DRAFT - Attachment 05 - Testing Requirements.pdf
PDF 218 KB Posted
- Attached to
- Request for Information (RFI) - Large-Scale Fixed Systems - Multi-Energy Portal and Low-Energy Portal
- Solicitation number
- 70B03C26R00000089
About this file
Testing Requirements for CBP Non-Intrusive Inspection Systems - Large-Scale Fixed Systems
This document is Attachment 05 to a U.S. Customs and Border Protection (CBP) contract solicitation, establishing comprehensive testing requirements for large-scale fixed Non-Intrusive Inspection (NII) Systems. The contractor must perform quality control and testing to ensure systems conform to CBP-approved technical documentation, including development of an Acceptance Test Plan (ATP) submitted in editable format for government approval. Testing standards include ANSI N42.46-2008 for image quality evaluation, a mandatory 40-hour system burn-in period, and compliance with data integration requirements per Attachments 02, Exhibit A (POV ICD Vendor), and Exhibit B (LSX ICD). The contractor is responsible for conducting Factory Tests at its facility for all units to verify suitability for shipment to designated Ports of Entry, with CBP technical team members retaining the right to observe and augment testing. Test Result Reports must be submitted to the Non-Intrusive Inspection Division (NIID) and Contracting Officer's Representative (COR) regardless of pass or failure status.
Material discrimination testing requires demonstration of the system's ability to differentiate three or four material categories (organic, intermediate, metallic, heavy metal) using test fixtures with specific materials including High Density Polyethylene, Aluminum, Steel, and Lead, with success criteria of 90% of plates displaying proper color across twelve scans. Radiation safety requirements mandate compliance with OSHA, NRC regulations, and ANSI N43.3-2008 and N43.14-2011 standards, with radiological surveys signed by a Radiation Safety Officer accompanying each delivered system. Contractors must conduct radiation surveys prior to site acceptance and annually thereafter, with surveys submitted to the ILD Operations Center within 48 hours of completion and compliance with CFR 21 Part 1020.31 standards for cabinet X-ray systems. CBP Site Acceptance Testing occurs at designated locations following contractor pre-SAT documentation review and cannot commence until the Office of Training and Development approves the training package and CBP approves the test plan.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Homeland Security U.S. Customs and Border Protection
Attachment 05 – Testing Requirements
For:
U.S. CUSTOMS AND BORDER PROTECTION
NON-INTRUSIVE INSPECTION SYSTEMS
Large-Scale Fixed Systems
PREPARED BY:
OFFICE OF FIELD OPERATIONS
INNOVATION AND STRATEGY DIRECTORATE
NON-INTRUSIVE INSPECTION PROGRAM OFFICE
LOGISTICS/DEPLOYMENT BRANCH
January 29, 2026
ATTACHMENT 05 – TESTING REQUIREMENTS
Table of Contents
1 Quality Control and Testing
1.1 Quality Control
1.2 Contractor Testing
1.2.1 Acceptance Test Plan (ATP)
1.3 First Article Testing
1.4 CBP Factory Testing
1.5 CBP Site Acceptance Testing
1.6 Material Discrimination Testing
2 Radiation Safety
2.1 Radiation Safety Design Review
2.2 Radiological Survey and Report
2.3 Radiation Survey and Report
Version Date Comments V1 7/14/2025 First draft, Kaitlin Merli and Cindy Savage 8/22/2025 NIID revisions
Testing
1 Quality Control and Testing The Contractor shall perform inspections and tests necessary to ensure that LS- NII Systems conform to CBP approved technical documentation and configuration.
1.1 Quality Control
The Contractor shall provide for Government review a Quality Control Plan prepared in accordance with the Statement of Work and Attachment 07, Deliverables as it pertains to measuring performance of the system production and manufacturing.
1.2 Contractor Testing
The Contractor shall develop separate Test Plans for, as a minimum, those tests which are designated as being witnessed or performed by the Government. The Test Plans shall detail the required tests that the Contractor shall perform to successfully complete the testing of the production and quality assurance phases of production and installation.
The Contractor shall utilize the following standard, ANSI N42.46-2008 American National Standard for Determination of the Imaging Performance of X-Ray and Gamma- Ray Systems for Cargo and Vehicle Security Screening for the testing and evaluation of image quality. The Contractor shall provide the test articles as defined in ANSI N42.46- 2008 to affect this level of testing. In addition, the Contractor's tests shall include a 40-hour "burn-in" period of the entire integrated system to ensure component(s) failures are discovered and corrected prior to any CBP tests.
1.2.1 Acceptance Test Plan (ATP)(TE001)
The Contractor shall be responsible for the preparation of and submission to the Government for approval, an Acceptance Test Plan (ATP). Using the approved ATP, the Contractor shall perform the tests necessary to ensure that the system meets the performance requirements of Attachment 1a, Functional Requirements Document (FRD) – MEP and 1b, Functional Requirements Document (FRD) – LEP and that the system can be operated as specified in the system's User Manual. The ATP details the required tests that the Contractor shall perform to successfully complete the testing of the production and quality assurance phases of development and production. It shall be written in sufficient detail so that the Government can be assured that when the system is ready for Government acceptance testing, it has in fact tested and met all SOW and contract delivery requirements.
The ATP shall be utilized to establish testing guidelines and support the requirements needed to conduct the test program. The ATP shall be submitted in an editable format, such as word.
The ATP shall include the following.
• Personnel and materials needed to successfully complete the Contractor's final Factory/Site Acceptance Test.
• An inventory of all FT/SAT required documents and major components including software. This is to include the serial numbers of hardware items, and the software version numbers
• The results of supporting test standards such as the ANSI N 42.46 Performance Test, Material Discrimination Test and Radiation Survey; this includes test fixtures.
• All normal and emergency system operations of a fully integrated system.
This shall include start up, safety checks, scanning, image analysis, image and Image Data Set operations (printing, exporting, copying, and deleting), and shut down.
• Compliance with data configuration and transmission requirements as required in Attachments 02 – Integration Overview and, as, appropriate Exhibit A –POV ICD Vendor or Exhibit B – LSX ICD.
1.3 First Article Testing
For this contract, the “First Article” means the initial production unit from the first lot. The first article testing shall include testing and evaluating the first article for conformance with specified contract requirements in the initial stage of production, prior to full system deployment. The Government will conduct the first article testing of the performance and other characteristics that the first article must meet for approval according to the ATP and conduct further system characterization testing for a period of 180 days of operation at the deployment location. The Government reserves the right to conduct Factory Testing on additional system components.
The Government will inform the contracting office whether to approve, conditionally approve, or disapprove the first article. The contracting officer shall then notify the contractor of the action taken and furnish a copy of the notice to the contract administration office. The notice shall include the first article shipment number, when available, and the applicable contract line-item number. Any changes in the drawings, designs, or specifications determined by the contracting officer to be necessary will be made under the Changes clause, and not by the notice of approval, conditional approval, or disapproval furnished by the contractor.
The Contractor shall not proceed with production of additional units beyond the first article unless otherwise directed by the contracting office.
1.4 CBP Factory Testing
A CBP Factory Test (FT) of all units shall be conducted at the Contractor's facility to verify that the unit is suitable for shipment to its intended Port of Entry (POE). The FT shall be conducted in accordance with a CBP FT Plan for that system. The Contractor shall provide the appropriate test articles for the CBP team to test the technical performance in accordance with the ANSI N42.46-2008 standards. At the time of CBP FT, the vendor shall provide to CBP samples of LSX compliant data packages for confirmation of compliance.
The Contractor is responsible for conducting Factory Tests. CBP Technical Team Members reserve the right to observe, augment and evaluate the Contractor's Factory Test program on an "as required" basis. Contractors shall submit Test Result Reports to the NIID and the COR upon completion of tests, regardless of whether the unit passed or failed.
1.5 CBP Site Acceptance Testing
A CBP Site Acceptance Test (SAT) shall be conducted in accordance with a CBP SAT Plan (SATP) for that system for each unit at its designated location. The CBP SAT shall consist of a review of the Contractor's pre-SAT documentation and Radiation Survey/Leak Test Report (Attachment 7, Deliverables), plus an inventory and physical inspection of the system, system component operations and tests of the total integrated system against actual targets. The Contractor may be required to provide test articles for the (SAT) as determined by the SAT Plan or the Test Manager. This allows CBP to verify that the system performance has not degraded during transit. The CBP SAT shall not occur until OTD has approved the training package and CBP has approved the test plan
1.6 Material Discrimination Testing
In the absence of an ANSI for Material Discrimination the following characteristics shall be tested, using the following or similar test fixtures, and shall be required to meet the following success rates. The two following characteristics shall be demonstrated:
The first characteristic is the system's ability to differentiate and identify the three or four categories of material (organic, intermediate, metallic (Threshold), and heavy metal (Objective)) from each other as a function of color when they are placed in close proximity to one another. The materials suggested are High Density Polyethylene (HDPE), Aluminum (Al), Steel, and Lead (Pb). The materials used shall all have the same attenuation, which can be between 20X and 50X. The test fixture used shall be able to hold at least two plates of each material. Success shall be based on the number of plates where at least 50% of the surface is the correct color. Twelve scans shall be required and 90% of the plates must display the proper color.
The second characteristic to be demonstrated is the system's attenuation range for two of the materials. For a three-material category system, the material used shall be HDPE and Steel. For a four-material category system, the material used can be either HDPE Steel or Al & Pb. There shall be at least 7 different thickness (steps) of each material.
One step shall be so thin that the system cannot properly identify the material and therefore it appears gray. The other step shall be so thick that the system cannot properly identify the material and therefore it appears black. All the other steps shall vary in color intensity as a function of their thickness (the thicker the step, the more intense the color). Success shall be based on the number of steps where at least 75% of the surface is the correct color intensity. Twelve scans shall be required and 90% of the steps must display the proper color intensity.
1.7 Data Integration Testing
Data integration test plans shall be coordinated between CBP and the Contractor. Data Integration testing shall be conducted at both the Factory Test and the Site Acceptance Test. This allows CBP to verify that the system meets all data integration and transmission requirements cited in Attachments 02 – Integration Overview and, as, appropriate Exhibit A – POV ICD Vendor or Exhibit B – LSX ICD Test plans shall include conducting end-to-end data transmission testing within a live traffic environment.
2 Radiation Safety The Contractor shall maintain a system safety program that continually identifies all hazards and provides a methodology to either eliminate or control these identified hazards.
All products, designs, and specifications provided, and all construction and installation activities conducted shall comply with all OSHA and NRC regulations, as well as any other appropriate laws, regulations, standards, codes and health and safety guidelines.
(See SOW Section 6, Applicable Documents for further details.)
2.1 Radiation Safety Design Review
The Contractor shall demonstrate the construction techniques, practices and design of the protective shielding/cabinet interfaces (corner joints, collimator joints, imaging source housing, etc.) and shall be in compliance with ANSI N43.3- 2008 and N43. 14- 2011 standards for their system. (See Section 6, Applicable Documents for further details.)
The Contractor shall ensure that any movement or shifting that may be associated with a system shall not produce or lead to emission leaks from cracks, stress or misalignment of the structures and shielding devices that are either associated with the primary beam containment or scatter containment scheme.
2.2 Radiological Survey and Report (TE002)
The Contractor shall be required to conduct a radiological survey to ensure that radiation emissions are within specified limits. A radiological survey carried out on the LS-NII unit, signed by the Radiation Safety Officer, shall accompany each system delivered by the company. This survey shall address both the radiation levels that LS- NII Inspection System operators shall be exposed to while at their workstations and the level of radiation that is transmitted to the environment as a result of system leakage.
The report shall show that by means of an outline drawing the levels of emission/scatter radiation measured, the operating conditions (worst case) and the measurement equipment used. The Contractor shall provide a radiological survey report and a Radiation Survey/Leak Test Report in accordance with Attachment 7, Deliverables for each system delivered.
2.3 Radiation Survey and Report
The Contractor shall perform Radiation Surveys prior to site acceptance and annually thereafter for the systems that contain radiation emitting devices (X-Ray systems). The X-ray systems shall be in compliance with CFR 21 Part 1020.31 of U.S. Food and Drug Administration: Performance Standards for Ionizing Radiation Emitting Products - Cabinet X-ray Systems. The Contractor shall provide a radiation survey report to the ILD Operations Center within 48 hours of completion. A Radiation Survey Report shall be submitted with the proposal and each Site Acceptance Test.
Remainder of page left intentionally blank
| 1 Quality Control and Testing |
| 1.1 Quality Control |
| 1.2 Contractor Testing |
| 1.2.1 Acceptance Test Plan (ATP)(TE001) |
| 1.3 First Article Testing |
| 1.4 CBP Factory Testing |
| 1.5 CBP Site Acceptance Testing |
| 1.6 Material Discrimination Testing |
| 2 Radiation Safety |
| 2.1 Radiation Safety Design Review |
| 2.2 Radiological Survey and Report (TE002) |
| 2.3 Radiation Survey and Report |