DRAFT - IDIQ Pricing Table - NII - MEP LEP.xlsx
XLSX spreadsheet 99 KB Posted
- Attached to
- Request for Information (RFI) - Large-Scale Fixed Systems - Multi-Energy Portal and Low-Energy Portal
- Solicitation number
- 70B03C26R00000089
About this file
This is a draft IDIQ pricing table template for Customs and Border Protection's Multi-Energy Portal (MEP) and Low-Energy Portal (LEP) systems. The pricing template is structured as a standardized submission format with separate pricing tables for MEP and LEP configurations, each covering a base year plus four option years. The contract employs mixed pricing types including Firm Fixed Price (FFP), Firm Fixed Unit Price (FFUP), and Time & Materials (T&M) across multiple Contract Line Item Numbers (CLINs) organized by category: Equipment, Site Design, Civil Works, Furniture/Fixtures/Equipment, Installation, Training, Preventative Maintenance, Corrective Maintenance, Warranty Periods, and On-Demand Services. For equipment CLINs, contractors must provide unit pricing across tiered quantity brackets (less than 5 units, 5-10 units, 11-20 units, and more than 20 units) for both MEP and multiple LEP types. The template requires detailed cost breakdowns for labor categories including Program Management, Technical Trade, and Systems Design personnel, along with pricing for ancillary items such as command centers, power conditioning equipment, operator stations, and technology infrastructure components.
The instructions mandate that contractors complete pricing tables, justification tabs, and assumptions tabs electronically without altering the template structure, with all formulas and calculations verified for accuracy. Contractors are explicitly permitted to add sub-CLINs not listed if deemed necessary for comprehensive coverage and should omit sub-CLINs they deem inapplicable. The solicitation applies a phased approach requiring separate IDIQs for MEP and LEP, with government acknowledgment that some costs under existing contracts will be absorbed in light of the phased implementation. Proposals lacking complete Attachment 8 submissions will be deemed non-compliant. Evaluation criteria emphasize the accuracy, completeness, reasonableness, clarity, and validity of proposed pricing, justifications, and stated assumptions. A threaded comment notes that the IGCE summary must describe assumptions, bases, methods, and escalation rates applied to option years. This is currently a draft document, as indicated by the RFI status and the presence of incomplete formula references and unfinalized pricing.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 Summary (2)
| Contractor Name: | Summary Table | |
| Solicitation Number: | ||
| Task Order Number: | ||
| Task Order Title: | ||
| Base Period: | ||
| Option 1: | ||
| Option 2: | ||
| Option 3: | ||
| Option 4: | ||
| Option 5: |
| Contract Value | ||||||||
| Description | Total Price Base | Total Price Option 1 | Total Price Option 2 | Total Price Option 3 | Total Price Option 4 | 52.217-8 Extension | Total Price | |
| EQUIPMENT - Multi Energy Portal (MEP) | ||||||||
| CLIN 001 MEP | $ - 0 | $ - 0 | ||||||
| CLIN 101 Command Center | ERROR:#REF! | |||||||
| CLIN 201 Blanking Wall | ERROR:#REF! | |||||||
| CLIN 301 Power Conditioner | ERROR:#REF! | |||||||
| CLIN 401 | ERROR:#REF! | |||||||
| CLIN 501 | ERROR:#REF! | ERROR:#REF! | ||||||
| STANDARD LABOR | ||||||||
| CLIN 002 Engineering | ERROR:#REF! | |||||||
| CLIN 102 Technical Trade | ERROR:#REF! | |||||||
| CLIN 202 Laborers | ERROR:#REF! | |||||||
| CLIN 302 MEP | ERROR:#REF! | |||||||
| CLIN 402 Architecture | ERROR:#REF! | |||||||
| CLIN 502 Systems Designer | ERROR:#REF! | ERROR:#REF! | ||||||
| GENERAL REQUIREMENTS | ||||||||
| CLIN 003 Design | $ - 0 | |||||||
| CLIN 103 Civil | $ - 0 | |||||||
| CLIN 203 Site | $ - 0 | |||||||
| CLIN 303 Systems | $ - 0 | |||||||
| CLIN 403 Structure | $ - 0 | |||||||
| CLIN 503 Infrastructure | $ - 0 | $ - 0 | ||||||
| TRAINING | ||||||||
| CLIN 004 Analyst | $ 156,481.00 | |||||||
| CLIN 104 Training for Trainers | $ - 0 | |||||||
| CLIN 204 Operators | $ - 0 | |||||||
| CLIN 304 | $ - 0 | |||||||
| CLIN 404 | $ - 0 | |||||||
| CLIN 504 | $ - 0 | $ 156,481.00 | ||||||
| TESTING | ||||||||
| CLIN 005 Commissioning | $ 3,542,353.00 | |||||||
| CLIN 105 SAT | $ - 0 | |||||||
| CLIN 205 FAT | $ - 0 | |||||||
| CLIN 305 Systems | $ - 0 | |||||||
| CLIN 405 | $ - 0 | |||||||
| CLIN 505 | $ - 0 | $ 3,542,353.00 | ||||||
| DESIGN | ||||||||
| CLIN 006 Site Design | $ 263,164.00 | |||||||
| CLIN 106 Systems Design | $ - 0 | |||||||
| CLIN 206 Security | $ - 0 | |||||||
| CLIN 306 OIT | $ - 0 | |||||||
| CLIN 406 Blanking | $ - 0 | |||||||
| CLIN 506 Infrastructure | $ - 0 | $ 263,164.00 | ||||||
| CIVIL WORKS | ||||||||
| CLIN 007 Site Prep | $ 8,858,355.00 | |||||||
| CLIN 107 Concrete work | $ - 0 | |||||||
| CLIN 207 Steel Work | $ - 0 | |||||||
| CLIN 307 Geotech Studies | $ - 0 | |||||||
| CLIN 308 Infrastructure Install | $ - 0 | |||||||
| CLIN 407 Site Grading | $ - 0 | |||||||
| CLIN 507 Saw Cutting | $ - 0 | $ 8,858,355.00 | ||||||
| INSTALLATION | ||||||||
| CLIN 008 Mechanical | $ - 0 | |||||||
| CLIN 108 Electrical | $ - 0 | |||||||
| CLIN 208 Plumbing | $ - 0 | |||||||
| CLIN 308 Foundations | $ - 0 | |||||||
| CLIN 308 Command Center | $ - 0 | |||||||
| CLIN 408 Technology Trenches | $ - 0 | |||||||
| CLIN 508 Conduit/Junction Boxes | $ - 0 | $ - 0 | ||||||
| Grand Total | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |
| Check | ||||||||
| ERROR:#REF! |
&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED
Table 1 Summary
| Contractor Name: | Summary Table | |
| Solicitation Number: | ||
| Task Order Number: | ||
| Task Order Title: | ||
| Base Period: | ||
| Option 1: | ||
| Option 2: | ||
| Option 3: | ||
| Option 4: | ||
| Option 5: |
| Contract Value | ||||||||
| Description | Total Price Base | Total Price Option 1 | Total Price Option 2 | Total Price Option 3 | Total Price Option 4 | 52.217-8 Extension | Total Price | |
| EQUIPMENT - Low Energy Portal (LEP) | ||||||||
| CLIN 101 LEP | $ - 0 | $ - 0 | ||||||
| CLIN 101 Command Center | ERROR:#REF! | |||||||
| CLIN 201 Blanking Wall | ERROR:#REF! | |||||||
| CLIN 301 Power Conditioner | ERROR:#REF! | |||||||
| CLIN 401 | ERROR:#REF! | |||||||
| CLIN 501 | ERROR:#REF! | ERROR:#REF! | ||||||
| STANDARD LABOR | ||||||||
| CLIN 002 Engineering | ERROR:#REF! | |||||||
| CLIN 102 Technical Trade | ERROR:#REF! | |||||||
| CLIN 202 Laborers | ERROR:#REF! | |||||||
| CLIN 302 Systems Design | ERROR:#REF! | |||||||
| CLIN 402 Architecture | ERROR:#REF! | |||||||
| CLIN 502 MEP | ERROR:#REF! | ERROR:#REF! | ||||||
| GENERAL REQUIREMENTS | ||||||||
| CLIN 003 Design | $ - 0 | |||||||
| CLIN 103 Civil | $ - 0 | |||||||
| CLIN 203 Site | $ - 0 | |||||||
| CLIN 303 Systems | $ - 0 | |||||||
| CLIN 403 Structure | $ - 0 | |||||||
| CLIN 503 Infrastructure | $ - 0 | $ - 0 | ||||||
| TRAINING | ||||||||
| CLIN 004 Analyst | $ 156,481.00 | |||||||
| CLIN 104 Training for Trainers | $ - 0 | |||||||
| CLIN 204 Operators | $ - 0 | |||||||
| CLIN 304 | $ - 0 | |||||||
| CLIN 404 | $ - 0 | |||||||
| CLIN 504 | $ - 0 | $ 156,481.00 | ||||||
| TESTING | ||||||||
| CLIN 005 Commissioning | $ 3,542,353.00 | |||||||
| CLIN 105 SAT | $ - 0 | |||||||
| CLIN 205 FAT | $ - 0 | |||||||
| CLIN 305 Systems | $ - 0 | |||||||
| CLIN 405 | $ - 0 | |||||||
| CLIN 505 | $ - 0 | $ 3,542,353.00 | ||||||
| DESIGN | ||||||||
| CLIN 006 Site Design | $ 263,164.00 | |||||||
| CLIN 106 Systems Design | $ - 0 | |||||||
| CLIN 206 Security | $ - 0 | |||||||
| CLIN 306 OIT | $ - 0 | |||||||
| CLIN 406 Blanking | $ - 0 | |||||||
| CLIN 506 Infrastructure | $ - 0 | $ 263,164.00 | ||||||
| CIVIL WORKS | ||||||||
| CLIN 007 Site Prep | $ 8,858,355.00 | |||||||
| CLIN 107 Concrete work | $ - 0 | |||||||
| CLIN 207 Steel Work | $ - 0 | |||||||
| CLIN 307 Geotech Studies | $ - 0 | |||||||
| CLIN 308 Infrastructure Install | $ - 0 | |||||||
| CLIN 407 Site Grading | ||||||||
| CLIN 507 Saw Cutting | $ - 0 | $ 8,858,355.00 | ||||||
| INSTALLATION | ||||||||
| CLIN 008 Mechanical | $ - 0 | |||||||
| CLIN 108 Electrical | $ - 0 | |||||||
| CLIN 208 Plumbing | ||||||||
| CLIN 308 Foundations | $ - 0 | |||||||
| CLIN 308 Command Center | $ - 0 | |||||||
| CLIN 408 Technology Trenches | $ - 0 | |||||||
| CLIN 508 Conduit/Junction Boxes | $ - 0 | $ - 0 | ||||||
| Grand Total | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |
| Check | ||||||||
| ERROR:#REF! |
&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED
Instructions Attachment 8 serves as the standardized format for submitting pricing information and associated details for all required Contract Line Item Numbers (CLINs). This ensures uniformity across proposals and facilitates efficient evaluation of submissions.
1. Required Information Contractors must complete the following sections of Attachment 8:
a. Pricing Table: Provide detailed pricing for all required CLINs as specified in the solicitation. Ensure that all costs are clearly itemized and align with the scope of work and technical requirements outlined in the Statement of Work (SOW).
I. You will notice there are several sub-CLINs under the main CLIN structure. CBP will factor the estimates included in the sub-CLINs into the main CLIN. Vendors will not be limited due to these sub-SLINs, however, the intent is to make sure all aspect of these CLINs are being considered, estimate, and proposed to. If vendors feel some of the sub-CLINs should not be proposed to, then refrain from providing an estimate. If vendors feel like a sub-CLIN is missing from consideration, please add the additional sub-CLIN and provide an estimate.
b. Justification Tab: Use this tab to provide a detailed explanation of the proposed pricing. Include any supporting rationale, such as cost breakdowns, market research, or other relevant data that substantiates the proposed costs.
c. Assumptions Tab: Clearly outline any assumptions made during the development of the proposal. These may include technical, operational, or logistical considerations that impact pricing or performance.
2. Formatting Requirements All entries in Attachment 8 must be completed electronically using the provided template. Do not alter the structure or format of the pricing table or tabs. If additional information is necessary, include it as supplemental documentation and reference it in the justification tab. Ensure all calculations are accurate and formulas within the pricing table are functional.
3. Submission Guidelines Proposals must be submitted in accordance with the timeline and instructions provided in the solicitation.
Ensure Attachment 8 is included as part of the proposal package. Proposals submitted without Attachment 8 completed in full may be deemed non-compliant and excluded from consideration.
5. Evaluation Considerations Proposals will be evaluated based on the accuracy, completeness, and reasonableness of the pricing provided in Attachment 8, as well as the clarity and validity of the justification and assumptions. Contractors are encouraged to provide detailed and transparent information to facilitate the evaluation process.
6. Questions and Clarifications If contractors have questions regarding the use of Attachment 8 or require clarification on any aspect of the pricing table template, they should submit inquiries in writing to the Contracting Officer prior to the proposal submission deadline.
MEP CLINs
| Contractor Name: |
| Solicitation Number: |
| Task Order Number: |
| Task Order Title: |
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| EQUIPMENT - MULTI-ENERGY PORTAL SYSTEM (FFP) | CLIN 001-XX | CLIN 101 | CLIN 201 | CLIN 301 | CLIN 401 | |||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Total |
| X100 | MEP (less than 5 units) | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | $0.00 |
| X101 | MEP (units 5-10) | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | $0.00 |
| X102 | MEP (units 11-20) | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | $0.00 |
| X103 | MEP (more than 20 units) | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | $0.00 |
| X116 | UVBx | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | $0.00 |
| Perephiral Sensors |
Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 $0.00
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| SITE DESIGN (FFP) | CLIN 002 | CLIN 102 | CLIN 202 | CLIN 302 | CLIN 402 | |||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Total |
| X200 | Program Management and Operations Labor- Fully Burdened | T&M | 1 | $0.00 | T&M | 1 | $0.00 | $0.00 | T&M | 1 | $0.00 | $0.00 | T&M | 1 | $0.00 | $0.00 | T&M | 1 | $0.00 | $0.00 | $0.00 | |
| X201 | Travel | Cost reimbursable | 1 | $0.00 | Cost reimbursable | 1 | $0.00 | $0.00 | Cost reimbursable | 1 | $0.00 | $0.00 | Cost reimbursable | 1 | $0.00 | $0.00 | Cost reimbursable | 1 | $0.00 | $0.00 | $0.00 | |
| X202 | Site Design | FFP | 1 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | $0.00 | |
| X203 | Concept Review | |||||||||||||||||||||
| X204 | 50% Design | |||||||||||||||||||||
| X205 | 95% Design | |||||||||||||||||||||
| X206 | Issued for Construction Drawings | |||||||||||||||||||||
| Total Site Design | $0.00 | Total Site Design | $0.00 | Total Site Design | $0.00 | Total Site Design | $0.00 | Total Site Design | $0.00 | $0.00 |
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| CIVIL WORKS (T&M) | CLIN 003 | CLIN 103 | CLIN 203 | CLIN 303 | CLIN 403 | |||||||||||||||||
| Sub - CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Total |
| X300 | Mobilization and Site Preparations, Securing the site, Demobilization | T&M | 1 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 | |
| X301 | Command Center-New Construction | T&M | 1 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 | |
| X302 | Command Center-Retrofit | T&M | 1 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 | |
| X303 | Demolition/Excavation/Removal/Saw Cut | T&M | 1 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 | |
| X304 | Clearing/Grubbing, Dirt Work (balancing cut/fill), Compaction, Drainage | T&M | 1 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 | |
| X305 | Electrical/Plumbing/Mechanical | T&M | 1 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 | |
| X306 | Concrete/Asphalt/Footers/Foundations/Lanes of Traffic | T&M | 1 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 | |
| X307 | Steel Work | T&M | 1 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 | |
| X308 | Traffic Control Measures, Jersey Barriers, Speed bumps, striping, signage | T&M | 1 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 | |
| X309 | IT Trenches, Conduit, Conduit Banks, Junction Boxes, Pull Strings | T&M | 1 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 | |
| X310 | Site Survey | T&M | 1 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 | |
| X311 | SWPPP, Permitting | T&M | 1 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 $ - 0
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| FURNITURE, FIXTURES, AND EQUIPMENT (FFP) | CLIN 004 | CLIN 104 | CLIN 204 | CLIN 304 | CLIN 404 | |||||||||||||||||
| Sub - CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Total |
| X400 | Analyst Station |
tc={359CBE6E-C3EC-4410-944C-1AE54CFDDAF6}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Separate IDIQs will require separate IDIQs for the MEP and LEP.
| The IGCEs will have to be updated to acknowledge that some of the costs will be absorbed under the current contracts in light of the phased approach being adopted. | FFUP | 1 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | |||
| X401 | Operator Station | FFUP | 1 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| X402 | Situational Wall | FFUP | 1 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| X403 | Furniture and fixtures | FFUP | 1 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| X404 | Generators | FFUP | 1 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| X405 | Uninterrupted Power Supplies | FFUP | 1 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| X406 | Power Conditioners | FFUP | 1 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| X407 | Operator Booth (8'x12') | FFUP | 1 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| X408 | Operator Booth (12'x16') | FFUP | 1 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| X409 | Laptops | FFUP | 1 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 |
Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 $ - 0
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| INSTALLATION (T&M) | CLIN 005 | CLIN 105 | CLIN 205 | CLIN 305 | CLIN 405 | |||||||||||||||||
| Sub - CLIN | Description | Type | Rate | Amount | Type | Rate | Amount | Type | Rate | Amount | Type | Rate | Amount | Type | Rate | Amount | Total | |||||
| X500 | Installation | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X501 | Integration | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X502 | Blanking Solution | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X503 | System Testing | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X504 | Software installation/upgrade | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X505 | License Plate Reader (LPR) | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X506 | Pan-Tilt-Zoom (PTZ) Camera | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X507 | Optical Character Recognition System | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X508 | Traffic Control System | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 $ - 0
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| TRAINING (FFP) | CLIN 006 | CLIN 106 | CLIN 206 | CLIN 306 | CLIN 406 | |||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | |
| X600 | Training Development | FFUP | 1 | $ - 0 | FFP | 0 | $ - 0 | $ - 0 | FFP | 0 | $ - 0 | $ - 0 | FFP | 0 | $ - 0 | $ - 0 | FFP | 0 | $ - 0 | $ - 0 | $ - 0 |
Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 $ - 0
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| PREVENTATIVE MAINTENANCE OPTIONS (FFP) | CLIN 007 | CLIN 107 | CLIN 207 | CLIN 307 | CLIN 407 | |||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | |
| X700 | MEP Service | FFUP | 0 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | |
| X701 | UVBx Service | FFUP | 0 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | |
| Total Preventative Maintenance (UVBx) | $ - 0 | Total Preventative Maintenance (UVBx) | $ - 0 | Total Preventative Maintenance (UVBx) | $ - 0 | Total Preventative Maintenance (UVBx) | $ - 0 | Total Preventative Maintenance (UVBx) | $ - 0 | $ - 0 |
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| CORRECTIVE MAINTENANCE OPTIONS (FFP) (parts, labor, diagnostics, and repair) | CLIN 009 | CLIN 109 | CLIN 209 | CLIN 309 | CLIN 409 | |||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | |
| X800 | MEP Service | FFUP | 0 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | |
| X801 | UVBx Service | FFUP | 0 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | |
| Total Corrective Maintenance (UVBx) | $ - 0 | Total Corrective Maintenance (UVBx) | $ - 0 | Total Corrective Maintenance (UVBx) | $ - 0 | Total Corrective Maintenance (UVBx) | $ - 0 | Total Corrective Maintenance (UVBx) | $ - 0 | $ - 0 |
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| WARRANTY PERIODS (FFP) | CLIN 011 | CLIN 111 | CLIN 211 | CLIN 311 | CLIN 411 | |||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Total |
| X110 | MEP-Required Comprehensive Base Warranty (1 Year) | FFP | 1 | $ - 0 | FFP | 0 | $0.00 | $ - 0 | FFP | 0 | $0.00 | $ - 0 | FFP | 0 | $0.00 | $ - 0 | FFP | 0 | $0.00 | $ - 0 | $ - 0 | |
| X111 | MEP-Two Years of Warranty | FFP | 1 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | |
| X112 | MEP-Three Years of Warranty | FFP | 1 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | |
| X113 | MEP-Four Years of Warranty | FFP | 1 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | |
| X114 | MEP-Five Years of Warranty | FFP | 1 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | |
| X115 | UVBx-Required Comprehensive Base Warranty (1 Year) | FFP | 1 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | |
| X116 | UVBx-Two Years of Warranty | FFP | 1 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | |
| X117 | UVBx-Three Years of Warranty | FFP | 1 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | |
| X118 | UVBx-Four Years of Warranty | FFP | 1 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | |
| X119 | UVBx-Five Years of Warranty | FFP | 1 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 $ - 0
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| ON-DEMAND SERVICES (FFP) | CLIN 012 | CLIN 112 | CLIN 212 | CLIN 312 | CLIN 412 | |||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Total |
| X126 | On-Demand Services | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| Engineering Services | ||||||||||||||||||||||
| Ad Hoc Reports | ||||||||||||||||||||||
| Site Surveys | ||||||||||||||||||||||
| Provisioning Support | ||||||||||||||||||||||
| Retrofit Support | ||||||||||||||||||||||
| Relocation Services | ||||||||||||||||||||||
| Site Work | ||||||||||||||||||||||
| Disposal | ||||||||||||||||||||||
| Emergency Services | ||||||||||||||||||||||
| Special Events | ||||||||||||||||||||||
| Training Activities | ||||||||||||||||||||||
| Total General Requirements | $ - 0 | Total General Requirements | $ - 0 | Total General Requirements | $ - 0 | Total General Requirements | $ - 0 | Total General Requirements | $ - 0 | $ - 0 |
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | |||||||||||||||||
| INDIRECT RATES | CLIN 013 | CLIN 113 | CLIN 213 | CLIN 313 | CLIN 413 | ||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount |
| X142 | G&A | ||||||||||||||||||||
| X143 | T&M | ||||||||||||||||||||
| X144 | Profit |
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| INCENTIVE POOL | CLIN 014 | CLIN 114 | CLIN 214 | CLIN 314 | CLIN 414 | |||||||||||||||||
| Sub-CLIN | Description (would need a CLIN for each Option Year) | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | |
| Year 1 Incentives: Equipment CLIN | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | $ - 0 | |
| Year 1 Incentives: Warranty CLIN | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | $ - 0 | |
| Total General Requirements | $0.00 | Total General Requirements | $0.00 | Total General Requirements | $0.00 | Total General Requirements | $0.00 | Total General Requirements | $0.00 | $0.00 |
| Total Price Per Period | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 |
| Check | ||||||
| ERROR:#REF! | ||||||
| FFP - Firm Fixed Price | ||||||
| FFUP - Firm Fixed Unit Price | ||||||
| T&M - Time and Materials |
Separate IDIQs will require separate IDIQs for the MEP and LEP.
The IGCEs will have to be updated to acknowledge that some of the costs will be absorbed under the current contracts in light of the phased approach being adopted.
&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED
LEP CLINs
| Contractor Name: |
| Solicitation Number: |
| Task Order Number: |
| Task Order Title: |
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| EQUIPMENT - LOW ENERGY PORTAL SYSTEM (FFP) | CLIN 001 | CLIN 101 | CLIN 201 | CLIN 301 | CLIN 401 | |||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Total |
| X104 | LEP-Type 1 (less than 5 units) | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | $0.00 |
| X105 | LEP-Type 1 (units 5-10) | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | $0.00 |
| X106 | LEP-Type 1 (units 11-20) | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | $0.00 |
| X107 | LEP-Type 1 (more than 20 units) | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | $0.00 |
| X108 | LEP-Type 2 (less than 5 units) | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | $0.00 |
| X109 | LEP-Type 2 (units 5-10) | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | $0.00 |
| X110 | LEP-Type 2 (units 11-20) | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | $0.00 |
| X111 | LEP-Type 2 (more than 20 units) | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | $0.00 |
| X112 | LEP-Type 3 (less than 5 units) | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | $0.00 |
| X113 | LEP-Type 3 (units 5-10) | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | FFUP | 5 | $0.00 | $0.00 | $0.00 |
| X114 | LEP-Type 3 (units 11-20) | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | FFUP | 11 | $0.00 | $0.00 | $0.00 |
| X115 | LEP-Type 3 (more than 20 units) | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | FFUP | 21 | $0.00 | $0.00 | $0.00 |
| X116 | UVBx | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | FFUP | 1 | $0.00 | $0.00 | $0.00 |
Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 $0.00
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| SITE DESIGN (FFP) | CLIN 002 | CLIN 102 | CLIN 202 | CLIN 302 | CLIN 402 | |||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Total |
| X200 | Program Management and Operations Labor- Fully Burdened | T&M | 1 | $0.00 | $0.00 | T&M | 1 | $0.00 | $0.00 | T&M | 1 | $0.00 | $0.00 | T&M | 1 | $0.00 | $0.00 | T&M | 1 | $0.00 | $0.00 | $0.00 |
| X201 | Travel | Cost reimbursable | 1 | $0.00 | $0.00 | Cost reimbursable | 1 | $0.00 | $0.00 | Cost reimbursable | 1 | $0.00 | $0.00 | Cost reimbursable | 1 | $0.00 | $0.00 | Cost reimbursable | 1 | $0.00 | $0.00 | $0.00 |
| X202 | Site Design | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | $0.00 |
| X203 | Concept Review | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | $0.00 |
| X204 | 50% Design | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | $0.00 |
| X205 | 95% Design | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | $0.00 |
| X206 | Issued for Construction Drawings | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | FFP | 1 | $0.00 | $0.00 | $0.00 |
| Total Site Design | $0.00 | Total Site Design | $0.00 | Total Site Design | $0.00 | Total Site Design | $0.00 | Total Site Design | $0.00 | $0.00 |
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| CIVIL WORKS (T&M) | CLIN 003 | CLIN 103 | CLIN 203 | CLIN 303 | CLIN 403 | |||||||||||||||||
| Sub - CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Total |
| X300 | Mobilization and Site Preparations, Securing the site, Demobilization | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X301 | Command Center-New Construction | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X302 | Command Center-Retrofit | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X303 | Demolition/Excavation/Removal/Saw Cut | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X304 | Clearing/Grubing, Dirt Work (balancing cut/fill), Compaction, Drainage | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X305 | Electrical/Plumbing/Mechanical | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X306 | Concrete/Asphalt/Footers/Foundations/Lanes of Traffic | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X307 | Steel Work | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X308 | Traffic Control Measures, Jersey Barriers, Speed bumps, striping, signage | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X309 | IT Trenches, Conduit, Conduit Banks, Junction Boxes, Pull Strings | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X310 | Site Survey | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X311 | SWPPP, Permiting | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 $ - 0
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| FURNITURE, FIXTURES, AND EQUIPMENT (FFP) | CLIN 004 | CLIN 104 | CLIN 204 | CLIN 304 | CLIN 404 | |||||||||||||||||
| Sub - CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Total |
| X400 | Analyst Station | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 |
| X401 | Operator Station | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 |
| X402 | Situational Wall | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 |
| X403 | Furniture and fixtures | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 |
| X404 | Generators | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 |
| X405 | Uninterrupted Power Supplies | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 |
| X406 | Power Conditioners | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 |
| X407 | Operator Booth (8'x12') | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 |
| X408 | Operator Booth (12'x16') | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 |
| X409 | Laptops | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 |
Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 $ - 0
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| INSTALLATION (T&M) | CLIN 005 | CLIN 105 | CLIN 205 | CLIN 305 | CLIN 405 | |||||||||||||||||
| Sub - CLIN | Description | Type | Rate | Amount | Type | Rate | Amount | Type | Rate | Amount | Type | Rate | Amount | Type | Rate | Amount | Total | |||||
| X500 | Installation | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X501 | Integration | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X502 | Blanking Solution | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X503 | System Testing | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X504 | Software installation/upgrade | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | T&M | 1 | $0.00 | $ - 0 | $ - 0 |
| X505 | License Plate Reader (LPR) | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X506 | Pan-Tilt-Zoom (PTZ) Camera | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X507 | Optical Character Recognition System | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X508 | Traffic Control System | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 $ - 0
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| TRAINING (FFP) | CLIN 006 | CLIN 106 | CLIN 206 | CLIN 306 | CLIN 406 | |||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | |
| X600 | Training Development | FFP | 1 | $0.00 | $ - 0 | FFP | 0 | $ - 0 | FFP | 0 | $ - 0 | FFP | 0 | $ - 0 | FFP | 0 | $ - 0 | $ - 0 |
Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 $ - 0
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| PREVENTATIVE MAINTENANCE OPTIONS (FFP) | CLIN 007 | CLIN 107 | CLIN 207 | CLIN 307 | CLIN 407 | |||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | |
| X700 | LEP Service | FFUP | 0 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | |
| X701 | UVBx Service | FFUP | 0 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | |
| Total Preventative Maintenance (UVBx) | $ - 0 | Total Preventative Maintenance (UVBx) | $ - 0 | Total Preventative Maintenance (UVBx) | $ - 0 | Total Preventative Maintenance (UVBx) | $ - 0 | Total Preventative Maintenance (UVBx) | $ - 0 | $ - 0 |
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| CORRECTIVE MAINTENANCE OPTIONS (FFP) | CLIN 009 | CLIN 109 | CLIN 209 | CLIN 309 | CLIN 409 | |||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | |
| X800 | LEP Service | FFUP | 0 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | |
| X801 | UVBx Service | FFUP | 0 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | FFUP | 1 | $0.00 | $ - 0 | $ - 0 | |
| Total Corrective Maintenance (UVBx) | $ - 0 | Total Corrective Maintenance (UVBx) | $ - 0 | Total Corrective Maintenance (UVBx) | $ - 0 | Total Corrective Maintenance (UVBx) | $ - 0 | Total Corrective Maintenance (UVBx) | $ - 0 | $ - 0 |
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| WARRANTY PERIODS (FFP) | CLIN 011 | CLIN 111 | CLIN 211 | CLIN 311 | CLIN 411 | |||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Total |
| X110 | LEP-Required Comprehensive Base Warranty (1 Year) | FFP | 1 | $0.00 | $ - 0 | FFP | 0 | $0.00 | $ - 0 | FFP | 0 | $0.00 | $ - 0 | FFP | 0 | $0.00 | $ - 0 | FFP | 0 | $0.00 | $ - 0 | $ - 0 |
| X126 | LEP-Type 1 Two Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X127 | LEP-Type 1 Three Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X128 | LEP Type 1 Four Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X129 | LEP Type 1 Five Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X130 | LEP-Type 2 Two Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X131 | LEP-Type 2 Three Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X132 | LEP Type 2 Four Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X133 | LEP Type 2 Five Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X134 | LEP-Type 3 Two Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X135 | LEP-Type 3 Three Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X136 | LEP Type 3 Four Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X137 | LEP Type 3 Five Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X115 | UVBx-Required Comprehensive Base Warranty (1 Year) | FFP | 1 | $0.00 | $ - 0 | FFP | 0 | $0.00 | $ - 0 | FFP | 0 | $0.00 | $ - 0 | FFP | 0 | $0.00 | $ - 0 | FFP | 0 | $0.00 | $ - 0 | $ - 0 |
| X138 | UVBx-Two Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X139 | UVBx-Three Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X140 | UVBx-Four Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
| X141 | UVBx-Five Years of Warranty | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 |
Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 $ - 0
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | |
| ON-DEMAND SERVICES (FFP) |
tc={E7390B8D-EE95-4665-A268-9E4FDA9CD2C5}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
[Tasks]
There is a task anchored to this comment that cannot be viewed in your client.
Comment:
@SHEYYAB, ALLA S I added an on-demand services section here we will need to work on completing.
Reply:
| My understanding is this line is for on-demand repair services (at least that’s my understanding from ILD spreadsheet). Some of the sub-CLINs here, such as “site work” are covered under civil works. It’s close to impossible to try and break the site work cost out of the civil works CLIN. I recommend renaming the “Civil works” CLIN if on-demand services is the preferred name | CLIN 012 | CLIN 112 | CLIN 212 | CLIN 312 | CLIN 412 | ||||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Total | |
| X126 | On-Demand Services (On-demand system repair) | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | |
| Engineering Services | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| Ad Hoc Reports | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| Site Surverys | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| Provisioning Support | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| Retrofit Support | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| Relocation Services | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| Site Work | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| Disposal | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| Emergency Services | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| Special Events | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| Training Activities | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | FFP | 1 | $0.00 | $ - 0 | $ - 0 | ||
| Total General Requirements | $ - 0 | Total General Requirements | $ - 0 | Total General Requirements | $ - 0 | Total General Requirements | $ - 0 | Total General Requirements | $ - 0 | $ - 0 |
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | |||||||||||||||||
| INDIRECT RATES | CLIN 012 | CLIN 112 | CLIN 212 | CLIN 312 | CLIN 412 | ||||||||||||||||
| Sub-CLIN | Description | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount |
| X142 | G&A | ||||||||||||||||||||
| X143 | T&M | ||||||||||||||||||||
| X144 | Profit |
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||
| INCENTIVE POOL | CLIN 013 | CLIN 113 | CLIN 213 | CLIN 313 | CLIN 413 | |||||||||||||||||
| Sub-CLIN | Description (would need a CLIN for each Option Year) | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | Type | Qty | Rate | Amount | |
| Year 1 Incentives: Equipment CLIN | ||||||||||||||||||||||
| Year 1 Incentives: Warranty CLIN | ||||||||||||||||||||||
| Total General Requirements | $0.00 | Total General Requirements | $0.00 | Total General Requirements | $0.00 | Total General Requirements | $0.00 | Total General Requirements | $0.00 | $ - 0 | ||||||||||||
| Total Price Per Period | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||||||||||||||||
| Check | ||||||||||||||||||||||
| ERROR:#REF! |
@SHEYYAB, ALLA S I added an on-demand services section here we will need to work on completing.
My understanding is this line is for on-demand repair services (at least that’s my understanding from ILD spreadsheet). Some of the sub-CLINs here, such as “site work” are covered under civil works. It’s close to impossible to try and break the site work cost out of the civil works CLIN. I recommend renaming the “Civil works” CLIN if on-demand services is the preferred name
&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED
Price Justification Price Justification tc={D7DA409D-6A65-4605-848C-D6EACE50A7E7}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
The IGCE should be accompanied by a Summary which describes the assumptions/bases/methods for developing it, including escalation rates applied to the outyears.
The IGCE should be accompanied by a Summary which describes the assumptions/bases/methods for developing it, including escalation rates applied to the outyears.
Assumptions
| Project/Price Assumptions |
| Allowances, Assumptions, Exclusions and Exceptions: |
File details come from the government source that posted it. Updated .