edge of the roofing membrane in 6 mm (1/4 inch) thick by 50 mm (2 inches) wide strip of temporary closure sealant. Weight roofing membrane edge with sandbags, to prevent displacement; space sandbags maximum 2400 mm (8 feet) on center.

2. Direct water away from work. Provide drainage, preventing water accumulation.

3. Check daily to ensure temporary seal remains watertight. Reseal open areas and weight down.

D. Before the work resumes, cut off and discard portions of roof membrane in contact with temporary seal.

1. Cut minimum 150 mm (6 inches) back from sealed edges and surfaces.

E. Remove sandbags and store for reuse.

07 54 23 - 9

3.4 INSTALLATION - GENERAL

A. Install products according to manufacturer's instructions and approved submittal drawings.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

B. Comply with NRCA Manual installation requirements.

C. Comply with UL 580 for uplift resistance.

D. Do not allow membrane and flashing to contact surfaces contaminated with asphalt, coal tar, oil, grease, or other substances incompatible with TPO.

3.5 ROOFING INSTALLATION

A. Install the membrane so the sheets run perpendicular to the long dimension of the insulation boards.

B. Begin installation at the low point of the roof and work towards the high point. Lap membrane shingled in water flow direction.

C. Position the membrane free of buckles and wrinkles.

D. Roll membrane out; inspect for defects as membrane is unrolled. Remove defective areas:

1. Lap edges and ends of sheets 50 mm (2 inches) or more as recommended by the manufacturer.

2. Heat weld laps. Apply pressure as required. Seam strength of laps as required by ASTM D4434/D4434M.

3. Check seams to ensure continuous adhesion and correct defects.

4. Finish seam edges with beveled bead of lap sealant.

5. Finish seams same day as membrane is installed.

6. Anchor membrane perimeter to roof deck or parapet wall as indicated on drawings.

7. Repair areas of welded seams where samples have been taken or marginal welds, bond voids, or skips occur.

8. Repair fishmouths and wrinkles by cutting to lay flat and installing patch over cut area extending 100 mm (4 inches) beyond cut.

E. Install underlayment and cover board per manufacturers instructions and approved submittals.

F. Install vapor barrier per manufacturer instructions and approved submittals.

G. Membrane Perimeter Anchorage:

07 54 23 - 10

1. Install batten at perimeter of each roof area, curb flashing, expansion joints and similar penetrations on top of roof membrane as indicated on drawings.

H. Adhered System:

1. Apply bonding adhesive in quantities required by roof membrane manufacturer.

2. Fold sheet back on itself, clean and coat the bottom side of the membrane and the top of substrate with adhesive. Do not coat the lap joint area.

3. After adhesive has set according to adhesive manufacturer's instruction, roll roofing membrane into adhesive minimizing voids and wrinkles.

4. Repeat for other half of sheet.

3.6 FLASHING INSTALLATION

A. Install flashings same day as roofing membrane is installed. When flashing cannot be completely installed in one day, complete installation until flashing is watertight and provide temporary covers or seals.

B. Installing Base Flashing and Pipe Flashing:

1. Install flashing sheet to pipes, wall or curbs to minimum200 mm

(8 inches) above roof surfaces and extending roofing manufacturer's standard lap dimension onto roofing membranes.

a. Adhere flashing with bonding adhesive.

b. Form inside and outside corners of flashing sheet according to

NRCA manual. Form pipe flashing according to NRCA manual.

c. Lap ends roofing manufacturer's standard dimension.

d. Heat weld flashing membranes together and flashing membranes to roofing membranes. Finish exposed edges with lap sealant.

e. Install flashing membranes according to NRCA manual.

2. Apply sealant to top edge of flashing.

3. Install base flashing on curbs as specified.

4. Install flexible tubing 1-1/2 times the width of joint centered over joint. Finish edges of laps with sealant.

C. Repairs to Membrane and Flashings:

1. Remove sections of roofing membrane or flashing that are creased, wrinkled, or fishmouthed.

07 54 23 - 11

3.7 FIELD QUALITY CONTROL

A. Field Tests: Performed by testing laboratory specified in Section

01 45 29, TESTING LABORATORY SERVICES.

1. Fastener Pull Out Tests: ANSI/SPRI FX-1; one test for every

230 square meter (2,500 square feet) of deck. Perform tests for each combination of fastener type and roof deck type before installing roof insulation.

a. Test at locations selected by Contracting Officer's Representative.

b. Do not proceed with roofing work when pull out resistance is less than manufacturer's required resistance.

c. Test Results:

1) Repeat tests using different fastener type or use additional fasteners achieve pull out resistance required to meet specified wind uplift performance.

2) Patch cementitious deck to repair areas of fastener tests holes.

2. Examine and probe roofing membrane and flashing seams in presence of

Contracting Officer's Representative and Manufacturer's field representative.

3. Probe seams to detect marginal bonds, voids, skips, and fishmouths.

4. Cut 100 mm (4 inch) wide by 300 mm (12 inch) long samples through seams where directed by Contracting Officer's Representative.

5. Cut one sample for every 450 m (1500 feet) of seams.

6. Cut samples perpendicular to seams.

7. Failure of samples to pass ASTM D1876 test will be cause for rejection of work.

8. Repair areas where samples are taken and where marginal bond, voids, and skips occur.

9. Repair fishmouths and wrinkles by cutting to lay flat. Install patch over cut area extending 100 mm (4 inches) beyond cut.

B. Manufacturer Services:

1. Inspect initial installation, installation in progress, and completed work.

2. Issue supplemental installation instructions necessitated by field conditions.

3. Prepare and submit inspection reports.

4. Certify completed installation complies with manufacturer's instructions and warranty requirements.

07 54 23 - 12

3.8 CLEANING

A. Remove excess adhesive before adhesive sets.

B. Clean exposed roofing surfaces. Remove contaminants and stains to comply with specified solar reflectance performance.

3.9 PROTECTION

A. Protect roofing system from traffic and construction operations.

1. Protect roofing system when used for subsequent work platform, materials storage, or staging.

2. Distribute scaffolding loads to exert maximum 50 percent roofing system materials compressive strength.

B. Loose lay temporary insulation board overlaid with plywood or OSB.

1. Weight boards to secure against wind uplift.

C. Remove protective materials immediately before acceptance.

D. Repair damage.

- - - E N D - - -