Sections F.3 & F.5 are replaced with following:
F.3 PERIOD OF PERFORMANCE
The contract period of performance is for a base period of two years with three, one-year option periods. The Contractor shall operate the New Hampshire Job Corps Center during the period of 12/01/2014 – 11/30/2019 (provided all option years are exercised), and if appropriate, shall perform necessary functions related to a Start-up period for assuming the responsibility for the operation of the center effective June 1, 2015.
It is anticipated that the center will begin accepting students June 1, 2015 and OBS will be at 300 by November 30, 2015. Offerors should provide separate 2110s for the 6-month Start-up/transition in period from December 1, 2014 through May 31, 2015 and the 6-month Build-Up period from June through November. There should also be a combined 2110 to show the total year-one costs (both Start-up and Build-up). During the Start-Up period the operator is expected to recruit, hire, and train qualified staff, initiate student recruitment efforts, and complete preparations for the commencement of the center operations to be effective June 1, 2015. During the Build-Up period the operator is expected to follow the input schedule provided in Section F.5 and maintain a reasonable Weekly Termination Rate (WTR) in order to achieve 100% OBS on or before November 30, 2014.
The operator will follow the input schedule provided below and maintain a reasonable Weekly Termination Rate (WTR) in order to achieve 100% OBS on or before November 30, 2014. In addition, as part of the Cost Proposal offerors shall provide separate 2110s for the 6-month Start-up period from December 1, 2014 through May 31, 2015 and the 6-month Build-up period from June through November. There should also be a combined 2110 to show the total year-one costs (both Start-up and Build-up). For purposes of this proposal offerors should develop cost estimates for year 2 based on full design capacity.
F.5 DELIVERABLES
The contractor shall deliver all program and reporting requirements as defined in the Program Requirements Handbook.
In addition to those deliverables required in the Program Requirements Handbook, the contractor shall adhere to the following Student On-Board Strength Build-up Plan and Student Arrival Goal schedule: |X| Applicable Not Applicable
(a) New Hampshire Student On-Board Strength Build-up Plan
Weekly Student Inputs
| Total Student Inputs |
| WTR* |
| Cumulative Net On-Board Strength |
Date
3.00%
* WTR is an estimated Weekly Termination Rate
(b) Student Arrival Goal
Annual Arrival by Month