Tech Exhibit 11 - CDRLs 17-20 22Apr2020.pdf

PDF 264 KB Posted

Attached to
Installation Support Services to the US Army Garrison-Redstone
Solicitation number
W9124P-20-R-0007
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) and details of a federal contract opportunity for Installation Support Services at Redstone Arsenal. The CDRL outlines reporting requirements for the contract, including monthly damage reports, a phase-in/phase-out plan, contract manpower reports, and revisions to government documents. Reports are to be submitted electronically in Microsoft Word format to the Contracting Officer and requiring offices. The opportunity notice is for a draft RFP seeking installation support services for facilities and utilities maintenance, supply operations, transportation, and administration at Redstone Arsenal and tenant offices. Questions must be submitted by email to the listed point of contact by the specified due date. The services will support the Army Aviation and Missile Command, Program Executive Offices, Marshall Space Flight Center, and other agencies located on the arsenal.

View the file

Other files

File Type Posted
Tech Exhibit 11 - CDRLs 69-72 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 41-44 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 29-32 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 73 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 53-56 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 33-36 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 21-24 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 45-48 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 57-60 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 37-40 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 61-64 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 49-52 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 25-28 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 65-68 22Apr2020.pdf PDF
Tech Ex 15 - BUILDER Program Data 10 Sep 19 _1.pdf PDF
Tech Ex 15 - BUILDER Program Data 10 Sep 19 _2.pdf PDF
Tech Ex 15 - BUILDER Program Data 10 Sep 19 _3.pdf PDF
Tech Ex 15 - BUILDER Program Data 10 Sep 19 _4.pdf PDF
Tech Exhibit 11 - DRAFT v1 CDRLs 9-12.pdf PDF
Tech Exhibit 11 - DRAFT v1 CDRLs 13-16.pdf PDF
Government Responses to Draft RFP Industry Questions_26Apr2020.xlsx XLSX spreadsheet
Tech Exhibit 11 - DRAFT v1 - CDRLs 5-8.pdf PDF
Tech Exhibit 11 DRAFT v1- CDRLs 1-4.pdf PDF
Tech Ex 14 Rev 1- MDA-FBI Bldgs at CL1 15Apr20.pdf PDF
Tech Ex 16 - Pavement-Drainage MaintenanceZoneMap 10 Sep 19.pdf PDF
Tech Ex 20 - Generator Testing Refusal Memo 10 Sep 19.pdf PDF
Tech Ex 37 - Septic Tanks_Lift Stations 10 Sep 19.pdf PDF
Tech Ex 29 - Utility Meter Count 10 Sep 19.pdf PDF
Tech Ex 19 - Generator List 10 Sep 19.pdf PDF
ISS Questions and Response 10 Apr 20.xlsx XLSX spreadsheet
Tech Ex 50 - Gov Furnished Equipment List 10 Sep 19.pdf PDF
Tech Ex 04 - Wage Rate Requirements Shop 4 Oct 19.pdf PDF
Tech Ex 13 - Preventative Maintenance Task Sheet 10 Sep 19.pdf PDF
Tech Ex 42 - Central Plants 10 Sep 19.pdf PDF
Tech Ex 26 - IMRE-PW (EIP Ref Recvry) Form 1 10 Sep 19.pdf PDF
Tech Ex 14 - MDA-FBI Bldgs at CL1 10 Sep 19.pdf PDF
Attachment 3 411 Facility Maintenence Vertical NS FY21 10Oct19 r3 26Mar2....docx DOCX document
Attachment 2 408 Pavement Clearance NS FY21 10Oct19 r3 9Apr2020.docx DOCX document
PWS November 13 2019 r5 9Apr20.docx DOCX document
Tech Ex 02 - Historical Workload Data 10 Sep 19.pdf PDF
Tech Ex 10 - Facilities with Niagra or JACE Controls 10 Sep 19.pdf PDF
Tech Ex 55 - Hydrdants 11 Sep 19.pdf PDF
Attachment 6 505 Environmental Compliance Svs NS FY21 10Oct19 r4 9Apr20.....docx DOCX document
Tech Ex 52 - Ice-Snow Plan 10 Sep 19.pdf PDF
Tech Ex 18 - Cooking Exhaust Systems List 10 Sep 19.pdf PDF
Tech Ex 17 - Bldg Component Checklist 10 Sep 19.pdf PDF
Tech Ex 21 - Cranes and Hoists 10 Sep 19.pdf PDF
Attachment 5 501 Heating Cooling NS FY21 10Oct19 r3 9Apr2020 - Ryan Edi.....docx DOCX document
Tech Ex 22 - Elevators 10 Sep 19.pdf PDF
Tech Ex 28 - Giant Voice Location Map-Bldg Notification Systems List 10 Sep 19.pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423, AUG 96

CONTRACT DATA REQUIREMENTS LIST

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.

DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;

Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423 (BACK), AUG 96

addr1_1:
draft1_1: 0
reg1_1: 1
repro1_1: 0
addr1_2: COR
draft1_2: 0
reg1_2: 1
repro1_2: 0
addr1_3:
draft1_3:
reg1_3:
repro1_3:
draft2_1: 0
addr2_1: KO
addr2_2: COR
reg2_1: 1
repro2_1: 0
addr2_3:
draft2_3:
reg2_3:
repro2_3:
addr3_1: COR
addr3_2:
addr3_3:
draft3_1: 0
reg3_1: 1
repro3_1: 0
draft3_2:
reg3_2:
repro3_2:
draft3_3:
reg3_3:
repro3_3:
addr4_1: KO
draft4_1: 0
reg4_1: 1
repro4_1: 0
addr4_2: ALL CORs
draft4_2: 0
reg4_2: 1
repro4_2: 0
addr4_3:
draft4_3:
reg4_3:
repro4_3:
draft2_2: 0
repro2_2: 0
reg2_2: 1
line_item:
exhibit: TE 11
xtdp: Off
xtm: Off
othercat:
system:
ctr_no: PR 11405440
contr:
data_item1: 017
title1: Technical Report–Study/Services
sub1: Monthly Damage Report
auth1: DI-MISC-80508B
ref1: C.3.1.1.1.2
req_ofc1: CCAM-CAD-C; IMRE-PW
dd250_1: No
appcode1: Yes
dist1: A
freq1: MONTHLY
asof1: 1/30/2020
firstsub1: 30 DACA
subsub1: MONTHLY
group1:
totalprice1:
rmks1: Provide 1 Electronic Copy in Microsoft Word format.
totaldraft1: 0
totalreq1: 2
totalrepro1: 0
data_item2: 018
title2: Phase-In/Out Plan
sub2: Transition Phase In/Phase Out
auth2: DI-SESS-82303 / DI-MGMT-81945
ref2: C.3.2
req_ofc2: CCAM-CAD-C; IMRE-PW
dd250_2: No
appcode2: Yes
dist2: A
freq2: N/A
asof2: 1/30/2020
firstsub2: 2 DACA
subsub2: N/A
rmks2: Provide 1 Electronic Copy in Microsoft Word format within two (2) days of contract award.
group2:
totalprice2:
totaldraft2: 0
totalreg2: 2
totalrepro2: 0
data_item3: 019
title3: Technical Report–Study/Services
sub3: Contract Manpower Reporting
auth3: DI-MISC-80508B
ref3: C.3.3.1
req_ofc3: CCAM-CAD-C; IMRE-PW
dd250_3: No
appcode3: Yes
dist3: A
freq3: SEE BLK 16
asof3: 1/30/2020
firstsub3: SEE BLK 16
subsub3: SEE BLK 16
rmks3: Provide 1 electronic copy Via website IAW requirements at https://armycmra.dmdc.osd.mil.
group3:
totalprice3:
totaldraft3: 0
totalreg3: 1
totalrepro3: 0
data_item4: 020
title4: Revisions to Existing Government Documents
sub4: Dispute Contingency Plan
auth4: DI-ADMN-80925A
ref4: C.2.4.6.8
req_ofc4: CCAM-CAD-C; IMRE-PW
dd250_4: No
appcode4: Yes
dist4: A
freq4: SEE BLK 16
asof4: 1/30/2020
firstsub4: 30 DACA
subsub4: SEE BLK 16
rmks4: Initial roster shall be provided within 30 days of contract award.

Provide 1 Electronic Copy in Microsoft Word format.

group4:
totalprice4:
totaldraft4: 0
totalreg4: 2
totalrepro4: 0
prep_by: Ryan W. Best
2020-02-14T10:44:00-0600
BEST.RYAN.W.1387568642
prep_date: 1/30/2020
app_by: DONALD E. TATUM
2020-04-22T12:51:25-0500
TATUM.DONALD.EDWIN.1112080240
app_date: 22 Apr 20
Page: 5
pages: 19
app: Adobe Professional 8.0
Reset:

File details come from the government source that posted it. Updated .