Attachment J-9 Facility Survey Part 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QandA3.docx | DOCX document | |
| DOL-ETA-15-R-00039_Amend_0003-signed.pdf | ||
| QandA.docx | DOCX document | |
| DOL-ETA-15-R-00039_Amend_00002.pdf | ||
| DOL-ETA-15-R-00039_00001.pdf | ||
| Attachment_J-13.xlsx | XLSX spreadsheet | |
| Attachment_J-8.pdf | ||
| Attachment_J-12.xlsx | XLSX spreadsheet | |
| Attachment_J-7.docx | DOCX document | |
| Attachment_J-1.xlsx | XLSX spreadsheet | |
| Attachment_J-2.pdf | ||
| Attachment_J-6.xlsx | XLSX spreadsheet | |
| Attachment_J-9-1.pdf | ||
| DOL-ETA-15-R-00039.pdf | ||
| Attachment_J-4.xlsx | XLSX spreadsheet | |
| Attachment_J-3.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Turner
Job Corps Center Albany, GA
Facility Planning Report Volume II
Supporting Data
Final August 2013
Department of Labor/ Office of Job Corps
22Turner Job Corps Center
Turner
Job Corps Center Albany, GA
Facility Planning Report Volume II
Supporting Data
Final August 2013
Dormitory 4803
33 Turner Job Corps Center
CONTENTS
TURNER JOB CORPS CENTER
FACILITY PLANNING REPORT
VOLUME I - Planning Strategy
• Existing Site Plan
• Center Statistics
INTRODUCTION
• Purpose
• Report Contents
EXECUTIVE SUMMARY
A. EXISTING CONDITIONS
• Background
• General Site Conditions
• General Building Conditions
• Preventive Maintenance
• Ownership
• Facility Assessment by Function
• EnergyIssues
• Environmental Issues
• Sustainability
• Accessibility Standards
• Health and Life Safety Issues
• Summary of Defi ciencies
B. RECOMMENDATIONS
• Status of the Previous (PY09) Plan
• Signifi cant Issues
• PY 12 Plan Overview
• Summary of Proposed Projects
• Proposed Site Plan
• Implementation Plan
• Summary of National Projects
• Project Data Sheets
C. PLANNING ANALYSIS
• Purpose
• Planning Objectives and Assumptions
• Space Utilization Analysis
• Federal Real Property Asset Management
• Mission Dependency Site Plan
• Defi ciency Analysis
• Facility Condition Summary Report
• Building Condition by Function
• Building Condition Site Plan
VOLUME II - Supporting Data
• Vicinity Map
• Location Map
• Existing Site Plan
D. DESCRIPTIONS
• Buildings and Structures
• Space Utilization By Function
• NSF by Building
• Energy Management Report
• Environmental Management
Asbestos Report Radon Report
• Site Descriptions
• Building Descriptions
E. DEFICIENCIES
F. CORRESPONDENCE AND REPORTS
• Center Review Meeting Minutes
• Survey Brief
• RA and Student Facility Feedback Questionnaire
• Life Safety Defi ciencies Transmittal and List
• O & M Defi ciency List
• Active Warranty Report
• FRPC Performance Measures Matrix
44Turner Job Corps Center
55 Turner Job Corps Center
Turner Job C orps C enter
77 Turner Job Corps Center
D Descriptions
BUILDINGS AND STRUCTURES
00404 TURNER 07/18/2013
1Page: of Date:
1604 - ADMINISTRATION
1605 - MAINTENANCE
2000 - ADMINISTRATION
2001 - GROUP LIFE/RESIDENTIAL LIVING
2007 - LIBRARY
2008 - VOCATIONAL EDUCATION
2102 - ADMINISTRATION/EDUCATION
2105 - REC/VOC/EDUC/STORE
2108 - PROPERTY STORAGE
2110 - VOCATION
3304 - RECREATION
4008 - TRANSPORTATION/SAFETY
4111 - EDUCATION
4114 - EDUCATION/STANDARDS
4214 - SECURITY OFFICE
4800 - DORMITORY
4801 - DORMITORY
4802 - DORMITORY
4803 - DORMITORY
4804 - DORMITORY
4805 - DORMITORY
4806 - DORMITORY
4807 - MECHANICAL PLANT
4808 - CAFETERIA
5557 -VST STORAGE
5558 - VOCATIONAL/EDUCATION
6018 - POOL HOUSE
7140 - CAREER PREPARATION PERIOD
7141 - CAREER PREPARATION PERIOD
7142 - COUNSELORS
7143 - ORIENTATION
7144 - MEDICAL/DENTAL
7145 - CHILD DEVELOPMENT CTR
7146 - TEAP
7148 - SOLO PARENT DORMITORY
7150 - SECURITY/VISITORS CTR
7160 - CULINARY ARTS/COMMUNITY
RELATIONS
9701 - GYMNASIUM
9704 - EDUCATION/ADMINISTRATION
1208 - PAINT STORAGE
2106 - RES LIVING STORAGE
2107 - RESIDENTIAL LIVING STORAGE
4900 - GAZEBO
4901 - GAZEBO
4902 - GAZEBO
4903 - GAZEBO
4904 - GAZEBO
6019 - PAVILION (POOL)
6020 - GREENHOUSE
Name GSF
26,456 4,000 6,724 9,000 7,620
35,289 9,591
20,404 19,910 13,444 9,433 1,152 9,334 6,176 5,014
25,584 25,584 25,584 25,584 25,584 25,584 25,584
27,000 5,000
16,000
1,700 3,490 1,700 3,540 4,025 2,691 1,700
18,684 13,057 15,800
24,234 32,295
2,000
Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active
Active Active Active Active Active Active Active Active Active Active Active Active
StatusType
Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building
Building Building Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure
Use Group Built Flrs Const
Business Utility/Misc.
Business Business Business Business Business Assembly Storage Business Assembly Business Business Business Business Residential Residential Residential Residential Residential Residential Residential Utility/Misc.
Assembly Storage Business Utility/Misc.
Business Business Business Business Business Day Care Business Residential Assembly Assembly/Bu
Assembly Business Storage Storage
Assembly Assembly
Assembly
Business
Fair Fair Fair Fair
Good Fair
Good Good Good Good Good Good Fair
Good Good Good Fair
Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good
Good Good Good Good Good Good Good Good Good Good Good Good
ConditionAsset Number
0040400004 0040400005 0040400007 0040400043 0040400011 0040400012 0040400013 0040400014 0040400066 0040408094 0040400023 0040400055 0040400025 0040400026 0040400028 0040400029 0040400030 0040400031 0040400032 0040400033 0040400034 0040400035 0040400036 0040400037 0040400069 0040400038 0040400039 0040400050 0040400057 0040400058 0040400059 0040400060 0040400061 0040400062 0040400064 0040400041 0040400042
0040400065 0040408093 0040400003 0040400052 0040408095 0040408089 0040408090 0040408098 0040408099 0040408100 0040408096 0040408103
BUILDINGS AND STRUCTURES
00404 TURNER 07/18/2013
2Page: of Date:
6021 - GREENHOUSE (STORAGE)
6022 - STORAGE
7161 - GAZEBO
7162 - PAVILION (SPD)
7163 - DUGOUT
7164 - DUGOUT
7248 - STORAGE SHED
7250 - STORAGE SHED
7251 - CTST TRAINING STRUCTURE
9703 - SECURITY BOOTH
Name GSF
1,440
2,000
Active Active Active Active Active Active Active Active Active Active
StatusType
Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure
Use Group Built Flrs Const
Storage Storage
Assembly Utility/Misc.
Utility/Misc.
Storage Storage Business Business
Good Good Good Good Good Good Good Good Good Good
ConditionAsset Number
0040408106 0040408107 0040408097 0040408102 0040408105 0040408104 0040408091 0040408092 0040408101 0040408087
39 535,059
20 11,223
59 546,282
Buildings
Structures
Total
GSF
GSF
GSF
Summary
07/18/2013
Space Utilization By Function 00404 Turner Page: 1 of Date:
HOUSING
EDUCATION
FOOD SERVICE
SUGGESTED
NSF/
ENROLLEE
SUGGESTED
TOTAL
NSF
ACTUAL
TOTAL
NSF
TYPE OF SPACE
SUB TOTAL
SUB TOTAL
SUB TOTAL
Resident Men Resident Women Total Residents
Residents 880 Non Residents 50
930Total Students
(880)
(930)
(930)
DIFFERENCE
88,000
67,660
16,740
118,162
122,933
22,436
Lounge Shower/Toilet Single Parent Dormitory Sleeping excl. SPD( rooms; beds) Storage
Academic (930) Non-Academic
40 -- ACT (Off-Ctr) 20 -- Advanced Asphalt Paving + 20 -- Advanced Cement Masonry + 20 -- Asphalt Paving + 20 -- Bricklayer + 20 -- Carpentry + 20 -- Cement Masonry + 100 -- Culinary Arts + 72 -- Electrical + 96 -- Facilities Maint. and Const. + 16 -- Heavy Equipment Mechanic + 24 -- Landscaping + 30 -- Medical Assistant 90 -- Medical Office Support 90 -- Nursing Assistant + 60 -- Office Administration 20 -- Plastering + 48 -- Welding +
Vocational Theory (586)
Dining (2 Servings) Food Preparation Food Storage
8,400 14,994 14,200 73,764
6,804
24,222 37,633
1,135 2,680 1,700 1,250 4,000 6,500 9,300 2,425
10,316 1,625 2,400 1,080 1,080 1,620 1,620 2,650 3,851
5,846
12,786 4,250 5,400
8,800 10,560
63,360
5,280
9,300 9,300
1,500 1,500 1,500 1,500 1,500 1,500 6,000 3,600 7,200 1,200 1,200
2,700 3,600 2,700 1,500 3,600
5,860
7,440 5,580 3,720
-400 4,434
10,404 1,524
14,922 28,333
-365 1,180
-250
2,500 5,000 3,300 -1,175 3,116
1,200
-1,620 -1,980 -1,080 1,150
-14
5,346 -1,330 1,680
Vocations
30,162
55,273
5,696
07/18/2013
Space Utilization By Function 00404 Turner Page: 2 of Date:
RECREATION
MEDICAL/DENTAL
ADMINISTRATION
STORAGE/SUPPORT
VACANT
SUGGESTED
NSF/
ENROLLEE
SUGGESTED
TOTAL
NSF
ACTUAL
TOTAL
NSF
TYPE OF SPACE
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
TOTAL 283.62 263,770 388,513
(930)
(930)
(930)
(930)
(0)
DIFFERENCE
535,059
0.73
TOTAL GSF
NET TO GROSS RATIO
44,750
5,500
22,520
18,600
42,498
3,100
26,744
20,700
31,940
Assembly Hall Auditorium Gymnasium Miscellaneous Recreation Pool Hall Raquetball Swimming Pool Weight Room
Medical/Dental
Administration Child Development Center (49)
Operations & Maintenance Warehouse
Vacant
5.91
3,600 2,345
10,504 16,900
4,949 2,600
3,100
24,644 2,100
7,600 13,100
31,940
5,500
18,600 3,920
7,440 11,160
-2,400
6,044 -1,820
1,940
RESIDENT
NON-RESIDENT
(880)
(50) 15
50 44,000
-2,252
-2,400
4,224
2,100
31,940
124,743
Net Square Footage By Building Date: 07/18/2013 Page: 1
Center: TURNER (00404) of 5
HOUSING
Sleeping excl. SPD
Lounge
Storage
Shower/Toilet
Single Parent Dormitory
Function Suggested
NSF
12,294 12,294 12,294 12,294 12,294 12,294
1,400 1,400 1,400 1,400 1,400 1,400
1,134 1,134 1,134 1,134 1,134 1,134
2,499 2,499 2,499 2,499 2,499 2,499
14,200
4800 - DORMITORY
4805 - DORMITORY
4802 - DORMITORY
4803 - DORMITORY
4804 - DORMITORY
4806 - DORMITORY
4804 - DORMITORY
4800 - DORMITORY
4802 - DORMITORY
4805 - DORMITORY
4803 - DORMITORY
4806 - DORMITORY
4804 - DORMITORY
4800 - DORMITORY
4806 - DORMITORY
4803 - DORMITORY
4802 - DORMITORY
4805 - DORMITORY
4803 - DORMITORY
4800 - DORMITORY
4805 - DORMITORY
4806 - DORMITORY
4802 - DORMITORY
4804 - DORMITORY
7148 - SOLO PARENT DORMITORY
Bldg Name Actual NSF Difference
73,764
8,400
6,804
14,994
14,200
Sub Total: 118,162
63,360
8,800
5,280
10,560
88,000
10,404
-400
1,524
4,434
14,200
( 880
30,162 rooms; beds rooms; beds rooms; beds rooms; beds rooms; beds rooms; beds
Page: 2
Center: TURNER (00404) of 5
EDUCATION
Academic
Vocational Theory (586)
Carpentry
Cement Masonry
Electrical
Culinary Arts
Welding
Plastering
Bricklayer
Facilities Maint. and Const.
Landscaping
Medical Assistant
Function Suggested
NSF
24,222
2,475 2,795
4,000
6,500
2,425
9,300
3,851
2,650
1,250
1,800 8,516
2,400
1,080
9704 - EDUCATION/ADMINISTRATION
7160 - CULINARY ARTS/COMMUNITY RELATIONS
2008 - VOCATIONAL EDUCATION
5558 - VOCATIONAL/EDUCATION
2008 - VOCATIONAL EDUCATION
2008 - VOCATIONAL EDUCATION
5558 - VOCATIONAL/EDUCATION
7160 - CULINARY ARTS/COMMUNITY RELATIONS
2110 - VOCATION
2008 - VOCATIONAL EDUCATION
2008 - VOCATIONAL EDUCATION
5558 - VOCATIONAL/EDUCATION
2008 - VOCATIONAL EDUCATION
5558 - VOCATIONAL/EDUCATION
4111 - EDUCATION
Bldg Name Actual NSF Difference
24,222
5,846
4,000
6,500
2,425
9,300
3,851
2,650
1,250
10,316
2,400
1,080
9,300
5,860
1,500
1,500
3,600
6,000
3,600
1,500
1,500
7,200
1,200
14,922
-14
2,500
5,000
-1,175
3,300
1,150
-250
3,116
1,200
( 930 )
Page: 3
Center: TURNER (00404) of 5
EDUCATION
Non-Academic
Advanced Cement Masonry
Heavy Equipment Mechanic
Nursing Assistant
Office Administration
Medical Office Support
Asphalt Paving
Advanced Asphalt Paving
Function Suggested
NSF
1,020 2,162 1,800
3,016 2,800 1,100
3,617 1,165 1,500 4,650 1,187 4,500
5,157
1,250
2,680
1,625
1,620
1,620
1,080
1,700
1,135
4111 - EDUCATION
1604 - ADMINISTRATION
7150 - SECURITY/VISITORS CTR
2007 - LIBRARY
4114 - EDUCATION/STANDARDS
7143 - ORIENTATION
7142 - COUNSELORS
7141 - CAREER PREPARATION PERIOD
5558 - VOCATIONAL/EDUCATION
7140 - CAREER PREPARATION PERIOD
7141 - CAREER PREPARATION PERIOD
2007 - LIBRARY
7146 - TEAP
5557 -VST STORAGE
2007 - LIBRARY
2102 - ADMINISTRATION/EDUCATION
4114 - EDUCATION/STANDARDS
2001 - GROUP LIFE/RESIDENTIAL LIVING
2008 - VOCATIONAL EDUCATION
2110 - VOCATION
4111 - EDUCATION
4111 - EDUCATION
4111 - EDUCATION
2110 - VOCATION
2110 - VOCATION
Bldg Name Actual NSF Difference
37,633
2,680
1,625
1,620
1,620
1,080
1,700
1,135
Sub Total: 122,933
9,300
1,500
1,200
3,600
2,700
2,700
1,500
1,500
67,660
28,333
1,180
-1,980
-1,080
-1,620
-365
55,273
Page: 4
Center: TURNER (00404) of 5
FOOD SERVICE
RECREATION
MEDICAL/DENTAL
Dining (2 Servings)
Food Preparation
Food Storage
Gymnasium
Swimming Pool
Weight Room
Auditorium
Raquetball
Miscellaneous Recreation
Pool Hall
Assembly Hall
Medical/Dental
Function Suggested
NSF
12,786
4,250
5,400
10,504
2,345
2,600
12,000 4,000
4,949
3,600
3,100
4808 - CAFETERIA
4808 - CAFETERIA
4808 - CAFETERIA
9701 - GYMNASIUM
6018 - POOL HOUSE
9701 - GYMNASIUM
2105 - REC/VOC/EDUC/STORE
9701 - GYMNASIUM
2105 - REC/VOC/EDUC/STORE
9701 - GYMNASIUM
3304 - RECREATION
3304 - RECREATION
7150 - SECURITY/VISITORS CTR
7144 - MEDICAL/DENTAL
Bldg Name Actual NSF Difference
12,786
4,250
5,400
10,504
2,345
2,600
16,900
4,949
3,600
3,100
Sub Total:
Sub Total:
Sub Total:
22,436
42,498
3,100
7,440
5,580
3,720
5,500
16,740
44,750
5,500
5,346
-1,330
1,680
-2,400
5,696
-2,252
-2,400
Page: 5
Center: TURNER (00404) of 5
ADMINISTRATION
STORAGE/SUPPORT
VACANT
Administration
Child Development Center
Warehouse
Operations & Maintenance
Vacant
Function Suggested
NSF
8,867
3,744 4,370 1,800 1,051 4,012
2,100
13,100
3,200 3,800
17,327 1,400 3,150
9,188
1604 - ADMINISTRATION
4008 - TRANSPORTATION/SAFETY
4214 - SECURITY OFFICE
2000 - ADMINISTRATION
2102 - ADMINISTRATION/EDUCATION
2001 - GROUP LIFE/RESIDENTIAL LIVING
7150 - SECURITY/VISITORS CTR
7145 - CHILD DEVELOPMENT CTR
2108 - PROPERTY STORAGE
4807 - MECHANICAL PLANT
1605 - MAINTENANCE
2108 - PROPERTY STORAGE
4801 - DORMITORY
2105 - REC/VOC/EDUC/STORE
2001 - GROUP LIFE/RESIDENTIAL LIVING
4114 - EDUCATION/STANDARDS
5558 - VOCATIONAL/EDUCATION
1604 - ADMINISTRATION
Bldg Name Actual NSF Difference
24,644
2,100
13,100
7,600
31,940
Sub Total:
Sub Total:
Sub Total:
26,744
20,700
31,940
18,600
3,920
11,160
7,440
22,520
18,600
6,044
-1,820
1,940
31,940
4,224
2,100
31,940
Energy Management Report Center: TURNER (00404)
Page: 1 Date: 07/18/2013 of 3
CENTER ENERGY DATA
Yes
ENERGY CONSUMPTION ASSESSMENT
16% 81,365
76,956 97,413
ENERGY USE BY FUEL TYPE
Energy Audit :
Date of Audit :
Status of Energy Conservation Measure Recommendations :
Electric Company :
Percent Change since Baseline Year :
Natural Gas Company :
Property Status :
4/2/2003 Not Implemented Albany Water, Gas and Light Commision City of Albany, Water, Gas & Light
Federally Owned (DOL)
7,541,528 25,732=
Total 42,850
MBtu
MBtu
Total $913,127 MBtu/ $21.310
BTU/GSF
BTU/GSF
BTU/GSF
Electricity
Natural Gas kWh
16,603 MCF = 17,118 MBtu
$741,157 $0.098= kWhElectricity
Natural Gas $171,970 = $10.358 MCF
ENERGY COST BY FUEL TYPE
WATER CONSUMPTION ASSESSMENT
Percent Reduction Compared to Goal:
1,000 Gallons
1,000 Gallons
FY 2012 Energy Goal:
Further Reduction in Energy Usage is needed to meet Energy Reduction Goals.
FY 2012 Energy Consumption:
Note: The Federal Government has set a goal of 3% Energy Consumption reduction per year in EO 13423.
16,996 15,296 31,928
- 109%
Further Reduction in Water Usage is needed to meet Water Reduction Goals.
Note:
FY 2012 Goal:
FY 2012 Water Consumption:
1,000 Gallons
FY 2003 Energy Baseline:
FY 2007 Baseline:
The Federal Government has set a goal of 2% Water Consumption reduction per year in EO 13423 compared to the FY 2007 Baseline.
Page: 2 of 3
Implementing some of the below recommendations can save you 10% to 25% off your annual energy bill without negatively impacting comfort or productivity.
1. Your staff and students are the key to savings. Educate the students and staff on the why of energy saving - costs and environmental impacts. Encouraging them to actively participate in energy reduction is also important. Post reminders at exit doors and bulletin boards about energy conservation. Simple tips include:
a. Turn it down (lights, heating & cooling),
b. Turn it off (lights, computers, other equipment),
c. Keep it tight (close doors and windows, use window blinds)
2. Operations and Maintenance: Educate the O&M staff on the why of energy saving -costs and environmental impacts. Simple tips include:
a. Make sure that the Operations and Maintenance staff is properly trained for the equipment they operate.
b. Tune and clean HVAC: Perform seasonal cleanups on air conditioners, boilers and furnaces, and regularly clean cooling coils and drain pans. Get rooftop or outdoor condenser coils cleaned and maintain an appropriate filter changing schedule.
c. Check (or ask your HVAC contractor to check) your outside air dampers or economizers to verify proper ventilation. Make sure economizer controls function properly. Make sure automatic dampers close during unoccupied periods.
d. Restore automatic control: When troubleshooting a system, take time to figure out and repair the automatic controls. Today's quick fix is tomorrow's bad idea.
e. Reasonable set points: Try 68°F in the heating season and 75°F in the cooling season.
f. Schedule HVAC equipment and lighting: (weekdays, weekends, holidays, off-season). Make sure equipment runs only when it is needed and the buildings are occupied. When buildings are vacant (i.e. dormitories during the day with students in class), make sure all the lights in the building are off.
g. Seasonal (resets, schedules, and shutoffs): As the seasons change, adjust set points and schedules to match the system's response to the weather.
h. Lighting: Invest in an inexpensive light level meter to measure the foot-candles in spaces to determine whether or not they are over lit and lamps can be safely removed. Where four-lamp fixtures are in use, two lamps can usually be removed from every fixture or every other fixture. After lamps are removed, disconnect ballasts. Contact the Energy team at PBDewberry for suggested light levels for individual space types. Cleaning fixtures regularly increases light levels.
i. Utilize power management features for all computers and monitors to shut them off when idle for more than 15 minutes.
Page: 3 of 3
j. Have your vending machine suppliers turn off or remove light tubes from the advertising lighting in the machine. This will save about $50 per year per vending machine.
k. Save water with low flow sink aerators (0.5gpm) and low flow shower heads (1.5gpm - 2.0gpm). This will also reduce water heating energy consumption.
l. Set your water heater to 120°F. Verify by measuring at the tap. Never go below 115°F.
m. For water heaters installed in unconditioned spaces, add insulation blankets making sure that access covers, electric connection areas, and pressure relief valves are left uncovered.
n. Caulk and fill cracks around doors and windows to reduce costly air leaks.
o. When replacing broken glass, use high transmittance, low heat gain windows.
p. Make sure automatic door closers are functioning properly to avoid drafts.
3. Buy energy efficient, buy EnergyStar (www.energystar.gov).
a. Buy EnergyStar appliances and equipment.
b. Replace burned out lightbulbs with EnergyStar labeled compact fluorescent lightbulbs (CFLs).
c. Replace broken thermostats with EnergyStar labeled programmable products.
d. Replace broken exit signs with EnergyStar LED exit signs.
Environmental Management Report
Page: 1 Date: 07/18/2013 of 3
SOLID & HAZARDOUS WASTE MANAGEMENT (RCRA)
Commercial Waste Service
HAZARDOUS MATERIALS STORAGE (EPCRA)
Yes Buildings 1208, 6018
Organic solvent (20 gals), pool chemicals/hypochlorite (50 lbs) Yes
Solid Waste Disposal :
Hazardous Waste Generator :
Hazardous Waste ID :
Generator Classification :
Hazadous Materials Storage :
Hazardous Materials ID :
HazMat Storage Area :
HazMat Spill Response Plan :
Local Hazardous Use Permit :
LEPC Notification :
EPA Generator ID Number :
Hazardous Waste Disposal :
Transwaste Material, Inc.
Yes Organic solvent (3 gals/month),hydraulic fluid (20 gals/month)
Conditionally Exempt Small Quantity Generator
GA7161633030
Commercial Hazardous Waste Disposal Service
Massey Industrial Oil, Inc.
N/A N/A
Page: 2 Date: 07/18/2013 of 3
PETROLEUM UNDERGROUND STORAGE TANKS (RCRA)
Compliance1
PETROLEUM ABOVEGROUND STORAGE TANKS (CWA)
Number of Regulated USTs :
Number of Un-regulated USTs :
RCRA Compliance
Building 1604
Building 1604
Building 1605
Building 2000
Building 2001
Building 2005
Building 2006
Building 2007
Building 2008
Building 2102
Building 2201
Building 3304
Building 4111
Building 4114
Building 4214
Building 4800
Building 4800
Building 4801
Building 4801
Building 4802
Building 4802
Building 4803
Building 4803
Building 4804
Building 4805
Building 5558
Building 7150
Building 7150
Building 4008
1,000
3,000
1,000
10,000
1,000
6,000
6,000
6,000
6,000
10,000
10,000
6,000
1,500
1,500
1,000
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Gasoline
ID LocationFuel Type Capacity
Number of ASTs :
Overfill Leak Corrosion
SPCC Plan Required : SPCC Plan Completed :
Yes No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Yes
ID Fuel Type Capacity Location Overfill
Prevention Secondary Containment
Petroleum - Heating Oil
Petroleum - Diesel Fuel
Petroleum - Heating Oil
Building 2008
Building 2108
Building 1605
No
Yes
No
No
No
No
Tank Status Active
Active
Active
Abandoned
Abandoned
Abandoned
Abandoned
Active
Active
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Active
Active
Active
Active
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Active
Tank Status Prevention/Detection
Page: 3 Date: 07/18/2013 of 3
ASBESTOS AND PCB MANAGEMENT (TSCA)
AIR POLLUTION CONTROL (CAA)
N/A None
Attainment
Asbestos Survey Date :
Asbestos Type :
Asbestos Coordinator :
Coordinator Training Date:
Custodial/Maintenance Training :
AHERA Regulated :
Management Plan Approval :
PCB Transformer Testing :
PCB Transformers :
PCB-Contaminated Transformers :
Transformers Labelled :
Regional Air Quality :
Permitted Air Pollution Source :
Source Description :
01/13/1989 Friable/Non-Friable Eldridge Brown
No No N/A Yes No
Asbestos-Containing Materials Inventory
Date: 07/18/2013Center : Turner (00404) Page: 1 of 5
HVAC (Bldg) Wall Finishes Wall Finishes HVAC (Bldg) Heating Floor Finishes
Exterior Walls
Exterior Walls Wall Finishes Heating
Exterior Walls Heating
Heating Roof Repair/Replacement Heating
Heating Floor Finishes
Bldg System
Bldg System
Bldg System
Bldg System
Bldg System
Bldg System
Asbestos cement board Asbestos cement board Asbestos cement board Flexible duct connector Boiler insulation 9x9 floor tile, various
Asbestos cement board
Asbestos cement siding Asbestos cement board Pipe fitting insulation
Asbestos cement siding Pipe fitting insulation
Boiler flue insulation Roof flashing Pipe fitting insulation
Pipe fitting insulation 12x12 floor tile, white/gray
Category Description
Category Description
Category Description
Category Description
Category Description
Category Description
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Ea.
Sq. Ft.
Ea.
Sq. Ft.
Sq. Ft.
Ea.
Sq. Ft.
Sq. Ft.
Location
Location
Location
Location
Location
Location
Unit
Unit
Unit
Unit
Unit
Unit
Quantity
Quantity
Quantity
Quantity
Quantity
Quantity
Cooling tower, roof Janitor's closet Mechanical room Mechanical room Mechanical room Throughout
Soffit, throughout
Throughout Mechanical room Mechanical room
Throughout Mechanical room
Mechanical room Building perimeter Mechanical room
Mechanical room Carpentry vocation
25000
10000
10000
Building :
Building :
Building :
Building :
Building :
Building :
1604 - ADMINISTRATION
1605 - MAINTENANCE
2000 - ADMINISTRATION
2001 - GROUP LIFE/RESIDENTIAL LIVING
2007 - LIBRARY
2008 - VOCATIONAL EDUCATION
Page: 2 of 5
Heating Exterior Walls Floor Finishes Floor Finishes Roof Repair/Replacement
HVAC (Bldg) Ceiling Finishes Heating
Heating HVAC (Bldg) Floor Finishes
Heating HVAC (Bldg) Heating Heating Floor Finishes
Heating Heating Floor Finishes
Bldg System
Bldg System
Bldg System
Bldg System
Bldg System
Pipe fitting insulation Asbestos cement board 9x9 floor tile, copper 12x12 floor tile, tan Roof flashing
Duct insulation Acoustical plaster Boiler insulation
Pipe fitting insulation Flexible duct connector 9x9 floor tile, green/brown
Boiler flue insulation Flexible duct connector Pipe fitting insulation Tank insulation 9x9 floor tile, green
Pipe fitting insulation Tank insulation 9x9 floor tile, green
Category Description
Category Description
Category Description
Category Description
Category Description
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Lin. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Ea.
Lin. Ft.
Sq. Ft.
Sq. Ft.
Lin. Ft.
Ea.
Sq. Ft.
Sq. Ft.
Ea.
Sq. Ft.
Sq. Ft.
Location
Location
Location
Location
Location
Unit
Unit
Unit
Unit
Unit
Quantity
Quantity
Quantity
Quantity
Quantity
Throughout Soffit (throughout) North hall Main storage Building perimeter
Mechanical room Orientation/pool rm.
Mechanical room
Mechanical room Mechanical room Throughout
Mechanical room Mechanical room Mechanical room Mechanical room 1st floor
Mechanical room Mechanical room 1st floor
10250
Building :
Building :
Building :
Building :
Building :
2102 - ADMINISTRATION/EDUCATION
3304 - RECREATION
4111 - EDUCATION
4114 - EDUCATION/STANDARDS
4214 - SECURITY OFFICE
Page: 3 of 5
Heating Heating Heating Heating Floor Finishes Floor Finishes
Floor Finishes HVAC (Bldg) Heating Heating Heating Floor Finishes Floor Finishes
Floor Finishes Floor Finishes HVAC (Bldg) Heating Heating Heating Heating
Roof Repair/Replacement Floor Finishes Floor Finishes HVAC (Bldg) Heating Heating Heating Heating
Bldg System
Bldg System
Bldg System
Bldg System
Tank insulation Pipe fitting insulation Boiler insulation Pipe fitting insulation 9x9 floor tile, gray/white 9x9 floor tile, tan
9x9 floor tile, black Duct sealing compound Pipe fitting insulation Boiler insulation Tank insulation 9x9 floor tile, brown 9x9 floor tile, white/gray
9x9 floor tile, tan 9x9 floor tile, gray/white Asphalt pipe wrap Pipe fitting insulation Pipe fitting insulation Boiler insulation Tank insulation
Roof flashing 9x9 floor tile, tan 9x9 floor tile, white/gray Duct sealing compound Pipe fitting insulation Pipe fitting insulation Boiler insulation Tank insulation
Category Description
Category Description
Category Description
Category Description
Sq. Ft.
Ea.
Sq. Ft.
Ea.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Ea.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Lin. Ft.
Ea.
Ea.
Sq. Ft.
Sq. Ft.
Lin. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Ea.
Ea.
Sq. Ft.
Sq. Ft.
Location
Location
Location
Location
Unit
Unit
Unit
Unit
Quantity
Quantity
Quantity
Quantity
Basement mech. room Basement mech. room Basement mech. room Penthouse mech. room 1st floor 2nd/3rd floors
1st floor, TV lounge Penthouse mech. room Penthouse mech. room Basement mech. room Basement mech. room 2nd/3rd floor 1st floor
2nd/3rd floors 1st floor Penthouse mech. room Penthouse mech. room Basement mech. room Basement mech. room Basement mech. room
Building perimeter 2nd/3rd floors 1st floor Penthouse mech. room Penthouse mech. room Basement mech. room Basement mech. room Basement mech. room
16000
16000
16000
16000
Building :
Building :
Building :
Building :
4800 - DORMITORY
4801 - DORMITORY
4802 - DORMITORY
4803 - DORMITORY
Page: 4 of 5
Floor Finishes Floor Finishes
Floor Finishes Floor Finishes Floor Finishes
Roof Repair/Replacement
Roof Repair/Replacement Heating Heating
Floor Finishes Floor Finishes Heating Heating HVAC (Bldg)
Wall Finishes Heating
Bldg System
Bldg System
Bldg System
Bldg System
Bldg System
Bldg System
9x9 floor tile, white/gray 9x9 floor tile, burgundy
9x9 floor tile, lt. green 9x9 floor tile, white/gray 9x9 floor tile, burgundy
Roof flashing
Roof flashing Tank insulation Pipe fitting insulation
9x9 floor tile, dark green 9x9 floor tile, gray Tank insulation Pipe fitting insulation Duct sealant compound
Wallboard joint compound Pipe fitting insulation
Category Description
Category Description
Category Description
Category Description
Category Description
Category Description
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Lin. Ft.
Lin. Ft.
Sq. Ft.
Ea.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Ea.
Sq. Ft.
Sq. Ft.
Ea.
Location
Location
Location
Location
Location
Location
Unit
Unit
Unit
Unit
Unit
Unit
Quantity
Quantity
Quantity
Quantity
Quantity
Quantity
1st floor 2nd/3rd floors
1st floor office 3rd floor office Throughout
Perimeter
Perimeter Mechanical room Mechanical room
Classrooms Food service area Mechanica room Mechanical room Maintenance office
Office Office
25000
25000
11000
Building :
Building :
Building :
Building :
Building :
Building :
4804 - DORMITORY
4805 - DORMITORY
4807 - MECHANICAL PLANT
4808 - CAFETERIA
5558 - VOCATIONAL/EDUCATION
6018 - POOL HOUSE
Page: 5 of 5
Heating HVAC (Bldg) Heating Heating Floor Finishes Exterior Walls
Heating HVAC (Bldg) HVAC (Bldg) Floor Finishes Ceiling Finishes
Heating Heating Floor Finishes
Bldg System
Bldg System
Bldg System
Boiler flue insulation Asphalt pipe insulation Tank insulation Pipe fitting insulation 9x9 floor tile, olive/beige Asbestos cement board
Pipe fitting insulation Asphalt pipe insulation Duct insulation 9x9 floor tile, gray/green Acoustical plaster
Pipe fitting insulation Tank insulation 9x9 floor tile, beige/tan
Category Description
Category Description
Category Description
Sq. Ft.
Lin. Ft.
Sq. Ft.
Ea.
Sq. Ft.
Sq. Ft.
Ea.
Lin. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Ea.
Sq. Ft.
Sq. Ft.
Location
Location
Location
Unit
Unit
Unit
Quantity
Quantity
Quantity
Mechanical room Mechanical room Mechanical room Laundry Throughout Beneath windows
Mechanical room Mechanical room Mechanical room East hallway/offices Assembly room
Mechanical room Mechanical room Classrooms/offices
18000
Building :
Building :
Building :
7148 - SOLO PARENT DORMITORY
7150 - SECURITY/VISITORS CTR
7160 - CULINARY ARTS/COMMUNITY RELATIONS
Radon
Page: 1 of 2
1604 - ADMINISTRATION
1605 - MAINTENANCE
2000 - ADMINISTRATION
2001 - GROUP LIFE/RESIDENTIAL LIVING
2007 - LIBRARY
2008 - VOCATIONAL EDUCATION
2102 - ADMINISTRATION/EDUCATION
2105 - REC/VOC/EDUC/STORE
2108 - PROPERTY STORAGE
2110 - VOCATION
3304 - RECREATION
4008 - TRANSPORTATION/SAFETY
4111 - EDUCATION
4114 - EDUCATION/STANDARDS
4214 - SECURITY OFFICE
4800 - DORMITORY
4801 - DORMITORY
4802 - DORMITORY
4803 - DORMITORY
4804 - DORMITORY
4805 - DORMITORY
4806 - DORMITORY
4807 - MECHANICAL PLANT
4808 - CAFETERIA
5557 -VST STORAGE
5558 - VOCATIONAL/EDUCATION
6018 - POOL HOUSE
7140 - CAREER PREPARATION PERIOD
7141 - CAREER PREPARATION PERIOD
7142 - COUNSELORS
7143 - ORIENTATION
7144 - MEDICAL/DENTAL
7145 - CHILD DEVELOPMENT CTR
7146 - TEAP
Bldg Name
08/12/1992
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
08/12/1992
05/23/1990
05/23/1990
05/23/1990
05/23/1990
08/12/1992
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
Test Date
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
N/A
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
N/A
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Radon Testing
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
Test Result
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Mitigation Mitigation Date
Radon
Page: 2 of 2
7148 - SOLO PARENT DORMITORY
7150 - SECURITY/VISITORS CTR
7160 - CULINARY ARTS/COMMUNITY RELATIONS
9701 - GYMNASIUM
9704 - EDUCATION/ADMINISTRATION
Bldg Name
05/23/1990
05/23/1990
05/23/1990
Test Date
Yes
Yes
Yes
No
No
Radon Testing
< 4 pCi
< 4 pCi
< 4 pCi
Test Result
N/A
N/A
N/A
N/A
N/A
Mitigation Mitigation Date
RADON EXPLANATORY NOTES
The US Environmental Protection Agency (EPA) has established a radon action level of 4.0 picoCuries per liter (pCi/L). Occupied buildings with radon concentrations less than 4.0 pCi/L do not require radon mitigation; un-occupied buildings, or those buildings which are occupied only infrequently for brief periods of time, also do not require radon mitigation. Occupied buildings with radon concentrations greater than
4.0 pCi/L require radon mitigation and verification of radon reductions as soon as possible, with priority given to dormitories and student recreation buildings. Occupied buildings with radon concentrations greater than 20.0 pCi/L should be considered significant radon exposure hazards, and priority for mitigation should be given to buildings with these highly elevated radon concentrations.
Radon mitigation techniques include: (1) adjustment of the building HVAC system to create a positive pressure within the building; (2) sealing of foundation wall cracks, penetrations, or other openings;
(3) sealing crawlspace openings and sump pits; (4) installing an active subslab depressurization (ASD) system.
Site Description
TURNER
Page: 1 Date: 07/18/2013 of 6
Paving Type for Roads & Parking Paving Type for Sidewalks
Asphalt Concrete
Comments:
Topography Buildings and Structures
Center is not fully enclosed by fencing. Ornemental femcing surrounds the northwest main access road to the center, the fence which surrounds the rest of the campus is chain link.
ROADS, PARKING & SIDEWALKS
Water Source Water Authority Service Meter On-Site Treatment Plant
1. Water System
Treatment Type Storage Type Storage Capacity(Gallons)
NoIndividualCity of Albany, Water, Gas & Light CommPublic Water Authority
None 0None
Water is metered at each building.Comments:
Comments:
Fire Hydrants On-Site Water Supply Storage Capacity
(Gallons) Pressure Source FD Response Time (Minutes)
Yes 0 5None Municipal
Albany-Dougherty County Fire station is approximately 2 miles or 5 minutes away. Fire hydrants appear to be well distributed over the center.
Number of Deficiencies = 3
Number of Deficiencies = 3
SITE FEATURES
UTILITIES
2. Fire Protection System
Buildings Structures39 20Flat
Surrounding
Outdoor Recreation
Light Industrial, Public Recreation, Suburban
Basketball, Field, Pool
Entrance
GSA Vehicle Parking
Wrought Iron
Chain Link
Location Type
Maintenance Responsibility System Capacity Adequate System Condition
Utility Utility Yes Good
Separate Loop
No
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Utility Utility Yes Good
Ownership
Roads & Parking Adequate Roads & Parking Condition Sidewalks Adequate Sidewalk Condition Yes Good Yes Good
Fencing
Other Features
Page: 2 Date: 07/18/2013 of 6
Comments:
Sewage Treatment Flow
The overall site system does not appear to have problems, although there are issues within buildings (example, cafeteria).
Utility
Publicly Owned Treatment Works
Utility
Gravity
Maintenance ResponsibilityOwnership
Comments: All buildings that utilize natural gas are provided with an individual gas meter.
City of Albany, Water, Gas & Light
Comments: Mechanical Plant Building 4807 is essentially a chiller plant and was designed to supply chilled water to the dorm buildings 4800 through 4806 for cooling. Each dorm building has a gas-fired water boiler and AHUs for heating. At the chiller plant are two water-cooled centrifugal chillers (York #YTC1C3C2CKG) and two cooling towers (Evapco #AT12212B). Each chiller uses R-123, a non-ozone depleting refrigerant. Chilled water circulation is configured with a primary-secondary loop arrangement. There are six base-mounted water pumps, two chilled water pumps (50 HP) and four condenser water pumps (15HP). Separate water treatment systems are provided for the closed chilled water loop (manual) and the open condenser-cooling tower water loop (automatic).
3. Sanitary Sewer System/ Sewage Treatment Plant
5. Fuel Distribution System
6. Central Plant Number of Deficiencies = 1
System Capacity Adequate System Condition
Yes Good
4. Storm Water System Number of Deficiencies = 1
Drain Type On-Site Storm Water Management
Surface Run-off N/A
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Center Yes GoodCenter
Comments: System has surface run-off, swales and storm sewers.
Gas Company Metering
Individual
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Utility Utility Yes Good
Type Energy Source
Chilled Water Electric 4800 through 4806.
Bldgs Served
Ownership Maintenance Responsibility Plant Capacity Adequate Plant Condition
Center Center Yes Good
Page: 3 Date: 07/18/2013 of 6
Comments:
Electric Company PCB Trans.
Transformer Mounting Transformer Ownership
Systems Ownership Maintenance Responsibility
Albany Water, Gas and Light Commision
The primary 13.860/8.000 kV lines are routed along Turner Field road, and enter from the northwest side to the campus. The service feeds several pole/pad-mounted step-down transformers with corresponding pole/wall-mounted secondary utility meters. There are several buildings with individual meters and some buildings with shared meters. Buildings 2108, 2110, 4807, 5558, 9701 and 9704 are provided with 480/277V services and step-down secondary transformers. All primary transformers are owned and maintained by utility.
Pole and Pad Utility
Utility Utility
No
Comments:
Telephone Company
On-site Line Owner
The telephone communication and data services main closet (MC) is located in Building 7150. Local service is provided by Deltacom, Inc by way of T1 lines. Long distance service is provided through the Job Corps Data center over T1 lines. Telephone switching is Toshiba Strategy IES 16 with voicemail system. Telephone transmission using fiber optic cables from MC to other switch panels located in Building 1604 and Building 9704 but uses copper wiring to connect to other buildings. Telephone system has digital ports for voice and analog ports are for fax machines and other analog devices. Telephone lines set-up and maintenance of the system is provided by Atlantic TelCom, Inc. Each building is connected with fiber optic cables to a Cisco 6500 switch in Building 1604 and route data transmission to two Cisco 3800 routers and a Cisco 1800 router in Building 7150.
The data traffics are distributed over 7 T1 lines, with 4 T1 lines utilized for direct Internet traffic and 3 T1 lines utilized for production (Citrix, STS, long distance, etc.). All routers in Building 7150 and Cisco 6500 switch in Building 1604 are connected to an UPS. The UPS buffers the power surges and drops in the line voltage and will maintain the power to allow for an orderly shutdown.
Deltacom, Inc
Maint. Responsibility
Center Center
Door Alarms, Electric Gate Operator
13.860/8.000 kV
277/480 & 120/208V, 3-Phase, 4 WireOverhead
OverheadPrimary Service
Secondary Service
Distribution Characteristics
Number of Deficiencies = 21
9. Electrical (Communication/Alarm/Security)
7. Electrical (Service)
Yes
Stand-Alone
VOIP
System Capacity Adequate System Condition
GoodYes
Transformer Maint Resp
Utility
System Capacity Adequate System Condition
Yes Good
Generator
None
8. Electrical (Site Lighting)
Roadways Parking Walkways Building Outdoor Sports
Mounting
Control
Pole Pole Pole Building None
Photocell Photocell Photocell Photocell None
System Ownership Maintenance Responsibility System Capacity Adequate System Condition
Utility, Center Utility, Center Yes Good
Comments: Site lighting is pole-mounted, controlled by photocells, owned and maintained by utility. Building-mounted lights are controlled by photocells and adequately complement the site lighting.
ATS MTS
No No
Number of Deficiencies = 14
Number of Deficiencies = 26
Fire Alarm Security
Metering Individual
Page: 4 Date: 07/18/2013 of 6
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
01/01/1970
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Center
Abandoned
Abandoned
Abandoned
Abandoned
Active
Active
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Active
Active
Active
Active
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Abandoned
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-
Building 1604
Building 1604
Building 1605
Building 2000
Building 2001
Building 2005
Building 2006
Building 2007
Building 2008
Building 2102
Building 2201
Building 3304
Building 4111
Building 4114
Building 4214
Building 4800
Building 4800
Building 4801
Building 4801
Building 4802
Building 4802
Building 4803
Building 4803
Building 4804
Building 4805
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
STORAGE TANKS
TypeStatus Location Owner Fuel Type Capacity (Gallons) Install DateID
Reg.
10000
10000
10000
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Heating
Purpose
Page: 5 Date: 07/18/2013 of 6
ACCESSIBILITY
Yes
NoNoNoNo
Nationally Registered Site
Site Eligible for National Register
Located in Historic District
Archaeological Significance
01/01/1970
01/01/1970
01/01/1970
01/01/1992
01/01/1999
01/05/2000
Unknown
Center
Center
Center
Center
Center
Center
Center
Abandoned
Abandoned
Abandoned
Active
Active
Active
Active regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Underground, Regulated
Aboveground
Aboveground
Aboveground
Building 5558
Building 7150
Building 7150
Building 4008
Building 2008
Building 2108
Building 1605
Yes
Yes
Yes
Yes
Yes
Yes
No
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Heating Oil
Petroleum - Gasoline
Petroleum - Heating Oil
Petroleum - Diesel Fuel
Petroleum - Heating Oil
TypeStatus Location Owner Fuel Type Capacity (Gallons) Install Date
Earthquake Risk
Low High LowHigh MediumIBC Low
LightningEarthquake Def. Authority Flooding Tornado Hurricane Forest
Fire
ID
Reg.
Accessible Parking: Accessible Slope:
Yes
Curb Cuts:
Yes
Ramps:
YesYes
Site Accessible Route:
HISTORIC PRESERVATION
NATURAL HAZARDS
Heating
Heating
Heating
Equip/Veh Fueling
Heating
Heating
Purpose
Active Energy Use Reduction Program
Active Water Use Reduction Program
Approximate or Measured Waste Recycled
Use of School Dude or CMMS for Preventative Maintenance
Green Purchasing Policy Practiced
Site Stormwater Absorption Measures in Place
Center has Onsite Renewable Energy (PV or Wind)
Center has a Chartered Green Committee & Roster
Center Uses Green Cleaning Practices
SUSTAINABILITY
NO
NO
NO
NO
NO
NO
NO
NO
Page: 6 Date: 07/18/2013 of 6
GENERAL SITE CONDITION
Rating X Good Fair Poor
The site condition is not impacting the functional use of the facilities.
The site condition IS impacting the functional use of the facilities.
The site condition IS SIGNIFICANTLY impacting the functional use of the facilities.
Building Descriptions and Utilities
BUILDING 1604 - ADMINISTRATION
Building Descriptions Date: 07/17/2013Center : Turner (00404) Page: 1 of 182
Building: 1604 - ADMINISTRATION
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Loadbearing Masonry Wood
CMU Masonry
Wall Roof Unknown Rigid
Metal Unit - Storefront Frame Metal Units - Metal Frame
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Business 26,456 20,217 2 Owned 1952 Not Evaluated
Comments: The doors to the rooms do not have accessible hardware.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
Yes
Yes
Yes
N/A
Yes
Yes
No
No
No
Yes
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Insulation4.
Exterior Doors5.
Material Drainage Year Life
Remaining Type Area Served
Built-up Roofing Gutters and Downspouts 2000 8 Flat Entire Building
3. Roof
Entire Building
Area Served
Page: 2 of 182
Building: 1604 - ADMINISTRATION
INTERIOR FINISH
Carpet Ceramic Tile Concrete Vinyl Tile
Ceramic Tile Drywall Exposed Structure Plaster Wood Paneling
Aluminum Storefront - Aluminum Frame Metal Units - Metal Frame
Wood Unit - Wood Frame
VERTICAL CIRCULATION
Concrete Stairs Ramp
Double Hung - Steel Frame; Single Glazing; Fixed - Steel Frame; Single Glazing;
Hopper - Steel Frame; Single Glazing;
Acoustical Tile Mineral Wool Plaster
Windows6.
Floors1. Asbestos: Yes
Interior Walls2. Asbestos: Yes
3.
Interior Doors4.
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
A gas-fired water boiler (RayPak) in the mechanical room provides heating to three air handlers (Carrier #39TVEMAA5EBENAC and # 39LD06MBEAMBKJF9 both mfd. 8/2001) located in the nearby main mechanical equipment room and another (Carrier # 39LD06MBBALBLJ79, mfd. 8/2001) located on the second floor.
Packaged units (ICP #PA5530AKA3, mfd. 11/1998 and #NPADC36AB01, mfd. 11/1988) serve classrooms and offices using electric resistence heaters.
Comments:
Comments:
HVAC
Heat1. Asbestos: Yes
Gas-Fired Hot Water Boiler
Packaged Heat Pump (Air
Source)
Single Duct
Single Duct
Two-Pipe
None
Electric
Electric
Mechanical
Natural
None
None
Entire Building
Classrooms and Offices
Ceilings
Page: 3 of 182
Building: 1604 - ADMINISTRATION
Mechanical
Mechanical
Restroom
Break Room
Comments: The staff break room is ventilated by two exhaust fans (Greenheck #CSP260).
Electric under-the-counter water heaters are provided in the restrooms. There is a water heater (Rheem #62V30D, 30 gallon, 3.5kW) in the west storage room.
Comments:
Cast Iron None None
Electric Water Cooler Hose Bibb Lavatory Sink Urinal Water Closet (Flush Valve)
Gas (Natural)
Ventilation Area Served
Galvanized Steel Galvanized Steel Electric None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Chiller
Packaged Direct
Expansion (Air Source)
Split Direct Expansion (Air
Source)
Single Duct
Single Duct
Single Duct
Two-Pipe
None
Refrigerant
Electric
Electric
Electric
Mechanical
Mechanical
Mechanical
None
None
None
Offices
Classrooms and Offices
Classrooms and Offices
PLUMBING
Exhaust Ventilation
An air-cooled packaged chiller (Carrier #30GTN060-520AK, 50 ton, mfd. 8/2000) located on the south side of the building provides cooling for three air handlers. Two of the air handlers (Carrier #39TVEMAA5EBENAC and # 39LD06MBEAMBKJF9 both mfd. 8/2001) are located in the nearby main mechanical equipment room and another (Carrier # 39LD06MBBALBLJ79, mfd. 8/2001) is located on the second floor.
Packaged units (ICP #PA5530AKA3, 2-1/2 ton, mfd. 11/1998 and #NPADC36AB01, 3 ton, mfd.
11/1988) serve classrooms and offices at the east end of the building. A packaged unit (Ruud #UBHA24J10NFBA, 2 ton, mfd. 12/1997) serves the west end.
The condensing unit (Rheem #RAHE030JAS, 2-1/2 ton, mfd. 5/1992) is ground-mounted.
Comments:
Comments:
Comments:
Ventilation2.
System Type
Number of Deficiencies = 1
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
3. Air Conditioning
Page: 4 of 182
Building: 1604 - ADMINISTRATION
None None ABC Type Fire Extinguisher
Comments: The building has four service entrances in (3) separate points. First overhead service is provided from a 3x100 kVA pole-mounted, utility-owned transformer bank to a 200A main service disconnect switch located in the supply room and serving the east building wing. The 200A disconnect serves a 200A panel through a 150A ASCO ATS with possibility of a generator connection. Second and third overhead services are provided from the same transformer bank. These services are provided to a 200A main disconnect switch and to an 800A MCB main distribution panel (both located in the main mechanical room) and serving the central part of the building. The 800A panel serves a chiller (from a 450A CB), one 200A MLO, one 100A MCB and three 125A panels (from a 200A CB, a 100A CB and (3) 125A CB) and has one 300A spare CB. Fourth overhead service is provided to a 200A main disconnect switch, which in-turn serves a 200A MCB panel. Utility meter is pole-mounted. Same transformers also serve Building 1605.
FIRE ALARM
Comments: The fire alarm control panel is a conventional, 24V, 4-zone panel (model Miniscan 4024 by Fire Lite Alarm Inc. by Honeywell) located in the corridor outside the east mechanical room.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Audible Alarm Control/Annunciator Panel Duct Smoke Detector Heat Detector Manual Pull Station Smoke Detector
Comments: Recorded footcandle levels include natural light contribution.
Halogen High Intensity Discharge (HID)
Comments: Halogen and HID exterior wall-mounted light fixtures are controlled by wall-mounted photocells.
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
Offices
Vacant
Toilets
Storage Rooms
Corridors & Stairs
N/A
Area Recommended Level
Recorded Level Light Type
Battery Backup Battery Backup
Main Disconnect Switch 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches
Sprinkler System Stand Pipe System Fire Suppression
Emergency Exit
Number of Deficiencies = 1FIRE PROTECTION
ELECTRICAL SERVICES
Exterior Lighting1.
Interior Lighting2. Number of Deficiencies = 1
Emergency /Exit Lighting3. Number of Deficiencies = 1
LIGHTING
Page: 5 of 182
Building: 1604 - ADMINISTRATION
Comments: Cable service for the center is provided from two large satellite dishes on the rear of this building. The building is connected to the center's LAN system.
Connected to Main System Motion Detector None Satellite Dish
Telephone Security Public Address Television
GENERAL BUILDING CONDITION
Rating
Comments:
X Good Fair Poor
The second floor of the building has been vacant for several years and most finishes are severely deteriorated. A number of HVAC units have exceeded their expected life and have been abandoned or are operating inefficiently. Several panelboards on the first and on the second floors are beyond life expectancy.
COMMUNICATION
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas Yes YesZone