DRAFT_Drawing 04 MABH-Architecture.pdf

PDF 23 MB Posted

Attached to
Sources Sought - Hospital Modernization Misawa Air Base, Japan Federal contract opportunity
Solicitation number
FA5205-21-PKP-002
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document is a sources sought notice for a hospital modernization project at Misawa Air Base in Japan. The Department of the Air Force Pacific Air Forces is seeking industry input to determine the availability of potential sources that can fulfill project requirements. No formal solicitation exists yet. Interested parties can provide voluntary responses through January 2022 to help develop an acquisition strategy. The draft specification and drawings are attached for informational purposes only. The government will not reimburse costs associated with responding nor be liable for any response costs. All input received will be used within the Air Force to facilitate decision making for the hospital modernization project.

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought - Hospital Modernization Misawa Air Base, Japan, newest first.
File Type Posted
Sources Sought - Misawa Hospital Modernization_3Feb2021.docx DOCX document
DRAFT_Drawing 05 MABH-Interiors.pdf PDF
DRAFT_Drawing 09 MABH-Mechanical.pdf PDF
Sources Sought - Misawa Hospital Modernization.docx DOCX document
DRAFT_Drawing 07 MABH-FireProtection.pdf PDF
DRAFT_Drawing 02 MABH-Civil.pdf PDF
DRAFT_Specifications_Volume 2.pdf PDF
DRAFT_Drawing 01 MABH-General.pdf PDF
DRAFT_Drawing 08 MABH-Plumbing.pdf PDF
DRAFT_Drawing 03 MABH-Structural.pdf PDF
DRAFT_Drawing 06 MABH-Equipment.pdf PDF
DRAFT_Drawing 10 MABH-Electrical.pdf PDF
DRAFT_Specifications_Volume 1.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP UP

UPUP

U T S R Q P N M

L K J

H G F E D C B A

AREA OF RENOVATION, SEE

PHASED DEMOLITION PLANS

AREA OF RENOVATION, SEE

PHASED DEMOLITION PLANS

AD100A

C1

AD100A

A3

R.9

AREA D

AREA E

A R

E A

A

A R

E A

C

A R

E A

C

A R

E A

E

A R

E A

B

A R

E A

D

AD100A

A1

PHASE D1

PHASE A2

PHASE B2

AD100A

B3

AD100A

B1

PHASE A1

AREA OF RENOVATION, SEE

PHASED DEMOLITION PLANS

PHASE B1

D1

D1

D1

A R

E A

A

A R

E A

B

D2

D2

D1

D2

LEVEL 3 ALTERATION:

DEMOLITION INCLUDES ALL BUILDING SYSTEMS (MAIN STRUCTURAL SYSTEMS

EXCLUDED) FROM STRUCTURAL DECK BELOW TO STRUCTURAL DECK ABOVE AND

TO THE EXTERIOR STRUCTURAL ENVELOPE. REMOVE MEP SYSTEMS SERVING

ALTERATION AREAS THAT ARE LOCATED BELOW STRUCTURAL FLOOR SLAB,

ABOVE STRUCTURAL DECK AND ON THE ROOF. THIS INCLUDES DEMOLITION OF

SYSTEMS LOCATED OUTSIDE ALTERATION BOUNDARIES AS NECESSARY TO MEET

ALL CODES, CRITERIA, AND STANDARDS FOR THE NEW ALTERATION AREAS.

CONTINUOUS OPERATIONS OF ALL IMPACTED AREAS (TO INCLUDE AREAS OUTSIDE

OF LEVEL 3 ALTERATION) MUST BE MAINTAINED IN ACCORDANCE WITH THE

CONTRACT SPECIFICATIONS. REMOVE ALL EXISTING SYSTEMS SERVING THE

ALTERATION AREA INCLUDING BUT NOT LIMITED TO:

A. COMPLETE REMOVAL OF ALL EXISTING WALL PARTITIONS (TO INCLUDE

INFILL OF CONCRETE SLAB FLOOR TRENCHES THAT REMAIN AS A RESULT OF

PARTITION DEMOLITION), CEILINGS AND ALL ASSOCIATED SUPPORTS,

CEILING DEVICES, FLOOR FINISHES, LIGHTING, CASEWORK, MECHANICAL,

VENTILATION SYSTEMS, HVAC PIPING, HVAC CONTROLS, PLUMBING

FIXTURES, PLUMBING PIPING, FIRE PROTECTION PIPING AS NEEDED, LIFE

SAFETY (FIRE ALARM, MNS), MEDICAL GASES, ELECTRICAL, LOW VOLTAGE,

SIGNAGE/WAY FINDING, TELEPHONE AND COMMUNICATIONS.

B. REMOVAL OF ALL EXISTING FINISH SYSTEMS AND SUBSTRATES AT

BOUNDARY WALL PARTITIONS AND ANY INFRASTRUCTURE (OUTLETS,

DEVICES, ACCESSORIES, INSULATION, PLUMBING, MECHANICAL, HVAC,

PIPING, DUCTING, ELECTRICAL, COMMUNICATION AND ELECTRONIC

SECURITY SYSTEMS (CES), ETC.) LOCATED ON AND INSIDE OF WALL CAVITY.

C. REMOVAL OF ALL EXISTING ABANDONED DEVICES, INFRASTRUCTURE,

SECONDARY STRUCTURAL SUPPORTS, OPENINGS, AND EQUIPMENT

LOCATED ON ROOFS AND WITHIN BOUNDARY AREAS

ABOVE CEILING WORK:

CONTRACTOR IS RESPONSIBLE TO PROTECT EXISTING SPACE INCLUDING ALL

CEILING TILES, DIFFUSERS, LIGHT FIXTURES, WALLS AND FLOORS. ANY DAMAGE

DURING CONSTRUCTION MUST BE REPAIRED.

CONTRACTOR IS TO PROTECT SPACES BELOW ABOVE CEILING WORK FROM

DUST AND DEBRIS ASSOCIATED WITH COMPLETION OF THE WORK.

HATCHED AREA DENOTES EXTENTS OF LEVEL 3 ALTERATION

NOTES BELOW APPLY TO HATCHED AREA UNLESS KEYNOTED

OTHERWISE

HATCHED AREA DENOTES ROOM REQUIRING ABATEMENT, REFER TO

ABATEMENT REPORT.

LN25A LN26 LN25

LN26A

LN17

LN14

LN13

LN10

LN11

LN09

LN03

LN24

LN16

LN18

LN08

LN15

LN12

LN21

LN19

LN22

LN05

LN01

LN02

LN04

LN07

LN07A LN23

LN06

LM22

LM21

LM19

LM18

LM17

LM16

LM15

LM14

LM13

LL15

LL14

LL13

LL12

LK14 LK16 LK17 LK18 LK19

LK01LK11

LK13

LK07

LJ32

LJ31

LJ28

LJ08A

LJ08

LJ07 LJ06 LJ05 LJ04 LJ03 LJ02 LJ01 LB08

LK15

LL11

LL10

L-STAIR

C

L-ELEV

LL17

LL05

LL03

LM01

LM03

LM02

LL16

LL06

LM05

LM04

LK10LK03

LJ33 L-STAIR

B

LJ35

LJ27

LJ37

LJ36

LL07

LM06LM07

L-ELEV

LM27

LM08

LM12

LM24

LM11LM10

LM25

LM23

L-STAIR

D

LL02

LL09

LL08

LJ24 LJ23 LJ22

LJ25LJ26

LJ17 LJ12

LJ13LJ18

LJ19 LJ15 LJ10

LJ20LJ21

LC40

LC39 LC31

LC32

LC33

LC41

LC34

LC35 LC37 LCC3

LC38

LF35

LF37

LF36

LF39

LF40

LF42

LF43

LG13

LG14

LG15ALG17A

LG15

LG18 LG19

LG21 LG22A LG22B

LJC4

LJC5

LJC3

LJC1

LJC2

LKC1

LKC2

LJC6

LB10

LB32 LB31

LB33

LB24

LC25

LC26

LC27

LC21

LC04

LC24

LC20

LC05

LG20

LGC5 LG12

LMC2

LM26

LG17

LG16

LMC1

LF41

LF44

LF38

LLC2

LLC4 LLC1

LMC3

LC36

LCC4

LBC3

LB28

LB29

LB26

LB25

LB23 LB20

LB04

LB02

LB03

LB06

LB21 LB18

LB15

LC02

LC03

LC06

LC12

LC10

LC08

LC09 LC11LC22

LC30 LC19 LC18 LC17

LC23

LC16 LC15

LC14

LF01LF03LF17LF18LF19

LF22

LF20

LF25

LF26

LF21 LF08

LF06

LE06

LF15

LF16 LF12

LF14LF30

LF31

LF29

LF09

LF33

LF34

LF32

LG09

LG10

LG11

LG06

LG08

LGC4A

LG22C LG22

LG05 LG04

LG03

LG02

LGC4

LFC1

LFC3

LGC3

LG01

LF13

LF28LF27 LF11

LC07

LC13

LB27

LBC4

LB30 LBC1

LB17 LB14

LB13

LB11

LB12

LB09

LB07 LB05

LBC2

LB01

LA45

LF23

LCC2 LFC2

LF05

LF04

LF10

LH31

LH30

L-STAIR

E LH24

LH19

LH14

LH28

LG23 LH26 LH25

LH27

LG24

LE26 LE25

LH20 LH16 LH15

LH29

LH29A

L-STAIR

A

LA46

LA42

LA44A

LA39A

LA44

LA07

LA11

LA12 LA08

LAC1

LA06 LA05 LA02

LA13

LA14

LA15LA16

LA01

LA04

LA29LA30LA40LA39

LA41

LA37 LA34LA31

LA03

LA35 LA32 LA28

LAC2

LA19

LA18

LA21

LA22

LAC5 LAC3

LA36 LA33

LD05 LD01

LAC4

LD04

LD02LD08

LA23 LA27

LA26

L-STAIR

F

LDC1 LA48

LA47

LD24 LD27

LD22

LD25

LD23

COURT

LD06

LD10

LD07LD09LD11

LD12LD13

LC01

LD14

LD16

LD15

LD17

LD19

LD18

LD21

LD20 LD26

LE05

LE04

LE09

LE08

LE07

LE10

LE12

LE11

LE13

LEC1

LE14

LE15

LE16

LE22 LE21

LE20LE23

LE19LE17

LE18LH22

LHC1

LHC2

LH13

LH11

LH10

LH09

LH01LH02

LH02A

LE02

LH06

LH08LH07

LH05LH04

UDGDRIVEWAY

LG27LG26

LG25

LG30 LG31

LG28 LG29

LH1204

LAC2

NOTWITHSTANDING ANYTHING HEREUNDER OR UNDER ANY AGREEMENT, IN CONSIDERATION OF

ANY PARTY’S USE OR RELIANCE ON THESE PLANS AND SPECIFICATIONS, THE USER AGREES THAT

(1) THESE PLANS AND SPECIFICATIONS ONLY IDENTIFY LOCATIONS OF POTENTIAL HAZARDOUS MATERIAL LIMITED TO THE SPECIFIC AND ISOLATED AREAS OF TESTING. THESE PLANS ARE NOT AN EXHAUSTIVE OR FINAL ASSESSMENT OF THE PROPERTY INCLUDING ANY LOCATIONS OUTSIDE OF THOSE ISOLATED AREAS SPECIFICALLY TESTED; (2) LEO A DALY IS NOT RESPONSIBLE FOR REMOVING, HAULING, HANDLING OR ANY OTHER ACTIVITY RELATED TO ANY HAZARDOUS MATERIAL ON THE PROPERTY AND/OR AS PART OF THE PROJECT; (3) THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE FINAL IDENTIFICATION OF ANY HAZARDOUS MATERIAL ON THE PROPERTY

AND/OR AS PART OF THE PROJECT AND/OR THE REMOVAL, HAULING, AND HANDLING OR ANY

OTHER DISTURBANCE, (WHETHER INTENDED OR UNINTENDED,) OF SAID HAZARDOUS MATERIAL;

AND (4) TO THE EXTENT ALLOWABLE UNDER APPLICABLE LAW, USER HEREBY RELEASES AND

SHALL INDEMNIFY LEO A DALY, ITS EMPLOYEES, SUBSIDIARIES, SHAREHOLDERS, AGENTS AND SUBCONSULTANTS FROM ANY CLAIMS, LIABILITIES, COSTS, EXPENSES (INCLUDING REASONABLE

ATTORNEYS’ FEES) ARISING FROM OR RELATED TO HAZARDOUS MATERIAL ON THE PROPERTY.

N

TRUE

NORTH

EPROJECT NO.:

CONSTR. CONTR. NO.

DRAWING NO.

SCALE:

SHEET

D E

P A

R T

M E

N T

O F

T H

E A

IR

F

O R

C E

A F

M S

A H

E A

L T

H F

A C

IL

IT

IE

S

D

IV

IS

IO

N

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

P A

C

IF

IC

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

DES

SUBMITTAL DATE

DRW CHK

ACTIVITY

FOR COMMANDER AFCEC

APPROVED

D D

C

B

A

54321

A

C

1 2 3 4 5

B

DRAWFORM

REVISION:

P L A N N I N G

A R C H I T E C T U R E

E N G I N E E R I N G

I N T E R I O R S

EST. 1915

IF SHEET MEASURES LESS THAN 594 X 841 mm. IT IS A

REDUCED SIZE PRINT. REDUCE SCALE ACCORDINGLY

A/E INFO

SEAL

FA8903-15-D-0004 TO: 18-F-0072

APPROVED BY

23 DECEMBER 2019

KEY PLAN

A C

B D

E

L E

G A

C Y

P R

O J

E C

T

Q K

K A

O

P P

O R

T U

N

IT

Y

As indicated

/1

/2

:2

:4

P M

C

U se rs N p ak

D o cu m en ts A u to d es k\ R ev it

P ro je ct s\

M A

B H

-A rc h it ec tu re

N

P ak le o ad al y.

co m

.r vt

AD100

D E

M O

LI

T

IO

N

P

LA

N L

O W

E R

L E

V E

L

O V

E R

A

LL

F Y

H O

S P

IT

A

L M

O D

E R

N

IZ

A T

IO

N

M

IS

A W

A A

IR

B

A S

E

J A

P A

N

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

ALS DMB BFH

8600 Indian Hills Drive

Omaha, NE 68114-4039

Tel 402.391.8111 Fax

402.391.8564

L A

D P ro je c t N o -1

-0

SCALE: 1 : 250A1

DEMOLITION PLAN LOWER LEVEL OVERALL

2.5m

SCALE: 1:250

0 10m5m2.5m

DEMOLITION NOTES ARCHITECTURAL

1 HALF-TONE NOTES AND DIMENSIONS ARE PROVIDED FOR INFORMATION ONLY.

2 DASHED LINES INDICATE MATERIAL OR EQUIPMENT REMOVED.

3 EXISTING SURFACES DISTURBED BY NEW CONSTRUCTION SHALL BE PATCHED AND

FINISHED TO MATCH ADJACENT SURFACES.

4 THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF

WORK. THE CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO REMOVAL OF MATERIAL

OR EQUIPMENT NOT INDICATED ON THE DRAWINGS TO BE REMOVED.

5 THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING

STRUCTURES SURROUNDING THE CONTRACT AREA. DAMAGE TO EXISTING STRUCTURES

OR EQUIPMENT SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE OWNER.

6 FOR ADDITIONAL DEMOLITION, SEE STRUCTURAL, MECHANICAL AND ELECTRICAL

DRAWINGS.

7 TEMPORARY PARTITIONS SHALL BE LOCATED SO AS NOT TO INTERFERE

WITH EXISTING LIGHT FIXTURES, SPRINKLER HEADS, HVAC DIFFUSERS, ETC.

8 CONTRACTOR SHALL REPAIR/REPLACE ANY DAMAGE CAUSED BY THE

TEMPORARY WALLS ONCE THEY HAVE BEEN REMOVED.

9 CONTRACTOR SHALL MAINTAIN NEGATIVE PRESSURE WITH VENTING

DIRECTLY TO OUTSIDE DURING DEMOLITION AND NEW CONSTRUCTION

ACTIVITIES IN ORDER TO MINIMIZE THE CHANCE FOR AIR POLLUTION TO

ENTER CLINIC VENTILATION SYSTEMS. ALL EXISTING RETURN AND SUPPLY

AIR DUCTWORK TO THESE AREAS SHALL BE SECURELY CAPPED AND

SEALED DURING THE CONSTRUCTION PERIOD. THIS REQUIREMENT APPLIES

TO ALL WORK AREAS.

10 SEE DEPARTMENTAL PHASING PLANS FOR SPECIFIC RESTRICTIONS BY DEPARTMENT.

11 EXISTING OCCUPIED FACILITY MUST BE WEATHER TIGHT AT ALL TIMES.

12 IN AREAS OF CONSTRUCTION, WHERE WALLS DO NOT EXTEND TO STRUCTURE,

CONTRACTOR SHALL PROVIDE BARRIER ABOVE CEILING TO PROTECT FACILITY FROM

DUST AND DEBRIS AS REQUIRED BY FACILITY ICRA (INFECTION CONTROL RISK

ASSESSMENT) STANDARDS.

13 SEE AD100 AND AD101 FOR ACM/LEAD PAINT LOCATIONS AND ADDITIONAL INFORMATION

PERTAINING TO ABATEMENT WORK.

KEYNOTE LEGEND

KEY DESCRIPTION

D1 LEAD PAINT, REFER TO LEAD PAINT REPORT.

D2 ASBESTOS CONTAINING MATERIAL, REFER TO ASBESTOS REPORT.

HAZARDOUS MATERIAL NOTES

1 IF ASBESTOS CONTAINING MATERIALS ARE IDENTIFIED WITHIN THE CONSTRUCTION

AREA, THE MATERIAL SHALL NOT BE DISTURBED UNLESS THE RENOVATION REQUIRES

ITS REMOVAL.

2 ANY DISTURBANCE TO THE ASBESTOS-CONTAINING MATERIALS SHALL BE IN

ACCORDANCE WITH THE JEGS, EPA REGULATIONS, AND THE SPECIFICATIONS

3 IDENTIFIED ASBESTOS CONTAINING MATERIALS ARE SHOWN TO THE EXTENT

PRACTICAL ON THESE PLANS SO THE CONTRACTOR CAN PLAN THEIR WORK IN A SAFE

AND REGULATORY COMPLIANT MANNER

4 REFER TO ENVIROQUEST INSPECTION REPORT FOR ASBESTOS, LEAD-BASED PAINT

AND PCB FOR DETAILED INFORMATION ON ALL MATERIAL SAMPLED.

5 THE CONTRACTOR SHALL CONDUCT ALL ASBESTOS DISTURBANCE WORK IN

ACCORDANCE WITH SPECIFICATION SECTION 02 82 00 ASBESTOS REMEDIATION AND

THE CONTRACTORS APPROVED ASBESTOS WORK PLAN.

6 THE CONTRACTOR SHALL CONDUCT ALL LEAD DISTURBANCE WORK IN ACCORDANCE

WITH SPECIFICATION SECTION 02 83 00 LEAD REMEDIATION AND THE CONTRACTORS

APPROVED LEAD COMPLIANCE PLAN, IF REQUIRED. CURRENT REPORT INDICATES

LEVELS BELOW REQUIREMENT FOR REMEDIATION, THEREFORE NO ABATEMENT IS

EXPECTED. CONTRACTOR SHALL REVIEW REPORT PRIOR TO START OF DEMOLITION.

7 ALL FLUORESCENT LIGHT BALLAST AND LIGHT TUBES IN THE CONSTRUCTION AREA

MUST BE COLLECTED FOR RECYCLING AND DISPOSED IN ACCORDANCE WITH THE

JEGS, EPA, AND PREFECTURAL REGULATIONS.

8 THE CONTRACTOR SHALL COORDINATE ALL WORK WITH CONTRACTING OFFICER AND

GENERAL CONTRACTOR.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

E D

101010

4 9

9 4 18

11 11

670 625 1940

3000 1000

E D

18 9

G F

TEMPORARY

KITCHEN SPACE

IPK01

CORR

LBC2

OR 1

LB01

STERILE STOR

LA45

L-STAIR

A

VEST

LA46

STERILE STOR

LA42

VEST

LA44A

EQUIP WASH &

DRY

LA39A

STERILE STOR

LA44

EQPM STOR

LA07

OFFICE

LA11

ALCOVE

LA12

ALCOVE

LA08

CORR

LAC1

OFFICE

LA06

STOR

LA40

NON-STERILE

ASSEMBLY

LA39

STERILE

WASHER

LA41

F/TLT

LA37

F/LOCKER

LA35

CORR

LAC5

STAIR

L-STAIR

E

WASH

LH24

OFFICE

LH19

OFFICE

LH14

ELEC

LE25

STORAGE

LH20

CORR

LEC1

JAN

LH22

ELEV

LEVEL 3 ALTERATION:

DEMOLITION INCLUDES ALL BUILDING SYSTEMS (MAIN STRUCTURAL SYSTEMS

EXCLUDED) FROM STRUCTURAL DECK BELOW TO STRUCTURAL DECK ABOVE AND

TO THE EXTERIOR STRUCTURAL ENVELOPE. REMOVE MEP SYSTEMS SERVING

ALTERATION AREAS THAT ARE LOCATED BELOW STRUCTURAL FLOOR SLAB,

ABOVE STRUCTURAL DECK AND ON THE ROOF. THIS INCLUDES DEMOLITION OF

SYSTEMS LOCATED OUTSIDE ALTERATION BOUNDARIES AS NECESSARY TO MEET

ALL CODES, CRITERIA, AND STANDARDS FOR THE NEW ALTERATION AREAS.

CONTINUOUS OPERATIONS OF ALL IMPACTED AREAS (TO INCLUDE AREAS OUTSIDE

OF LEVEL 3 ALTERATION) MUST BE MAINTAINED IN ACCORDANCE WITH THE

CONTRACT SPECIFICATIONS. REMOVE ALL EXISTING SYSTEMS SERVING THE

ALTERATION AREA INCLUDING BUT NOT LIMITED TO:

A. COMPLETE REMOVAL OF ALL EXISTING WALL PARTITIONS (TO INCLUDE

INFILL OF CONCRETE SLAB FLOOR TRENCHES THAT REMAIN AS A RESULT OF

PARTITION DEMOLITION), CEILINGS AND ALL ASSOCIATED SUPPORTS,

CEILING DEVICES, FLOOR FINISHES, LIGHTING, CASEWORK, MECHANICAL,

VENTILATION SYSTEMS, HVAC PIPING, HVAC CONTROLS, PLUMBING

FIXTURES, PLUMBING PIPING, FIRE PROTECTION PIPING AS NEEDED, LIFE

SAFETY (FIRE ALARM, MNS), MEDICAL GASES, ELECTRICAL, LOW VOLTAGE,

SIGNAGE/WAY FINDING, TELEPHONE AND COMMUNICATIONS.

B. REMOVAL OF ALL EXISTING FINISH SYSTEMS AND SUBSTRATES AT

BOUNDARY WALL PARTITIONS AND ANY INFRASTRUCTURE (OUTLETS,

DEVICES, ACCESSORIES, INSULATION, PLUMBING, MECHANICAL, HVAC,

PIPING, DUCTING, ELECTRICAL, COMMUNICATION AND ELECTRONIC

SECURITY SYSTEMS (CES), ETC.) LOCATED ON AND INSIDE OF WALL CAVITY.

C. REMOVAL OF ALL EXISTING ABANDONED DEVICES, INFRASTRUCTURE,

SECONDARY STRUCTURAL SUPPORTS, OPENINGS, AND EQUIPMENT

LOCATED ON ROOFS AND WITHIN BOUNDARY AREAS

ABOVE CEILING WORK:

CONTRACTOR IS RESPONSIBLE TO PROTECT EXISTING SPACE INCLUDING ALL

CEILING TILES, DIFFUSERS, LIGHT FIXTURES, WALLS AND FLOORS. ANY DAMAGE

DURING CONSTRUCTION MUST BE REPAIRED.

CONTRACTOR IS TO PROTECT SPACES BELOW ABOVE CEILING WORK FROM

DUST AND DEBRIS ASSOCIATED WITH COMPLETION OF THE WORK.

HATCHED AREA DENOTES EXTENTS OF LEVEL 3 ALTERATION

NOTES BELOW APPLY TO HATCHED AREA UNLESS KEYNOTED

OTHERWISE

HATCHED AREA DENOTES ROOM REQUIRING ABATEMENT, REFER TO

ABATEMENT REPORT.

G F

7RECORDS

LG22

C B A

14 14

MECHANICAL

LD25

WAREHOUSE

LD23

M/TLT

LD27

SHOWER

LD24

F/TLT

LD22

N

TRUE

NORTH

EPROJECT NO.:

CONSTR. CONTR. NO.

DRAWING NO.

SCALE:

SHEET

D E

P A

R T

M E

N T

O F

T H

E A

IR

F

O R

C E

A F

M S

A H

E A

L T

H F

A C

IL

IT

IE

S

D

IV

IS

IO

N

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

P A

C

IF

IC

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

DES

SUBMITTAL DATE

DRW CHK

ACTIVITY

FOR COMMANDER AFCEC

APPROVED

D D

C

B

A

54321

A

C

1 2 3 4 5

B

DRAWFORM

REVISION:

P L A N N I N G

A R C H I T E C T U R E

E N G I N E E R I N G

I N T E R I O R S

EST. 1915

IF SHEET MEASURES LESS THAN 594 X 841 mm. IT IS A

REDUCED SIZE PRINT. REDUCE SCALE ACCORDINGLY

A/E INFO

SEAL

FA8903-15-D-0004 TO: 18-F-0072

APPROVED BY

23 DECEMBER 2019

KEY PLAN

A C

B D

E

L E

G A

C Y

P R

O J

E C

T

Q K

K A

O

P P

O R

T U

N

IT

Y

As indicated

/1

/2

:2

:4

P M

C

U se rs N p ak

D o cu m en ts A u to d es k\ R ev it

P ro je ct s\

M A

B H

-A rc h it ec tu re

N

P ak le o ad al y.

co m

.r vt

AD100A

D E

M O

LI

T

IO

N

P

LA

N L

O W

E R

L E

V E

L

A R

E A

C , D

, A N

D E

F Y

H O

S P

IT

A

L M

O D

E R

N

IZ

A T

IO

N

M

IS

A W

A A

IR

B

A S

E

J A

P A

N

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

ALS DMB BFH

8600 Indian Hills Drive

Omaha, NE 68114-4039

Tel 402.391.8111 Fax

402.391.8564

L A

D P ro je c t N o -1

-0

1m

SCALE: 1:100

0 4m2m1m

SCALE: 1 : 100C1

DEMOLITION PLAN LOWER LEVEL AREA D - PHASE B2

SCALE: 1 : 100A3

DEMOLITION PLAN LOWER LEVEL AREA E - PHASE A2

SCALE: 1 : 100A1

DEMOLITION PLAN LOWER LEVEL AREA C - PHASE A1

DEMOLITION NOTES ARCHITECTURAL

1 HALF-TONE NOTES AND DIMENSIONS ARE PROVIDED FOR INFORMATION ONLY.

2 DASHED LINES INDICATE MATERIAL OR EQUIPMENT REMOVED.

3 EXISTING SURFACES DISTURBED BY NEW CONSTRUCTION SHALL BE PATCHED AND

FINISHED TO MATCH ADJACENT SURFACES.

4 THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF

WORK. THE CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO REMOVAL OF MATERIAL

OR EQUIPMENT NOT INDICATED ON THE DRAWINGS TO BE REMOVED.

5 THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING

STRUCTURES SURROUNDING THE CONTRACT AREA. DAMAGE TO EXISTING STRUCTURES

OR EQUIPMENT SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE OWNER.

6 FOR ADDITIONAL DEMOLITION, SEE STRUCTURAL, MECHANICAL AND ELECTRICAL

DRAWINGS.

7 TEMPORARY PARTITIONS SHALL BE LOCATED SO AS NOT TO INTERFERE

WITH EXISTING LIGHT FIXTURES, SPRINKLER HEADS, HVAC DIFFUSERS, ETC.

8 CONTRACTOR SHALL REPAIR/REPLACE ANY DAMAGE CAUSED BY THE

TEMPORARY WALLS ONCE THEY HAVE BEEN REMOVED.

9 CONTRACTOR SHALL MAINTAIN NEGATIVE PRESSURE WITH VENTING

DIRECTLY TO OUTSIDE DURING DEMOLITION AND NEW CONSTRUCTION

ACTIVITIES IN ORDER TO MINIMIZE THE CHANCE FOR AIR POLLUTION TO

ENTER CLINIC VENTILATION SYSTEMS. ALL EXISTING RETURN AND SUPPLY

AIR DUCTWORK TO THESE AREAS SHALL BE SECURELY CAPPED AND

SEALED DURING THE CONSTRUCTION PERIOD. THIS REQUIREMENT APPLIES

TO ALL WORK AREAS.

10 SEE DEPARTMENTAL PHASING PLANS FOR SPECIFIC RESTRICTIONS BY DEPARTMENT.

11 EXISTING OCCUPIED FACILITY MUST BE WEATHER TIGHT AT ALL TIMES.

12 IN AREAS OF CONSTRUCTION, WHERE WALLS DO NOT EXTEND TO STRUCTURE,

CONTRACTOR SHALL PROVIDE BARRIER ABOVE CEILING TO PROTECT FACILITY FROM

DUST AND DEBRIS AS REQUIRED BY FACILITY ICRA (INFECTION CONTROL RISK

ASSESSMENT) STANDARDS.

13 SEE AD100 AND AD101 FOR ACM/LEAD PAINT LOCATIONS AND ADDITIONAL INFORMATION

PERTAINING TO ABATEMENT WORK.

KEYED DEMO NOTES

1 CUT OPENING IN WALL, COORDINATE OPENING SIZE WITH EXISTING SALVAGED

LOUVER AS PART OF NEW WORK, SEE KEYED NOTE 2.

2 SALVAGE LOUVER, PREPARE FOR REINSTALLATION IN OPPISITE SIDE OF HVAC

VENTILATION TOWER

3 SALVAGE LOUVER, PREPARE FOR REINSTALLATION IN SOUTH TOWERS

OPPOSITE SIDE

4 CUT OPENING IN WALL, PREPARE OPENING TO RECEIVE SCHEDULED DOOR.

5 REMOVE EXTERIOR WINDOW AND FRAME

6 REMOVE EXISTING CANOPY, WALLS AND DOOR

7 REMOVE ALL FIXTURES/EQUIPMENT SHOWN DASHED THIS ROOM

8 REMOVE FACE OF WALL 150 MM BACK FROM OUTER-MOST FACE OF WALL

9 REMOVE DOOR AND FRAME FOR INFILL OF WALL.

10 REMOVE GYP ON FACE OF WALL INSIDE AREA OF DEMOLITION AND INSULATION.

GWB ON FACE OF WALL OUTSIDE AREA OF DEMOLITION TO REMAIN

11 REMOVE GYP AND INSULATION BACK TO CONCRETE WALL

12 PREPARE EXISTING SURFACE MOUNTED WIRING, DATA CONNECTIONS ETC. FOR

RELOCATION OR DEMOLITION PER ELECTRICAL AND COMM SHEETS.

13 REMOVE AWNING OVERHEAD.

14 REMOVE EXISTING HIGH-DENSITY STORAGE SYSTEM. DEMOLISH EXISTING

HIGH-DENSITY STORAGE TRACKS AND PATCH AND INFILL TRACK LOCATION WITH

CONCRETE. SURFACE TO BE SMOOTH AND FLUSH WITH EXISTING FLOOR.

15 REMOVE CEILING AT NEW MECHANICAL ROOM

16 REMOVE CONCRETE LEDGE AT SILL OF EXISTING WINDOW OPENING TO BE

INFILLED. DEMOLISH BACK TO BE FLUSH WITH ADJACENT SURFACE.

17 CUT OPENING IN WALL, PREPARE OPENING TO RECEIVE SCHEDULED COILING

SHUTTER.

18 REMOVE DOOR AND FRAME PREPARE OPENING FOR REPLACMENT

19 REMOVE EXISTING CEILING THIS ROOM

X

SCALE: 1 : 100B1

DEMOLITION PLAN LOWER LEVEL AREA C - PHASE D1

SCALE: 1 : 100B3

DEMOLITION PLAN LOWER LEVEL AREA D/E- PHASE B1

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P

UP UP

UPUP

U T S R Q P N M

L K J H G F E D C B A

AE100A

A1

AE100A

A2

AE100A

C1

LA11

LA42

LA41

LA12

LA44

LA45

LA39A

LA39

LA07 LA06

LH22

LH19

LH19A

LH19B

LH19C

LG22

PHASE A1 - TEMPORARY NUTRITION

SERVICES

PHASE D1 - RECORDS

NUTRITION SERVICES

STERILE PROCESSING

DEPARTMENT

R.9

A R

E A

A

A R

E A

C A R

E A

C

A R

E A

E

A R

E A

B

A R

E A

D

AREA D

AREA E

PHASE B2

PHASE A2

PHASE A1

PHASE B1

LD25A

MECHANICAL

ROOM

AE100A

B1

PHASE D1

CHAIN LINK FENCE ENCLOSURE, 1850 MM HIGH

DIMENSIONS ARE FROM EDGE OF EXISTING CHECKERED PLATE

DRILL AND EPOXY FASTENERS FOR POSTS INTO FLOOR SLAB

PROVIDE GATE AS SHOWN.

A R

E A

A

A R

E A

B AE100A

C3

LN25A LN26 LN25

LN26A

LN17

LN14

LN13

LN10

LN11

LN09

LN03

LN24

LN16

LN18

LN08

LN15

LN12

LN21

LN19

LN22

LN05

LN01

LN02

LN04

LN07

LN07A LN23

LN06

LM22

LM21

LM19

LM18

LM17

LM16

LM15

LM14

LM13

LL15

LL14

LL13

LL12

LK14 LK16 LK17 LK18 LK19

LK01LK11

LK13

LK07

LJ32

LJ31

LJ28

LJ08A

LJ08

LJ07 LJ06 LJ05 LJ04 LJ03 LJ02 LJ01 LB08

LK15

LL11

LL10

L-STAIR

C

L-ELEV

LL17

LL05

LL03

LM01

LM03

LM02

LL16

LL06

LM05

LM04

LK10LK03

LJ33 L-STAIR

B

LJ35

LJ27

LJ37

LJ36

LL07

LM06LM07

L-ELEV

LM27

LM08

LM12

LM24

LM11LM10

LM25

LM23

L-STAIR

D

LL02

LL09

LL08

LJ24 LJ23 LJ22

LJ25LJ26

LJ17 LJ12

LJ13

LJ18

LJ19

LJ15 LJ10

LJ20LJ21

LC40

LC39 LC31

LC32

LC33

LC41

LC34

LC35 LC37

LCC3

LC38

LF35

LF37

LF36

LF39

LF40

LF42

LF43

LG13

LG14

LG15ALG17A

LG15

LG18 LG19

LG21 LG22A LG22B

LJC4 LJC5

LJC3

LJC1

LJC2

LKC1

LKC2

LJC6

LB10

LB32 LB31

LB33

LB24

LC25

LC26

LC27

LC21

LC04

LC24

LC20

LC05

LG20

LGC5 LG12

LMC2

LM26

LG17

LG16

LMC1

LF41

LF44

LF38

LLC2

LLC4

LLC1

LMC3

LC36

LCC4

LBC3

LB28

LB29

LB26

LB25

LB23 LB20

LB04

LB02

LB03

LB06

LB21 LB18

LB15

LC02

LC03

LC06

LC12

LC10LC08

LC09 LC11LC22

LC30 LC19 LC18 LC17

LC23

LC16 LC15

LC14

LF01LF03LF17LF18LF19

LF22

LF20

LF25

LF26

LF21 LF08 LF06

LE06

LF15

LF16

LF12

LF14LF30

LF31

LF29

LF09

LF33

LF34

LF32

LG09

LG10

LG11

LG06

LG08

LGC4A

LG22C

LG05 LG04

LG03

LG02

LGC4

LFC1

LFC3

LGC3

LG01

LF13

LF28LF27 LF11

LC07

LC13

LB27

LBC4

LB30 LBC1

LB17 LB14

LB13

LB11

LB12

LB09

LB07 LB05

LBC2

LB01

LF23

LCC2

LFC2

LF05

LF04

LF10

LH31

LH30

L-STAIR

E

LH14

LH28

LG23 LH26 LH25

LH27

LG24

LE26 LE25

LH16 LH15

LH29

LH29A

L-STAIR

A

LA46

LAC1

LA05 LA02

LA13

LA14

LA15

LA16

LA01

LA04

LA29LA30

LA37 LA34LA31

LA03

LA35 LA32

LA28

LAC2

LA19

LA18

LA21

LA22

LAC5 LAC3

LA36 LA33

LD05 LD01

LAC4

LD04

LD02LD08

LA23 LA27

LA26

L-STAIR

F

LDC1

LA48LA47

LD24

LD27

LD22

LD25

LD23

COURT

LD06LD10

LD07LD09LD11

LD12

LD13

LC01

LD14

LD16

LD15

LD17

LD19

LD18

LD21

LD20

LD26

LE05

LE04

LE09 LE08

LE07

LE10

LE12

LE11

LE13

LEC1

LE14

LE15

LE16

LE22 LE21

LE20LE23

LE19

LE17

LE18

LH22

LHC1

LHC2

LH13

LH11

LH10

LH09

LH01LH02LH02A LE02

LH06

LH08LH07

LH05LH04

UDGDRIVEWAY

LG27LG26

LG25

LG30 LG31

LG28 LG29

LH1204

LAC2

N

TRUE

NORTH

EPROJECT NO.:

CONSTR. CONTR. NO.

DRAWING NO.

SCALE:

SHEET

D E

P A

R T

M E

N T

O F

T H

E A

IR

F

O R

C E

A F

M S

A H

E A

L T

H F

A C

IL

IT

IE

S

D

IV

IS

IO

N

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

P A

C

IF

IC

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

DES

SUBMITTAL DATE

DRW CHK

ACTIVITY

FOR COMMANDER AFCEC

APPROVED

D D

C

B

A

54321

A

C

1 2 3 4 5

B

DRAWFORM

REVISION:

P L A N N I N G

A R C H I T E C T U R E

E N G I N E E R I N G

I N T E R I O R S

EST. 1915

IF SHEET MEASURES LESS THAN 594 X 841 mm. IT IS A

REDUCED SIZE PRINT. REDUCE SCALE ACCORDINGLY

A/E INFO

SEAL

FA8903-15-D-0004 TO: 18-F-0072

APPROVED BY

23 DECEMBER 2019

KEY PLAN

A C

B D

E

L E

G A

C Y

P R

O J

E C

T

Q K

K A

O

P P

O R

T U

N

IT

Y

1 : 250

/1

/2

:3

:0

P M

C

U se rs N p ak

D o cu m en ts A u to d es k\ R ev it

P ro je ct s\

M A

B H

-A rc h it ec tu re

N

P ak le o ad al y.

co m

.r vt

AE100

F

LO

O R

P

LA

N L

O W

E R

L E

V E

L

O V

E R

A

LL

F Y

H O

S P

IT

A

L M

O D

E R

N

IZ

A T

IO

N

M

IS

A W

A A

IR

B

A S

E

J A

P A

N

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

ALS DMB BFH

8600 Indian Hills Drive

Omaha, NE 68114-4039

Tel 402.391.8111 Fax

402.391.8564

L A

D P ro je c t N o -1

-0

2.5m

SCALE: 1:250

0 10m5m2.5m

SCALE: 1 : 250A1

FLOOR PLAN LOWER LEVEL OVERALL

PFD COMPARISON SCHEDULE

RM NO.

ROOM

CODE ROOM NAME

PROGRAMED

AREA

AREA

PFD COMMENTACTUAL DIFF.

1 - FOOD SERVICE (510)

1 - NUTRITIONAL MEDICINE

LH19 IPK01 KITCHEN SPACE 23.2 m² 39.0 m² 15.8 m²

LH19A OFA03 CUBICLE 3.7 m² 4.6 m² 0.9 m²

LH19B OFA03 CUBICLE 3.7 m² 3.6 m² -0.1 m²

LH19C OFA03 CUBICLE 3.7 m² 3.7 m² 0.0 m²

LH19D WRC03 WAITING 5.6 m² 0.0 m² -5.6 m² NOT ENOUGH SPACE AVAILABLE, ROOM ELIMINATED

LH22 OFA04 OFFICE, PRIVATE, MDG 8.4 m² 0.0 m² -8.4 m² NOT ENOUGH SPACE AVAILABLE, ROOM ELIMINATED

LH22 OFA04 OFFICE, CONSULT 10.2 m² 7.7 m² -2.5 m²

UE73 OFA03 CUBICLE 4.0 m²

1 - NUTRITIONAL MEDICINE 58.5 m² 0.0 m²

2 - STERILE PROCESSING (450)

1 - DECONTAMINATION (SOILED WORK AREA)

LA11 CSCR1 VEST, SOILED TRANSITION 7.4 m² 7.1 m² -0.3 m²

LA12 JANC1 NEPT STOR 5.6 m² 1.9 m² -3.7 m²

LA41 CWSH2 AUTOMATED CART WASHER 8.4 m² 10.8 m² 2.4 m² INCLUDES MAINTENANCE SPACE

LA42 CSDE1 DECONTAMINATION WORK AREA 23.2 m² 31.6 m² 8.4 m²

1 - DECONTAMINATION (SOILED WORK AREA) 51.4 m² 6.8 m²

2 - PREPARATION AND ASSEMBLY (CLEAN WORK AREA)

LA44 CSIA2 CLEAN WORKROOM, ASSEMBLY 55.7 m² 49.9 m² -5.8 m² NOT ENOUGH AVAILABLE SPACE

2 - PREPARATION AND ASSEMBLY (CLEAN WORK AREA) 49.9 m² -5.8 m²

3 - STERILIZATION AREA

LA45 CSSS1 STERILIZERS 9.3 m² 9.3 m² 0.0 m²

3 - STERILIZATION AREA 9.3 m² 0.0 m²

4 - RECEIVING, STORAGE AND DISPATCH

LA06 SRE01 STORAGE, EQUIPMENT 26.0 m² 25.8 m² -0.2 m²

LA07 ORSS1 STORAGE, STERILE SUPPLY 41.8 m² 41.5 m² -0.3 m²

LA39 ORSS1 STORAGE, STERILE INSTRUMENTS 31.6 m² 29.3 m² -2.3 m² NOT ENOUGH AVAILABLE SPACE; MOST INSTRUMENTS RETURN TO DENTAL CLINIC

LA39A CHC01 CART HOLDING, CLEAN 4.6 m² 3.2 m² -1.4 m²

4 - RECEIVING, STORAGE AND DISPATCH 99.8 m² -4.2 m²

Grand total 268.8 m² -3.3 m²

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P

G F

LOUNGE

LG22C

OFFICE

LH30

MECH

LH31

SO

SO

SO

SO

SOCT050

AE416

C1

C3

D3

D5

CONSTRUCTION; THEN IO&T

TEMORARY OUTFIT AND

TRANSITION: 1 WEEK PAUSE

IO&T CONTRACTOR TO DEMO TEMPORARY

NUTRITION EQUIPMENT: 1 WEEK PAUSE

CONSTRUCTION RECORDS; THEN

IO&T TEMORARY OUTFIT AND

TRANSITION: 1 WEEK PAUSE

IO&T CONTRACTOR TO DEMO GYM: NO

CONSTRUCTION PAUSE: DURATION: 1 WEEK

FE

AE416

D1

F E D

VEST, SOILED

TRANSITION

LA11

8 m² / 7 m²

CSCR1

DECONTAMINATION

WORK AREA

LA42

23 m² / 32 m²

CSDE1

AUTOMATED

CART WASHER

LA41

8 m² / 11 m²

CWSH2

NEPT STOR

LA12

6 m² / 2 m²

JANC1

CART HOLDING,

CLEAN

LA39A

5 m² / 3 m²

CHC01

STORAGE,

STERILE

INSTRUMENTS

LA39

32 m² / 29 m²

ORSS1

STORAGE,

STERILE SUPPLY

LA07

42 m² / 42 m²

ORSS1

STORAGE,

EQUIPMENT

LA06

26 m² / 26 m²

SRE01

STERILIZERS

LA45

9 m² / 9 m²

CSSS1

CLEAN

WORKROOM,

ASSEMBLY

LA44

56 m² / 50 m²

CSIA2

LA

LA

LA

LA

LA11

LA

A

LA

NURSE STAT

LB11

CORR

LB12

CORR

LBC2

OR 1

LB01

STAIR

L-STAIR A

VEST

LA46

CORR

LAC1

DELIVERY RM

LA05

NURSE STAT

LA29

F/TLT

LA37

M/TLT

LA34CORR

LA31

F/LOCKER

LA35

M/LOCKER

LA32

F/SHWR

LA36

M/SHWR

LA33

NURSE STAT

LB11

F V

F V

3003 5997

JAN

LB14

ALCOVE

LB13

OFFICE

LB15

CENT STERILE

LB02

SCRUB

LB03

LOUNGE

LA30

OR 2

LB04

LA

MIN

M

IN

ALIGN

AE418

A1

SOW8

WALL MODIFICATIONS INCLUDE

FIRE SAFING

FV

1016 988

FV

1016 432

SO

SOSO

W7

SO

SO

ALIGN

4188 FV

F V

SO

SO

1SAX

SO

SOSO

2SA

2SA

SO

SO

SO

2SA

W8

E D

KITCHEN SPACE

LH19

23 m² / 39 m²

IPK01

CUBICLE

LH19A

4 m² / 5 m²

OFA03

CUBICLE

LH19B

4 m² / 4 m²

OFA03

CUBICLE

LH19C

4 m² / 4 m²

OFA03

OFFICE,

CONSULT

LH22

10 m² / 8 m²

OFA04

LH

B

LH

A

LH

FACILITIES OFFICE

LH30

STAIR

L-STAIR E

OFFICE

LH14

HOUSEKEEPING

LH28

STOR

LG23

OFFICE

LH26

ELEC

LH25

L&D CL LINEN

LE26

ELEC

LE25

OFFICE

LH16

OFFICE

LH15

FACILITIES OFFICE

LH29

TLT

LE13

TLT

LE15

TLT

LE17

CORR

LEC1

CORR

LHC1

622 5123

CORR

LHC1

L&D PATIENT RM

LE12

OFFICE

LE16

AE502

B2

AE420

A1

IO&T CONTRACTOR TO DRMO

CURRENT NUTRITION SERVICES; 1

WEEK PAUSE IN CONSTRUCTION

CONSTRUCTION; THEN IO&T OUTFIT

AND TRANSITION: 1 WEEK PAUSE

SA

SA

SA

2SA

C B A

LA13

MECHANICAL

ROOM

LD25A

57 m²

ALIGN

ALIGN

1SA1SA

1SA

G F

RECORDS

LG22

58 m²

MRS02

A1145

TEMPORARY

KITCHEN SPACE

LG22

58 m²

IPK01

MECHANICAL

LD25

WAREHOUSE

LD23

N

TRUE

NORTH

EPROJECT NO.:

CONSTR. CONTR. NO.

DRAWING NO.

SCALE:

SHEET

D E

P A

R T

M E

N T

O F

T H

E A

IR

F

O R

C E

A F

M S

A H

E A

L T

H F

A C

IL

IT

IE

S

D

IV

IS

IO

N

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

P A

C

IF

IC

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

DES

SUBMITTAL DATE

DRW CHK

ACTIVITY

FOR COMMANDER AFCEC

APPROVED

D D

C

B

A

54321

A

C

1 2 3 4 5

B

DRAWFORM

REVISION:

P L A N N I N G

A R C H I T E C T U R E

E N G I N E E R I N G

I N T E R I O R S

EST. 1915

IF SHEET MEASURES LESS THAN 594 X 841 mm. IT IS A

REDUCED SIZE PRINT. REDUCE SCALE ACCORDINGLY

A/E INFO

SEAL

FA8903-15-D-0004 TO: 18-F-0072

APPROVED BY

23 DECEMBER 2019

KEY PLAN

A C

B D

E

L E

G A

C Y

P R

O J

E C

T

Q K

K A

O

P P

O R

T U

N

IT

Y

1 : 100

/1

/2

:3

:1

P M

C

U se rs N p ak

D o cu m en ts A u to d es k\ R ev it

P ro je ct s\

M A

B H

-A rc h it ec tu re

N

P ak le o ad al y.

co m

.r vt

AE100A

F

LO

O R

P

LA

N L

O W

E R

L E

V E

L

A R

E A

S C

, D , A

N D

E

F Y

H O

S P

IT

A

L M

O D

E R

N

IZ

A T

IO

N

M

IS

A W

A A

IR

B

A S

E

J A

P A

N

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

ALS DMB BFH

8600 Indian Hills Drive

Omaha, NE 68114-4039

Tel 402.391.8111 Fax

402.391.8564

L A

D P ro je c t N o -1

-0

1m

SCALE: 1:100

0 4m2m1mSCALE: 1 : 100A1

FLOOR PLAN LOWER LEVEL AREA C - PHASE A1

SCALE: 1 : 100C1

FLOOR PLAN LOWER LEVEL AREA D - PHASE B2

SCALE: 1 : 100A2

FLOOR PLAN LOWER LEVEL AREA E - PHASE A2

GENERAL NOTES ARCHITECTURAL

A. PARTITION AND WALLS

1 WHERE PLAN AREA IS SHOWN TO BE ENLARGED, SEE ENLARGED PLAN

FOR DIMENSIONS AND WALL TYPE CALLOUTS.

2 DIMENSIONS ARE TO FINISH FACE OF PARTITIONS, FACE OF CMU,

FACE OF EXISTING FINISH OR CENTER LINE OF COLUMNS UNLESS

SHOWN OR NOTED OTHERWISE.

3 PARTITIONS SHALL BE TYPE SA PARTITIONS: 90 mm METAL STUDS AT 300 mm ON CENTER WITH 15 mm GYPSUM WALLBOARD EACH SIDE

WITH ACOUSTIC BATT INSULATION, UNLESS NOTED OTHERWISE.

4 ALL PARTITIONS SHALL EXTEND FROM FLOOR TO UNDER SIDE OF

DECK ABOVE EXCEPT WHERE NOTED OR SHOWN OTHERWISE.

5 EXTEND ALL SOUND RATED PARTITIONS TO THE UNDER SIDE OF DECK

ABOVE TO PREVENT SOUND TRANSMISSION. FURNISH 4-1/4 POUNDS

DENSITY GLASS FIBER INSULATION SHAPED TO FIT THE VOID ABOVE

THE PARTITION WHERE AIR-BORNE SOUND CAN PENETRATE SPACES.

6 FOR LOCATIONS OF FIRE-RATED PARTITIONS SEE FIRE PROTECTION

PLANS.

7 CONTROL JOINTS SHALL BE PROVIDED ABOVE DOORS AT EACH SIDE

IN STUD AND GWB PARTITIONS.

8 EXPANSION JOINTS AT ALL FLOORS, CEILINGS AND WALLS THAT ARE

EXPOSED TO VIEW SHALL BE COVERED WITH EXPANSION JOINT

COVERS APPROPRIATE FOR FINISHED SURFACES.

9 ALL COLUMNS WITHIN FINISHED SPACES SHALL BE FINISHED WITH

SAME MATERIALS SCHEDULED AT WALLS UNLESS OTHERWISE SHOWN

OR DETAILED.

10 PROVIDE ALL WALL AND FLOOR OPENINGS FOR MECHANICAL AND

ELECTRICAL ITEMS.

11 FOR WALL PARTITION TYPES, SEE SHEET AE601. FOR WINDOW TYPES

SEE SHEET AE620

12 EXTERIOR CAST-IN-PLACE CONCRETE WALLS ABOVE FINISH GRADE

SHALL RECEIVE TEXTURE FINISH AND PAINT TO MATCH EXISTING

ADJACENT CAST-IN-PLACE CONCRETE.

13 WHERE DOOR RELOCATION AND WALL INFILL OCCURS AT FIRE RATED

PARTITIONS/BARRIERS, INFILL IS TO MATCH FIRE RATED ASSEMBLY OF

THE WALL IT IS INFILLING. PERIMETER OF INFILL AREA IS TO RECEIVE

CONTINUOUS FIRE SEALANT AT BOTH SIDES.

14 EXTERIOR WALL ASSEMBLY INCLUDES R-13 MINIMUM RIGID

INSULATION. AT BUILDING ADDITION: ROOF ASSEMBLY INCLUDES R-30

(IP) MINIMUM RIGID INSULATION. PROVIDE TAPERED INSULATION AT

CRICKETS TO CREATE FINISHED BACK SLOPE MATCHING OVERALL

ROOF SLOPE.

15 WHERE NEW WALLS MEET EXISTING WALL CONDITIONS FURRING MAY

BE REQUIRED TO ALIGN BOTH SIDES OF WALLS TO EXISTING

CONDITIONS, FUR WALLS AS REQUIRED FOR ALIGNMENT

B. DOORS AND FRAMES

1 PROVIDE LABELS ON DOORS AND FRAMES WHERE SCHEDULED.

2 INSTALL CONTINUOUS CAULKING AROUND METAL FRAMES UNLESS

NOTED OTHERWISE.

3 HOLLOW METAL FRAMES SHALL BE ANCHORED TO THE STRUCTURAL

FLOOR WITH A MINIMUM OF TWO (2) ANCHOR BOLTS.

4 HOLLOW METAL FRAMES IN EXTERIOR WALLS SHALL BE FILLED WITH

GROUT TO THE DEPTH OF THE FRAME ANCHOR FULL HEIGHT FOR

SOUND DAMPENING BEFORE SETTING IN PLACE.

5 INSTALL CASING BEADS AND CAULK WHERE GWB ABUTS METAL

FRAMES.

6 DOOR TYPES AND SIZES ARE SHOWN ON SHEET AE611.

7 TERMINATED DOOR STOPS IN CLEAN ROOM AND DECONTAMINATION

ROOM

C. MISCELLANEOUS

1 ELEVATION 6600 ON THE ARCHITECTURAL DRAWINGS = 40.680 M ON

THE CIVIL DRAWINGS.

2 ALL WALL HUNG CASEWORK, GRAB BARS, DOOR HARDWARE AND

EQUIPMENT ATTACHED TO WALLS SHALL BE ANCHORED TO 45x170

WOOD BLOCKING ANCHORED BETWEEN STUDS UNLESS OTHERWISE

NOTED. BLOCKING SHALL BE CONTINUOUS AND LOCATED BOTH AT

BOTTOM AND TOP OF EQUIPMENT.

3 SEE PHASING PLANS AND INITIAL OUTFITTING AND TRANSITION PLANS

IN THE GENERAL SERIES FOR ADDITIONAL INFORMATION RELATED TO

PHASING, TRANSITION, AND TEMPORARY SPACE REQUIREMENTS

WHICH INCLUDE UTILITY MODIFICATIONS FOR TEMPORARY SPACES.

SCALE: 1 : 100C3

FLOOR PLAN LOWER LEVEL AREA D & E - PHASE B1

SCALE: 1 : 100B1

FLOOR PLAN LOWER LEVEL AREA C - PHASE D1

OFFICE

LH30

MECH

LH31

LOUNGE

LG22C

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P

DN

G F E

PROVIDE TEMPORARY

WALKWAY ENCLOSURE TO

SPD, ENCLOSURE IS TO

BE DEMOLISHED AND

REMOVED UPON MOBILE

SPD TRAILER REMOVAL.

C1

AE101C-B1

T O

E D

G E

O F

C U

R B

, F

IE

LD

V

E R

IF

Y

A

LI

G N

MIN

2 METERS

14000

FIELD VERIFY

SPD1A SPD1B

MOBILE SPD TRAILER

GC TO PROVIDE AND INSTALL. SEE

EQUIPMENT CUT SHEETS FOR INFORMATION.

COMPRESSIBLE, HIGH DENSITY TRAFFIC

SEAL WHERE ENCLOSURE ABUTS TRAILER

LINE OF ROOF ABOVE

NOTE:

TEMPORARY WALKWAY ENCLOSURE IS TO BE

CONSTRUCTED AFTER SPD TRAILER HAS BEEN

INSTALLED ON SITE.

G F E

MOBILE SPD TRAILER

C1

AE101C-B1

GC TO PROVIDE AND INSTALL. SEE

EQUIPMENT CUT SHEETS FOR INFORMATION.

MATCH SLOPE TO

EXISTING CANOPY

STRUCTURE, FIELD

VERIFY

S

LO

P E

: 1

.7

AE101C-B1

C3

MOBILE SPD TRAILER (BEYOND)

STAIRS AND HANDRAILTO

BE INCLUDED AS PART OF

SPD TRAILER

EXTERIOR GRADE

PLYWOOD SHEATHING,

20 MM OR GREATER,

PAINTED, BOTH SIDES

90 MM METAL STUDS,

PROVIDE BRACING AND

BLOCKING AS REQUIRED

ROOFING MATERIAL FOR TEMPORARY CONSTRUCTION,

CONTRACTOR'S CHOICE. ROOF MUST BE WATERPROOF AND

PROVIDE PROTECTION TO WALKWAY BELOW.

20 MM CONTINUOUS BEAD

OF SEALANT AT BASE

20041

F

IE

LD

V

E R

IF

Y

1.73

F.V.

120 75

BOLT THROUGH ON

EITHER SIDE OF

EXISTING POSTS. DO

NOT PENETRATE OR

DAMAGE STRUCTURE OF

EXISTING CANOPY.

EXISTING CANOPY

AND STRUCTURE

TO REMAIN

EXTERIOR GRADE

PLYWOOD

SHEATHING,

PAINTED

NOTE: CONDITION IS TYPICAL AT EACH POST OF EXISTING CANOPY/WALKWAY COVER.

CONTINUOUS BEAD OF

SEALANT

WOOD BLOCKING,

PAINTED

PLYWOOD SOFFIT,

PAINTED

METAL DRIP EDGE

ASPHALT SHINGLE

ROOFING

20 MM PLYWOOD

SHEATHING, EXT. GRADE

CONTINUOUS BEAD OF

SEALANT

PLYWOOD

SHEATHING, EXT.

GRADE, PAINTED

MOBILE SPD TRAILER

(BEYOND)

N

TRUE

NORTH

EPROJECT NO.:

CONSTR. CONTR. NO.

DRAWING NO.

SCALE:

SHEET

D E

P A

R T

M E

N T

O F

T H

E A

IR

F

O R

C E

A F

M S

A H

E A

L T

H F

A C

IL

IT

IE

S

D

IV

IS

IO

N

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

P A

C

IF

IC

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

DES

SUBMITTAL DATE

DRW CHK

ACTIVITY

FOR COMMANDER AFCEC

APPROVED

D D

C

B

A

54321

A

C

1 2 3 4 5

B

DRAWFORM

REVISION:

P L A N N I N G

A R C H I T E C T U R E

E N G I N E E R I N G

I N T E R I O R S

EST. 1915

IF SHEET MEASURES LESS THAN 594 X 841 mm. IT IS A

REDUCED SIZE PRINT. REDUCE SCALE ACCORDINGLY

A/E INFO

SEAL

FA8903-15-D-0004 TO: 18-F-0072

APPROVED BY

23 DECEMBER 2019

A C

KEY PLAN

B

L E

G A

C Y

P R

O J

E C

T

Q K

K A

O

P P

O R

T U

N

IT

Y

As indicated

/1

/2

:3

:5

P M

C

U se rs N p ak

D o cu m en ts A u to d es k\ R ev it

P ro je ct s\

M A

B H

-A rc h it ec tu re

N

P ak le o ad al y.

co m

.r vt

AE101C-B1

S P

D T

E M

P O

R A

R Y

W A

LK

W

A Y

P

LA

N S

, S E

C T

IO

N

S A

N D

D E

T A

IL

S

F Y

H O

S P

IT

A

L M

O D

E R

N

IZ

A T

IO

N

M

IS

A W

A A

IR

B

A S

E

J A

P A

N

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

ALS Author Checker

8600 Indian Hills Drive

Omaha, NE 68114-4039

Tel 402.391.8111 Fax

402.391.8564

L A

D P ro je c t N o -1

-0

SCALE: 1 : 100A1

FLOOR PLAN GROUND LEVEL AREA C - PHASE B1

SCALE: 1 : 100A3

ROOF PLAN GROUND LEVEL AREA C - PHASE B1

SCALE: 1 : 20C1

SPD TEMPORARY WALKWAY SECTION

SCALE: 1 : 10C3

TEMPORARY WALKWAY - ROOF EDGE DETAIL

1m

SCALE: 1:100

0 4m2m1m

200mm

SCALE: 1:20

0 800mm400mm

100mm

SCALE: 1:10

0 400mm200mm

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P

DN DN

DNDN

R Q P N M L K J H G F E D

R.9

AD101A-C1

A1

AD101A-C2

A1

AD101A-C5

A1

AD101A-C4

A1

PHASE C1

PHASE C2 PHASE C5

PHASE C4

A R

E A

A

A R

E A

B

A R

E A

A

A R

E A

C

AREA B

AREA C

PHASE D2

AREA OF RENOVATION, SEE

PHASED DEMOLITION PLANS

AD101C-D2

A1

D1

D2

D2

D2

D1 D2

D2

D1

UF29

UF30

UF33

UF32UF31

UF34

UF38

UF28

UF27

UF26

UE25 UF22

UF23

UF24

UEC5

UE38 UE35

UE34UE37

UE33UE36 UE30

UE31

UE32

UF19

UF20

UF21 UF18

UF17

UF16

UEC6

UEC4

UE28

UFC7

UF37

UF15

UF14

UF13

UE26

UE25

UE24

UE23

UE27

UE29

UEC3

UE09

UE12

UE07 UE06

UE05UE08 UE04 UE03

UE02

UEC1

UE01

UE21 UE19 UE16 UE13

UE14UE17

UF21A

UE22 UE20 UE18 UE15

UFC2

UFC1

UF04UF12UF11UF10

UF08

UF05

UF01

UF09 UF06 UF02

UF03

UF07

UF41

UC22 UC16

UC18A UC18

UC19UC20

UC24 UC21 UC12

UC13

UC14

UC15

UC03

UCC4

UCC4A

UC23

02 UC34

UCC3

UC11

UC31

UC32

UC30

UC29

UC25

UC28 UC27

UC26

UC33

UD32

UD33

UD34

UD31

UD29

UD30

UC10

UC07

UC09

UC08

STAIR

D

UD25 UD24 UD23

UD27

UD26

UD28

UC02

UCC2

UDC4

UD16

UD11

UD10

UD06

UD05UE09

UD15

STAIR

E

UD04

UD03

UD08

UD07

UDC2

UD14

UD13

UD21

UD22

UDC3

03UDC5

UC06UC05

UC04

UD18

UD20

UD17 UD12 UD02 UD01

UC03A UC02A

UD35

STAIR

B

UBC2

UB33

UB36

UB35

UB37

UB38

UB39

STAIR

C

UB41

UB42

UB43

UB45

UB44

UB46

UB21

UB20

UB19

UB16A

UB23

UB16

UB15

UB14

UB24

UB18

UB13

UB25

UB28UB32

UB26

UB09

UB27

UB31

UB30

UB29 UB07

UB08

UBC5

UBC5

UBC6

UBC4

UB06

UB05 UB04 UB03 UB02

UBC1

UB11

UB12

UA46

UA47UB10

UA45

UA44

UA43

UA42

UBC3

UB01 UA32 UA31 UA04

UA33

UA34

UA35

UA36

UA37

UA38

UA41UB17

UA29

UA28

UA27

UA26

UA25

UA24

UA23 UA22

UAC4

UA20

UA19

UA18

UA17

UA16

UA15

UA14

UA13

UA12

UA11

UA09

UA08

UA07

UA06

UA10

UAC3

UAC1 UAC2UA21

UA02 UA04

STAIR

A

UA03

UDC1

LEVEL 3 ALTERATION:

DEMOLITION INCLUDES ALL BUILDING SYSTEMS (MAIN STRUCTURAL SYSTEMS

EXCLUDED) FROM STRUCTURAL DECK BELOW TO STRUCTURAL DECK ABOVE AND

TO THE EXTERIOR STRUCTURAL ENVELOPE. REMOVE MEP SYSTEMS SERVING

ALTERATION AREAS THAT ARE LOCATED BELOW STRUCTURAL FLOOR SLAB,

ABOVE STRUCTURAL DECK AND ON THE ROOF. THIS INCLUDES DEMOLITION OF

SYSTEMS LOCATED OUTSIDE ALTERATION BOUNDARIES AS NECESSARY TO MEET

ALL CODES, CRITERIA, AND STANDARDS FOR THE NEW ALTERATION AREAS.

CONTINUOUS OPERATIONS OF ALL IMPACTED AREAS (TO INCLUDE AREAS OUTSIDE

OF LEVEL 3 ALTERATION) MUST BE MAINTAINED IN ACCORDANCE WITH THE

CONTRACT SPECIFICATIONS. REMOVE ALL EXISTING SYSTEMS SERVING THE

ALTERATION AREA INCLUDING BUT NOT LIMITED TO:

A. COMPLETE REMOVAL OF ALL EXISTING WALL PARTITIONS (TO INCLUDE

INFILL OF CONCRETE SLAB FLOOR TRENCHES THAT REMAIN AS A RESULT OF

PARTITION DEMOLITION), CEILINGS AND ALL ASSOCIATED SUPPORTS,

CEILING DEVICES, FLOOR FINISHES, LIGHTING, CASEWORK, MECHANICAL,

VENTILATION SYSTEMS, HVAC PIPING, HVAC CONTROLS, PLUMBING

FIXTURES, PLUMBING PIPING, FIRE PROTECTION PIPING AS NEEDED, LIFE

SAFETY (FIRE ALARM, MNS), MEDICAL GASES, ELECTRICAL, LOW VOLTAGE,

SIGNAGE/WAY FINDING, TELEPHONE AND COMMUNICATIONS.

B. REMOVAL OF ALL EXISTING FINISH SYSTEMS AND SUBSTRATES AT

BOUNDARY WALL PARTITIONS AND ANY INFRASTRUCTURE (OUTLETS,

DEVICES, ACCESSORIES, INSULATION, PLUMBING, MECHANICAL, HVAC,

PIPING, DUCTING, ELECTRICAL, COMMUNICATION AND ELECTRONIC

SECURITY SYSTEMS (CES), ETC.) LOCATED ON AND INSIDE OF WALL CAVITY.

C. REMOVAL OF ALL EXISTING ABANDONED DEVICES, INFRASTRUCTURE,

SECONDARY STRUCTURAL SUPPORTS, OPENINGS, AND EQUIPMENT

LOCATED ON ROOFS AND WITHIN BOUNDARY AREAS

ABOVE CEILING WORK:

CONTRACTOR IS RESPONSIBLE TO PROTECT EXISTING SPACE INCLUDING ALL

CEILING TILES, DIFFUSERS, LIGHT FIXTURES, WALLS AND FLOORS. ANY DAMAGE

DURING CONSTRUCTION MUST BE REPAIRED.

CONTRACTOR IS TO PROTECT SPACES BELOW ABOVE CEILING WORK FROM

DUST AND DEBRIS ASSOCIATED WITH COMPLETION OF THE WORK.

HATCHED AREA DENOTES EXTENTS OF LEVEL 3 ALTERATION

NOTES BELOW APPLY TO HATCHED AREA UNLESS KEYNOTED

OTHERWISE

HATCHED AREA DENOTES ROOM REQUIRING ABATEMENT, REFER TO

ABATEMENT REPORT.

NOTWITHSTANDING ANYTHING HEREUNDER OR UNDER ANY AGREEMENT, IN CONSIDERATION OF

ANY PARTY’S USE OR RELIANCE ON THESE PLANS AND SPECIFICATIONS, THE USER AGREES THAT

(1) THESE PLANS AND SPECIFICATIONS ONLY IDENTIFY LOCATIONS OF POTENTIAL HAZARDOUS MATERIAL LIMITED TO THE SPECIFIC AND ISOLATED AREAS OF TESTING. THESE PLANS ARE NOT AN EXHAUSTIVE OR FINAL ASSESSMENT OF THE PROPERTY INCLUDING ANY LOCATIONS OUTSIDE OF THOSE ISOLATED AREAS SPECIFICALLY TESTED; (2) LEO A DALY IS NOT RESPONSIBLE FOR REMOVING, HAULING, HANDLING OR ANY OTHER ACTIVITY RELATED TO ANY HAZARDOUS MATERIAL ON THE PROPERTY AND/OR AS PART OF THE PROJECT; (3) THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE FINAL IDENTIFICATION OF ANY HAZARDOUS MATERIAL ON THE PROPERTY

AND/OR AS PART OF THE PROJECT AND/OR THE REMOVAL, HAULING, AND HANDLING OR ANY

OTHER DISTURBANCE, (WHETHER INTENDED OR UNINTENDED,) OF SAID HAZARDOUS MATERIAL;

AND (4) TO THE EXTENT ALLOWABLE UNDER APPLICABLE LAW, USER HEREBY RELEASES AND

SHALL INDEMNIFY LEO A DALY, ITS EMPLOYEES, SUBSIDIARIES, SHAREHOLDERS, AGENTS AND SUBCONSULTANTS FROM ANY CLAIMS, LIABILITIES, COSTS, EXPENSES (INCLUDING REASONABLE

ATTORNEYS’ FEES) ARISING FROM OR RELATED TO HAZARDOUS MATERIAL ON THE PROPERTY.

N

TRUE

NORTH

EPROJECT NO.:

CONSTR. CONTR. NO.

DRAWING NO.

SCALE:

SHEET

D E

P A

R T

M E

N T

O F

T H

E A

IR

F

O R

C E

A F

M S

A H

E A

L T

H F

A C

IL

IT

IE

S

D

IV

IS

IO

N

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

P A

C

IF

IC

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

DES

SUBMITTAL DATE

DRW CHK

ACTIVITY

FOR COMMANDER AFCEC

APPROVED

D D

C

B

A

54321

A

C

1 2 3 4 5

B

DRAWFORM

REVISION:

P L A N N I N G

A R C H I T E C T U R E

E N G I N E E R I N G

I N T E R I O R S

EST. 1915

IF SHEET MEASURES LESS THAN 594 X 841 mm. IT IS A

REDUCED SIZE PRINT. REDUCE SCALE ACCORDINGLY

A/E INFO

SEAL

FA8903-15-D-0004 TO: 18-F-0072

APPROVED BY

23 DECEMBER 2019

A C

KEY PLAN

B

L E

G A

C Y

P R

O J

E C

T

Q K

K A

O

P P

O R

T U

N

IT

Y

As indicated

/1

/2

:2

:4

P M

C

U se rs N p ak

D o cu m en ts A u to d es k\ R ev it

P ro je ct s\

M A

B H

-A rc h it ec tu re

N

P ak le o ad al y.

co m

.r vt

AD101

D E

M O

LI

T

IO

N

P

LA

N G

R O

U N

D L

E V

E L

O

V E

R A

LL

F Y

H O

S P

IT

A

L M

O D

E R

N

IZ

A T

IO

N

M

IS

A W

A A

IR

B

A S

E

J A

P A

N

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

ALS DMB BFH

8600 Indian Hills Drive

Omaha, NE 68114-4039

Tel 402.391.8111 Fax

402.391.8564

L A

D P ro je c t N o -1

-0

SCALE: 1 : 250A1

DEMOLITION PLAN GROUND LEVEL OVERALL

2.5m

SCALE: 1:250

0 10m5m2.5m

DEMOLITION NOTES ARCHITECTURAL

1 HALF-TONE NOTES AND DIMENSIONS ARE PROVIDED FOR INFORMATION ONLY.

2 DASHED LINES INDICATE MATERIAL OR EQUIPMENT REMOVED.

3 EXISTING SURFACES DISTURBED BY NEW CONSTRUCTION SHALL BE PATCHED AND

FINISHED TO MATCH ADJACENT SURFACES.

4 THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF

WORK. THE CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO REMOVAL OF MATERIAL

OR EQUIPMENT NOT INDICATED ON THE DRAWINGS TO BE REMOVED.

5 THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING

STRUCTURES SURROUNDING THE CONTRACT AREA. DAMAGE TO EXISTING STRUCTURES

OR EQUIPMENT SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE OWNER.

6 FOR ADDITIONAL DEMOLITION, SEE STRUCTURAL, MECHANICAL AND ELECTRICAL

DRAWINGS.

7 TEMPORARY PARTITIONS SHALL BE LOCATED SO AS NOT TO INTERFERE

WITH EXISTING LIGHT FIXTURES, SPRINKLER HEADS, HVAC DIFFUSERS, ETC.

8 CONTRACTOR SHALL REPAIR/REPLACE ANY DAMAGE CAUSED BY THE

TEMPORARY WALLS ONCE THEY HAVE BEEN REMOVED.

9 CONTRACTOR SHALL MAINTAIN NEGATIVE PRESSURE WITH VENTING

DIRECTLY TO OUTSIDE DURING DEMOLITION AND NEW CONSTRUCTION

ACTIVITIES IN ORDER TO MINIMIZE THE CHANCE FOR AIR POLLUTION TO

ENTER CLINIC VENTILATION SYSTEMS. ALL EXISTING RETURN AND SUPPLY

AIR DUCTWORK TO THESE AREAS SHALL BE SECURELY CAPPED AND

SEALED DURING THE CONSTRUCTION PERIOD. THIS REQUIREMENT APPLIES

TO ALL WORK AREAS.

10 SEE DEPARTMENTAL PHASING PLANS FOR SPECIFIC RESTRICTIONS BY DEPARTMENT.

11 EXISTING OCCUPIED FACILITY MUST BE WEATHER TIGHT AT ALL TIMES.

12 IN AREAS OF CONSTRUCTION, WHERE WALLS DO NOT EXTEND TO STRUCTURE,

CONTRACTOR SHALL PROVIDE BARRIER ABOVE CEILING TO PROTECT FACILITY FROM

DUST AND DEBRIS AS REQUIRED BY FACILITY ICRA (INFECTION CONTROL RISK

ASSESSMENT) STANDARDS.

13 SEE AD100 AND AD101 FOR ACM/LEAD PAINT LOCATIONS AND ADDITIONAL INFORMATION

PERTAINING TO ABATEMENT WORK.

KEYNOTE LEGEND

KEY DESCRIPTION

D1 LEAD PAINT, REFER TO LEAD PAINT REPORT.

D2 ASBESTOS CONTAINING MATERIAL, REFER TO ASBESTOS REPORT.

HAZARDOUS MATERIAL NOTES

1 IF ASBESTOS CONTAINING MATERIALS ARE IDENTIFIED WITHIN THE CONSTRUCTION

AREA, THE MATERIAL SHALL NOT BE DISTURBED UNLESS THE RENOVATION REQUIRES

ITS REMOVAL.

2 ANY DISTURBANCE TO THE ASBESTOS-CONTAINING MATERIALS SHALL BE IN

ACCORDANCE WITH THE JEGS, EPA REGULATIONS, AND THE SPECIFICATIONS

3 IDENTIFIED ASBESTOS CONTAINING MATERIALS ARE SHOWN TO THE EXTENT

PRACTICAL ON THESE PLANS SO THE CONTRACTOR CAN PLAN THEIR WORK IN A SAFE

AND REGULATORY COMPLIANT MANNER

4 REFER TO ENVIROQUEST INSPECTION REPORT FOR ASBESTOS, LEAD-BASED PAINT

AND PCB FOR DETAILED INFORMATION ON ALL MATERIAL SAMPLED.

5 THE CONTRACTOR SHALL CONDUCT ALL ASBESTOS DISTURBANCE WORK IN

ACCORDANCE WITH SPECIFICATION SECTION 02 82 00 ASBESTOS REMEDIATION AND

THE CONTRACTORS APPROVED ASBESTOS WORK PLAN.

6 THE CONTRACTOR SHALL CONDUCT ALL LEAD DISTURBANCE WORK IN ACCORDANCE

WITH SPECIFICATION SECTION 02 83 00 LEAD REMEDIATION AND THE CONTRACTORS

APPROVED LEAD COMPLIANCE PLAN, IF REQUIRED. CURRENT REPORT INDICATES

LEVELS BELOW REQUIREMENT FOR REMEDIATION, THEREFORE NO ABATEMENT IS

EXPECTED. CONTRACTOR SHALL REVIEW REPORT PRIOR TO START OF DEMOLITION.

7 ALL FLUORESCENT LIGHT BALLAST AND LIGHT TUBES IN THE CONSTRUCTION AREA

MUST BE COLLECTED FOR RECYCLING AND DISPOSED IN ACCORDANCE WITH THE

JEGS, EPA, AND PREFECTURAL REGULATIONS.

8 THE CONTRACTOR SHALL COORDINATE ALL WORK WITH CONTRACTING OFFICER AND

GENERAL CONTRACTOR.

EXTERIOR LEAD PAINT

BUILDING COMPONENT SUBSTRATE COLOR

UPPER LEVEL, EXIT COVERED

WALKWAY

POST/FRAME METAL DARK BROWN/RED

UPPER LEVEL, DENTAL BUILDING ROOF EAVES METAL BEIGE

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P

S R Q

PROSTHO LAB

UF29

VEST

UF28

OFFICE

UF27

LAB

UF26

DTR

UE25

CORR

UEC5

DTR

UE38

DTR

UE37

DTR

UE36

DENTAL

CONFERENCE

UE09

VEST

UE12

R.9

A2

AD101A-C1

EXISTING EXHAUST TOWERS

TO REMAIN, SEE MECHANICAL

FOR ADDITIONAL

INFORMATION

FIELD VERIFY

F

IE

L D V

E R

IF

Y

F

IE

LD

V

E R

IF

Y

EXISTING AWNING

TO REMAIN

GROUND LEVEL

QR.9

DEMOLISH FACE OF

CONCRETE WALL (BEYOND)

REMOVE CAST IN PLACE

CONCRETE AWNING AND

METAL PANEL CLADDING

REMOVE ENTRANCE

CANOPY, INCLUDING BUT

NOT LIMITED TO WALLS

ROOF AND COLUMNS.

REMOVE EXISTING ROOF DRIP

EDGE FLASHING

GROUND LEVEL

Q

REMOVE EXISTING STOREFRONT

WINDOWS

WHERE INDICATED ON PLANS,

REMOVE EXISTING WALL PREPARE

OPENING TO RECEIVE SCHEDULED

DOOR.

REMOVE CONCRETE SILL

WITH FACE OF WALL

100 MM, F.V.

DEMOLISH FLUSH

, F .V

N

TRUE

NORTH

EPROJECT NO.:

CONSTR. CONTR. NO.

DRAWING NO.

SCALE:

SHEET

D E

P A

R T

M E

N T

O F

T H

E A

IR

F

O R

C E

A F

M S

A H

E A

L T

H F

A C

IL

IT

IE

S

D

IV

IS

IO

N

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

P A

C

IF

IC

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

DES

SUBMITTAL DATE

DRW CHK

ACTIVITY

FOR COMMANDER AFCEC

APPROVED

D D

C

B

A

54321

A

C

1 2 3 4 5

B

DRAWFORM

REVISION:

P L A N N I N G

A R C H I T E C T U R E

E N G I N E E R I N G

I N T E R I O R S

EST. 1915

IF SHEET MEASURES LESS THAN 594 X 841 mm. IT IS A

REDUCED SIZE PRINT. REDUCE SCALE ACCORDINGLY

A/E INFO

SEAL

FA8903-15-D-0004 TO: 18-F-0072

APPROVED BY

23 DECEMBER 2019

L E

G A

C Y

P R

O J

E C

T

Q K

K A

O

P P

O R

T U

N

IT

Y

As indicated

/1

/2

:2

:4

P M

C

U se rs N p ak

D o cu m en ts A u to d es k\ R ev it

P ro je ct s\

M A

B H

-A rc h it ec tu re

N

P ak le o ad al y.

co m

.r vt

AD101A-C1

F Y

H O

S P

IT

A

L M

O D

E R

N

IZ

A T

IO

N

M

IS

A W

A A

IR

B

A S

E

J A

P A

N

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

ALS DMB BFH

8600 Indian Hills Drive

Omaha, NE 68114-4039

Tel 402.391.8111 Fax

402.391.8564

L A

D P ro je c t N o -1

-0

D E

M O

LI

T

IO

N

P

LA

N G

R O

U N

D L

E V

E L

A

R E

A A

P

H A

S E

C

D

E M

O

LI

T

IO

N W

A

LL

S E

C T

IO

N

SCALE: 1 : 100A1

DEMOLITION PLAN GROUND LEVEL AREA A - PHASE C1

KEYED DEMO NOTES

1 CUT OPENING IN WALL, COORDINATE OPENING SIZE WITH EXISTING SALVAGED

LOUVER AS PART OF NEW WORK, SEE KEYED NOTE 2.

2 SALVAGE LOUVER, PREPARE FOR REINSTALLATION IN OPPISITE SIDE OF HVAC

VENTILATION TOWER

3 SALVAGE LOUVER, PREPARE FOR REINSTALLATION IN SOUTH TOWERS

OPPOSITE SIDE

4 CUT OPENING IN WALL, PREPARE OPENING TO RECEIVE SCHEDULED DOOR.

5 REMOVE EXTERIOR WINDOW AND FRAME

6 REMOVE EXISTING CANOPY, WALLS AND DOOR

7 REMOVE ALL FIXTURES/EQUIPMENT SHOWN DASHED THIS ROOM

8 REMOVE FACE OF WALL 150 MM BACK FROM OUTER-MOST FACE OF WALL

9 REMOVE DOOR AND FRAME FOR INFILL OF WALL.

10 REMOVE GYP ON FACE OF WALL INSIDE AREA OF DEMOLITION AND INSULATION.

GWB ON FACE OF WALL OUTSIDE AREA OF DEMOLITION TO REMAIN

11 REMOVE GYP AND INSULATION BACK TO CONCRETE WALL

12 PREPARE EXISTING SURFACE MOUNTED WIRING, DATA CONNECTIONS ETC. FOR

RELOCATION OR DEMOLITION PER ELECTRICAL AND COMM SHEETS.

13 REMOVE AWNING OVERHEAD.

14 REMOVE EXISTING HIGH-DENSITY STORAGE SYSTEM. DEMOLISH EXISTING

HIGH-DENSITY STORAGE TRACKS AND PATCH AND INFILL TRACK LOCATION WITH

CONCRETE. SURFACE TO BE SMOOTH AND FLUSH WITH EXISTING FLOOR.

15 REMOVE CEILING AT NEW MECHANICAL ROOM

16 REMOVE CONCRETE LEDGE AT SILL OF EXISTING WINDOW OPENING TO BE

INFILLED. DEMOLISH BACK TO BE FLUSH WITH ADJACENT SURFACE.

17 CUT OPENING IN WALL, PREPARE OPENING TO RECEIVE SCHEDULED COILING

SHUTTER.

18 REMOVE DOOR AND FRAME PREPARE OPENING FOR REPLACMENT

19 REMOVE EXISTING CEILING THIS ROOM

DEMOLITION NOTES ARCHITECTURAL

1 HALF-TONE NOTES AND DIMENSIONS ARE PROVIDED FOR INFORMATION ONLY.

2 DASHED LINES INDICATE MATERIAL OR EQUIPMENT REMOVED.

3 EXISTING SURFACES DISTURBED BY NEW CONSTRUCTION SHALL BE PATCHED AND

FINISHED TO MATCH ADJACENT SURFACES.

4 THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF

WORK. THE CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO REMOVAL OF MATERIAL

OR EQUIPMENT NOT INDICATED ON THE DRAWINGS TO BE REMOVED.

5 THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING

STRUCTURES SURROUNDING THE CONTRACT AREA. DAMAGE TO EXISTING STRUCTURES

OR EQUIPMENT SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE OWNER.

6 FOR ADDITIONAL DEMOLITION, SEE STRUCTURAL, MECHANICAL AND ELECTRICAL

DRAWINGS.

7 TEMPORARY PARTITIONS SHALL BE LOCATED SO AS NOT TO INTERFERE

WITH EXISTING LIGHT FIXTURES, SPRINKLER HEADS, HVAC DIFFUSERS, ETC.

8 CONTRACTOR SHALL REPAIR/REPLACE ANY DAMAGE CAUSED BY THE

TEMPORARY WALLS ONCE THEY HAVE BEEN REMOVED.

9 CONTRACTOR SHALL MAINTAIN NEGATIVE PRESSURE WITH VENTING

DIRECTLY TO OUTSIDE DURING DEMOLITION AND NEW CONSTRUCTION

ACTIVITIES IN ORDER TO MINIMIZE THE CHANCE FOR AIR POLLUTION TO

ENTER CLINIC VENTILATION SYSTEMS. ALL EXISTING RETURN AND SUPPLY

AIR DUCTWORK TO THESE AREAS SHALL BE SECURELY CAPPED AND

SEALED DURING THE CONSTRUCTION PERIOD. THIS REQUIREMENT APPLIES

TO ALL WORK AREAS.

10 SEE DEPARTMENTAL PHASING PLANS FOR SPECIFIC RESTRICTIONS BY DEPARTMENT.

11 EXISTING OCCUPIED FACILITY MUST BE WEATHER TIGHT AT ALL TIMES.

12 IN AREAS OF CONSTRUCTION, WHERE WALLS DO NOT EXTEND TO STRUCTURE,

CONTRACTOR SHALL PROVIDE BARRIER ABOVE CEILING TO PROTECT FACILITY FROM

DUST AND DEBRIS AS REQUIRED BY FACILITY ICRA (INFECTION CONTROL RISK

ASSESSMENT) STANDARDS.

13 SEE AD100 AND AD101 FOR ACM/LEAD PAINT LOCATIONS AND ADDITIONAL INFORMATION

PERTAINING TO ABATEMENT WORK.

X

SCALE: 1 : 20A2

DEMOLITION WALL SECTION - PHASE 1

SCALE: 1 : 20A4

DEMOLITION WALL SECTION - PHASE 2

200mm

SCALE: 1:20

0 800mm400mm1m

SCALE: 1:100

0 4m2m1m

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P

DNDN

R Q P N M L K J H G F E D

AE201

B1

AE201

D1

AE201

A1

R.9

AE101A-C1

A1 AE101A-C2

A1

AE101A-C5

A1

AE101A-C4

A1

PHASE C1

PHASE C2 PHASE C5

PHASE C4

A R

E A

A

A R

E A

C

A R

E A

A

A R

E A

B

AREA B

AREA C

AE101A-C3

A1

PHASE C3

AE101C-D2

A1

PHASE D2

AE101C-B1

A1

PHASE B1

UE29UE25UE23

UE26UE24 UE28

UE27

UEC13

UE72

UE69 UE68

UE56

UE67

UE70

UE71

UE64

UE60

UE66

UE62

UE58

UE65UE59 UE61 UE63

UE57

UEC11

UEC10

UEC9

UE12

UE17

UE16 UE20UE14 UE18 UE22

UE40

UE38

UE11

UE39

UE37

UE15

UE55UE32

UE36

UE42

UE43

UE44

UE54

UE49

UE19

UE41

UE47

UE48

UE53

UE35

UE50

UE52

UE31

UE33 UE34

UE13B

UE01

UE04A

UE02

UE10

UE09

UE07

UE05

UE06

UE03

UEC1

UEC2

UEC3

UEC4

UEC5

UEC6

UEC7UEC8

UE21

UF41

UE43A

UE51

UD21

UD20

UD21D

UD21C

UD21B

UC22 UC16

UC18A UC18

UC19UC20

UC24 UC21 UC12

UC13

UC14

UC15

UC03

UCC4

UCC4A

UC23

02 UC34

UCC3

UC11

UC31

UC32

UC30

UC29

UC25

UC28 UC27

UC26

UC33

UD32

UD33

UD34

UD31

UD29

UD30

UC10

UC07

UC09

UC08

STAIR

D

UD25 UD24 UD23

UD27

UD26

UD28

UC02

UCC2

UDC4

UD16 UD11 UD10

UD06

UD05UE09

UD15

STAIR

E

UD04

UD03

UD08

UD07

UDC2

UD14

UD13

UD22

UDC3

03UDC5

UC06UC05

UC04

UD18

UD20

UD17 UD12 UD02 UD01

UC03A UC02A

UD35

STAIR

B

UBC2

UB33

UB36

UB35

UB37

UB38

UB39

STAIR

C

UB41

UB42

UB43

UB45

UB44

UB46

UB21

UB20

UB19

UB16A

UB23

UB16

UB15

UB14

UB24

UB18

UB13

UB25

UB28UB32

UB26

UB09

UB27

UB31

UB30

UB29 UB07

UB08

UBC5

UBC5

UBC6

UBC4

UB06

UB05 UB04 UB03 UB02

UBC1

UB11

UB12

UA46

UA47UB10

UA45

UA44

UA43

UA42

UBC3

UB01 UA32 UA31 UA04

UA33

UA34

UA35

UA36

UA37

UA38

UA41UB17

UA29

UA28

UA27

UA26

UA25

UA24

UA23 UA22

UAC4

UA20

UA19

UA18

UA17

UA16

UA15

UA14

UA13

UA12

UA11

UA09

UA08

UA07

UA06

UA10

UAC3

UAC1 UAC2

UA21

UA02 UA04

STAIR

A

UA03

UDC1

N

TRUE

NORTH

EPROJECT NO.:

CONSTR. CONTR. NO.

DRAWING NO.

SCALE:

SHEET

D E

P A

R T

M E

N T

O F

T H

E A

IR

F

O R

C E

A F

M S

A H

E A

L T

H F

A C

IL

IT

IE

S

D

IV

IS

IO

N

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

P A

C

IF

IC

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R C

E N

T E

R

DES

SUBMITTAL DATE

DRW CHK

ACTIVITY

FOR COMMANDER AFCEC

APPROVED

D D

C

B

A

54321

A

C

1 2 3 4 5

B

DRAWFORM

REVISION:

P L A N N I N G

A R C H I T E C T U R E

E N G I N E E R I N G

I N T E R I O R S

EST. 1915

IF SHEET MEASURES LESS THAN 594 X 841 mm. IT IS A

REDUCED SIZE PRINT. REDUCE SCALE ACCORDINGLY

A/E INFO

SEAL

FA8903-15-D-0004 TO: 18-F-0072

APPROVED BY

23 DECEMBER 2019

A C

KEY PLAN

B

L E

G A

C Y

P R

O J

E C

T

Q K

K A

O

P P

O R

T U

N

IT

Y

1 : 250

/1

/2

:3

:2

P M

C

U se rs N p ak

D o cu m en ts A u to d es k\ R ev it

P ro je ct s\

M A

B H

-A rc h it ec tu re

N

P ak le o ad al y.

co m

.r vt

AE101

F

LO

O R

P

LA

N G

R O

U N

D L

E V

E L

O

V E

R A

LL

F Y

H O

S P

IT

A

L M

O D

E R

N

IZ

A T

IO

N

M

IS

A W

A A

IR

B

A S

E

J A

P A

N

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

ALS DMB BFH

8600 Indian Hills Drive

Omaha, NE 68114-4039

Tel 402.391.8111 Fax

402.391.8564

L A

D P ro je c t N o -1

-0

SCALE: 1 : 250A1

FLOOR PLAN GROUND LEVEL OVERALL 2.5m

SCALE: 1:250

0 10m5m2.5m

GENERAL NOTES ARCHITECTURAL

A. PARTITION AND WALLS

1 WHERE PLAN AREA IS SHOWN TO BE ENLARGED, SEE ENLARGED PLAN

FOR DIMENSIONS AND WALL TYPE CALLOUTS.

2 DIMENSIONS ARE TO FINISH FACE OF PARTITIONS, FACE OF CMU,

FACE OF EXISTING FINISH OR CENTER LINE OF COLUMNS UNLESS

SHOWN OR NOTED OTHERWISE.

3 PARTITIONS SHALL BE TYPE SA PARTITIONS: 90 mm METAL STUDS AT 300 mm ON CENTER WITH 15 mm GYPSUM WALLBOARD EACH SIDE

WITH ACOUSTIC BATT INSULATION, UNLESS NOTED OTHERWISE.

4 ALL PARTITIONS SHALL EXTEND FROM FLOOR TO UNDER SIDE OF

DECK ABOVE EXCEPT WHERE NOTED OR SHOWN OTHERWISE.

5 EXTEND ALL SOUND RATED PARTITIONS TO THE UNDER SIDE OF DECK

ABOVE TO PREVENT SOUND TRANSMISSION. FURNISH 4-1/4 POUNDS

DENSITY GLASS FIBER INSULATION SHAPED TO FIT THE VOID ABOVE

THE PARTITION WHERE AIR-BORNE SOUND CAN PENETRATE SPACES.

6 FOR LOCATIONS OF FIRE-RATED PARTITIONS SEE FIRE PROTECTION

PLANS.

7 CONTROL JOINTS SHALL BE PROVIDED ABOVE DOORS AT EACH SIDE

IN STUD AND GWB PARTITIONS.

8 EXPANSION JOINTS AT ALL FLOORS, CEILINGS AND WALLS THAT ARE

EXPOSED TO VIEW SHALL BE COVERED WITH EXPANSION JOINT

COVERS APPROPRIATE FOR FINISHED SURFACES.

9 ALL COLUMNS WITHIN FINISHED SPACES SHALL BE FINISHED WITH

SAME MATERIALS SCHEDULED AT WALLS UNLESS OTHERWISE SHOWN

OR DETAILED.

10 PROVIDE ALL WALL AND FLOOR OPENINGS FOR MECHANICAL AND

ELECTRICAL ITEMS.

11 FOR WALL PARTITION TYPES, SEE SHEET AE601. FOR WINDOW TYPES

SEE SHEET AE620

12 EXTERIOR CAST-IN-PLACE CONCRETE WALLS ABOVE FINISH…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .