DRAFT RFP_W9124P-20-R-0007.PDF

PDF 566 KB Posted

Attached to
Installation Support Services to the US Army Garrison-Redstone
Solicitation number
W9124P-20-R-0007
Issued by

About this file

This is a draft Request for Proposal for installation support services at Redstone Arsenal. The contractor will provide facilities maintenance, utility operations, supply operations, transportation, and administrative services to support US Army Garrison-Redstone and tenant organizations located on the arsenal. Specific services include engineering, pavement maintenance, vertical and horizontal facility maintenance, heating/cooling utilities, environmental compliance, and program management. The period of performance is ten years including options, with an estimated start date of April 2021. The solicitation includes firm fixed price, cost plus fixed fee, and cost reimbursement contract line items. This acquisition will be set aside for the Small Business Administration 8(a) program. Questions are due by close of business on an unspecified date.

View the file

Other files

File Type Posted
Tech Exhibit 11 - CDRLs 69-72 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 17-20 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 41-44 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 29-32 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 73 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 53-56 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 33-36 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 21-24 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 45-48 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 57-60 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 37-40 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 61-64 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 49-52 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 25-28 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 65-68 22Apr2020.pdf PDF
Tech Ex 15 - BUILDER Program Data 10 Sep 19 _1.pdf PDF
Tech Ex 15 - BUILDER Program Data 10 Sep 19 _2.pdf PDF
Tech Ex 15 - BUILDER Program Data 10 Sep 19 _3.pdf PDF
Tech Ex 15 - BUILDER Program Data 10 Sep 19 _4.pdf PDF
Tech Exhibit 11 - DRAFT v1 CDRLs 9-12.pdf PDF
Tech Exhibit 11 - DRAFT v1 CDRLs 13-16.pdf PDF
Government Responses to Draft RFP Industry Questions_26Apr2020.xlsx XLSX spreadsheet
Tech Exhibit 11 - DRAFT v1 - CDRLs 5-8.pdf PDF
Tech Exhibit 11 DRAFT v1- CDRLs 1-4.pdf PDF
Tech Ex 14 Rev 1- MDA-FBI Bldgs at CL1 15Apr20.pdf PDF
Tech Ex 16 - Pavement-Drainage MaintenanceZoneMap 10 Sep 19.pdf PDF
Tech Ex 20 - Generator Testing Refusal Memo 10 Sep 19.pdf PDF
Tech Ex 37 - Septic Tanks_Lift Stations 10 Sep 19.pdf PDF
Tech Ex 29 - Utility Meter Count 10 Sep 19.pdf PDF
Tech Ex 19 - Generator List 10 Sep 19.pdf PDF
ISS Questions and Response 10 Apr 20.xlsx XLSX spreadsheet
Tech Ex 50 - Gov Furnished Equipment List 10 Sep 19.pdf PDF
Tech Ex 04 - Wage Rate Requirements Shop 4 Oct 19.pdf PDF
Tech Ex 13 - Preventative Maintenance Task Sheet 10 Sep 19.pdf PDF
Tech Ex 42 - Central Plants 10 Sep 19.pdf PDF
Tech Ex 26 - IMRE-PW (EIP Ref Recvry) Form 1 10 Sep 19.pdf PDF
Tech Ex 14 - MDA-FBI Bldgs at CL1 10 Sep 19.pdf PDF
Attachment 3 411 Facility Maintenence Vertical NS FY21 10Oct19 r3 26Mar2....docx DOCX document
Attachment 2 408 Pavement Clearance NS FY21 10Oct19 r3 9Apr2020.docx DOCX document
PWS November 13 2019 r5 9Apr20.docx DOCX document
Tech Ex 02 - Historical Workload Data 10 Sep 19.pdf PDF
Tech Ex 10 - Facilities with Niagra or JACE Controls 10 Sep 19.pdf PDF
Tech Ex 55 - Hydrdants 11 Sep 19.pdf PDF
Attachment 6 505 Environmental Compliance Svs NS FY21 10Oct19 r4 9Apr20.....docx DOCX document
Tech Ex 52 - Ice-Snow Plan 10 Sep 19.pdf PDF
Tech Ex 18 - Cooking Exhaust Systems List 10 Sep 19.pdf PDF
Tech Ex 17 - Bldg Component Checklist 10 Sep 19.pdf PDF
Tech Ex 21 - Cranes and Hoists 10 Sep 19.pdf PDF
Attachment 5 501 Heating Cooling NS FY21 10Oct19 r3 9Apr2020 - Ryan Edi.....docx DOCX document
Tech Ex 22 - Elevators 10 Sep 19.pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 05:00 PM local time 29 Apr 2020

A X B

C D E

G F 77

78 - 94 H 95 - 102

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 102

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W9124P 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and courtney.r.hawkins conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

SECTION L

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 74

I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

PART II - CONTRACT CLAUSES

ACC REDSTONE ARSENAL CONTRACTING COMMAND

SPARKMAN CENTER BLDG 5303

REDSTONE ARSENAL AL 35898

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

75 - 76

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

14 Apr 2020

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W9124P20R0007

Section A - Solicitation/Contract Form

SOLICITATION NARRITIVE

The United States Army Garrison-Redstone is located on Redstone Arsenal surrounded by 38,000 acres of land in Northern Alabama . US Army Garrison provides a wide range of Installation Support Services (ISS) that represent an estimated 30,000 service calls per year to an the estimated 2,000 facilities located on Redstone Arsenal. The many many agencies that call Redstone Arsenal home include but are not limited: to Army Materiel Command (AMC), United States Army Aviation and Missile Command (AMCOM), the Space and Missile Defense Command (SMDC), numerous Program Executive Offices (PEO), and major components of the Defense Intelligence Agency, the Missile Defense Agency (MDA) and the Federal Bureau of Investigation (FBI). Also located here are numerous tenant and satellite organizations (located in Technical Exhibit #08). The purpose of this service acquisition is to satisfy recurring requirements for ISS consisting of Facilities Maintenance, HVAC service, Landfill Operations, Pavement Clearence Operations, Environmental Services, Supply Operations, Facilities Engineering Sevices and Prevenative Mainenance

The projected Period of Performance is ten (10) years, inclusive of a five (5) year base, and five (5) Option Periods with 1 April 2021 being the performance commencement date.

Phase-in/out Period 1 April 2021 to 31 May 2021

5 Year Base Period 1 June 2021 to 31 May 2026

Option Period 1 1 June 2026 to 31 May 2027

Option Period 2 1 June 2027 to 31 May 2028

Option Period 3 1 June 2028 to 31 May 2029

Option Period 4 1 June 2029 to 31 May 2030

Option Period 5 1 June 2030 to 31 May 2031

The anticipated contract type is as follows: ACC-Redstone proposes to award a hybrid standard requirement, “C” type contract. The anticipated contract will consist of Firm Fixed Price (FFP), Cost Plus Fixed Fee- Level of Effort (CPFF-LOE) and Cost Reimbursable (CR) Contract Line Items.

This requirement will be acquired as a total set aside acquisition for exclusive competition under the Small Business Administration (SBA) 8(a) program. Statutory authority being found at 15 USC.637(a) in accordance with (IAW) FAR Part 19.8, Contracting with the Small Business Administration (The 8(a) Program).

The ISS effort is centered around the primary requirement to provide facilities maintenance and support services. ISS will be a services contract, utilizing a manufacturing The North American Industry Classification System (NAICS) code 561210, and any additional services will be incidental to installation support.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Environmental Services

FFP

BASE PERIOD - All direct supervision, labor, administrative support, materials, and other direct costs associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in Attachment 6 in support of the Overarching PWS and Attachments 1 through 5 where referenced.

NET AMT

Material -Environmental Services

COST

BASE PERIOD - All materials associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in Attachment 6 in support of the PWS and Attachments 1 through 5 where referenced.

ESTIMATED COST

Program Management

FFP

BASE PERIOD - All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Program Management requirements as defined in the Overarching PWS and Attachments 1 through 6 where referenced.

FOB: Destination

Supply Operations

FFP

BASE PERIOD - All direct supervision, labor, material, administrative support, and other direct costs associated with the Management of supply operations to include receipt, stocking, inventory, and distribution of supplies and materialsof the requirements asdefined in the Overarching PWS and Attachments 1 through 6 where referenced.

Replenishment of Gov.Furnished Material

FFP

BASE PERIOD- Includes the restocking of the Government furnished material inventory expended in the performance of work requirements as defined in the Overarching PWS and Attachments 1 through 6 where referenced.

Facilities Engineering Services

FFP

BASE PERIOD - (Attachment 1) All direct supervision, labor, administrative support, other direct costs, material, tools, equipment, and vehicles costs associated with Facilities Engineering Services (CLS 400), work in the performance of the requirements as defined in the Overarching PWS and Attachments 2 through 6

Landfill Operations

FFP

BASE PERIOD - IAW CLS 403, All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Landfill Operations as defined in Attachment 4.

Pavement Clearance Operations

CPFF

BASE PERIOD - (CPFF-LOE) IAW CLS 403, All direct supervision, labor, administrative support, and other direct costs associated with Pavement Clearance Operations defined in Attachment 2.

FIXED FEE

TOTAL EST COST + FEE

Material Pavement Clearance

FFP

BASE PERIOD - IAW CLS 403, All material, tools, equipment, and vehicles costs associated with Pavement Clearance Operations defined in Attachment 2.

Heating-Cooling Utility Services

FFP

BASE PERIOD - All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Heating and Cooling Utility Services requirements as defined in the PWS and in Attachment 5 where referenced.

Preventative Maintenance Orders, PMO

CPFF

BASE PERIOD - (CPFF-LOE) Labor and ODC All direct supervision, labor, administrative support, and other direct costs associated with work in the performance of Preventative Maintenance work as defined in the PWS and Attachments 1-6 where mentioned.

Material Preventative Maintenance Orders

COST

BASE PERIOD - All material, tools, equipment, and vehicles costs associated with Preventative Maintenance work in the performance of work as defined in the PWS and Attachments 1-6 where mentioned.

Demand Maintenance Orders, DMO

FFP

BASE PERIOD - All management, supervision, personnel, labor, administrative support, and other direct costs associated with Demand Maintenance work in the performance of the work as defined in the PWS and Attachments 1-6 where

0013AA

Capability Level 1 18,000 - 20,000 DMOs

FFP

BASE PERIOD - DMO Annual Range from 18,000 min to 20,000 max during base period 1 April 2021 to 1 April 2026.

0013AB

Capability Level 2 20,001 - 22,000 DMOs

FFP

BASE PERIOD - DMO Annual Range from 20,001 min to 22,000 max during base

0013AC

Capability Level 3 22,001 - 24,000 DMOs

FFP

BASE PERIOD - DMO Annual Range from 22,001 min to 24,000 max during base

0013AD

Capability Level 4 24,001 - 26,000 DMOs

FFP

BASE PERIOD - DMO Annual Range from 24,001 min to 26,000 max during base

0013AE

Capability Level 5 26,001 - 28,000 DMOs

FFP

BASE PERIOD- DMO Annual Range from 26,001 min to 28,000 max during base

0013AF

Capability Level 6 28,001 - 30,000 DMOs

FFP

BASE YEARS - DMO Annual Range from 28,001 min to 30,000 max during base

Material Demand Maintenance Orders

COST

BASE PERIOD - All material, tools, equipment, and vehicles associated with Demand Maintenance work in the performance of work as defined in the Overarching PWS and Attachments 1-6 where referenced.

Maintenance and Repair for UPWO's

CPFF

BASE PERIOD - (CPFF-LOE) All direct supervision, labor, administrative support, and other direct costs associated with Maintenance & Repair work in the performance of work as defined in Overarching PWS and Attachments 1-6

Material Mantenance and Repair for UPWO

COST

BASE PERIOD - All material, tools, equipment, and vehicles costs associated with Maintenance & Repair work in the performance of the work as defined in the

M&R for PWO's and Sustainment Projects

FFP

BASE PERIOD - Maintenance and Repair - All management, supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, equipment, and vehicles associated with M&R Water, Waste Water, Electrical, Steam, and Gas Systems, Buildings and Structures, Roads and Grounds, Grounds, Fence, and Walls Project Work Order (UPWO) work in the performance of work as defined in Attachments 1-6 where mentioned.

Repair GOV. Prop. damaged by 3rd Party

CPFF

BASE PERIOD - (CPFF-LOE) All management, supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, equipment, and vehicles associated with the repair of property damage caused by third parties.

PHASE IN/PHASE OUT PLAN

FFP

BASE PERIOD - Phase In/Phase Out effort as set forth in Exhibit 7 to be completed within 60 days of contract award.

Contractor Acquired Property (CAP)

FFP

BASE PERIOD - All contractor provided propety utlized in the performance of this contract for which the Government has title IAW FAR 52.245-1.

Contractor Manpower Reporting

FFP

BASE PERIOD - Contractor Manpower Reporting as set forth in Paragraph 3.3 of the Overarching PWS. IAW AFARS 5137.9101, Contracting officers shall ensure that the requirement to report contractor manpower is included in all contracts, task/delivery orders and modifications. The Contractor Manpower Reporting application is available via the Internet at www.ecmra.mil

Contract Data Requirements List (CDRL)

BASE PERIOD - IAW Paragraph 6.0 in the Overarching PWS - The purpose of the CDRL is to provide a standardized method of clearly and unambiguously delineating the Government’s minimum essential data needs. FAR 27.401 reference theterm "technical data and computer software", however, DFAR subpart

215.470 Installation Support Services (ISS) CDRLsInfo Paperrequires the use of the CDRL in solicitations when the contract will require delivery of any data.

OPTION Environmental Services

FFP

OPTION YEAR 1- All direct supervision, labor, administrative support, materials, and other direct costs associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, OPTION Material -Environmental Services

COST

OPTION YEAR 1- All materials associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in

OPTION Program Management

FFP

OPTION YEAR 1- All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Program Management requirements as defined in the Overarching PWS and

OPTION Supply Operations

FFP

OPTION YEAR 1 - All direct supervision, labor, material, administrative support, and other direct costs associated with the Management of supply operations to include receipt, stocking, inventory, and distribution of supplies and materialsof the

OPTION Replenishment of Gov.Furnished Material

FFP

OPTION YEAR 1 - Includes the restocking of the Government furnished material

OPTION Facilities Engineering Services

FFP

OPTION YEAR - (Attachment 1) All direct supervision, labor, administrative support, other direct costs, material, tools, equipment, and vehicles costs associated with Facilities Engineering Services (CLS 400), work in the performance of the

OPTION Landfill Operations

FFP

OPTION YEAR 1 - IAW CLS 403, All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Landfill Operations as defined in Attachment 4.

OPTION Pavement Clearance Operations

CPFF

OPTION YEAR 1 - (CPFF-LOE) IAW CLS 403, All direct supervision, labor, OPTION Material Pavement Clearance

FFP

OPTION YEAR 1 - IAW CLS 403, All material, tools, equipment, and vehicles costs associated with Pavement Clearance Operations defined in Attachment 2.

OPTION Heating-Cooling Utility Services

FFP

OPTION YEAR 1 - All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with

OPTION Preventative Maintenance Orders, PMO

CPFF

OPTION YEAR 1 - (CPFF-LOE) Labor and ODC All direct supervision, labor, administrative support, and other direct costs associated with work in the

OPTION Material Preventative Maintenance Orders

COST

OPTION YEAR 1 - All material, tools, equipment, and vehicles costs associated

OPTION Demand Maintenance Orders, DMO

FFP

OPTION PERIOD 1 - All management, supervision, personnel, labor, administrative support, and other direct costs associated with Demand Maintenance work in the performance of the work as defined in the PWS and Attachments 1-6

1013AA

OPTION Capability Level 1 18,000 - 20,000 DMOs

FFP

OPTION YEAR 1 - DMO Annual Range from 18,000 min to 20,000 max during base period 1 April 2021 to 1 April 2026.

1013AB

OPTION Capability Level 2 20,001 - 22,000 DMOs

FFP

OPTION YEAR 1 - DMO Annual Range from 20,001 min to 22,000 max during

1013AC

OPTION Capability Level 3 22,001 - 24,000 DMOs

FFP

BASE PERIOD - DMO Annual Range from 22,001 min to 24,000 max during base

1013AD

OPTION Capability Level 4 24,001 - 26,000 DMOs

FFP

OPTION YEAR 1 - DMO Annual Range from 24,001 min to 26,000 max during

1013AE

OPTION Capability Level 5 26,001 - 28,000 DMOs

FFP

OPTION YEAR 1 - DMO Annual Range from 26,001 min to 28,000 max during

1013AF

OPTION Capability Level 6 28,001 - 30,000 DMOs

FFP

OPTION YEAR 1 - DMO Annual Range from 28,001 min to 30,000 max during

OPTION Material Demand Maintenance Orders

COST

OPTION YEAR 1 - All material, tools, equipment, and vehicles associated with

OPTION Maintenance and Repair for UPWO's

CPFF

OPTION YEAR 1 - (CPFF-LOE) All direct supervision, labor, administrative support, and other direct costs associated with Maintenance & Repair work in the

OPTION Material Mantenance and Repair for UPWO

COST

OPTION YEAR 1 - All material, tools, equipment, and vehicles costs associated

OPTION M&R for PWO's and Sustainment Projects

FFP

OPTION YEAR 1 - Maintenance and Repair - All management, supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, equipment, and vehicles associated with M&R Water, Waste Water, Electrical, Steam, and Gas Systems, Buildings and Structures, Roads and Grounds, OPTION Repair GOV. Prop. damaged by 3rd Party

CPFF

OPTION YEAR 1 - (CPFF-LOE) All management, supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, equipment, and vehicles associated with the repair of property damage caused by third parties.

OPTION PHASE IN/PHASE OUT PLAN

FFP

OPTION YEAR 1 - Phase In/Phase Out effort as set forth in Exhibit 7 to be

OPTION Contractor Acquired Property (CAP)

FFP

OPTION YEAR 1 - All contractor provided propety utlized in the performance of

OPTION Contractor Manpower Reporting

FFP

OPTION YEAR 1 - Contractor Manpower Reporting as set forth in Paragraph 3.3 of the Overarching PWS. IAW AFARS 5137.9101, Contracting officers shall ensure that the requirement to report contractor manpower is included in all contracts, task/delivery orders and modifications. The Contractor Manpower Reporting application is available via the Internet at www.ecmra.mil

OPTION Contract Data Requirements List (CDRL)

OPTION YEAR 1 - IAW Paragraph 6.0 in the Overarching PWS - The purpose of the CDRL is to provide a standardized method of clearly and unambiguously delineating the Government’s minimum essential data needs. FAR 27.401 reference theterm "technical data and computer software", however, DFAR subpart

215.470 Installation Support Services (ISS) CDRLsInfo Paperrequires the use of

OPTION Environmental Services

FFP

OPTION YEAR 1- All direct supervision, labor, administrative support, materials, and other direct costs associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, OPTION Material -Environmental Services

COST

OPTION YEAR 2- All materials associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in

OPTION Program Management

FFP

OPTION YEAR 2- All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Program Management requirements as defined in the Overarching PWS and

OPTION Supply Operations

FFP

OPTION YEAR 2 - All direct supervision, labor, material, administrative support, and other direct costs associated with the Management of supply operations to include receipt, stocking, inventory, and distribution of supplies and materialsof the

OPTION Replenishment of Gov.Furnished Material

FFP

OPTION YEAR 2 - Includes the restocking of the Government furnished material

OPTION Facilities Engineering Services

FFP

OPTION YEAR - (Attachment 1) All direct supervision, labor, administrative support, other direct costs, material, tools, equipment, and vehicles costs associated with Facilities Engineering Services (CLS 400), work in the performance of the

OPTION Landfill Operations

FFP

OPTION YEAR 2 - IAW CLS 403, All management, supervision, personnel, OPTION Pavement Clearance Operations

CPFF

OPTION YEAR 2 - (CPFF-LOE) IAW CLS 403, All direct supervision, labor, OPTION Material Pavement Clearance

FFP

OPTION YEAR 2 - IAW CLS 403, All material, tools, equipment, and vehicles

OPTION Heating-Cooling Utility Services

FFP

OPTION YEAR 2 - All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with

OPTION Preventative Maintenance Orders, PMO

CPFF

OPTION YEAR 2 - (CPFF-LOE) Labor and ODC All direct supervision, labor, administrative support, and other direct costs associated with work in the

OPTION Material Preventative Maintenance Orders

COST

OPTION YEAR 2 - All material, tools, equipment, and vehicles costs associated

OPTION Demand Maintenance Orders, DMO

FFP

OPTION YEAR 2 - All management, supervision, personnel, labor, administrative support, and other direct costs associated with Demand Maintenance work in the

2013AA

OPTION Capability Level 1 18,000 - 20,000 DMOs

FFP

OPTION YEAR 2 - DMO Annual Range from 18,000 min to 20,000 max during

2013AB

OPTION Capability Level 2 20,001 - 22,000 DMOs

FFP

OPTION YEAR 2 - DMO Annual Range from 20,001 min to 22,000 max during

2013AC

OPTION Capability Level 3 22,001 - 24,000 DMOs

FFP

BASE PERIOD - DMO Annual Range from 22,001 min to 24,000 max during base

2013AD

OPTION Capability Level 4 24,001 - 26,000 DMOs

FFP

OPTION YEAR 2 - DMO Annual Range from 24,001 min to 26,000 max during

2013AE

OPTION Capability Level 5 26,001 - 28,000 DMOs

FFP

OPTION YEAR 2 - DMO Annual Range from 26,001 min to 28,000 max during

2013AF

OPTION Capability Level 6 28,001 - 30,000 DMOs

FFP

OPTION YEAR 2 - DMO Annual Range from 28,001 min to 30,000 max during

OPTION Material Demand Maintenance Orders

COST

OPTION YEAR 2 - All material, tools, equipment, and vehicles associated with

OPTION Maintenance and Repair for UPWO's

CPFF

OPTION YEAR 2 - (CPFF-LOE) All direct supervision, labor, administrative support, and other direct costs associated with Maintenance & Repair work in the

OPTION Material Mantenance and Repair for UPWO

COST

OPTION YEAR 2 - All material, tools, equipment, and vehicles costs associated

OPTION M&R for PWO's and Sustainment Projects

FFP

OPTION YEAR 2 - Maintenance and Repair - All management, supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, equipment, and vehicles associated with M&R Water, Waste Water, Electrical, Steam, and Gas Systems, Buildings and Structures, Roads and Grounds, OPTION Repair GOV. Prop. damaged by 3rd Party

CPFF

OPTION YEAR 2 - (CPFF-LOE) All management, supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, OPTION PHASE IN/PHASE OUT PLAN

FFP

OPTION YEAR 2 - Phase In/Phase Out effort as set forth in Exhibit 7 to be

OPTION Contractor Acquired Property (CAP)

FFP

OPTION YEAR 2 - All contractor provided propety utlized in the performance of

OPTION Contractor Manpower Reporting

FFP

OPTION YEAR 2 - Contractor Manpower Reporting as set forth in Paragraph 3.3 of the Overarching PWS. IAW AFARS 5137.9101, Contracting officers shall ensure that the requirement to report contractor manpower is included in all

OPTION YEAR 2 - IAW Paragraph 6.0 in the Overarching PWS - The purpose of delineating the Government’s minimum essential data needs. FAR 27.401 reference theterm "technical data and computer software", however, DFAR subpart

215.470 Installation Support Services (ISS) CDRLsInfo Paperrequires the use of

OPTION Environmental Services

FFP

OPTION YEAR 3- All direct supervision, labor, administrative support, materials, and other direct costs associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, OPTION Material -Environmental Services

COST

OPTION YEAR 3- All materials associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in

OPTION Program Management

FFP

OPTION YEAR 3- All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Program Management requirements as defined in the Overarching PWS and

OPTION Supply Operations

FFP

OPTION YEAR 3 - All direct supervision, labor, material, administrative support, and other direct costs associated with the Management of supply operations to include receipt, stocking, inventory, and distribution of supplies and materialsof the

OPTION Replenishment of Gov.Furnished Material

FFP

OPTION YEAR 3 - Includes the restocking of the Government furnished material

OPTION Facilities Engineering Services

FFP

OPTION YEAR - (Attachment 1) All direct supervision, labor, administrative support, other direct costs, material, tools, equipment, and vehicles costs associated with Facilities Engineering Services (CLS 400), work in the performance of the

OPTION Landfill Operations

FFP

OPTION YEAR 3 - IAW CLS 403, All management, supervision, personnel, OPTION Pavement Clearance Operations

CPFF

OPTION YEAR 3 - (CPFF-LOE) IAW CLS 403, All direct supervision, labor, OPTION Material Pavement Clearance

FFP

OPTION YEAR 3 - IAW CLS 403, All material, tools, equipment, and vehicles

OPTION Heating-Cooling Utility Services

FFP

OPTION YEAR 3 - All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with

OPTION Preventative Maintenance Orders, PMO

CPFF

OPTION YEAR 3 - (CPFF-LOE) Labor and ODC All direct supervision, labor, administrative support, and other direct costs associated with work in the

OPTION Material Preventative Maintenance Orders

COST

OPTION YEAR 3 - All material, tools, equipment, and vehicles costs associated

OPTION Demand Maintenance Orders, DMO

FFP

OPTION YEAR 3 - All management, supervision, personnel, labor, administrative support, and other direct costs associated with Demand Maintenance work in the

3013AA

OPTION Capability Level 1 18,000 - 20,000 DMOs

FFP

OPTION YEAR 3 - DMO Annual Range from 18,000 min to 20,000 max during

3013AB

OPTION Capability Level 2 20,001 - 22,000 DMOs

FFP

OPTION YEAR 3 - DMO Annual Range from 20,001 min to 22,000 max during

3013AC

OPTION Capability Level 3 22,001 - 24,000 DMOs

FFP

BASE PERIOD - DMO Annual Range from 22,001 min to 24,000 max during base

3013AD

OPTION Capability Level 4 24,001 - 26,000 DMOs

FFP

OPTION YEAR 3 - DMO Annual Range from 24,001 min to 26,000 max during

3013AE

OPTION Capability Level 5 26,001 - 28,000 DMOs

FFP

OPTION YEAR 3 - DMO Annual Range from 26,001 min to 28,000 max during

3013AF

OPTION Capability Level 6 28,001 - 30,000 DMOs

FFP

OPTION YEAR 3 - DMO Annual Range from 28,001 min to 30,000 max during

OPTION Material Demand Maintenance Orders

COST

OPTION YEAR 3 - All material, tools, equipment, and vehicles associated with

OPTION Maintenance and Repair for UPWO's

CPFF

OPTION YEAR 3 - (CPFF-LOE) All direct supervision, labor, administrative support, and other direct costs associated with Maintenance & Repair work in the

OPTION Material Mantenance and Repair for UPWO

COST

OPTION YEAR 3 - All material, tools, equipment, and vehicles costs associated

OPTION M&R for PWO's and Sustainment Projects

FFP

OPTION YEAR 3 - Maintenance and Repair - All management, supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, equipment, and vehicles associated with M&R Water, Waste Water, Electrical, Steam, and Gas Systems, Buildings and Structures, Roads and Grounds, of work as deined in Attachments 1-6 where mentioned.

OPTION Repair GOV. Prop. damaged by 3rd Party

CPFF

OPTION YEAR 3 - (CPFF-LOE) All management, supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, OPTION PHASE IN/PHASE OUT PLAN

FFP

OPTION YEAR 3 - Phase In/Phase Out effort as set forth in Exhibit 7 to be

OPTION Contractor Acquired Property (CAP)

FFP

OPTION YEAR 3 - All contractor provided propety utlized in the performance of

OPTION Contractor Manpower Reporting

FFP

OPTION YEAR 3 - Contractor Manpower Reporting as set forth in Paragraph 3.3 of the Overarching PWS. IAW AFARS 5137.9101, Contracting officers shall ensure that the requirement to report contractor manpower is included in all

OPTION YEAR 3 - IAW Paragraph 6.0 in the Overarching PWS - The purpose of delineating the Government’s minimum essential data needs. FAR 27.401 reference theterm "technical data and computer software", however, DFAR subpart

215.470 Installation Support Services (ISS) CDRLsInfo Paperrequires the use of

OPTION Environmental Services

FFP

OPTION YEAR 4- All direct supervision, labor, administrative support, materials, and other direct costs associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, OPTION Material -Environmental Services

COST

OPTION YEAR 4- All materials associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in

OPTION Program Management

FFP

OPTION YEAR 4- All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Program Management requirements as defined in the Overarching PWS and

OPTION Supply Operations

FFP

OPTION YEAR 4 - All direct supervision, labor, material, administrative support, and other direct costs associated with the Management of supply operations to include receipt, stocking, inventory, and distribution of supplies and materialsof the

OPTION Replenishment of Gov.Furnished Material

FFP

OPTION YEAR 4 - Includes the restocking of the Government furnished material

OPTION Facilities Engineering Services

FFP

OPTION YEAR - (Attachment 1) All direct supervision, labor, administrative support, other direct costs, material, tools, equipment, and vehicles costs associated with Facilities Engineering Services (CLS 400), work in the performance of the

OPTION Landfill Operations

FFP

OPTION YEAR 4 - IAW CLS 403, All management, supervision, personnel, OPTION Pavement Clearance Operations

CPFF

OPTION YEAR 4 - (CPFF-LOE) IAW CLS 403, All direct supervision, labor, OPTION Material Pavement Clearance

FFP

OPTION YEAR 4 - IAW CLS 403, All material, tools, equipment, and vehicles

OPTION Heating-Cooling Utility Services

FFP

OPTION YEAR 4 - All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with

OPTION Preventative Maintenance Orders, PMO

CPFF

OPTION YEAR 4 - (CPFF-LOE) Labor and ODC All direct supervision, labor, administrative support, and other direct costs associated with work in the

OPTION Material Preventative Maintenance Orders

COST

OPTION YEAR 4 - All material, tools, equipment, and vehicles costs associated

OPTION Demand Maintenance Orders, DMO

FFP

OPTION YEAR 4 - All management, supervision, personnel, labor, administrative support, and other direct costs associated with Demand Maintenance work in the

4013AA

OPTION Capability Level 1 18,000 - 20,000 DMOs

FFP

OPTION YEAR 4 - DMO Annual Range from 18,000 min to 20,000 max during

4013AB

OPTION Capability Level 2 20,001 - 22,000 DMOs

FFP

OPTION YEAR 4 - DMO Annual Range from 20,001 min to 22,000 max during

4013AC

OPTION Capability Level 3 22,001 - 24,000 DMOs

FFP

BASE PERIOD - DMO Annual Range from 22,001 min to 24,000 max during base

4013AD

OPTION Capability Level 4 24,001 - 26,000 DMOs

FFP

OPTION YEAR 4 - DMO Annual Range from 24,001 min to 26,000 max during

4013AE

OPTION Capability Level 5 26,001 - 28,000 DMOs

FFP

OPTION YEAR 4 - DMO Annual Range from 26,001 min to 28,000 max during

4013AF

OPTION Capability Level 6 28,001 - 30,000 DMOs

FFP

OPTION YEAR 4 - DMO Annual Range from 28,001 min to 30,000 max during

OPTION Material Demand Maintenance Orders

COST

OPTION YEAR 4 - All material, tools, equipment, and vehicles associated with

OPTION Maintenance and Repair for UPWO's

CPFF

OPTION YEAR 4 - (CPFF-LOE) All direct supervision, labor, administrative support, and other direct costs associated with Maintenance & Repair work in the

OPTION Material Mantenance and Repair for UPWO

COST

OPTION YEAR 4 - All material, tools, equipment, and vehicles costs associated

OPTION M&R for PWO's and Sustainment Projects

FFP

OPTION YEAR 4 - Maintenance and Repair - All management, supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, equipment, and vehicles associated with M&R Water, Waste Water, Electrical, Steam, and Gas Systems, Buildings and Structures, Roads and Grounds, OPTION Repair GOV. Prop. damaged by 3rd Party

CPFF

OPTION YEAR 4 - (CPFF-LOE) All management, supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, OPTION PHASE IN/PHASE OUT PLAN

FFP

OPTION YEAR 4 - Phase In/Phase Out effort as set forth in Exhibit 7 to be

OPTION Contractor Acquired Property (CAP)

FFP

OPTION YEAR 4 - All contractor provided propety utlized in the performance of

OPTION Contractor Manpower Reporting

FFP

OPTION YEAR 4 - Contractor Manpower Reporting as set forth in Paragraph 3.3 of the Overarching PWS. IAW AFARS 5137.9101, Contracting officers shall ensure that the requirement to report contractor manpower is included in all

OPTION YEAR 4 - IAW Paragraph 6.0 in the Overarching PWS - The purpose of delineating the Government’s minimum essential data needs. FAR 27.401 reference theterm "technical data and computer software", however, DFAR subpart

215.470 Installation Support Services (ISS) CDRLsInfo Paperrequires the use of

OPTION Environmental Services

FFP

OPTION YEAR 5- All direct supervision, labor, administrative support, materials, and other direct costs associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, OPTION Material -Environmental Services

COST

OPTION YEAR 5- All materials associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in

OPTION Program Management

FFP

OPTION YEAR 5- All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Program Management requirements as defined in the Overarching PWS and

OPTION Supply Operations

FFP

OPTION YEAR 5 - All direct supervision, labor, material, administrative support, and other direct costs associated with the Management of supply operations to include receipt, stocking, inventory, and distribution of supplies and materialsof the

OPTION Replenishment of Gov.Furnished Material

FFP

OPTION YEAR 5 - Includes the restocking of the Government furnished material

OPTION Facilities Engineering Services

FFP

OPTION YEAR - (Attachment 1) All direct supervision, labor, administrative support, other direct costs, material, tools, equipment, and vehicles costs associated with Facilities Engineering Services (CLS 400), work in the performance of the

OPTION Landfill Operations

FFP

OPTION YEAR 5 - IAW CLS 403, All management, supervision, personnel, OPTION Pavement Clearance Operations

CPFF

OPTION YEAR 5 - (CPFF-LOE) IAW CLS 403, All direct supervision, labor, OPTION Material Pavement Clearance

FFP

OPTION YEAR 5 - IAW CLS 403, All material, tools, equipment, and vehicles

OPTION Heating-Cooling Utility Services

FFP

OPTION YEAR 5 - All management, supervision, personnel, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with

OPTION Preventative Maintenance Orders, PMO

CPFF

OPTION YEAR 5 - (CPFF-LOE) Labor and ODC All direct supervision, labor, administrative support, and other direct costs associated with work in the

OPTION Material Preventative Maintenance Orders

COST

OPTION YEAR 5 - All material, tools, equipment, and vehicles costs associated

OPTION Demand Maintenance Orders, DMO

FFP

OPTION YEAR 5 - All management, supervision, personnel, labor, administrative support, and other direct costs associated with Demand Maintenance work in the

5013AA

OPTION Capability Level 1 18,000 - 20,000 DMOs

FFP

OPTION YEAR 5 - DMO Annual Range from 18,000 min to 20,000 max during

5013AB

OPTION Capability Level 2 20,001 - 22,000 DMOs

FFP

OPTION YEAR 5 - DMO Annual Range from 20,001 min to 22,000 max during

5013AC

OPTION Capability Level 3 22,001 - 24,000 DMOs

FFP

BASE PERIOD - DMO Annual Range from 22,001 min to 24,000 max during base

5013AD

OPTION Capability Level 4 24,001 - 26,000 DMOs

FFP

OPTION YEAR 5 - DMO Annual Range from 24,001 min to 26,000 max during

5013AE

OPTION Capability Level 5 26,001 - 28,000 DMOs

FFP

OPTION YEAR 5 - DMO Annual Range from 26,001 min to 28,000 max during

5013AF

OPTION Capability Level 6 28,001 - 30,000 DMOs

FFP

OPTION YEAR 5 - DMO Annual Range from 28,001 min to 30,000 max during

OPTION Material Demand Maintenance Orders

COST

OPTION YEAR 5 - All material, tools, equipment, and vehicles associated with

OPTION Maintenance and Repair for UPWO's

CPFF

OPTION YEAR 5 - (CPFF-LOE) All direct supervision, labor, administrative support, and other direct costs associated with Maintenance & Repair work in the

OPTION Material Mantenance and Repair for UPWO

COST

OPTION YEAR 5 - All material, tools, equipment, and vehicles costs associated

OPTION M&R for PWO's and Sustainment Projects

FFP

OPTION YEAR 5 - Maintenance and Repair - All management, supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, equipment, and vehicles associated with M&R Water, Waste Water, Electrical, Steam, and Gas Systems, Buildings and Structures, Roads and Grounds, OPTION Repair GOV. Prop. damaged by 3rd Party

CPFF

OPTION YEAR 5 - (CPFF-LOE) All management, supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, OPTION PHASE IN/PHASE OUT PLAN

FFP

OPTION YEAR 5 - Phase In/Phase Out effort as set forth in Exhibit 7 to be

OPTION Contractor Acquired Property (CAP)

FFP

OPTION YEAR 5 - All contractor provided propety utlized in the performance of

OPTION Contractor Manpower Reporting

FFP

OPTION YEAR 5 - Contractor Manpower Reporting as set forth in Paragraph 3.3 of the Overarching PWS. IAW AFARS 5137.9101, Contracting officers shall ensure that the requirement to report contractor manpower is included in all

OPTION YEAR 5 - IAW Paragraph 6.0 in the Overarching PWS - The purpose of delineating the Government’s minimum essential data needs. FAR 27.401 reference theterm "technical data and computer software", however, DFAR subpart

215.470 Installation Support Services (ISS) CDRLsInfo Paperrequires the use of

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Alt I Restrictions On Subcontractor Sales To The Government

(Sep 2006) -- Alternate I

OCT 1995

52.203-7 Anti-Kickback Procedures MAY 2014 52.203-14 Display of Hotline Poster(s) OCT 2015 52.204-2 Security Requirements AUG 1996 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.208-4 Vehicle Lease Payments APR 1984 52.208-5 Condition of Leased Vehicles APR 1984 52.208-6 Marking of Leased Vehicles APR 1984 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.211-15 Defense Priority And Allocation Requirements APR 2008 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--

Modifications

AUG 2011

52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications OCT 2010 52.215-14 Integrity of Unit Prices OCT 2010 52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-17 Waiver of Facilities Capital Cost of Money OCT 1997 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits

(PRB) Other than Pensions

JUL 2005

52.215-20 Alt IV Requirements for Certified Cost or Pricing Data or Information Other Than Certified Cost or Pricing Data (Oct 2010) - Alternate IV

OCT 2010

52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications

OCT 2010

52.215-23 Limitations on Pass-Through Charges OCT 2009 52.216-7 Allowable Cost And Payment AUG 2018 52.217-8 Option To Extend Services NOV 1999 52.217-9 Option To Extend The Term Of The Contract MAR 2000 52.219-8 Utilization of Small Business Concerns OCT 2018 52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime

Compensation

MAY 2018

52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records AUG 2018 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-16 Approval of Wage Rates MAY 2014 52.222-17 Nondisplacement of Qualified Workers MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-23 Notice of Requirement for Affirmative Action to Ensure

Equal Employment Opportunity for Construction

FEB 1999

52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-30 Construction Wage Rate Requirements--Price Adjustment (None or Separately Specified Method)

AUG 2018

52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-41 Service Contract Labor Standards AUG 2018 52.222-42 Statement Of Equivalent Rates For Federal Hires MAY 2014 52.222-43 Fair Labor Standards Act And Service Contract Labor

Standards - Price Adjustment (Multiple Year And Option Contracts)

AUG 2018

52.222-54 Employment Eligibility Verification OCT 2015 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-10 Waste Reduction Program MAY 2011 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration

Equipment and Air Conditioners.

JUN 2016

52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007 52.223-16 Acquisition of EPEAT (R) - Registered Personal Computer

Products

OCT 2015

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.223-19 Compliance with Environmental Management Systems MAY 2011 52.224-1 Privacy Act Notification APR 1984 52.224-2 Privacy Act APR 1984 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

AUG 2018

52.226-1 Utilization Of Indian Organizations And Indian-Owned Economic Enterprises

JUN 2000

52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-14 Rights in Data--General MAY 2014 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-8 Liability and Insurance - Leased Motor Vehicles MAY 1999 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-9 Limitation On Withholding Of Payments APR 1984 52.232-11 Extras APR 1984 52.232-17 Interest MAY 2014 52.232-18 Availability Of Funds APR 1984 52.232-20 Limitation Of Cost APR 1984 52.232-22 Limitation Of Funds APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-25 Prompt Payment JAN 2017

52.232-33 Payment by Electronic Funds Transfer--System for Award Management

OCT 2018

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-5 Material and Workmanship APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.237-2 Protection Of Government Buildings, Equipment, And Vegetation

APR 1984

52.237-3 Continuity Of Services JAN 1991 52.237-10 Identification of Uncompensated Overtime MAR 2015 52.242-1 Notice of Intent to Disallow Costs APR 1984 52.242-3 Penalties for Unallowable Costs MAY 2014 52.242-4 Certification of Final Indirect Costs JAN 1997 52.242-13 Bankruptcy JUL 1995 52.243-1 Alt II Changes--Fixed-Price (Aug 1987) - Alternate II APR 1984 52.243-7 Notification Of Changes JAN 2017 52.245-1 Government Property JAN 2017 52.245-2 Government Property Installation Operation Services APR 2012 52.245-9 Use And Charges APR 2012 52.245-9 Use And Charges APR 2012 52.246-20 Warranty Of Services MAY 2001 52.246-20 Warranty Of Services MAY 2001 52.246-25 Limitation Of Liability--Services FEB 1997 52.247-5 Familiarization With Conditions APR 1984 52.247-9 Agreed Weight - General Freight APR 1984 52.247-10 Net Weight - General Freight APR 1984 52.247-11 Net Weight - Household Goods or Office Furniture APR 1984 52.247-12 Supervision, Labor, or Materials APR 1984 52.247-13 Accessorial Services - Moving Contracts APR 1984 52.247-14 Contractor Responsibility for Receipt of Shipment APR 1984 52.247-15 Contractor Responsibility for Loading and Unloading APR 1984 52.247-16 Contractor Responsibility for Returning Undelivered Freight APR 1984 52.247-17 Charges APR 1984 52.248-1 Value Engineering OCT 2010 52.249-2 Termination For Convenience Of The Government (Fixed-

Price)

APR 2012

52.249-6 Termination (Cost Reimbursement) MAY 2004 52.249-8 Default (Fixed-Price Supply & Service) APR 1984 52.251-1 Government Supply Sources APR 2012 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7002 Disclosure Of Ownership Or Control By A Foreign

Government

JUN 2010

252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.215-7009 Proposal Adequacy Checklist JAN 2014 252.219-7011 Notification to Delay Performance JUN 1998 252.223-7001 Hazard Warning Labels DEC 1991 252.223-7002 Safety Precautions For Ammunition And Explosives MAY 1994

252.223-7003 Changes In Place Of Performance--Ammunition And Explosives

DEC 1991

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

DEC 2018

252.232-7004 DOD Progress Payment Rates OCT 2014 252.232-7007 Limitation Of Government's Obligation APR 2014 252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.237-7023 Continuation of Essential Contractor Services OCT 2010 252.237-7024 Notice of Continuation of Essential Contractor Services. OCT 2010 252.241-7001 Government Access DEC 1991 252.242-7005 Contractor Business Systems FEB 2012 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.245-7000 Government-Furnished Mapping, Charting, and Geodesy

Property

APR 2012

252.245-7001 Tagging, Labeling, and Marking of Government-Furnished Property

APR 2012

252.245-7002 Reporting Loss of Government Property DEC 2017 252.245-7003 Contractor Property Management System Administration APR 2012 252.245-7004 Reporting, Reutilization, and Disposal DEC 2017 252.251-7000 Ordering From Government Supply Sources AUG 2012

Section J - List of Documents, Exhibits and Other Attachments

ATTACHMENT LIST

Over arching PWS

PWS November 13 2019 r3 25Mar20.docx

Technical Exhibits

Tech Ex 02 ‐ Historical Workload Data 10 Sep 19.pdf

Tech Ex 03 ‐ Real Property Assets 10 Sep 19.pdf

Tech Ex 04 ‐ Wage Rate Requirements Shop 4 Oct 19.pdf

Tech Ex 05 ‐ Form DD 254 10 Sep 19.pdf

Tech Ex 06 ‐ Gov Facilities Assigned to Contractor 10 Sep 19.pdf

Tech Ex 07 ‐ Phase‐in Phase‐Out Plan 10 Sep 19.pdf

Tech Ex 08 ‐ Supported Organizations 10 Sep 19.pdf

Tech Ex 09 ‐ RSA Historic Property List 10 Sep 19.pdf

Tech Ex 10 ‐ Facilities with Niagra or JACE Controls 10 Sep 19.pdf

Tech Ex 12 ‐ PM Frequency Tables 10 Sep 19.pdf

Tech Ex 13 ‐ Preventative Maintenance Task Sheet 10 Sep 19.pdf

Tech Ex 14 ‐ MDA‐FBI Bldgs at CL1 10 Sep 19.pdf

Tech Ex 15 ‐ BUILDER Program Data 10 Sep 19.pdf

Tech Ex 16 ‐ Pavement‐Drainage MaintenanceZoneMap 10 Sep 19.pdf

Tech Ex 17 ‐ Bldg Component…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .