Section L, Page 106, Item D is amended as follows:
d. Narrative Cost Detail - Center
0. A narrative justification for each line item of the ETA 2110, Attachment J.3, for all contract years. Include all explanatory narratives and necessary calculations showing how costs are determined.
As part of the Cost Proposal, offerors shall provide separate 2110s for the 6-month Start-up period from December 1, 2014 through May 31, 2015 and the 6-month Build-up period from June through November. There should also be a combined 2110 to show the total year-one costs (both Start-up and Build-up). For purposes of this proposal offerors should develop cost estimates for year 2 based on full design capacity.
For the purposes of this RFP, the inflationary rate used in projecting costs shall be determined by the offeror.
Cost justifications based solely on historical data may be considered insufficient to support cost proposals. Historical data may be used to the extent that it can be shown to be relevant to this specific procurement, reflective of any changed conditions and circumstances. Provide narrative justification for each line item showing how the labor, material, travel, subcontractors, facility maintenance, and other costs outlined on the ETA 2110 were determined. Include the backup data to support the type of labor and estimated numbers of staff within each labor category.
The facility shall be provided as Government-furnished property at no cost to the contractor.