Design Change Log.xlsx

XLSX spreadsheet 102 KB Posted

Attached to
Solicitation Number 47PB5126R0022 - Centers for Medicare & Medicaid Services Headquarters (CMS) Roofs & Elevators Project
Solicitation number
47PB5126R0022
Issued by
Not on record

About this file

This is a Design Change Log template intended to document and track all design changes and their associated cost impacts throughout the design submission phase of a federal construction project. The form serves as a summary document that must accompany each design estimate submission and is specifically required when changes result in contractual modifications. The Design Based Consultant (DBC) submits this log for the CMS Headquarters Roofs & Elevators Project, a design-build contract for roof renovation (approximately 300,000 sq ft) and elevator replacement across multiple buildings at the CMS facility in Woodlawn, Maryland. The estimated project value is $20–$25 million with a 450-day completion timeline.

The template requires documentation of each proposed change including: a short change name, general scope classification (such as HVAC), and total cost impact. For each design change sheet, contractors must provide the change name, scope description, total cost impact, and the specific source directing the change. Additionally, contractors must submit a detailed narrative explaining the exact nature of the change, including quantity adjustments and scope modifications with a separate estimate breakdown for GSA verification. Critically, contractors must justify why each item constitutes a change rather than standard design development, supporting GSA's evaluation of the change's validity and necessity. The template permits DBC use of alternative forms provided the minimum information specified is included.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Log

This is a summary sheet intedned to summarize all changes and the total cost impact. This should accompany the estimate for each design submission. Please only use this if the changes result in a contractual change. Red text shows the instructions and can be deleted by the DBC. The DBC is also free to use their own forms but the information below, at a mimimum, shall be shown.
Submission
Change NameScopeCost Impact
Please refer to a short name for this changeGeneral Scope (ie HVAC)Total Cost

Design Change Sheet

Please make a change sheet for every proposed cost increease and project change during each design submission.
Change Nameplace the short name for this change
Scopewhat is the general scope
Costtotal cost impact

Source what is the source of this change. please be specific on where the direction for this change came from

Change Description Please create a narrative that explains what exaclty this change is. List necessary quantity changes, scope changes, etc to explain where the cost increase came from. Please also provide a seaprate breakdown of this change in the estimate so the quantities and etc can be verified by GSA. List why you think this is change and not design development. This section is to help GSA understand the valdity of this change and evaluate if it is both valid and necessary for the project.