Attachment_J-9-2.pdf

PDF 36 MB Posted

Attached to
Operation of Turner Job Corps Center
Solicitation number
DOL-ETA-15-R-00039
Issued by

About this file

Attachment J-9 Facility Survey Part 2

View the file

Other files

File Type Posted
QandA3.docx DOCX document
DOL-ETA-15-R-00039_Amend_0003-signed.pdf PDF
QandA.docx DOCX document
DOL-ETA-15-R-00039_Amend_00002.pdf PDF
DOL-ETA-15-R-00039_00001.pdf PDF
Attachment_J-13.xlsx XLSX spreadsheet
Attachment_J-8.pdf PDF
Attachment_J-12.xlsx XLSX spreadsheet
Attachment_J-7.docx DOCX document
Attachment_J-1.xlsx XLSX spreadsheet
Attachment_J-2.pdf PDF
Attachment_J-6.xlsx XLSX spreadsheet
Attachment_J-9-1.pdf PDF
DOL-ETA-15-R-00039.pdf PDF
Attachment_J-4.xlsx XLSX spreadsheet
Attachment_J-3.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Turner

Job Corps Center Albany, GA

Facility Planning Report Volume II

Supporting Data

Final August 2013

Department of Labor/ Office of Job Corps

22Turner Job Corps Center

Turner

Job Corps Center Albany, GA

Facility Planning Report Volume II

Supporting Data

Final August 2013

Dormitory 4803

33 Turner Job Corps Center

CONTENTS

TURNER JOB CORPS CENTER

FACILITY PLANNING REPORT

VOLUME I - Planning Strategy

• Existing Site Plan

• Center Statistics

INTRODUCTION

• Purpose

• Report Contents

EXECUTIVE SUMMARY

A. EXISTING CONDITIONS

• Background

• General Site Conditions

• General Building Conditions

• Preventive Maintenance

• Ownership

• Facility Assessment by Function

• EnergyIssues

• Environmental Issues

• Sustainability

• Accessibility Standards

• Health and Life Safety Issues

• Summary of Defi ciencies

B. RECOMMENDATIONS

• Status of the Previous (PY09) Plan

• Signifi cant Issues

• PY 12 Plan Overview

• Summary of Proposed Projects

• Proposed Site Plan

• Implementation Plan

• Summary of National Projects

• Project Data Sheets

C. PLANNING ANALYSIS

• Purpose

• Planning Objectives and Assumptions

• Space Utilization Analysis

• Federal Real Property Asset Management

• Mission Dependency Site Plan

• Defi ciency Analysis

• Facility Condition Summary Report

• Building Condition by Function

• Building Condition Site Plan

VOLUME II - Supporting Data

• Vicinity Map

• Location Map

• Existing Site Plan

D. DESCRIPTIONS

• Buildings and Structures

• Space Utilization By Function

• NSF by Building

• Energy Management Report

• Environmental Management

Asbestos Report Radon Report

• Site Descriptions

• Building Descriptions

E. DEFICIENCIES

F. CORRESPONDENCE AND REPORTS

• Center Review Meeting Minutes

• Survey Brief

• RA and Student Facility Feedback Questionnaire

• Life Safety Defi ciencies Transmittal and List

• O & M Defi ciency List

• Active Warranty Report

• FRPC Performance Measures Matrix

44Turner Job Corps Center

55 Turner Job Corps Center

Turner Job C orps C enter

77 Turner Job Corps Center

D Descriptions

BUILDINGS AND STRUCTURES

00404 TURNER 07/18/2013

1Page: of Date:

1604 - ADMINISTRATION

1605 - MAINTENANCE

2000 - ADMINISTRATION

2001 - GROUP LIFE/RESIDENTIAL LIVING

2007 - LIBRARY

2008 - VOCATIONAL EDUCATION

2102 - ADMINISTRATION/EDUCATION

2105 - REC/VOC/EDUC/STORE

2108 - PROPERTY STORAGE

2110 - VOCATION

3304 - RECREATION

4008 - TRANSPORTATION/SAFETY

4111 - EDUCATION

4114 - EDUCATION/STANDARDS

4214 - SECURITY OFFICE

4800 - DORMITORY

4801 - DORMITORY

4802 - DORMITORY

4803 - DORMITORY

4804 - DORMITORY

4805 - DORMITORY

4806 - DORMITORY

4807 - MECHANICAL PLANT

4808 - CAFETERIA

5557 -VST STORAGE

5558 - VOCATIONAL/EDUCATION

6018 - POOL HOUSE

7140 - CAREER PREPARATION PERIOD

7141 - CAREER PREPARATION PERIOD

7142 - COUNSELORS

7143 - ORIENTATION

7144 - MEDICAL/DENTAL

7145 - CHILD DEVELOPMENT CTR

7146 - TEAP

7148 - SOLO PARENT DORMITORY

7150 - SECURITY/VISITORS CTR

7160 - CULINARY ARTS/COMMUNITY

RELATIONS

9701 - GYMNASIUM

9704 - EDUCATION/ADMINISTRATION

1208 - PAINT STORAGE

2106 - RES LIVING STORAGE

2107 - RESIDENTIAL LIVING STORAGE

4900 - GAZEBO

4901 - GAZEBO

4902 - GAZEBO

4903 - GAZEBO

4904 - GAZEBO

6019 - PAVILION (POOL)

6020 - GREENHOUSE

Name GSF

26,456 4,000 6,724 9,000 7,620

35,289 9,591

20,404 19,910 13,444 9,433 1,152 9,334 6,176 5,014

25,584 25,584 25,584 25,584 25,584 25,584 25,584

27,000 5,000

16,000

1,700 3,490 1,700 3,540 4,025 2,691 1,700

18,684 13,057 15,800

24,234 32,295

2,000

Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active

Active Active Active Active Active Active Active Active Active Active Active Active

StatusType

Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building

Building Building Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure

Use Group Built Flrs Const

Business Utility/Misc.

Business Business Business Business Business Assembly Storage Business Assembly Business Business Business Business Residential Residential Residential Residential Residential Residential Residential Utility/Misc.

Assembly Storage Business Utility/Misc.

Business Business Business Business Business Day Care Business Residential Assembly Assembly/Bu

Assembly Business Storage Storage

Assembly Assembly

Assembly

Business

Fair Fair Fair Fair

Good Fair

Good Good Good Good Good Good Fair

Good Good Good Fair

Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good

Good Good Good Good Good Good Good Good Good Good Good Good

ConditionAsset Number

0040400004 0040400005 0040400007 0040400043 0040400011 0040400012 0040400013 0040400014 0040400066 0040408094 0040400023 0040400055 0040400025 0040400026 0040400028 0040400029 0040400030 0040400031 0040400032 0040400033 0040400034 0040400035 0040400036 0040400037 0040400069 0040400038 0040400039 0040400050 0040400057 0040400058 0040400059 0040400060 0040400061 0040400062 0040400064 0040400041 0040400042

0040400065 0040408093 0040400003 0040400052 0040408095 0040408089 0040408090 0040408098 0040408099 0040408100 0040408096 0040408103

BUILDINGS AND STRUCTURES

00404 TURNER 07/18/2013

2Page: of Date:

6021 - GREENHOUSE (STORAGE)

6022 - STORAGE

7161 - GAZEBO

7162 - PAVILION (SPD)

7163 - DUGOUT

7164 - DUGOUT

7248 - STORAGE SHED

7250 - STORAGE SHED

7251 - CTST TRAINING STRUCTURE

9703 - SECURITY BOOTH

Name GSF

1,440

2,000

Active Active Active Active Active Active Active Active Active Active

StatusType

Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure

Use Group Built Flrs Const

Storage Storage

Assembly Utility/Misc.

Utility/Misc.

Storage Storage Business Business

Good Good Good Good Good Good Good Good Good Good

ConditionAsset Number

0040408106 0040408107 0040408097 0040408102 0040408105 0040408104 0040408091 0040408092 0040408101 0040408087

39 535,059

20 11,223

59 546,282

Buildings

Structures

Total

GSF

GSF

GSF

Summary

07/18/2013

Space Utilization By Function 00404 Turner Page: 1 of Date:

HOUSING

EDUCATION

FOOD SERVICE

SUGGESTED

NSF/

ENROLLEE

SUGGESTED

TOTAL

NSF

ACTUAL

TOTAL

NSF

TYPE OF SPACE

SUB TOTAL

SUB TOTAL

SUB TOTAL

Resident Men Resident Women Total Residents

Residents 880 Non Residents 50

930Total Students

(880)

(930)

(930)

DIFFERENCE

88,000

67,660

16,740

118,162

122,933

22,436

Lounge Shower/Toilet Single Parent Dormitory Sleeping excl. SPD( rooms; beds) Storage

Academic (930) Non-Academic

40 -- ACT (Off-Ctr) 20 -- Advanced Asphalt Paving + 20 -- Advanced Cement Masonry + 20 -- Asphalt Paving + 20 -- Bricklayer + 20 -- Carpentry + 20 -- Cement Masonry + 100 -- Culinary Arts + 72 -- Electrical + 96 -- Facilities Maint. and Const. + 16 -- Heavy Equipment Mechanic + 24 -- Landscaping + 30 -- Medical Assistant 90 -- Medical Office Support 90 -- Nursing Assistant + 60 -- Office Administration 20 -- Plastering + 48 -- Welding +

Vocational Theory (586)

Dining (2 Servings) Food Preparation Food Storage

8,400 14,994 14,200 73,764

6,804

24,222 37,633

1,135 2,680 1,700 1,250 4,000 6,500 9,300 2,425

10,316 1,625 2,400 1,080 1,080 1,620 1,620 2,650 3,851

5,846

12,786 4,250 5,400

8,800 10,560

63,360

5,280

9,300 9,300

1,500 1,500 1,500 1,500 1,500 1,500 6,000 3,600 7,200 1,200 1,200

2,700 3,600 2,700 1,500 3,600

5,860

7,440 5,580 3,720

-400 4,434

10,404 1,524

14,922 28,333

-365 1,180

-250

2,500 5,000 3,300 -1,175 3,116

1,200

-1,620 -1,980 -1,080 1,150

-14

5,346 -1,330 1,680

Vocations

30,162

55,273

5,696

07/18/2013

Space Utilization By Function 00404 Turner Page: 2 of Date:

RECREATION

MEDICAL/DENTAL

ADMINISTRATION

STORAGE/SUPPORT

VACANT

SUGGESTED

NSF/

ENROLLEE

SUGGESTED

TOTAL

NSF

ACTUAL

TOTAL

NSF

TYPE OF SPACE

SUB TOTAL

SUB TOTAL

SUB TOTAL

SUB TOTAL

SUB TOTAL

TOTAL 283.62 263,770 388,513

(930)

(930)

(930)

(930)

(0)

DIFFERENCE

535,059

0.73

TOTAL GSF

NET TO GROSS RATIO

44,750

5,500

22,520

18,600

42,498

3,100

26,744

20,700

31,940

Assembly Hall Auditorium Gymnasium Miscellaneous Recreation Pool Hall Raquetball Swimming Pool Weight Room

Medical/Dental

Administration Child Development Center (49)

Operations & Maintenance Warehouse

Vacant

5.91

3,600 2,345

10,504 16,900

4,949 2,600

3,100

24,644 2,100

7,600 13,100

31,940

5,500

18,600 3,920

7,440 11,160

-2,400

6,044 -1,820

1,940

RESIDENT

NON-RESIDENT

(880)

(50) 15

50 44,000

-2,252

-2,400

4,224

2,100

31,940

124,743

Net Square Footage By Building Date: 07/18/2013 Page: 1

Center: TURNER (00404) of 5

HOUSING

Sleeping excl. SPD

Lounge

Storage

Shower/Toilet

Single Parent Dormitory

Function Suggested

NSF

12,294 12,294 12,294 12,294 12,294 12,294

1,400 1,400 1,400 1,400 1,400 1,400

1,134 1,134 1,134 1,134 1,134 1,134

2,499 2,499 2,499 2,499 2,499 2,499

14,200

4800 - DORMITORY

4805 - DORMITORY

4802 - DORMITORY

4803 - DORMITORY

4804 - DORMITORY

4806 - DORMITORY

4804 - DORMITORY

4800 - DORMITORY

4802 - DORMITORY

4805 - DORMITORY

4803 - DORMITORY

4806 - DORMITORY

4804 - DORMITORY

4800 - DORMITORY

4806 - DORMITORY

4803 - DORMITORY

4802 - DORMITORY

4805 - DORMITORY

4803 - DORMITORY

4800 - DORMITORY

4805 - DORMITORY

4806 - DORMITORY

4802 - DORMITORY

4804 - DORMITORY

7148 - SOLO PARENT DORMITORY

Bldg Name Actual NSF Difference

73,764

8,400

6,804

14,994

14,200

Sub Total: 118,162

63,360

8,800

5,280

10,560

88,000

10,404

-400

1,524

4,434

14,200

( 880

30,162 rooms; beds rooms; beds rooms; beds rooms; beds rooms; beds rooms; beds

Page: 2

Center: TURNER (00404) of 5

EDUCATION

Academic

Vocational Theory (586)

Carpentry

Cement Masonry

Electrical

Culinary Arts

Welding

Plastering

Bricklayer

Facilities Maint. and Const.

Landscaping

Medical Assistant

Function Suggested

NSF

24,222

2,475 2,795

4,000

6,500

2,425

9,300

3,851

2,650

1,250

1,800 8,516

2,400

1,080

9704 - EDUCATION/ADMINISTRATION

7160 - CULINARY ARTS/COMMUNITY RELATIONS

2008 - VOCATIONAL EDUCATION

5558 - VOCATIONAL/EDUCATION

2008 - VOCATIONAL EDUCATION

2008 - VOCATIONAL EDUCATION

5558 - VOCATIONAL/EDUCATION

7160 - CULINARY ARTS/COMMUNITY RELATIONS

2110 - VOCATION

2008 - VOCATIONAL EDUCATION

2008 - VOCATIONAL EDUCATION

5558 - VOCATIONAL/EDUCATION

2008 - VOCATIONAL EDUCATION

5558 - VOCATIONAL/EDUCATION

4111 - EDUCATION

Bldg Name Actual NSF Difference

24,222

5,846

4,000

6,500

2,425

9,300

3,851

2,650

1,250

10,316

2,400

1,080

9,300

5,860

1,500

1,500

3,600

6,000

3,600

1,500

1,500

7,200

1,200

14,922

-14

2,500

5,000

-1,175

3,300

1,150

-250

3,116

1,200

( 930 )

Page: 3

Center: TURNER (00404) of 5

EDUCATION

Non-Academic

Advanced Cement Masonry

Heavy Equipment Mechanic

Nursing Assistant

Office Administration

Medical Office Support

Asphalt Paving

Advanced Asphalt Paving

Function Suggested

NSF

1,020 2,162 1,800

3,016 2,800 1,100

3,617 1,165 1,500 4,650 1,187 4,500

5,157

1,250

2,680

1,625

1,620

1,620

1,080

1,700

1,135

4111 - EDUCATION

1604 - ADMINISTRATION

7150 - SECURITY/VISITORS CTR

2007 - LIBRARY

4114 - EDUCATION/STANDARDS

7143 - ORIENTATION

7142 - COUNSELORS

7141 - CAREER PREPARATION PERIOD

5558 - VOCATIONAL/EDUCATION

7140 - CAREER PREPARATION PERIOD

7141 - CAREER PREPARATION PERIOD

2007 - LIBRARY

7146 - TEAP

5557 -VST STORAGE

2007 - LIBRARY

2102 - ADMINISTRATION/EDUCATION

4114 - EDUCATION/STANDARDS

2001 - GROUP LIFE/RESIDENTIAL LIVING

2008 - VOCATIONAL EDUCATION

2110 - VOCATION

4111 - EDUCATION

4111 - EDUCATION

4111 - EDUCATION

2110 - VOCATION

2110 - VOCATION

Bldg Name Actual NSF Difference

37,633

2,680

1,625

1,620

1,620

1,080

1,700

1,135

Sub Total: 122,933

9,300

1,500

1,200

3,600

2,700

2,700

1,500

1,500

67,660

28,333

1,180

-1,980

-1,080

-1,620

-365

55,273

Page: 4

Center: TURNER (00404) of 5

FOOD SERVICE

RECREATION

MEDICAL/DENTAL

Dining (2 Servings)

Food Preparation

Food Storage

Gymnasium

Swimming Pool

Weight Room

Auditorium

Raquetball

Miscellaneous Recreation

Pool Hall

Assembly Hall

Medical/Dental

Function Suggested

NSF

12,786

4,250

5,400

10,504

2,345

2,600

12,000 4,000

4,949

3,600

3,100

4808 - CAFETERIA

4808 - CAFETERIA

4808 - CAFETERIA

9701 - GYMNASIUM

6018 - POOL HOUSE

9701 - GYMNASIUM

2105 - REC/VOC/EDUC/STORE

9701 - GYMNASIUM

2105 - REC/VOC/EDUC/STORE

9701 - GYMNASIUM

3304 - RECREATION

3304 - RECREATION

7150 - SECURITY/VISITORS CTR

7144 - MEDICAL/DENTAL

Bldg Name Actual NSF Difference

12,786

4,250

5,400

10,504

2,345

2,600

16,900

4,949

3,600

3,100

Sub Total:

Sub Total:

Sub Total:

22,436

42,498

3,100

7,440

5,580

3,720

5,500

16,740

44,750

5,500

5,346

-1,330

1,680

-2,400

5,696

-2,252

-2,400

Page: 5

Center: TURNER (00404) of 5

ADMINISTRATION

STORAGE/SUPPORT

VACANT

Administration

Child Development Center

Warehouse

Operations & Maintenance

Vacant

Function Suggested

NSF

8,867

3,744 4,370 1,800 1,051 4,012

2,100

13,100

3,200 3,800

17,327 1,400 3,150

9,188

1604 - ADMINISTRATION

4008 - TRANSPORTATION/SAFETY

4214 - SECURITY OFFICE

2000 - ADMINISTRATION

2102 - ADMINISTRATION/EDUCATION

2001 - GROUP LIFE/RESIDENTIAL LIVING

7150 - SECURITY/VISITORS CTR

7145 - CHILD DEVELOPMENT CTR

2108 - PROPERTY STORAGE

4807 - MECHANICAL PLANT

1605 - MAINTENANCE

2108 - PROPERTY STORAGE

4801 - DORMITORY

2105 - REC/VOC/EDUC/STORE

2001 - GROUP LIFE/RESIDENTIAL LIVING

4114 - EDUCATION/STANDARDS

5558 - VOCATIONAL/EDUCATION

1604 - ADMINISTRATION

Bldg Name Actual NSF Difference

24,644

2,100

13,100

7,600

31,940

Sub Total:

Sub Total:

Sub Total:

26,744

20,700

31,940

18,600

3,920

11,160

7,440

22,520

18,600

6,044

-1,820

1,940

31,940

4,224

2,100

31,940

Energy Management Report Center: TURNER (00404)

Page: 1 Date: 07/18/2013 of 3

CENTER ENERGY DATA

Yes

ENERGY CONSUMPTION ASSESSMENT

16% 81,365

76,956 97,413

ENERGY USE BY FUEL TYPE

Energy Audit :

Date of Audit :

Status of Energy Conservation Measure Recommendations :

Electric Company :

Percent Change since Baseline Year :

Natural Gas Company :

Property Status :

4/2/2003 Not Implemented Albany Water, Gas and Light Commision City of Albany, Water, Gas & Light

Federally Owned (DOL)

7,541,528 25,732=

Total 42,850

MBtu

MBtu

Total $913,127 MBtu/ $21.310

BTU/GSF

BTU/GSF

BTU/GSF

Electricity

Natural Gas kWh

16,603 MCF = 17,118 MBtu

$741,157 $0.098= kWhElectricity

Natural Gas $171,970 = $10.358 MCF

ENERGY COST BY FUEL TYPE

WATER CONSUMPTION ASSESSMENT

Percent Reduction Compared to Goal:

1,000 Gallons

1,000 Gallons

FY 2012 Energy Goal:

Further Reduction in Energy Usage is needed to meet Energy Reduction Goals.

FY 2012 Energy Consumption:

Note: The Federal Government has set a goal of 3% Energy Consumption reduction per year in EO 13423.

16,996 15,296 31,928

- 109%

Further Reduction in Water Usage is needed to meet Water Reduction Goals.

Note:

FY 2012 Goal:

FY 2012 Water Consumption:

1,000 Gallons

FY 2003 Energy Baseline:

FY 2007 Baseline:

The Federal Government has set a goal of 2% Water Consumption reduction per year in EO 13423 compared to the FY 2007 Baseline.

Page: 2 of 3

Implementing some of the below recommendations can save you 10% to 25% off your annual energy bill without negatively impacting comfort or productivity.

1. Your staff and students are the key to savings. Educate the students and staff on the why of energy saving - costs and environmental impacts. Encouraging them to actively participate in energy reduction is also important. Post reminders at exit doors and bulletin boards about energy conservation. Simple tips include:

a. Turn it down (lights, heating & cooling),

b. Turn it off (lights, computers, other equipment),

c. Keep it tight (close doors and windows, use window blinds)

2. Operations and Maintenance: Educate the O&M staff on the why of energy saving -costs and environmental impacts. Simple tips include:

a. Make sure that the Operations and Maintenance staff is properly trained for the equipment they operate.

b. Tune and clean HVAC: Perform seasonal cleanups on air conditioners, boilers and furnaces, and regularly clean cooling coils and drain pans. Get rooftop or outdoor condenser coils cleaned and maintain an appropriate filter changing schedule.

c. Check (or ask your HVAC contractor to check) your outside air dampers or economizers to verify proper ventilation. Make sure economizer controls function properly. Make sure automatic dampers close during unoccupied periods.

d. Restore automatic control: When troubleshooting a system, take time to figure out and repair the automatic controls. Today's quick fix is tomorrow's bad idea.

e. Reasonable set points: Try 68°F in the heating season and 75°F in the cooling season.

f. Schedule HVAC equipment and lighting: (weekdays, weekends, holidays, off-season). Make sure equipment runs only when it is needed and the buildings are occupied. When buildings are vacant (i.e. dormitories during the day with students in class), make sure all the lights in the building are off.

g. Seasonal (resets, schedules, and shutoffs): As the seasons change, adjust set points and schedules to match the system's response to the weather.

h. Lighting: Invest in an inexpensive light level meter to measure the foot-candles in spaces to determine whether or not they are over lit and lamps can be safely removed. Where four-lamp fixtures are in use, two lamps can usually be removed from every fixture or every other fixture. After lamps are removed, disconnect ballasts. Contact the Energy team at PBDewberry for suggested light levels for individual space types. Cleaning fixtures regularly increases light levels.

i. Utilize power management features for all computers and monitors to shut them off when idle for more than 15 minutes.

Page: 3 of 3

j. Have your vending machine suppliers turn off or remove light tubes from the advertising lighting in the machine. This will save about $50 per year per vending machine.

k. Save water with low flow sink aerators (0.5gpm) and low flow shower heads (1.5gpm - 2.0gpm). This will also reduce water heating energy consumption.

l. Set your water heater to 120°F. Verify by measuring at the tap. Never go below 115°F.

m. For water heaters installed in unconditioned spaces, add insulation blankets making sure that access covers, electric connection areas, and pressure relief valves are left uncovered.

n. Caulk and fill cracks around doors and windows to reduce costly air leaks.

o. When replacing broken glass, use high transmittance, low heat gain windows.

p. Make sure automatic door closers are functioning properly to avoid drafts.

3. Buy energy efficient, buy EnergyStar (www.energystar.gov).

a. Buy EnergyStar appliances and equipment.

b. Replace burned out lightbulbs with EnergyStar labeled compact fluorescent lightbulbs (CFLs).

c. Replace broken thermostats with EnergyStar labeled programmable products.

d. Replace broken exit signs with EnergyStar LED exit signs.

Environmental Management Report

Page: 1 Date: 07/18/2013 of 3

SOLID & HAZARDOUS WASTE MANAGEMENT (RCRA)

Commercial Waste Service

HAZARDOUS MATERIALS STORAGE (EPCRA)

Yes Buildings 1208, 6018

Organic solvent (20 gals), pool chemicals/hypochlorite (50 lbs) Yes

Solid Waste Disposal :

Hazardous Waste Generator :

Hazardous Waste ID :

Generator Classification :

Hazadous Materials Storage :

Hazardous Materials ID :

HazMat Storage Area :

HazMat Spill Response Plan :

Local Hazardous Use Permit :

LEPC Notification :

EPA Generator ID Number :

Hazardous Waste Disposal :

Transwaste Material, Inc.

Yes Organic solvent (3 gals/month),hydraulic fluid (20 gals/month)

Conditionally Exempt Small Quantity Generator

GA7161633030

Commercial Hazardous Waste Disposal Service

Massey Industrial Oil, Inc.

N/A N/A

Page: 2 Date: 07/18/2013 of 3

PETROLEUM UNDERGROUND STORAGE TANKS (RCRA)

Compliance1

PETROLEUM ABOVEGROUND STORAGE TANKS (CWA)

Number of Regulated USTs :

Number of Un-regulated USTs :

RCRA Compliance

Building 1604

Building 1604

Building 1605

Building 2000

Building 2001

Building 2005

Building 2006

Building 2007

Building 2008

Building 2102

Building 2201

Building 3304

Building 4111

Building 4114

Building 4214

Building 4800

Building 4800

Building 4801

Building 4801

Building 4802

Building 4802

Building 4803

Building 4803

Building 4804

Building 4805

Building 5558

Building 7150

Building 7150

Building 4008

1,000

3,000

1,000

10,000

1,000

6,000

6,000

6,000

6,000

10,000

10,000

6,000

1,500

1,500

1,000

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Gasoline

ID LocationFuel Type Capacity

Number of ASTs :

Overfill Leak Corrosion

SPCC Plan Required : SPCC Plan Completed :

Yes No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

Yes

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

Yes

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

No

Yes

ID Fuel Type Capacity Location Overfill

Prevention Secondary Containment

Petroleum - Heating Oil

Petroleum - Diesel Fuel

Petroleum - Heating Oil

Building 2008

Building 2108

Building 1605

No

Yes

No

No

No

No

Tank Status Active

Active

Active

Abandoned

Abandoned

Abandoned

Abandoned

Active

Active

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Active

Active

Active

Active

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Active

Tank Status Prevention/Detection

Page: 3 Date: 07/18/2013 of 3

ASBESTOS AND PCB MANAGEMENT (TSCA)

AIR POLLUTION CONTROL (CAA)

N/A None

Attainment

Asbestos Survey Date :

Asbestos Type :

Asbestos Coordinator :

Coordinator Training Date:

Custodial/Maintenance Training :

AHERA Regulated :

Management Plan Approval :

PCB Transformer Testing :

PCB Transformers :

PCB-Contaminated Transformers :

Transformers Labelled :

Regional Air Quality :

Permitted Air Pollution Source :

Source Description :

01/13/1989 Friable/Non-Friable Eldridge Brown

No No N/A Yes No

Asbestos-Containing Materials Inventory

Date: 07/18/2013Center : Turner (00404) Page: 1 of 5

HVAC (Bldg) Wall Finishes Wall Finishes HVAC (Bldg) Heating Floor Finishes

Exterior Walls

Exterior Walls Wall Finishes Heating

Exterior Walls Heating

Heating Roof Repair/Replacement Heating

Heating Floor Finishes

Bldg System

Bldg System

Bldg System

Bldg System

Bldg System

Bldg System

Asbestos cement board Asbestos cement board Asbestos cement board Flexible duct connector Boiler insulation 9x9 floor tile, various

Asbestos cement board

Asbestos cement siding Asbestos cement board Pipe fitting insulation

Asbestos cement siding Pipe fitting insulation

Boiler flue insulation Roof flashing Pipe fitting insulation

Pipe fitting insulation 12x12 floor tile, white/gray

Category Description

Category Description

Category Description

Category Description

Category Description

Category Description

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Ea.

Sq. Ft.

Ea.

Sq. Ft.

Sq. Ft.

Ea.

Sq. Ft.

Sq. Ft.

Location

Location

Location

Location

Location

Location

Unit

Unit

Unit

Unit

Unit

Unit

Quantity

Quantity

Quantity

Quantity

Quantity

Quantity

Cooling tower, roof Janitor's closet Mechanical room Mechanical room Mechanical room Throughout

Soffit, throughout

Throughout Mechanical room Mechanical room

Throughout Mechanical room

Mechanical room Building perimeter Mechanical room

Mechanical room Carpentry vocation

25000

10000

10000

Building :

Building :

Building :

Building :

Building :

Building :

1604 - ADMINISTRATION

1605 - MAINTENANCE

2000 - ADMINISTRATION

2001 - GROUP LIFE/RESIDENTIAL LIVING

2007 - LIBRARY

2008 - VOCATIONAL EDUCATION

Page: 2 of 5

Heating Exterior Walls Floor Finishes Floor Finishes Roof Repair/Replacement

HVAC (Bldg) Ceiling Finishes Heating

Heating HVAC (Bldg) Floor Finishes

Heating HVAC (Bldg) Heating Heating Floor Finishes

Heating Heating Floor Finishes

Bldg System

Bldg System

Bldg System

Bldg System

Bldg System

Pipe fitting insulation Asbestos cement board 9x9 floor tile, copper 12x12 floor tile, tan Roof flashing

Duct insulation Acoustical plaster Boiler insulation

Pipe fitting insulation Flexible duct connector 9x9 floor tile, green/brown

Boiler flue insulation Flexible duct connector Pipe fitting insulation Tank insulation 9x9 floor tile, green

Pipe fitting insulation Tank insulation 9x9 floor tile, green

Category Description

Category Description

Category Description

Category Description

Category Description

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Lin. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Ea.

Lin. Ft.

Sq. Ft.

Sq. Ft.

Lin. Ft.

Ea.

Sq. Ft.

Sq. Ft.

Ea.

Sq. Ft.

Sq. Ft.

Location

Location

Location

Location

Location

Unit

Unit

Unit

Unit

Unit

Quantity

Quantity

Quantity

Quantity

Quantity

Throughout Soffit (throughout) North hall Main storage Building perimeter

Mechanical room Orientation/pool rm.

Mechanical room

Mechanical room Mechanical room Throughout

Mechanical room Mechanical room Mechanical room Mechanical room 1st floor

Mechanical room Mechanical room 1st floor

10250

Building :

Building :

Building :

Building :

Building :

2102 - ADMINISTRATION/EDUCATION

3304 - RECREATION

4111 - EDUCATION

4114 - EDUCATION/STANDARDS

4214 - SECURITY OFFICE

Page: 3 of 5

Heating Heating Heating Heating Floor Finishes Floor Finishes

Floor Finishes HVAC (Bldg) Heating Heating Heating Floor Finishes Floor Finishes

Floor Finishes Floor Finishes HVAC (Bldg) Heating Heating Heating Heating

Roof Repair/Replacement Floor Finishes Floor Finishes HVAC (Bldg) Heating Heating Heating Heating

Bldg System

Bldg System

Bldg System

Bldg System

Tank insulation Pipe fitting insulation Boiler insulation Pipe fitting insulation 9x9 floor tile, gray/white 9x9 floor tile, tan

9x9 floor tile, black Duct sealing compound Pipe fitting insulation Boiler insulation Tank insulation 9x9 floor tile, brown 9x9 floor tile, white/gray

9x9 floor tile, tan 9x9 floor tile, gray/white Asphalt pipe wrap Pipe fitting insulation Pipe fitting insulation Boiler insulation Tank insulation

Roof flashing 9x9 floor tile, tan 9x9 floor tile, white/gray Duct sealing compound Pipe fitting insulation Pipe fitting insulation Boiler insulation Tank insulation

Category Description

Category Description

Category Description

Category Description

Sq. Ft.

Ea.

Sq. Ft.

Ea.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Ea.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Lin. Ft.

Ea.

Ea.

Sq. Ft.

Sq. Ft.

Lin. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Ea.

Ea.

Sq. Ft.

Sq. Ft.

Location

Location

Location

Location

Unit

Unit

Unit

Unit

Quantity

Quantity

Quantity

Quantity

Basement mech. room Basement mech. room Basement mech. room Penthouse mech. room 1st floor 2nd/3rd floors

1st floor, TV lounge Penthouse mech. room Penthouse mech. room Basement mech. room Basement mech. room 2nd/3rd floor 1st floor

2nd/3rd floors 1st floor Penthouse mech. room Penthouse mech. room Basement mech. room Basement mech. room Basement mech. room

Building perimeter 2nd/3rd floors 1st floor Penthouse mech. room Penthouse mech. room Basement mech. room Basement mech. room Basement mech. room

16000

16000

16000

16000

Building :

Building :

Building :

Building :

4800 - DORMITORY

4801 - DORMITORY

4802 - DORMITORY

4803 - DORMITORY

Page: 4 of 5

Floor Finishes Floor Finishes

Floor Finishes Floor Finishes Floor Finishes

Roof Repair/Replacement

Roof Repair/Replacement Heating Heating

Floor Finishes Floor Finishes Heating Heating HVAC (Bldg)

Wall Finishes Heating

Bldg System

Bldg System

Bldg System

Bldg System

Bldg System

Bldg System

9x9 floor tile, white/gray 9x9 floor tile, burgundy

9x9 floor tile, lt. green 9x9 floor tile, white/gray 9x9 floor tile, burgundy

Roof flashing

Roof flashing Tank insulation Pipe fitting insulation

9x9 floor tile, dark green 9x9 floor tile, gray Tank insulation Pipe fitting insulation Duct sealant compound

Wallboard joint compound Pipe fitting insulation

Category Description

Category Description

Category Description

Category Description

Category Description

Category Description

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Lin. Ft.

Lin. Ft.

Sq. Ft.

Ea.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Ea.

Sq. Ft.

Sq. Ft.

Ea.

Location

Location

Location

Location

Location

Location

Unit

Unit

Unit

Unit

Unit

Unit

Quantity

Quantity

Quantity

Quantity

Quantity

Quantity

1st floor 2nd/3rd floors

1st floor office 3rd floor office Throughout

Perimeter

Perimeter Mechanical room Mechanical room

Classrooms Food service area Mechanica room Mechanical room Maintenance office

Office Office

25000

25000

11000

Building :

Building :

Building :

Building :

Building :

Building :

4804 - DORMITORY

4805 - DORMITORY

4807 - MECHANICAL PLANT

4808 - CAFETERIA

5558 - VOCATIONAL/EDUCATION

6018 - POOL HOUSE

Page: 5 of 5

Heating HVAC (Bldg) Heating Heating Floor Finishes Exterior Walls

Heating HVAC (Bldg) HVAC (Bldg) Floor Finishes Ceiling Finishes

Heating Heating Floor Finishes

Bldg System

Bldg System

Bldg System

Boiler flue insulation Asphalt pipe insulation Tank insulation Pipe fitting insulation 9x9 floor tile, olive/beige Asbestos cement board

Pipe fitting insulation Asphalt pipe insulation Duct insulation 9x9 floor tile, gray/green Acoustical plaster

Pipe fitting insulation Tank insulation 9x9 floor tile, beige/tan

Category Description

Category Description

Category Description

Sq. Ft.

Lin. Ft.

Sq. Ft.

Ea.

Sq. Ft.

Sq. Ft.

Ea.

Lin. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Ea.

Sq. Ft.

Sq. Ft.

Location

Location

Location

Unit

Unit

Unit

Quantity

Quantity

Quantity

Mechanical room Mechanical room Mechanical room Laundry Throughout Beneath windows

Mechanical room Mechanical room Mechanical room East hallway/offices Assembly room

Mechanical room Mechanical room Classrooms/offices

18000

Building :

Building :

Building :

7148 - SOLO PARENT DORMITORY

7150 - SECURITY/VISITORS CTR

7160 - CULINARY ARTS/COMMUNITY RELATIONS

Radon

Page: 1 of 2

1604 - ADMINISTRATION

1605 - MAINTENANCE

2000 - ADMINISTRATION

2001 - GROUP LIFE/RESIDENTIAL LIVING

2007 - LIBRARY

2008 - VOCATIONAL EDUCATION

2102 - ADMINISTRATION/EDUCATION

2105 - REC/VOC/EDUC/STORE

2108 - PROPERTY STORAGE

2110 - VOCATION

3304 - RECREATION

4008 - TRANSPORTATION/SAFETY

4111 - EDUCATION

4114 - EDUCATION/STANDARDS

4214 - SECURITY OFFICE

4800 - DORMITORY

4801 - DORMITORY

4802 - DORMITORY

4803 - DORMITORY

4804 - DORMITORY

4805 - DORMITORY

4806 - DORMITORY

4807 - MECHANICAL PLANT

4808 - CAFETERIA

5557 -VST STORAGE

5558 - VOCATIONAL/EDUCATION

6018 - POOL HOUSE

7140 - CAREER PREPARATION PERIOD

7141 - CAREER PREPARATION PERIOD

7142 - COUNSELORS

7143 - ORIENTATION

7144 - MEDICAL/DENTAL

7145 - CHILD DEVELOPMENT CTR

7146 - TEAP

Bldg Name

08/12/1992

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

08/12/1992

05/23/1990

05/23/1990

05/23/1990

05/23/1990

08/12/1992

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

05/23/1990

Test Date

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

N/A

No

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

N/A

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Radon Testing

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

Test Result

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Mitigation Mitigation Date

Radon

Page: 2 of 2

7148 - SOLO PARENT DORMITORY

7150 - SECURITY/VISITORS CTR

7160 - CULINARY ARTS/COMMUNITY RELATIONS

9701 - GYMNASIUM

9704 - EDUCATION/ADMINISTRATION

Bldg Name

05/23/1990

05/23/1990

05/23/1990

Test Date

Yes

Yes

Yes

No

No

Radon Testing

< 4 pCi

< 4 pCi

< 4 pCi

Test Result

N/A

N/A

N/A

N/A

N/A

Mitigation Mitigation Date

RADON EXPLANATORY NOTES

The US Environmental Protection Agency (EPA) has established a radon action level of 4.0 picoCuries per liter (pCi/L). Occupied buildings with radon concentrations less than 4.0 pCi/L do not require radon mitigation; un-occupied buildings, or those buildings which are occupied only infrequently for brief periods of time, also do not require radon mitigation. Occupied buildings with radon concentrations greater than

4.0 pCi/L require radon mitigation and verification of radon reductions as soon as possible, with priority given to dormitories and student recreation buildings. Occupied buildings with radon concentrations greater than 20.0 pCi/L should be considered significant radon exposure hazards, and priority for mitigation should be given to buildings with these highly elevated radon concentrations.

Radon mitigation techniques include: (1) adjustment of the building HVAC system to create a positive pressure within the building; (2) sealing of foundation wall cracks, penetrations, or other openings;

(3) sealing crawlspace openings and sump pits; (4) installing an active subslab depressurization (ASD) system.

Site Description

TURNER

Page: 1 Date: 07/18/2013 of 6

Paving Type for Roads & Parking Paving Type for Sidewalks

Asphalt Concrete

Comments:

Topography Buildings and Structures

Center is not fully enclosed by fencing. Ornemental femcing surrounds the northwest main access road to the center, the fence which surrounds the rest of the campus is chain link.

ROADS, PARKING & SIDEWALKS

Water Source Water Authority Service Meter On-Site Treatment Plant

1. Water System

Treatment Type Storage Type Storage Capacity(Gallons)

NoIndividualCity of Albany, Water, Gas & Light CommPublic Water Authority

None 0None

Water is metered at each building.Comments:

Comments:

Fire Hydrants On-Site Water Supply Storage Capacity

(Gallons) Pressure Source FD Response Time (Minutes)

Yes 0 5None Municipal

Albany-Dougherty County Fire station is approximately 2 miles or 5 minutes away. Fire hydrants appear to be well distributed over the center.

Number of Deficiencies = 3

Number of Deficiencies = 3

SITE FEATURES

UTILITIES

2. Fire Protection System

Buildings Structures39 20Flat

Surrounding

Outdoor Recreation

Light Industrial, Public Recreation, Suburban

Basketball, Field, Pool

Entrance

GSA Vehicle Parking

Wrought Iron

Chain Link

Location Type

Maintenance Responsibility System Capacity Adequate System Condition

Utility Utility Yes Good

Separate Loop

No

Ownership Maintenance Responsibility System Capacity Adequate System Condition

Utility Utility Yes Good

Ownership

Roads & Parking Adequate Roads & Parking Condition Sidewalks Adequate Sidewalk Condition Yes Good Yes Good

Fencing

Other Features

Page: 2 Date: 07/18/2013 of 6

Comments:

Sewage Treatment Flow

The overall site system does not appear to have problems, although there are issues within buildings (example, cafeteria).

Utility

Publicly Owned Treatment Works

Utility

Gravity

Maintenance ResponsibilityOwnership

Comments: All buildings that utilize natural gas are provided with an individual gas meter.

City of Albany, Water, Gas & Light

Comments: Mechanical Plant Building 4807 is essentially a chiller plant and was designed to supply chilled water to the dorm buildings 4800 through 4806 for cooling. Each dorm building has a gas-fired water boiler and AHUs for heating. At the chiller plant are two water-cooled centrifugal chillers (York #YTC1C3C2CKG) and two cooling towers (Evapco #AT12212B). Each chiller uses R-123, a non-ozone depleting refrigerant. Chilled water circulation is configured with a primary-secondary loop arrangement. There are six base-mounted water pumps, two chilled water pumps (50 HP) and four condenser water pumps (15HP). Separate water treatment systems are provided for the closed chilled water loop (manual) and the open condenser-cooling tower water loop (automatic).

3. Sanitary Sewer System/ Sewage Treatment Plant

5. Fuel Distribution System

6. Central Plant Number of Deficiencies = 1

System Capacity Adequate System Condition

Yes Good

4. Storm Water System Number of Deficiencies = 1

Drain Type On-Site Storm Water Management

Surface Run-off N/A

Ownership Maintenance Responsibility System Capacity Adequate System Condition

Center Yes GoodCenter

Comments: System has surface run-off, swales and storm sewers.

Gas Company Metering

Individual

Ownership Maintenance Responsibility System Capacity Adequate System Condition

Utility Utility Yes Good

Type Energy Source

Chilled Water Electric 4800 through 4806.

Bldgs Served

Ownership Maintenance Responsibility Plant Capacity Adequate Plant Condition

Center Center Yes Good

Page: 3 Date: 07/18/2013 of 6

Comments:

Electric Company PCB Trans.

Transformer Mounting Transformer Ownership

Systems Ownership Maintenance Responsibility

Albany Water, Gas and Light Commision

The primary 13.860/8.000 kV lines are routed along Turner Field road, and enter from the northwest side to the campus. The service feeds several pole/pad-mounted step-down transformers with corresponding pole/wall-mounted secondary utility meters. There are several buildings with individual meters and some buildings with shared meters. Buildings 2108, 2110, 4807, 5558, 9701 and 9704 are provided with 480/277V services and step-down secondary transformers. All primary transformers are owned and maintained by utility.

Pole and Pad Utility

Utility Utility

No

Comments:

Telephone Company

On-site Line Owner

The telephone communication and data services main closet (MC) is located in Building 7150. Local service is provided by Deltacom, Inc by way of T1 lines. Long distance service is provided through the Job Corps Data center over T1 lines. Telephone switching is Toshiba Strategy IES 16 with voicemail system. Telephone transmission using fiber optic cables from MC to other switch panels located in Building 1604 and Building 9704 but uses copper wiring to connect to other buildings. Telephone system has digital ports for voice and analog ports are for fax machines and other analog devices. Telephone lines set-up and maintenance of the system is provided by Atlantic TelCom, Inc. Each building is connected with fiber optic cables to a Cisco 6500 switch in Building 1604 and route data transmission to two Cisco 3800 routers and a Cisco 1800 router in Building 7150.

The data traffics are distributed over 7 T1 lines, with 4 T1 lines utilized for direct Internet traffic and 3 T1 lines utilized for production (Citrix, STS, long distance, etc.). All routers in Building 7150 and Cisco 6500 switch in Building 1604 are connected to an UPS. The UPS buffers the power surges and drops in the line voltage and will maintain the power to allow for an orderly shutdown.

Deltacom, Inc

Maint. Responsibility

Center Center

Door Alarms, Electric Gate Operator

13.860/8.000 kV

277/480 & 120/208V, 3-Phase, 4 WireOverhead

OverheadPrimary Service

Secondary Service

Distribution Characteristics

Number of Deficiencies = 21

9. Electrical (Communication/Alarm/Security)

7. Electrical (Service)

Yes

Stand-Alone

VOIP

System Capacity Adequate System Condition

GoodYes

Transformer Maint Resp

Utility

System Capacity Adequate System Condition

Yes Good

Generator

None

8. Electrical (Site Lighting)

Roadways Parking Walkways Building Outdoor Sports

Mounting

Control

Pole Pole Pole Building None

Photocell Photocell Photocell Photocell None

System Ownership Maintenance Responsibility System Capacity Adequate System Condition

Utility, Center Utility, Center Yes Good

Comments: Site lighting is pole-mounted, controlled by photocells, owned and maintained by utility. Building-mounted lights are controlled by photocells and adequately complement the site lighting.

ATS MTS

No No

Number of Deficiencies = 14

Number of Deficiencies = 26

Fire Alarm Security

Metering Individual

Page: 4 Date: 07/18/2013 of 6

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

01/01/1970

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Center

Abandoned

Abandoned

Abandoned

Abandoned

Active

Active

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Active

Active

Active

Active

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Abandoned

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-

Building 1604

Building 1604

Building 1605

Building 2000

Building 2001

Building 2005

Building 2006

Building 2007

Building 2008

Building 2102

Building 2201

Building 3304

Building 4111

Building 4114

Building 4214

Building 4800

Building 4800

Building 4801

Building 4801

Building 4802

Building 4802

Building 4803

Building 4803

Building 4804

Building 4805

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

STORAGE TANKS

TypeStatus Location Owner Fuel Type Capacity (Gallons) Install DateID

Reg.

10000

10000

10000

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Heating

Purpose

Page: 5 Date: 07/18/2013 of 6

ACCESSIBILITY

Yes

NoNoNoNo

Nationally Registered Site

Site Eligible for National Register

Located in Historic District

Archaeological Significance

01/01/1970

01/01/1970

01/01/1970

01/01/1992

01/01/1999

01/05/2000

Unknown

Center

Center

Center

Center

Center

Center

Center

Abandoned

Abandoned

Abandoned

Active

Active

Active

Active regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Non-regulated

Underground, Regulated

Aboveground

Aboveground

Aboveground

Building 5558

Building 7150

Building 7150

Building 4008

Building 2008

Building 2108

Building 1605

Yes

Yes

Yes

Yes

Yes

Yes

No

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Heating Oil

Petroleum - Gasoline

Petroleum - Heating Oil

Petroleum - Diesel Fuel

Petroleum - Heating Oil

TypeStatus Location Owner Fuel Type Capacity (Gallons) Install Date

Earthquake Risk

Low High LowHigh MediumIBC Low

LightningEarthquake Def. Authority Flooding Tornado Hurricane Forest

Fire

ID

Reg.

Accessible Parking: Accessible Slope:

Yes

Curb Cuts:

Yes

Ramps:

YesYes

Site Accessible Route:

HISTORIC PRESERVATION

NATURAL HAZARDS

Heating

Heating

Heating

Equip/Veh Fueling

Heating

Heating

Purpose

Active Energy Use Reduction Program

Active Water Use Reduction Program

Approximate or Measured Waste Recycled

Use of School Dude or CMMS for Preventative Maintenance

Green Purchasing Policy Practiced

Site Stormwater Absorption Measures in Place

Center has Onsite Renewable Energy (PV or Wind)

Center has a Chartered Green Committee & Roster

Center Uses Green Cleaning Practices

SUSTAINABILITY

NO

NO

NO

NO

NO

NO

NO

NO

Page: 6 Date: 07/18/2013 of 6

GENERAL SITE CONDITION

Rating X Good Fair Poor

The site condition is not impacting the functional use of the facilities.

The site condition IS impacting the functional use of the facilities.

The site condition IS SIGNIFICANTLY impacting the functional use of the facilities.

Building Descriptions and Utilities

BUILDING 1604 - ADMINISTRATION

Building Descriptions Date: 07/17/2013Center : Turner (00404) Page: 1 of 182

Building: 1604 - ADMINISTRATION

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Loadbearing Masonry Wood

CMU Masonry

Wall Roof Unknown Rigid

Metal Unit - Storefront Frame Metal Units - Metal Frame

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership#Floors

Business 26,456 20,217 2 Owned 1952 Not Evaluated

Comments: The doors to the rooms do not have accessible hardware.

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

Yes

Yes

Yes

N/A

Yes

Yes

No

No

No

Yes

N/A

ACCESSIBILITY

Structural Systems1.

Exterior Walls2.

Insulation4.

Exterior Doors5.

Material Drainage Year Life

Remaining Type Area Served

Built-up Roofing Gutters and Downspouts 2000 8 Flat Entire Building

3. Roof

Entire Building

Area Served

Page: 2 of 182

Building: 1604 - ADMINISTRATION

INTERIOR FINISH

Carpet Ceramic Tile Concrete Vinyl Tile

Ceramic Tile Drywall Exposed Structure Plaster Wood Paneling

Aluminum Storefront - Aluminum Frame Metal Units - Metal Frame

Wood Unit - Wood Frame

VERTICAL CIRCULATION

Concrete Stairs Ramp

Double Hung - Steel Frame; Single Glazing; Fixed - Steel Frame; Single Glazing;

Hopper - Steel Frame; Single Glazing;

Acoustical Tile Mineral Wool Plaster

Windows6.

Floors1. Asbestos: Yes

Interior Walls2. Asbestos: Yes

3.

Interior Doors4.

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

A gas-fired water boiler (RayPak) in the mechanical room provides heating to three air handlers (Carrier #39TVEMAA5EBENAC and # 39LD06MBEAMBKJF9 both mfd. 8/2001) located in the nearby main mechanical equipment room and another (Carrier # 39LD06MBBALBLJ79, mfd. 8/2001) located on the second floor.

Packaged units (ICP #PA5530AKA3, mfd. 11/1998 and #NPADC36AB01, mfd. 11/1988) serve classrooms and offices using electric resistence heaters.

Comments:

Comments:

HVAC

Heat1. Asbestos: Yes

Gas-Fired Hot Water Boiler

Packaged Heat Pump (Air

Source)

Single Duct

Single Duct

Two-Pipe

None

Electric

Electric

Mechanical

Natural

None

None

Entire Building

Classrooms and Offices

Ceilings

Page: 3 of 182

Building: 1604 - ADMINISTRATION

Mechanical

Mechanical

Restroom

Break Room

Comments: The staff break room is ventilated by two exhaust fans (Greenheck #CSP260).

Electric under-the-counter water heaters are provided in the restrooms. There is a water heater (Rheem #62V30D, 30 gallon, 3.5kW) in the west storage room.

Comments:

Cast Iron None None

Electric Water Cooler Hose Bibb Lavatory Sink Urinal Water Closet (Flush Valve)

Gas (Natural)

Ventilation Area Served

Galvanized Steel Galvanized Steel Electric None No

Hot Water Cold Water Water Heater Water Treatment HW Storage Tank

Grease InterceptorWaste / Vent Interior Storm

Chiller

Packaged Direct

Expansion (Air Source)

Split Direct Expansion (Air

Source)

Single Duct

Single Duct

Single Duct

Two-Pipe

None

Refrigerant

Electric

Electric

Electric

Mechanical

Mechanical

Mechanical

None

None

None

Offices

Classrooms and Offices

Classrooms and Offices

PLUMBING

Exhaust Ventilation

An air-cooled packaged chiller (Carrier #30GTN060-520AK, 50 ton, mfd. 8/2000) located on the south side of the building provides cooling for three air handlers. Two of the air handlers (Carrier #39TVEMAA5EBENAC and # 39LD06MBEAMBKJF9 both mfd. 8/2001) are located in the nearby main mechanical equipment room and another (Carrier # 39LD06MBBALBLJ79, mfd. 8/2001) is located on the second floor.

Packaged units (ICP #PA5530AKA3, 2-1/2 ton, mfd. 11/1998 and #NPADC36AB01, 3 ton, mfd.

11/1988) serve classrooms and offices at the east end of the building. A packaged unit (Ruud #UBHA24J10NFBA, 2 ton, mfd. 12/1997) serves the west end.

The condensing unit (Rheem #RAHE030JAS, 2-1/2 ton, mfd. 5/1992) is ground-mounted.

Comments:

Comments:

Comments:

Ventilation2.

System Type

Number of Deficiencies = 1

Air Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Water Distribution1.

Sanitary Distribution2.

Fixtures3.

Fuel Distribution4.

3. Air Conditioning

Page: 4 of 182

Building: 1604 - ADMINISTRATION

None None ABC Type Fire Extinguisher

Comments: The building has four service entrances in (3) separate points. First overhead service is provided from a 3x100 kVA pole-mounted, utility-owned transformer bank to a 200A main service disconnect switch located in the supply room and serving the east building wing. The 200A disconnect serves a 200A panel through a 150A ASCO ATS with possibility of a generator connection. Second and third overhead services are provided from the same transformer bank. These services are provided to a 200A main disconnect switch and to an 800A MCB main distribution panel (both located in the main mechanical room) and serving the central part of the building. The 800A panel serves a chiller (from a 450A CB), one 200A MLO, one 100A MCB and three 125A panels (from a 200A CB, a 100A CB and (3) 125A CB) and has one 300A spare CB. Fourth overhead service is provided to a 200A main disconnect switch, which in-turn serves a 200A MCB panel. Utility meter is pole-mounted. Same transformers also serve Building 1605.

FIRE ALARM

Comments: The fire alarm control panel is a conventional, 24V, 4-zone panel (model Miniscan 4024 by Fire Lite Alarm Inc. by Honeywell) located in the corridor outside the east mechanical room.

Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices

Audible Alarm Control/Annunciator Panel Duct Smoke Detector Heat Detector Manual Pull Station Smoke Detector

Comments: Recorded footcandle levels include natural light contribution.

Halogen High Intensity Discharge (HID)

Comments: Halogen and HID exterior wall-mounted light fixtures are controlled by wall-mounted photocells.

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

Offices

Vacant

Toilets

Storage Rooms

Corridors & Stairs

N/A

Area Recommended Level

Recorded Level Light Type

Battery Backup Battery Backup

Main Disconnect Switch 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches

Sprinkler System Stand Pipe System Fire Suppression

Emergency Exit

Number of Deficiencies = 1FIRE PROTECTION

ELECTRICAL SERVICES

Exterior Lighting1.

Interior Lighting2. Number of Deficiencies = 1

Emergency /Exit Lighting3. Number of Deficiencies = 1

LIGHTING

Page: 5 of 182

Building: 1604 - ADMINISTRATION

Comments: Cable service for the center is provided from two large satellite dishes on the rear of this building. The building is connected to the center's LAN system.

Connected to Main System Motion Detector None Satellite Dish

Telephone Security Public Address Television

GENERAL BUILDING CONDITION

Rating

Comments:

X Good Fair Poor

The second floor of the building has been vacant for several years and most finishes are severely deteriorated. A number of HVAC units have exceeded their expected life and have been abandoned or are operating inefficiently. Several panelboards on the first and on the second floors are beyond life expectancy.

COMMUNICATION

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting the functional use of the facility.

The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.

Electric Water Gas Yes YesZone

BUILDING UTILITY…