This file is Attachment 10 to a U.S. Customs and Border Protection (CBP) solicitation for Non-Intrusive Inspection (NII) Systems—Large-Scale Fixed Systems. The document serves as a reference guide containing acronyms, abbreviations, and definitions specific to the contract opportunity.
The document provides comprehensive technical and administrative terminology relevant to NII large-scale fixed systems used for cargo and vehicle inspection at ports of entry. Key acronym categories include government and organizational entities (DHS, CBP, OFO, FLETC), technical systems and equipment (CAVSS, RPM, UVBS, LEP, MEP, HE Rail), information technology and security standards (FISMA, NIST, AES, PKI, CUI), testing and quality assurance processes (FAT, SAT, ATP, QAP, QASP), and contract management terms (CLIN, COR, CO, FAR, RFP). Definitions address critical operational and technical concepts including deployment, integration platforms (air-gapped, BSDP, common integration platform), radiographic imaging, radiation control areas, maintenance types (corrective and preventative), performance metrics (throughput, availability), requirement levels (threshold versus objective values), and system components (LEP Types 1-3 for different vehicle classes, large-scale equipment capabilities). The document establishes standardized language for contract communications between CBP, contractors, and stakeholders involved in the design, testing, deployment, and maintenance of non-intrusive inspection equipment at U.S. borders.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Homeland Security U.S. Customs and Border Protection
Attachment 10 – Acronyms, Abbreviations, and Definitions
For:
U.S. CUSTOMS AND BORDER PROTECTION
NON-INTRUSIVE INSPECTION SYSTEMS
Large-Scale Fixed Systems
PREPARED BY:
Office of Field Operations
Innovation and Strategy Directorate Non-Intrusive Inspection Program Office
ATTACHMENT 10 – ACRONYMS, ABBREVIATIONS, & DEFINITIONS
Table of Contents 1 Acronyms and Abbreviations
A
B
C
D
E
F
G
H
I
J
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
2 Definitions
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Version Date Comments
V1 7/14/2025 First draft, Kaitlin Merli and Cindy Savage
Acronyms, Abbreviations, and Definitions
1 Acronyms and Abbreviations
A
ACE Automated Commercial Environment AES Advanced Encryption Standard ANSI American National Standards Institute Ai Inherent Availability Ao Operational Availability AQUA Advanced Qualified Unlading Approval ASC Area Surveillance Camera ASCE American Society of Civil Engineers ATO Authority to Operate ATP Acceptance Test Plan ATS Automated Targeting System
B
BSDP Bilateral Site Deployment Plan BLSR Baseline Security Requirements BPMN Business Process Modeling Notation BSLR Baseline Security Requirements
C
CA Chief Architect CAVSS Cargo Advanced Vehicle Scanning System CBP Customs and Border Protection CCTV Closed Circuit Television CFR Code of Federal Regulations CICS Customer Information Control System(s) CIO Chief Information Officer CIRT Computer Incident Response Team CISO Chief Information Security Officer CLIN Contract Line Item Number CMII Institute for Configuration Management CO Contracting Officer CONOP Concept of Operations CONUS Continental United States COR Contracting Officer Representative
COTS Commercial Off the Shelf CPARS Contractor Performance Assessment Reports CSO Chief Security Officer CTO Chief Technology Officers CUI Controlled Unclassified Information CWT Customer Wait Time
D
DHS Department of Homeland Security DID Data Item Description DS Data Store DTOPS Decal and Transponder Online Procurement System DUNS Data Universal Numbering System
E
EA Enterprise Architecture ECP Engineering Change Proposal EDMO Enterprise Data Management Office EIOD Enterprise Infrastructure and Operation Directorate EIT Electronic and Information Technology ESOC Enterprise Security Operations Center ETA Estimated Time of Arrival
F
FAR Federal Acquisition Regulations FAT Factory Acceptance Test / First Article Test FCR Final Configuration Review FCU Flex Control Unit FEA Federal Enterprise Architecture FIPS Federal Information Processing Standards FISMA Federal Information Security Management Act FLETC Federal Law Enforcement Training Center FRD Functional Requirements Document FSE Field Service Engineer FT Factory Test
G
GFE Government Furnished Equipment GIF Graphics Interchange Format GOTS Government Off the Shelf GSA General Services Administration GSS General Support System
H
HE Rail High-Energy Rail Inspection System HLS Homeland Security HMI Human Machine Interface HRM Human Resources Management HTTP Hyper Text Transfer Protocol HTTPS Hyper Text Transfer Protocol Secure
I
IA Information Assurance IB In Bound ICCB Infrastructure Change Control Board ICD Interface Control Document ICAM Identity Credential and Access Management ID Identification IDIQ Indefinite Delivery/Indefinite Quantity IDP Integrated Data Package IDS Image Data Set ILD Integrated Logistics Division IMI Interactive Multimedia Instruction IPP Invoice Processing Platform IPT Integrated Project Team ISB Instructional Systems Design IT Information Technology ITB Interdiction Technology Branch
J
JSON JavaScript Objection Notification
L
LBI Land Border Integration LED Light Emitting Diode LEP Low-Energy Portal LPR License Plate Reader LS Large Scale LSC Lane Security Controller LSSD Laboratories and Scientific Services Directorate
M
MD Management Directive MEP Multi-Energy Portal MM Mexican State Codes MSD Mission Support Directorate MSDS Material Safety Data Sheet MTBF Mean Time between Failures MTTR Mean Time to Repair
N
NEC National Electrical Code NIDS Network Intrusion Detection System NIEM National Information Exchange Model NII Non-Intrusive Inspection NII PMO Non-Intrusive Inspection Program Management Office NIST National Institute of Standards and Technology NRC Nuclear Regulatory Commission NSA National Security Agency
O
OAST Office of Accessible Systems and Technology OCONUS Outside Continental United States OCR Optical Character Recognition OEM Original Equipment Manufacturer OFO Office of Field Operations OIT Office of Information and Technology
OMB Office of Management and Budget O&M Operations and Maintenance OSHA Occupational Safety and Health Administration OTD Office of Training and Development
P
PALMS Performance and Learning Management System PCII Protected Critical Infrastructure Information PII Personally Identifiable Information PIV Personal Identity Verification PLC Programmable Logic Controllers PKI Public Key Infrastructure PM Program Manager PMR Program Management Review POA&M Plan of Action and Milestone POC Point of Contact POE Port of Entry POL Petroleum, Oil, and Lubricants POV Privately Owned Vehicles PPIP Preplanned Product Improvement Plan PNG Portable Network Graphics PQS Personal Qualification Standard
Q
QAP Quality Assurance Plan QASP Quality Assurance Surveillance Plan QCP Quality Control Plan QR Quick Reader
R
RDE Radiation Detection Equipment RFIC Radio Frequency Integrated Circuit RFID Radio-Frequency Identification RFP Request for Proposal ROI Region of Interest RPM Radiation Portal Monitor RV Recreational Vehicles
S
SAT Site Acceptance Test SATP Site Acceptance Test Plan SCORM Sharable Content Object Reference Model SDLC System Development Life Cycle SIEM Security Information Event Management SLEP Service Life Extension Programs SPII Sensitive Personally Identifiable Information SOC Security Operations Center SOW Statement of Work SR System Review STIG Security Technical Implementation Guide
T
TBD To be determined TCS Traffic Control System TI Technology Insertion TIFF Tag Image File Format TO Task Order TRM Technical Reference Model TSD Technology Service Desk
U
UML Universal Modeling Language UL Underwriter’s Laboratories USBP United States Border Patrol USC United States Code USGCB US Government Configuration Baseline UVBS Under-Vehicle Back-Scatter System
V
W
WCF Work Completion Form WME Weapons of Mass Effect WO Work Order
X
Y
Z
2 Definitions
A Advanced "smart" signal processing - Automatically identifies threats in an image without any Operator action.
B
C Capture – Recording a readable image of the license plate.
Command Center – Defined location in which the controls for a system reside.
Configuration Baseline –
• An agreed-to description of the attributes of a product, at a point in time, which serves as a basis for defining change.
• An approved and released document, or set of documents, each of a specific revision;
the purpose of which is to provide a defined basis for managing change.
• The currently approved and released configuration documentation.
• A released set of files comprising a software version and associated configuration documentation.
Controlled Environment - Any personnel, systems, networks, vehicles or facilities that are under direct operations and security of CBP personnel.
Corrective Maintenance – Any maintenance and sustainment activity which is required to diagnose, correct equipment malfunctions, failures, and outages that have occurred or is in the process of occurring.
Critical Design Review - the last review of the contractor’s proposed system to conform to SOW/FRD requirements prior to Factory Testing and production of systems. In essence, CBP’s last review of the system to ensure it meets our requirements.
Critical Item – An identified weak link in a system, has an adverse impact on, or contributes to failures of the system performing its mission, creates potential safety problems, or contributes to other areas of high risk to overall system reliability.
D Data Item Description - A completed document that defines the data required of a Contractor.
Day – Means “calendar” day unless otherwise specified.
Deployment - The process of successfully installing, configuring, and integrating equipment, ensuring its acceptance through testing and validation, and achieving full operational status to meet intended functionality and performance requirements.
E Engineering Change Proposal – Proposals to enhance the value of the finished goods or services to the Government or reduce the cost of the goods or services.
F First Article – Means the initial production unit from the first lot.
G Government Furnished Information - data and information in the possession of or acquired by the Government and made available to the Contractor.
H
I Image Data Set - All elements of a scanned image to include the radiographic image, snapshots, data sheets or scanned manifests, notes and the release/hold resolution.
Information Assurance – Is considered a requirement for all systems used to input, process, store, display, or transmit sensitive or national security information.
Integration –
• Air Gapped - process of designing, implementing, and managing the interconnection and interoperability of multiple independent IT systems, hardware, or software components within a physically isolated (air-gapped) environment. An air-gapped system is one that is completely separated and not integrated to networks, such as the public internet or other internal networks.
• Border Security Deployment Program (BSDP) - process of coordinating and connecting various border security technologies, systems to create a unified, effective, and secure operational environment. This integration ensures that disparate systems— such as surveillance sensors, biometric identification, communications, command and control, and data analytics—work together seamlessly to support border security missions.
• Common Integration Platform - a switch or data aggregator/transferer that allows all of CBPs various inspection technologies, regardless of manufacturer, to "speak the same language" and share information seamlessly.
• Interface Control Document – o NII POV ICD - describes the interface between the Land Border Integration (LBI)
NII Lane Security Controller Unit, Flex Control Unit, LBI Server, and X-ray inspection system for the purposes of displaying adjudication results and lane data to the Booth Officers and Booth Officers acknowledge the adjudication results.
o Large-Scale X-Ray (LSX) ICD - specifies the interface requirements participating systems must meet to transfer data from x-ray imaging systems to CBP’s cloud.
J
K
L Large Scale - Equipment capable of scanning large cargo to include pallets, sea containers, trucks and similar.
LEP Type 1 - Portals with a limited footprint to support high traffic volume scanning in pre/post primary passenger vehicle operations.
LEP Type 2 - Portals with a larger footprint and top down and side views to support secondary passenger vehicle operations.
LEP Type 3 - Portals to accommodate Bus and Truck/Semi-Trailer scanning operations.
M Maximum Controlled Operating Area - Area defined by this document in which specified equipment must be able to operate.
Mobile type systems - Imaging systems which are mounted on a self- powered vehicle and capable of being driven on public roads.
N Non-Intrusive Inspection - Non-destructive methods of inspecting and identifying goods in transportation systems.
O Objective – A level of performance that significantly improves mission performance, safety, or supportability beyond that of the threshold value, and represents the maximum desired yield for system performance is considered an objective.
Objective Values are not required but can be defined to provide guidance to the Contractor with respect to areas where increased capability is of interest/value to the Government. If Objectives are defined, the interval between the Objective and Threshold values for a given parameter is the government program manager’s (PM) trade-space.
P Payment Request – any request for contract financing payment or invoice payment by the Contractor. The Payment request shall comply with the requirements identified in FAR 32.905(b), “Payment documentation and process” and the applicable Prompt Payment clause in the awarded contract.
Preventative Maintenance – Any scheduled and planned maintenance actions performed to maintain the target Operational Availability (Ao) and maintenance metrics to include periodic inspections, calibration, oil change, filter replacement, wiper blades, tires, condition monitoring, critical item replacement, and vehicle/chassis and system servicing requirements.
Q
R Radiation Control Area - An area to which access is managed to protect individuals from exposure to radiation or radioactive material.
Radiographic Image - An image produced by a panel of solid state detectors after the radiation from a source has passed through the object being imaged or has been reflected back by it.
S Single Requirement – Some requirement will have only a single parameter value and, when this is the case, these values are thresholds.
T Threshold - The minimum level of operational performance that the Government is willing to accept is considered a threshold value.
Throughput - Number of scans of objects within a defined time.
U
V Video Image Capture "snapshot" - Capturing a snapshot or still image of an area or object on a video screen.
W
Warranty - Guarantee stipulating repeat failure or collateral damage due to a faulty replacement part or workmanship will be repaired by the Contractor free of charge for a minimum period of one (1) year or more.
Work Completion Form – A unique service ticket or form specific to each vendor or O.E.M.
Work Order – A Government assigned work ticket number that is unique to a specific maintenance event; there is one (1) WO per requested individual activity or reported problem.
X
Y
Z
Remainder of page left intentionally blank
| 1 Acronyms and Abbreviations |
| A |
| B |
| C |
| D |
| E |
| F |
| G |
| H |
| I |
| J |
| L |
| M |
| N |
| O |
| P |
| Q |
| R |
| S |
| T |
| U |
| V |
| W |
| X |
| Y |
| Z |
| 2 Definitions |
| A |
| B |
| C |
| D |
| E |
| F |
| G |
| H |
| I |
| J |
| K |
| L |
| M |
| N |
| O |
| P |
| Q |
| R |
| S |
| T |
| U |
| V |
| W |
| X |
| Y |
| Z |
File details come from the government source that posted it. Updated .