This is a Standard Detail specification document prepared by the City of West Sacramento, California, for driveway construction with curb and gutter separate from sidewalk installations (Detail #205). The specification outlines construction requirements for both residential and commercial/industrial driveways, establishing minimum material standards and installation procedures. Residential driveways must be 6 inches thick concrete at 4,000 PSI minimum, while commercial/industrial driveways require a minimum of 8 inches thick with #4 rebar spaced 12 inches on center in both directions. All driveways must be placed on a minimum 6-inch compacted Class II aggregate base over 6 inches of subgrade, with all base materials and subgrade processed to 95% relative compaction. The specification addresses driveway width requirements, sidewalk compatibility, curb height standards (6 inches standard), slope limitations (10% maximum without City Engineer approval), and finishing requirements including light broom finishes applied perpendicular to the street centerline for sidewalk areas and parallel to the roadway centerline for driveway, curb, and gutter areas.
The document provides detailed technical requirements for doweling connections between new driveway sections and existing concrete through rebar installation via coring or drilling methods, with rebar placement in existing concrete using epoxy to fill annular voids. Specific construction procedures include sawcutting and removal of existing street sections, placement of minimum 6-inch thick asphalt concrete patches, and joint and score marking specifications with deep tool joints at 1-1/2 inches minimum. The standard detail was approved August 2025 and is referenced in conjunction with Standard Detail #202 for concrete, base, and subgrade installation specifications, establishing comprehensive guidelines for contractors bidding on the City of West Sacramento's CFD Sidewalk Replacement 2026 project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRIVATE
DRIVEWAY
A
STANDARD CITY SIDEWALK - SEE STANDARD DETAIL #202 FOR CONCRETE, BASE AND SUBGRADE INSTALLATION.
DEEP TOOL JOINT 1-1/2 INCH MIN., (SEE STD. DETAIL 202 FOR SPACING)
ALL CONCRETE SHALL BE 4,000 PSI MIN. RESIDENTIAL DRIVEWAY SHALL BE 6 INCHES THICK. UNLESS OTHERWISE SHOWN ON APPROVED CONST. PLANS, COMMERCIAL/INDUSTRIAL DRIVEWAY SHALL BE MIN. 8 INCHES THICK WITH #4 REBAR, 12 INCHES O.C. BOTH DIRECTIONS WITH 3 INCH MIN. COVER IN ALL DIRECTIONS. DRIVEWAY SHALL BE PLACE ON MIN. 6 INCH COMPACTED CLASS II AB OVER 6 INCHES OF SUBGRADE OR CLASS II AB. ALL AB AND/OR SUBGRADE
SHALL BE PROCESSED TO 95% RELATIVE COMPACTION.
SCORE MARK, TYPICAL.
SAW CUT AND REMOVE EXISTING STREET SECTION. PLACE MIN. 6" THICK ASPHALT CONCRETE PATCH OR MATCH EXISTING, WHICHEVER IS GREATER. STREET SECTION SHALL BE 1/4" ABOVE LIP OF GUTTER. SEE DETAIL "A".
NOTES AND DIMENSIONS:
A. DRIVEWAY WIDTH SHALL MEET THE REQUIREMENTS OF SECTION 3.06 OF THE DESIGN STANDARDS, DIVISION I OF THE
STANDARD SPECIFICATIONS.
B. MATCH EXISTING SIDEWALK WIDTH IF 5 FEET OR GREATER, OR SEE SECTION 3, TABLE 3.01 OF THE DESIGN STANDARDS DESCRIBED ABOVE. REBAR SHALL BE PLACED IN THE EXISTING CONCRETE BY CORING OR DRILLING 1/8” LARGER HOLE THAN REBAR INTO THE EXISTING CONCRETE (4” MIN.). BRUSH/BLOWOUT HOLES, INSTALLING THE REBAR, AND FILLING THE ANNULAR VOIDS WITH EPOXY. DRIVEWAY FLARE SECTIONS SHALL START AT GRADE BREAK.
IF 10% MAX SLOPE IS EXCEEDED, DRIVEWAY CONSTRUCTION REQUIRES CITY ENGINEER APPROVAL.
C. CURB HEIGHT VARIES FOR EXISTING AREAS. STANDARD HEIGHT IS 6 INCHES.
D. WHEN DRIVEWAY IS CONSTRUCTED WITHIN EXISTING SIDEWALK AREAS, THE NEW DRIVEWAY SECTION, INCLUDING
THE CURB AND GUTTER, SHALL BE DOWELED INTO THE EXISTING CONCRETE WITH 12 INCH LENGTHS OF #4 REBAR AT 18 INCH CENTERS. REBAR SHALL BE PLACED IN THE EXISTING CONCRETE BY CORING OR DRILLING 1/8” LARGER HOLE THAN REBAR INTO THE EXISTING CONCRETE (4” MIN.). BRUSH/BLOWOUT HOLES, INSTALLING THE REBAR, AND FILLING
THE ANNULAR VOIDS WITH EPOXY.
E. APPLY A LIGHT BROOM FINISH ON SIDEWALK AREAS PERPENDICULAR TO THE STREET CENTERLINE. APPLY A LIGHT BROOM FINISH TO THE DRIVEWAY, CURB AND GUTTER PARALLEL TO THE ROADWAY CENTERLINE.
3'
3'
C
2'
6"
1"
2'
B
10% MAX.
1.75%
1/4"
DETAIL "A"
MAX
GRADE BREAK
LANDSCAPE
WIDTH VARIES
THE CITY OF WEST SACRAMENTO - STANDARD DETAIL
TITLE:
DRIVEWAY WITH CURB
& GUTTER SEPARATE
FROM SIDEWALK
STANDARD
DETAIL #
APPROVED: Aug. X, 2025
No. 54031
C I V I L
ST A T E O F C A L IF O R NIA
R
EG
IS
T E
R E D P R O F E S S IO NA L ENG
IN
EERM
A
R K
LO UIS COLLIER
dtl #205 drvwy w_c&g sep f_sdwk_06-20-25.dwg
File details come from the government source that posted it. Updated .