DRAFT - IDIQ Pricing Table - NII - MEP LEP.xlsx

XLSX spreadsheet 99 KB Posted

Attached to
Request for Information (RFI) - Large-Scale Fixed Systems - Multi-Energy Portal and Low-Energy Portal
Solicitation number
70B03C26R00000089
Issued by

About this file

This is a draft IDIQ pricing table template for Customs and Border Protection's Multi-Energy Portal (MEP) and Low-Energy Portal (LEP) systems. The pricing template is structured as a standardized submission format with separate pricing tables for MEP and LEP configurations, each covering a base year plus four option years. The contract employs mixed pricing types including Firm Fixed Price (FFP), Firm Fixed Unit Price (FFUP), and Time & Materials (T&M) across multiple Contract Line Item Numbers (CLINs) organized by category: Equipment, Site Design, Civil Works, Furniture/Fixtures/Equipment, Installation, Training, Preventative Maintenance, Corrective Maintenance, Warranty Periods, and On-Demand Services. For equipment CLINs, contractors must provide unit pricing across tiered quantity brackets (less than 5 units, 5-10 units, 11-20 units, and more than 20 units) for both MEP and multiple LEP types. The template requires detailed cost breakdowns for labor categories including Program Management, Technical Trade, and Systems Design personnel, along with pricing for ancillary items such as command centers, power conditioning equipment, operator stations, and technology infrastructure components.

The instructions mandate that contractors complete pricing tables, justification tabs, and assumptions tabs electronically without altering the template structure, with all formulas and calculations verified for accuracy. Contractors are explicitly permitted to add sub-CLINs not listed if deemed necessary for comprehensive coverage and should omit sub-CLINs they deem inapplicable. The solicitation applies a phased approach requiring separate IDIQs for MEP and LEP, with government acknowledgment that some costs under existing contracts will be absorbed in light of the phased implementation. Proposals lacking complete Attachment 8 submissions will be deemed non-compliant. Evaluation criteria emphasize the accuracy, completeness, reasonableness, clarity, and validity of proposed pricing, justifications, and stated assumptions. A threaded comment notes that the IGCE summary must describe assumptions, bases, methods, and escalation rates applied to option years. This is currently a draft document, as indicated by the RFI status and the presence of incomplete formula references and unfinalized pricing.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1 Summary (2)

Contractor Name:Summary Table
Solicitation Number:
Task Order Number:
Task Order Title:
Base Period:
Option 1:
Option 2:
Option 3:
Option 4:
Option 5:
Contract Value
DescriptionTotal Price BaseTotal Price Option 1Total Price Option 2Total Price Option 3Total Price Option 452.217-8 ExtensionTotal Price
EQUIPMENT - Multi Energy Portal (MEP)
CLIN 001 MEP$ - 0$ - 0
CLIN 101 Command CenterERROR:#REF!
CLIN 201 Blanking WallERROR:#REF!
CLIN 301 Power ConditionerERROR:#REF!
CLIN 401ERROR:#REF!
CLIN 501ERROR:#REF!ERROR:#REF!
STANDARD LABOR
CLIN 002 EngineeringERROR:#REF!
CLIN 102 Technical TradeERROR:#REF!
CLIN 202 LaborersERROR:#REF!
CLIN 302 MEPERROR:#REF!
CLIN 402 ArchitectureERROR:#REF!
CLIN 502 Systems DesignerERROR:#REF!ERROR:#REF!
GENERAL REQUIREMENTS
CLIN 003 Design$ - 0
CLIN 103 Civil$ - 0
CLIN 203 Site$ - 0
CLIN 303 Systems$ - 0
CLIN 403 Structure$ - 0
CLIN 503 Infrastructure$ - 0$ - 0
TRAINING
CLIN 004 Analyst$ 156,481.00
CLIN 104 Training for Trainers$ - 0
CLIN 204 Operators$ - 0
CLIN 304$ - 0
CLIN 404$ - 0
CLIN 504$ - 0$ 156,481.00
TESTING
CLIN 005 Commissioning$ 3,542,353.00
CLIN 105 SAT$ - 0
CLIN 205 FAT$ - 0
CLIN 305 Systems$ - 0
CLIN 405$ - 0
CLIN 505$ - 0$ 3,542,353.00
DESIGN
CLIN 006 Site Design$ 263,164.00
CLIN 106 Systems Design$ - 0
CLIN 206 Security$ - 0
CLIN 306 OIT$ - 0
CLIN 406 Blanking$ - 0
CLIN 506 Infrastructure$ - 0$ 263,164.00
CIVIL WORKS
CLIN 007 Site Prep$ 8,858,355.00
CLIN 107 Concrete work$ - 0
CLIN 207 Steel Work$ - 0
CLIN 307 Geotech Studies$ - 0
CLIN 308 Infrastructure Install$ - 0
CLIN 407 Site Grading$ - 0
CLIN 507 Saw Cutting$ - 0$ 8,858,355.00
INSTALLATION
CLIN 008 Mechanical$ - 0
CLIN 108 Electrical$ - 0
CLIN 208 Plumbing$ - 0
CLIN 308 Foundations$ - 0
CLIN 308 Command Center$ - 0
CLIN 408 Technology Trenches$ - 0
CLIN 508 Conduit/Junction Boxes$ - 0$ - 0
Grand TotalERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Check
ERROR:#REF!

&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED

Table 1 Summary

Contractor Name:Summary Table
Solicitation Number:
Task Order Number:
Task Order Title:
Base Period:
Option 1:
Option 2:
Option 3:
Option 4:
Option 5:
Contract Value
DescriptionTotal Price BaseTotal Price Option 1Total Price Option 2Total Price Option 3Total Price Option 452.217-8 ExtensionTotal Price
EQUIPMENT - Low Energy Portal (LEP)
CLIN 101 LEP$ - 0$ - 0
CLIN 101 Command CenterERROR:#REF!
CLIN 201 Blanking WallERROR:#REF!
CLIN 301 Power ConditionerERROR:#REF!
CLIN 401ERROR:#REF!
CLIN 501ERROR:#REF!ERROR:#REF!
STANDARD LABOR
CLIN 002 EngineeringERROR:#REF!
CLIN 102 Technical TradeERROR:#REF!
CLIN 202 LaborersERROR:#REF!
CLIN 302 Systems DesignERROR:#REF!
CLIN 402 ArchitectureERROR:#REF!
CLIN 502 MEPERROR:#REF!ERROR:#REF!
GENERAL REQUIREMENTS
CLIN 003 Design$ - 0
CLIN 103 Civil$ - 0
CLIN 203 Site$ - 0
CLIN 303 Systems$ - 0
CLIN 403 Structure$ - 0
CLIN 503 Infrastructure$ - 0$ - 0
TRAINING
CLIN 004 Analyst$ 156,481.00
CLIN 104 Training for Trainers$ - 0
CLIN 204 Operators$ - 0
CLIN 304$ - 0
CLIN 404$ - 0
CLIN 504$ - 0$ 156,481.00
TESTING
CLIN 005 Commissioning$ 3,542,353.00
CLIN 105 SAT$ - 0
CLIN 205 FAT$ - 0
CLIN 305 Systems$ - 0
CLIN 405$ - 0
CLIN 505$ - 0$ 3,542,353.00
DESIGN
CLIN 006 Site Design$ 263,164.00
CLIN 106 Systems Design$ - 0
CLIN 206 Security$ - 0
CLIN 306 OIT$ - 0
CLIN 406 Blanking$ - 0
CLIN 506 Infrastructure$ - 0$ 263,164.00
CIVIL WORKS
CLIN 007 Site Prep$ 8,858,355.00
CLIN 107 Concrete work$ - 0
CLIN 207 Steel Work$ - 0
CLIN 307 Geotech Studies$ - 0
CLIN 308 Infrastructure Install$ - 0
CLIN 407 Site Grading
CLIN 507 Saw Cutting$ - 0$ 8,858,355.00
INSTALLATION
CLIN 008 Mechanical$ - 0
CLIN 108 Electrical$ - 0
CLIN 208 Plumbing
CLIN 308 Foundations$ - 0
CLIN 308 Command Center$ - 0
CLIN 408 Technology Trenches$ - 0
CLIN 508 Conduit/Junction Boxes$ - 0$ - 0
Grand TotalERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Check
ERROR:#REF!

&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED

Instructions Attachment 8 serves as the standardized format for submitting pricing information and associated details for all required Contract Line Item Numbers (CLINs). This ensures uniformity across proposals and facilitates efficient evaluation of submissions.

1. Required Information Contractors must complete the following sections of Attachment 8:

a. Pricing Table: Provide detailed pricing for all required CLINs as specified in the solicitation. Ensure that all costs are clearly itemized and align with the scope of work and technical requirements outlined in the Statement of Work (SOW).

I. You will notice there are several sub-CLINs under the main CLIN structure. CBP will factor the estimates included in the sub-CLINs into the main CLIN. Vendors will not be limited due to these sub-SLINs, however, the intent is to make sure all aspect of these CLINs are being considered, estimate, and proposed to. If vendors feel some of the sub-CLINs should not be proposed to, then refrain from providing an estimate. If vendors feel like a sub-CLIN is missing from consideration, please add the additional sub-CLIN and provide an estimate.

b. Justification Tab: Use this tab to provide a detailed explanation of the proposed pricing. Include any supporting rationale, such as cost breakdowns, market research, or other relevant data that substantiates the proposed costs.

c. Assumptions Tab: Clearly outline any assumptions made during the development of the proposal. These may include technical, operational, or logistical considerations that impact pricing or performance.

2. Formatting Requirements All entries in Attachment 8 must be completed electronically using the provided template. Do not alter the structure or format of the pricing table or tabs. If additional information is necessary, include it as supplemental documentation and reference it in the justification tab. Ensure all calculations are accurate and formulas within the pricing table are functional.

3. Submission Guidelines Proposals must be submitted in accordance with the timeline and instructions provided in the solicitation.

Ensure Attachment 8 is included as part of the proposal package. Proposals submitted without Attachment 8 completed in full may be deemed non-compliant and excluded from consideration.

5. Evaluation Considerations Proposals will be evaluated based on the accuracy, completeness, and reasonableness of the pricing provided in Attachment 8, as well as the clarity and validity of the justification and assumptions. Contractors are encouraged to provide detailed and transparent information to facilitate the evaluation process.

6. Questions and Clarifications If contractors have questions regarding the use of Attachment 8 or require clarification on any aspect of the pricing table template, they should submit inquiries in writing to the Contracting Officer prior to the proposal submission deadline.

MEP CLINs

Contractor Name:
Solicitation Number:
Task Order Number:
Task Order Title:
Base YearOption Year 1Option Year 2Option Year 3Option Year 4
EQUIPMENT - MULTI-ENERGY PORTAL SYSTEM (FFP)CLIN 001-XXCLIN 101CLIN 201CLIN 301CLIN 401
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTotal
X100MEP (less than 5 units)FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00$0.00
X101MEP (units 5-10)FFUP5$0.00$0.00FFUP5$0.00$0.00FFUP5$0.00$0.00FFUP5$0.00$0.00FFUP5$0.00$0.00$0.00
X102MEP (units 11-20)FFUP11$0.00$0.00FFUP11$0.00$0.00FFUP11$0.00$0.00FFUP11$0.00$0.00FFUP11$0.00$0.00$0.00
X103MEP (more than 20 units)FFUP21$0.00$0.00FFUP21$0.00$0.00FFUP21$0.00$0.00FFUP21$0.00$0.00FFUP21$0.00$0.00$0.00
X116UVBxFFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00$0.00
Perephiral Sensors

Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 $0.00

Base YearOption Year 1Option Year 2Option Year 3Option Year 4
SITE DESIGN (FFP)CLIN 002CLIN 102CLIN 202CLIN 302CLIN 402
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTotal
X200Program Management and Operations Labor- Fully BurdenedT&M1$0.00T&M1$0.00$0.00T&M1$0.00$0.00T&M1$0.00$0.00T&M1$0.00$0.00$0.00
X201TravelCost reimbursable1$0.00Cost reimbursable1$0.00$0.00Cost reimbursable1$0.00$0.00Cost reimbursable1$0.00$0.00Cost reimbursable1$0.00$0.00$0.00
X202Site DesignFFP1$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00$0.00
X203Concept Review
X20450% Design
X20595% Design
X206Issued for Construction Drawings
Total Site Design$0.00Total Site Design$0.00Total Site Design$0.00Total Site Design$0.00Total Site Design$0.00$0.00
Base YearOption Year 1Option Year 2Option Year 3Option Year 4
CIVIL WORKS (T&M)CLIN 003CLIN 103CLIN 203CLIN 303CLIN 403
Sub - CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTotal
X300Mobilization and Site Preparations, Securing the site, DemobilizationT&M1$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X301Command Center-New ConstructionT&M1$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X302Command Center-RetrofitT&M1$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X303Demolition/Excavation/Removal/Saw CutT&M1$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X304Clearing/Grubbing, Dirt Work (balancing cut/fill), Compaction, DrainageT&M1$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X305Electrical/Plumbing/MechanicalT&M1$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X306Concrete/Asphalt/Footers/Foundations/Lanes of TrafficT&M1$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X307Steel WorkT&M1$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X308Traffic Control Measures, Jersey Barriers, Speed bumps, striping, signageT&M1$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X309IT Trenches, Conduit, Conduit Banks, Junction Boxes, Pull StringsT&M1$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X310Site SurveyT&M1$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X311SWPPP, PermittingT&M1$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0

Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 $ - 0

Base YearOption Year 1Option Year 2Option Year 3Option Year 4
FURNITURE, FIXTURES, AND EQUIPMENT (FFP)CLIN 004CLIN 104CLIN 204CLIN 304CLIN 404
Sub - CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTotal
X400Analyst Station

tc={359CBE6E-C3EC-4410-944C-1AE54CFDDAF6}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Separate IDIQs will require separate IDIQs for the MEP and LEP.

The IGCEs will have to be updated to acknowledge that some of the costs will be absorbed under the current contracts in light of the phased approach being adopted.FFUP1$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X401Operator StationFFUP1$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X402Situational WallFFUP1$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X403Furniture and fixturesFFUP1$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X404GeneratorsFFUP1$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X405Uninterrupted Power SuppliesFFUP1$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X406Power ConditionersFFUP1$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X407Operator Booth (8'x12')FFUP1$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X408Operator Booth (12'x16')FFUP1$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X409LaptopsFFUP1$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0

Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 $ - 0

Base YearOption Year 1Option Year 2Option Year 3Option Year 4
INSTALLATION (T&M)CLIN 005CLIN 105CLIN 205CLIN 305CLIN 405
Sub - CLINDescriptionTypeRateAmountTypeRateAmountTypeRateAmountTypeRateAmountTypeRateAmountTotal
X500InstallationT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X501IntegrationT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X502Blanking SolutionT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X503System TestingT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X504Software installation/upgradeT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X505License Plate Reader (LPR)FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X506Pan-Tilt-Zoom (PTZ) CameraFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X507Optical Character Recognition SystemFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X508Traffic Control SystemFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0

Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 $ - 0

Base YearOption Year 1Option Year 2Option Year 3Option Year 4
TRAINING (FFP)CLIN 006CLIN 106CLIN 206CLIN 306CLIN 406
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmount
X600Training DevelopmentFFUP1$ - 0FFP0$ - 0$ - 0FFP0$ - 0$ - 0FFP0$ - 0$ - 0FFP0$ - 0$ - 0$ - 0

Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 $ - 0

Base YearOption Year 1Option Year 2Option Year 3Option Year 4
PREVENTATIVE MAINTENANCE OPTIONS (FFP)CLIN 007CLIN 107CLIN 207CLIN 307CLIN 407
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmount
X700MEP ServiceFFUP0$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X701UVBx ServiceFFUP0$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0$ - 0
Base YearOption Year 1Option Year 2Option Year 3Option Year 4
CORRECTIVE MAINTENANCE OPTIONS (FFP) (parts, labor, diagnostics, and repair)CLIN 009CLIN 109CLIN 209CLIN 309CLIN 409
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmount
X800MEP ServiceFFUP0$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X801UVBx ServiceFFUP0$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0$ - 0
Base YearOption Year 1Option Year 2Option Year 3Option Year 4
WARRANTY PERIODS (FFP)CLIN 011CLIN 111CLIN 211CLIN 311CLIN 411
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTotal
X110MEP-Required Comprehensive Base Warranty (1 Year)FFP1$ - 0FFP0$0.00$ - 0FFP0$0.00$ - 0FFP0$0.00$ - 0FFP0$0.00$ - 0$ - 0
X111MEP-Two Years of WarrantyFFP1$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X112MEP-Three Years of WarrantyFFP1$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X113MEP-Four Years of WarrantyFFP1$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X114MEP-Five Years of WarrantyFFP1$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X115UVBx-Required Comprehensive Base Warranty (1 Year)FFP1$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X116UVBx-Two Years of WarrantyFFP1$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X117UVBx-Three Years of WarrantyFFP1$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X118UVBx-Four Years of WarrantyFFP1$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X119UVBx-Five Years of WarrantyFFP1$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0

Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 $ - 0

Base YearOption Year 1Option Year 2Option Year 3Option Year 4
ON-DEMAND SERVICES (FFP)CLIN 012CLIN 112CLIN 212CLIN 312CLIN 412
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTotal
X126On-Demand ServicesFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
Engineering Services
Ad Hoc Reports
Site Surveys
Provisioning Support
Retrofit Support
Relocation Services
Site Work
Disposal
Emergency Services
Special Events
Training Activities
Total General Requirements$ - 0Total General Requirements$ - 0Total General Requirements$ - 0Total General Requirements$ - 0Total General Requirements$ - 0$ - 0
Base YearOption Year 1Option Year 2Option Year 3Option Year 4
INDIRECT RATESCLIN 013CLIN 113CLIN 213CLIN 313CLIN 413
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmount
X142G&A
X143T&M
X144Profit
Base YearOption Year 1Option Year 2Option Year 3Option Year 4
INCENTIVE POOLCLIN 014CLIN 114CLIN 214CLIN 314CLIN 414
Sub-CLINDescription (would need a CLIN for each Option Year)TypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmount
Year 1 Incentives: Equipment CLINFFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00$ - 0
Year 1 Incentives: Warranty CLINFFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00$ - 0
Total General Requirements$0.00Total General Requirements$0.00Total General Requirements$0.00Total General Requirements$0.00Total General Requirements$0.00$0.00
Total Price Per Period$0.00$0.00$0.00$0.00$0.00$ - 0
Check
ERROR:#REF!
FFP - Firm Fixed Price
FFUP - Firm Fixed Unit Price
T&M - Time and Materials

Separate IDIQs will require separate IDIQs for the MEP and LEP.

The IGCEs will have to be updated to acknowledge that some of the costs will be absorbed under the current contracts in light of the phased approach being adopted.

&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED

LEP CLINs

Contractor Name:
Solicitation Number:
Task Order Number:
Task Order Title:
Base YearOption Year 1Option Year 2Option Year 3Option Year 4
EQUIPMENT - LOW ENERGY PORTAL SYSTEM (FFP)CLIN 001CLIN 101CLIN 201CLIN 301CLIN 401
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTotal
X104LEP-Type 1 (less than 5 units)FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00$0.00
X105LEP-Type 1 (units 5-10)FFUP5$0.00$0.00FFUP5$0.00$0.00FFUP5$0.00$0.00FFUP5$0.00$0.00FFUP5$0.00$0.00$0.00
X106LEP-Type 1 (units 11-20)FFUP11$0.00$0.00FFUP11$0.00$0.00FFUP11$0.00$0.00FFUP11$0.00$0.00FFUP11$0.00$0.00$0.00
X107LEP-Type 1 (more than 20 units)FFUP21$0.00$0.00FFUP21$0.00$0.00FFUP21$0.00$0.00FFUP21$0.00$0.00FFUP21$0.00$0.00$0.00
X108LEP-Type 2 (less than 5 units)FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00$0.00
X109LEP-Type 2 (units 5-10)FFUP5$0.00$0.00FFUP5$0.00$0.00FFUP5$0.00$0.00FFUP5$0.00$0.00FFUP5$0.00$0.00$0.00
X110LEP-Type 2 (units 11-20)FFUP11$0.00$0.00FFUP11$0.00$0.00FFUP11$0.00$0.00FFUP11$0.00$0.00FFUP11$0.00$0.00$0.00
X111LEP-Type 2 (more than 20 units)FFUP21$0.00$0.00FFUP21$0.00$0.00FFUP21$0.00$0.00FFUP21$0.00$0.00FFUP21$0.00$0.00$0.00
X112LEP-Type 3 (less than 5 units)FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00$0.00
X113LEP-Type 3 (units 5-10)FFUP5$0.00$0.00FFUP5$0.00$0.00FFUP5$0.00$0.00FFUP5$0.00$0.00FFUP5$0.00$0.00$0.00
X114LEP-Type 3 (units 11-20)FFUP11$0.00$0.00FFUP11$0.00$0.00FFUP11$0.00$0.00FFUP11$0.00$0.00FFUP11$0.00$0.00$0.00
X115LEP-Type 3 (more than 20 units)FFUP21$0.00$0.00FFUP21$0.00$0.00FFUP21$0.00$0.00FFUP21$0.00$0.00FFUP21$0.00$0.00$0.00
X116UVBxFFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00FFUP1$0.00$0.00$0.00

Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 $0.00

Base YearOption Year 1Option Year 2Option Year 3Option Year 4
SITE DESIGN (FFP)CLIN 002CLIN 102CLIN 202CLIN 302CLIN 402
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTotal
X200Program Management and Operations Labor- Fully BurdenedT&M1$0.00$0.00T&M1$0.00$0.00T&M1$0.00$0.00T&M1$0.00$0.00T&M1$0.00$0.00$0.00
X201TravelCost reimbursable1$0.00$0.00Cost reimbursable1$0.00$0.00Cost reimbursable1$0.00$0.00Cost reimbursable1$0.00$0.00Cost reimbursable1$0.00$0.00$0.00
X202Site DesignFFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00$0.00
X203Concept ReviewFFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00$0.00
X20450% DesignFFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00$0.00
X20595% DesignFFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00$0.00
X206Issued for Construction DrawingsFFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00FFP1$0.00$0.00$0.00
Total Site Design$0.00Total Site Design$0.00Total Site Design$0.00Total Site Design$0.00Total Site Design$0.00$0.00
Base YearOption Year 1Option Year 2Option Year 3Option Year 4
CIVIL WORKS (T&M)CLIN 003CLIN 103CLIN 203CLIN 303CLIN 403
Sub - CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTotal
X300Mobilization and Site Preparations, Securing the site, DemobilizationT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X301Command Center-New ConstructionT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X302Command Center-RetrofitT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X303Demolition/Excavation/Removal/Saw CutT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X304Clearing/Grubing, Dirt Work (balancing cut/fill), Compaction, DrainageT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X305Electrical/Plumbing/MechanicalT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X306Concrete/Asphalt/Footers/Foundations/Lanes of TrafficT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X307Steel WorkT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X308Traffic Control Measures, Jersey Barriers, Speed bumps, striping, signageT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X309IT Trenches, Conduit, Conduit Banks, Junction Boxes, Pull StringsT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X310Site SurveyT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X311SWPPP, PermitingT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0

Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 $ - 0

Base YearOption Year 1Option Year 2Option Year 3Option Year 4
FURNITURE, FIXTURES, AND EQUIPMENT (FFP)CLIN 004CLIN 104CLIN 204CLIN 304CLIN 404
Sub - CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTotal
X400Analyst StationFFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X401Operator StationFFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X402Situational WallFFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X403Furniture and fixturesFFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X404GeneratorsFFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X405Uninterrupted Power SuppliesFFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X406Power ConditionersFFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X407Operator Booth (8'x12')FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X408Operator Booth (12'x16')FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X409LaptopsFFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0

Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 $ - 0

Base YearOption Year 1Option Year 2Option Year 3Option Year 4
INSTALLATION (T&M)CLIN 005CLIN 105CLIN 205CLIN 305CLIN 405
Sub - CLINDescriptionTypeRateAmountTypeRateAmountTypeRateAmountTypeRateAmountTypeRateAmountTotal
X500InstallationT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X501IntegrationT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X502Blanking SolutionT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X503System TestingT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X504Software installation/upgradeT&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0T&M1$0.00$ - 0$ - 0
X505License Plate Reader (LPR)FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X506Pan-Tilt-Zoom (PTZ) CameraFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X507Optical Character Recognition SystemFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X508Traffic Control SystemFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0

Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 $ - 0

Base YearOption Year 1Option Year 2Option Year 3Option Year 4
TRAINING (FFP)CLIN 006CLIN 106CLIN 206CLIN 306CLIN 406
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmount
X600Training DevelopmentFFP1$0.00$ - 0FFP0$ - 0FFP0$ - 0FFP0$ - 0FFP0$ - 0$ - 0

Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 $ - 0

Base YearOption Year 1Option Year 2Option Year 3Option Year 4
PREVENTATIVE MAINTENANCE OPTIONS (FFP)CLIN 007CLIN 107CLIN 207CLIN 307CLIN 407
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmount
X700LEP ServiceFFUP0$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X701UVBx ServiceFFUP0$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0$ - 0
Base YearOption Year 1Option Year 2Option Year 3Option Year 4
CORRECTIVE MAINTENANCE OPTIONS (FFP)CLIN 009CLIN 109CLIN 209CLIN 309CLIN 409
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmount
X800LEP ServiceFFUP0$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
X801UVBx ServiceFFUP0$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0FFUP1$0.00$ - 0$ - 0
Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0$ - 0
Base YearOption Year 1Option Year 2Option Year 3Option Year 4
WARRANTY PERIODS (FFP)CLIN 011CLIN 111CLIN 211CLIN 311CLIN 411
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTotal
X110LEP-Required Comprehensive Base Warranty (1 Year)FFP1$0.00$ - 0FFP0$0.00$ - 0FFP0$0.00$ - 0FFP0$0.00$ - 0FFP0$0.00$ - 0$ - 0
X126LEP-Type 1 Two Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X127LEP-Type 1 Three Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X128LEP Type 1 Four Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X129LEP Type 1 Five Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X130LEP-Type 2 Two Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X131LEP-Type 2 Three Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X132LEP Type 2 Four Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X133LEP Type 2 Five Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X134LEP-Type 3 Two Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X135LEP-Type 3 Three Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X136LEP Type 3 Four Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X137LEP Type 3 Five Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X115UVBx-Required Comprehensive Base Warranty (1 Year)FFP1$0.00$ - 0FFP0$0.00$ - 0FFP0$0.00$ - 0FFP0$0.00$ - 0FFP0$0.00$ - 0$ - 0
X138UVBx-Two Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X139UVBx-Three Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X140UVBx-Four Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
X141UVBx-Five Years of WarrantyFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0

Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 $ - 0

Base YearOption Year 1Option Year 2Option Year 3Option Year 4
ON-DEMAND SERVICES (FFP)

tc={E7390B8D-EE95-4665-A268-9E4FDA9CD2C5}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

[Tasks]

There is a task anchored to this comment that cannot be viewed in your client.

Comment:

@SHEYYAB, ALLA S I added an on-demand services section here we will need to work on completing.

Reply:

My understanding is this line is for on-demand repair services (at least that’s my understanding from ILD spreadsheet). Some of the sub-CLINs here, such as “site work” are covered under civil works. It’s close to impossible to try and break the site work cost out of the civil works CLIN. I recommend renaming the “Civil works” CLIN if on-demand services is the preferred nameCLIN 012CLIN 112CLIN 212CLIN 312CLIN 412
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTotal
X126On-Demand Services (On-demand system repair)FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
Engineering ServicesFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
Ad Hoc ReportsFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
Site SurverysFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
Provisioning SupportFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
Retrofit SupportFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
Relocation ServicesFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
Site WorkFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
DisposalFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
Emergency ServicesFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
Special EventsFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
Training ActivitiesFFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0FFP1$0.00$ - 0$ - 0
Total General Requirements$ - 0Total General Requirements$ - 0Total General Requirements$ - 0Total General Requirements$ - 0Total General Requirements$ - 0$ - 0
Base YearOption Year 1Option Year 2Option Year 3Option Year 4
INDIRECT RATESCLIN 012CLIN 112CLIN 212CLIN 312CLIN 412
Sub-CLINDescriptionTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmount
X142G&A
X143T&M
X144Profit
Base YearOption Year 1Option Year 2Option Year 3Option Year 4
INCENTIVE POOLCLIN 013CLIN 113CLIN 213CLIN 313CLIN 413
Sub-CLINDescription (would need a CLIN for each Option Year)TypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmountTypeQtyRateAmount
Year 1 Incentives: Equipment CLIN
Year 1 Incentives: Warranty CLIN
Total General Requirements$0.00Total General Requirements$0.00Total General Requirements$0.00Total General Requirements$0.00Total General Requirements$0.00$ - 0
Total Price Per Period$0.00$0.00$0.00$0.00$0.00$ - 0
Check
ERROR:#REF!

@SHEYYAB, ALLA S I added an on-demand services section here we will need to work on completing.

My understanding is this line is for on-demand repair services (at least that’s my understanding from ILD spreadsheet). Some of the sub-CLINs here, such as “site work” are covered under civil works. It’s close to impossible to try and break the site work cost out of the civil works CLIN. I recommend renaming the “Civil works” CLIN if on-demand services is the preferred name

&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED

Price Justification Price Justification tc={D7DA409D-6A65-4605-848C-D6EACE50A7E7}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

The IGCE should be accompanied by a Summary which describes the assumptions/bases/methods for developing it, including escalation rates applied to the outyears.

The IGCE should be accompanied by a Summary which describes the assumptions/bases/methods for developing it, including escalation rates applied to the outyears.

Assumptions

Project/Price Assumptions
Allowances, Assumptions, Exclusions and Exceptions:

File details come from the government source that posted it. Updated .