Tech Ex 42 - Central Plants 10 Sep 19.pdf

PDF 2 MB Posted

Attached to
Installation Support Services to the US Army Garrison-Redstone
Solicitation number
W9124P-20-R-0007
Issued by

About this file

This document contains information on existing heating and cooling equipment across multiple buildings located on Redstone Arsenal in Alabama, as well as details of a draft request for proposal for installation support services at the U.S. Army Garrison located at Redstone Arsenal.

The first section lists existing steam boilers and chilled water chillers by building, including nomenclature, capacity in pounds per hour, and relevant comments. The second section describes a draft RFP seeking proposals for a non-personal services contract to provide installation support services to the U.S. Army Garrison at Redstone Arsenal and its tenant offices. Required services include maintenance of equipment and facilities, operations and maintenance of utility systems, supply operations, transportation, and administration. The contractor shall perform to standards specified in the attached performance work statement. Questions regarding the presolicitation must be submitted by email to the specified point of contact by the listed email address, with no other form of communication accepted.

View the file

Other files

File Type Posted
Tech Exhibit 11 - CDRLs 69-72 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 17-20 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 41-44 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 29-32 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 73 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 53-56 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 33-36 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 21-24 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 45-48 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 57-60 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 37-40 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 61-64 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 49-52 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 25-28 22Apr2020.pdf PDF
Tech Exhibit 11 - CDRLs 65-68 22Apr2020.pdf PDF
Tech Ex 15 - BUILDER Program Data 10 Sep 19 _1.pdf PDF
Tech Ex 15 - BUILDER Program Data 10 Sep 19 _2.pdf PDF
Tech Ex 15 - BUILDER Program Data 10 Sep 19 _3.pdf PDF
Tech Ex 15 - BUILDER Program Data 10 Sep 19 _4.pdf PDF
Tech Exhibit 11 - DRAFT v1 CDRLs 9-12.pdf PDF
Tech Exhibit 11 - DRAFT v1 CDRLs 13-16.pdf PDF
Government Responses to Draft RFP Industry Questions_26Apr2020.xlsx XLSX spreadsheet
Tech Exhibit 11 - DRAFT v1 - CDRLs 5-8.pdf PDF
Tech Exhibit 11 DRAFT v1- CDRLs 1-4.pdf PDF
Tech Ex 14 Rev 1- MDA-FBI Bldgs at CL1 15Apr20.pdf PDF
Tech Ex 16 - Pavement-Drainage MaintenanceZoneMap 10 Sep 19.pdf PDF
Tech Ex 20 - Generator Testing Refusal Memo 10 Sep 19.pdf PDF
Tech Ex 37 - Septic Tanks_Lift Stations 10 Sep 19.pdf PDF
Tech Ex 29 - Utility Meter Count 10 Sep 19.pdf PDF
Tech Ex 19 - Generator List 10 Sep 19.pdf PDF
ISS Questions and Response 10 Apr 20.xlsx XLSX spreadsheet
Tech Ex 50 - Gov Furnished Equipment List 10 Sep 19.pdf PDF
Tech Ex 04 - Wage Rate Requirements Shop 4 Oct 19.pdf PDF
Tech Ex 13 - Preventative Maintenance Task Sheet 10 Sep 19.pdf PDF
Tech Ex 26 - IMRE-PW (EIP Ref Recvry) Form 1 10 Sep 19.pdf PDF
Tech Ex 14 - MDA-FBI Bldgs at CL1 10 Sep 19.pdf PDF
Attachment 3 411 Facility Maintenence Vertical NS FY21 10Oct19 r3 26Mar2....docx DOCX document
Attachment 2 408 Pavement Clearance NS FY21 10Oct19 r3 9Apr2020.docx DOCX document
PWS November 13 2019 r5 9Apr20.docx DOCX document
Tech Ex 02 - Historical Workload Data 10 Sep 19.pdf PDF
Tech Ex 10 - Facilities with Niagra or JACE Controls 10 Sep 19.pdf PDF
Tech Ex 55 - Hydrdants 11 Sep 19.pdf PDF
Attachment 6 505 Environmental Compliance Svs NS FY21 10Oct19 r4 9Apr20.....docx DOCX document
Tech Ex 52 - Ice-Snow Plan 10 Sep 19.pdf PDF
Tech Ex 18 - Cooking Exhaust Systems List 10 Sep 19.pdf PDF
Tech Ex 17 - Bldg Component Checklist 10 Sep 19.pdf PDF
Tech Ex 21 - Cranes and Hoists 10 Sep 19.pdf PDF
Attachment 5 501 Heating Cooling NS FY21 10Oct19 r3 9Apr2020 - Ryan Edi.....docx DOCX document
Tech Ex 22 - Elevators 10 Sep 19.pdf PDF
Tech Ex 28 - Giant Voice Location Map-Bldg Notification Systems List 10 Sep 19.pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This is a representative list of equipment as of date of publication and is subject to update as required

Bldg. Type (heating-H; cooling-C) Nomenclature/Capacity (LBS/HR) Comments

3775 H-Steam Boiler #1 / 3451

5494 H-Steam Boiler#1 / 2070

5540 H-Steam Boiler #1 / 5175

5661 H-Steam Boiler #1 / 1380 (layed up) Bldg. closed

7105 H-Steam Boiler #1 / 8625

H-Steam Boiler #2 / 8625

7153 H-Steam Boiler #1 / 6000

H-Steam Boiler #2 / 6000

7291 H-Steam Boiler #1 / 8625

H-Steam Boiler #2 / 2760

7668 H-Steam Boiler #1 / 20700

H-Steam Boiler #2 / 8625

H-Steam Boiler #3 / 8625

H-Steam Boiler #4 / 13800

7855 H-Steam Boiler #1 / 5175

H-Steam Boiler #2 / 5175

8028 H-Steam Boiler #1 / 2760

H-Steam Boiler #2 / 2760

8874 H-Steam Boiler #1 /2070

H-Steam Boiler #2 / 2020

8977 H-Steam Boiler #1 / 5175

H-Steam Boiler #2 / 3450

7549 H-Steam Boiler #1 / 2760

Technical Exhibit #42 Central Heating/Boiler Plants 10 Sep 19

H-Steam Boiler #2 / 1600

3316 C-Chilled Water Chiller#1 / 300 ton Centrifugal

C-Chilled Water Chiller #2 / 700 ton Centrifugal

C-Chilled Water Chiller #3 / 500 ton Centrifugal

Cont. Central Heating/Cooling Plants:

Bldg. Type (heating-H; cooling-C) Nomenclature/Capacity (LBS/HR) Comments

5306 H-Steam to Hot Water; C-chilled Water Chiller #1 /1400 Ton Centrifugal

Chiller #2 / 380 Ton Absorption

Chiller #3 / 380 Ton Absorption

Chiller #4 /800 Ton Absorption

Chiller #5 / 1050 Ton Absorption

5221 H-steam to Hot water; Gas to Hot

Water; C-Chilled Water Chiller #1 / 1050 Ton Centrifugal

Chiller #2 / 550 Ton Centrifugal

Chiller #3 / 550 Ton Centrifugal

Technical Exhibit #42 Central Heating/Boiler Plants 10 Sep 19

File details come from the government source that posted it. Updated .