47PB5126R0022 CMS Roofs and Elevators Project Woodlawn MD Form 101 Solicitation 4 28 2026.docx

DOCX document 3 MB Posted

Attached to
Solicitation Number 47PB5126R0022 - Centers for Medicare & Medicaid Services Headquarters (CMS) Roofs & Elevators Project
Solicitation number
47PB5126R0022
Issued by
Not on record

About this file

This is a GSA Form 101 Solicitation for a Design-Build contract to renovate roofs and elevators at the Centers for Medicare and Medicaid Services (CMS) Headquarters in Woodlawn, Maryland. The scope includes renovation of approximately 300,000 square feet of roofs across campus and modernization of 15 elevators total (6 passenger and 1 freight traction in the Central Building, 6 passenger and 1 freight hydraulic in the South Building, and 1 warehouse elevator). The estimated contract value ranges from $20,000,000 to $25,000,000 with a firm-fixed-price structure. This is a Total Small Business Set-Aside procurement under NAICS code 236220 with a small business size standard of $45 million.

The two-phase selection process begins with Phase 1 technical evaluation on May 29, 2026, where three offerors will be shortlisted based on technical qualifications, design-build approach, lead roof designer qualifications, and lead elevator designer qualifications. Unsuccessful Phase 1 participants will receive a stipend of up to $50,000. Phase 2 will evaluate design concept, key personnel qualifications, and management plans. The pre-proposal conference is scheduled for May 5, 2026, and the mandatory site visit is May 7, 2026. Proposals must be submitted electronically in PDF format with a maximum file size of 25MB to Raymond J. Porter (Contracting Officer) at raymondj.porter@gsa.gov. Offerors must provide evidence of bonding capacity for the full $25 million project value and demonstrate prior experience on similar renovation projects completed within the last ten years. The Government reserves the right to award without discussions, though post-submission oral presentations are permitted for Phase 2 finalists.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Solicitation No. 47PB5126R0022 Design Build Contract for: DESIGN/BUILD PROCUREMENT FOR ROOFS AND ELEVATORS OF THE CMS CAMPUS RENOVATION IN WOODLAWN, MD The Solicitation

Table of Contents I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Pre-Proposal Conference E. Estimated Price Range F. FAR 52.228-1 Bid Guarantee G. FAR 52.236-27 Site Visit – Construction H. Receipt of Offers

II. Proposals A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Other Information to be Submitted with Proposal F. Requirements of Joint Venture Offerors

III. General Provisions A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Bond Requirements H. Contractor Performance Information I. Safeguarding and Dissemination of Controlled Unclassified Information (CUI) Building Information

J. INFORM

K. Mega Construction Project Program

IV. FAR/GSAR Solicitation Provisions FAR 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR 101-29 FAR 52.211-3, Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Items Description FAR 52.216-1 Type Of Contract (GSA Class Deviation RFO-2025-16) FAR 52.222-5 Construction Wage Rate Requirements-Secondary Site of Work (GSA Class Deviation RFO-2025-22) FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction Buy American Requirements Buy American Exceptions FAR 52.233-2 Service of Protest (GSA Class Deviation RFO-2025-33) FAR 52.252-1 Solicitation Provisions Incorporated by Reference GSAR 552.102 Incorporating Provisions and Clauses by Reference GSAR 552.252-5 Authorized Deviations in Provisions (Nov 2021)(DEVIATION FAR 52.252-5) Small Business Subcontracting Plan GSAR 552.236-74, Evaluation of Options (Mar 2019) GSAR Clause 552.236-77, Government’s Right to Exercise Options (Mar 2019) Certified Cost or Pricing Data

V. Instructions to Offerors and Clauses A. FAR 52.215-1 Instructions to Offerors – Competitive Acquisition (GSA Class Deviation RFO-2025-15) B. FAR 52.219-18 Notice of Competition Limited to 8(a) Eligible Participants C. Security Requirements D. Additional Clauses

VI. Method Of Award A. Evaluation of Offers B. Determination of Responsibility C. Price Reasonableness/Price Realism D. Unbalanced Price E. Total Evaluated Price F. Non-Price Factors G. Evaluation of Joint Ventures

I. General Information I.A. The Solicitation and Contract The General Services Administration - Public Buildings Service, Office of Program & Project Management, Capital Project Acquisition Delivery Division, intends to award a firm-fixed price design-build contract for the Roofs and Elevators renovation project at the U.S. Department of Health and Human Services, Centers for Medicare and Medicaid Services (CMS) Headquarters in Woodlawn, Maryland.

The general scope of the project includes renovation of all the roofs on campus (approximately 300,000 sq ft), and most of the elevators (6 passenger and 1 freight traction elevators in the Central Building, 6 passenger elevators and 1 freight hydraulic elevators in the South Building, and 1 Warehouse elevator).

(1) This procurement is being conducted using the two-phase selection process. Phase 1 will be composed of the technical evaluation, and Phase 2 will be the price evaluation. One contract will be awarded using competitive negotiation under FAR Part 15 (GSA Class Deviation RFO-2025-15).

(2) This Solicitation is set-aside for Small Businesses, in accordance with FAR 19(GSA Class Deviation RFO-2025-19). This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the attached Agreement. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.

(3) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.

(4) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.

Notice 1: Clause and provision deviations dated February 2025 do not affect the following:

1. Any FAR subparts that are based on statute or are not covered by E.O. 11246 such as:

a. FAR subparts 22.13, Equal Opportunity for Veterans and its related clauses and provisions; and

b. FAR subpart 22.14, Employment of Workers and Disabilities.

2. Existing U.S. laws on civil rights, nondiscrimination, or any laws that generally apply to a company regardless of whether it is a government contractor.

End of Notice Notice 2:

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including FAR 52.222-25, Affirmative Action Compliance, 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation and paragraph (t) of FAR 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services.

GSA will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

End of Notice NOTICE 3: February 2025 clause or provision deviations are available in class deviations CD-2025-04 (February 15, 2025) and CD-2025-05 with Supplement 1 (March 7, 2025), available at https://www.gsa.gov/policy-regulations/policy/acquisiti2on-policy/acquisition-policy-library-and-resources#tab--Class-deviations) End of Notice I.B. List of Solicitation Documents The Solicitation Documents are comprised of:

(1) The Solicitation - Phase 1

(2) Offeror Representations and Certifications Form

(3) Standard Form (SF) 1442 – Solicitation Offer and Award – Provided in Phase II

(4) The Agreement and Attachments to the Agreement - Phase 1

(5) The Statement of Work

(6) Other Forms Required for Submission with Proposals I.C. Authorized Representatives

The following individuals are designated as the authorized GSA representatives under this Solicitation:

Authorized Representative Information:

Contracting Officer’s Information

Name: Raymond J Porter

100 S. Independence Mall West Philadelphia, PA 19106

Telephone: (215) 756-3439

Email: raymondj.porter@gsa.gov

Alternate POC Information

Name: Mark Lewandowski

100 S. Independence Mall West Philadelphia, PA 19106

Telephone: (215) 266-9741

Email: Mark.lewandowski@gsa.gov

I.D. Pre-Proposal Conference Virtual pre-proposal conference call will be held on google meets on Tuesday 5/5/26 at 9am ET. Please provide the email addresses of anyone interested in attending to jacob.wyshinski@gsa.gov and raymondj.porter@gsa.gov by COB on Monday 5/4/26.

Meeting call-in information below:

Meeting code meet.google.com/qnw-covh-onb Phone Numbers

PIN:

More joining options Information shall be provided via a project amendment by the GSA Contracting Officer, Raymond J Porter.

I.E. Estimated Price Range The estimated price range for the Project is $20,000,000 to $25,000,000.

I.F. FAR 52.228-1 Bid Guarantee (Sep 96) (GSA Class Deviation RFO-2025-28)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

I.G. FAR 52.236-27 Site Visit – Construction (Feb 95)

(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.

The site visit will be held on Thursday 5/7/26 at 9AM ET. Please provide the attached Site Visit Request Form to LalZoliana@hillintl.com, jacob.wyshinski@gsa.gov and raymondj.porter@gsa.gov by noon 12PM ET on Tuesday 5/5/26.

I.H. Receipt of Qualifications The Receipt of Qualifications is due on Friday 29 May 2026 at 1 PM ET. The Receipt of Qualifications is to be submitted electronically to Mr. Raymond J Porter, Lead Contracting Officer, at email raymondj.porter@gsa.gov.

II. Proposals

1. The Government will issue a single solicitation covering both phases of the Two-phase Design-Build Selection Procedures set forth in FAR 36.3. In Phase 1 technical qualifications will be evaluated to determine which Offerors will submit proposals for Phase II. Three (3) Offerors will be shortlisted and invited to submit Phase II proposals. Those unsuccessful offerors participating in Phase II will be paid a stipend of up to $50,000 to offset the costs associated with the preparation of required conceptual designs.

2. In Phase II, using the best value trade-off procedures described under 15.101-1 and 15.3, the Government will evaluate the technical and price proposals of the firms short-listed as a result of the Phase 1 selection. Per FAR 52.215-1 (ALT I), Instructions to Offerors-Competitive Acquisition, it is the Government’s prerogative to award a contract without discussions (except clarifications as described in FAR 15.306(a)). Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions with those firms identified in the short list, if the Contracting Officer determines discussions are necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the short list exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the short list to the greatest number that will permit an efficient competition among the most highly rated proposals.

PRE-PROPOSAL ACTIVITIES

PHASE 1

A pre-proposal conference will be held shortly after issuance of the solicitation for Phase 1 in Woodlawn, MD. The purpose of this conference is to provide a briefing on the project and the source selection procedures to be used in making the award.

The general nature of this requirement will be presented at the conference. Representatives from GSA, CMS and consultants will be present to provide responses to general questions. Specific questions pertaining to the terms and conditions of the solicitation must be submitted in writing to the Contracting Officer who will issue a formal response in the form of an amendment to the RFP.

PHASE 2

A Phase 2 pre-proposal meeting will be held in Woodlawn, MD shortly after issuance of the Phase 2 RFP. The purpose of this pre-proposal meeting is to provide the Phase 2 Offerors with an overview of the Phase 2 process as well as to provide time for the Offerors to ask questions pertaining to the RFP to address any questions that they may have up to that point. Representatives from GSA, CMS and other technical consultants will be present to provide responses to general questions. The questions and answers during this kick-off will be captured in a formal Amendment and distributed to all Phase 2 Offerors.

Pre-Submission Oral Presentation: As permitted in FAR 15.102, GSA will provide each Offeror selected to participate in Phase 2 with the opportunity to engage in one (1) individual presentation with the Government evaluators prior to the submission of Phase 2 proposals. The purpose of the Pre-Submission Oral Presentation is to clarify project requirements and to provide further information as it relates to the preparation of the Offeror’s Design Concept.

The Offeror may utilize presentation materials to illustrate a “preliminary concept” and identify project requirements that warrant further clarification. By “preliminary concept,” the Government is referring to drawings, schematics, and other similar architectural or engineering renderings that the Offeror prepares in response to the Phase 2 RFP. The Government anticipates that the Pre-Submission Oral Presentations will enable the Phase 2 Offerors to provide more complete and accurate proposal submissions, without incurring additional costs during the procurement process.

There are no maximum or minimum materials that must be presented or prepared as part of the “preliminary concept.” Offerors are free to develop as much, or as little, material as they desire. Each Offeror will have a maximum of ninety (90) minutes in which to provide a presentation and to clarify associated requirements of the contract documents. Offerors may allot this time in any manner they choose.

The Offeror is free to choose its presenters.

The Pre-Submission Oral Presentation will be held in Woodlawn, MD with each Phase 2 Offeror. The presentation will take place within a few weeks of the pre-proposal meeting. GSA will contact each Offeror via email to schedule the Pre-Submission Oral Presentation.

Each Offeror shall be responsible for providing its own audiovisual, computing, and other technical equipment that it needs to use during the presentations. To the extent available, and as worked out in advance with the Contracting Officer, the Government may permit each Offeror to utilize available equipment at the location site, such as a screen or TV.

The Government may record the presentation and provide a copy of the record to the Offeror within ten (10) business days after the presentation. In addition, the Offeror may decide to record the presentation with its own device. In such instances, the Offeror must provide a copy of the recording to the Government within ten (10) business days after the presentation.

The Offeror may not leave any materials with the Government at the conclusion of the Pre- Submission Oral Presentation. No materials will be incorporated into the Contract. No oral statements made by the Government during the presentations may be used to modify, change, or otherwise alter the Phase 2 RFP. Information impacting project requirements of the Phase 2 RFP will be issued in writing by the Contracting Officer to all Phase 2 Offerors.

The materials presented as part of the “preliminary concept” during the Pre-Submission Oral Presentation will not substitute for, or augment, written proposal information. There will be no scoring or evaluation done of the “preliminary concept” itself during the presentation.

Post-Submission Oral Presentation: As permitted in FAR 15.306 (GSA Class Deviation RFO-2025-15), each Offeror selected to participate in Phase 2 will have the opportunity to make a Post-Submission Oral Presentation. The purpose of the Post-Submission Oral Presentation is to allow Offerors an opportunity to further demonstrate their project understanding and abilities by giving an oral presentation to augment the written information submitted in response to the Phase 2 RFP.

Unlike the Pre-Submission Oral Presentations, the Government will use the Post-Submission Oral Presentation as an element of the overall evaluation of the Offeror.

Each Offeror will have a maximum of ninety (90) minutes in which to provide a presentation and to engage in dialogue with the Government. Offerors may allot this time in any manner that they so choose.

The Offeror’s key personnel as identified in response to RFP should attend the Post-Submission Oral Presentation in person. The Offeror may also bring additional persons to the presentation (eight (8) total participants maximum). The Government reserves the right to take into consideration the following: (a) the preparedness of key personnel; (b) the ease of interaction between the key personnel: and (c) the extent to which the key personnel are or are not aligned in terms of the overall vision of the project.

The Contracting Officer will schedule a location, date, and time for the Post-Submission Oral Presentation.

Each Offeror shall be responsible for providing its own audiovisual, computing, and other technical equipment that it needs to use during the Oral Presentation. To the extent available, and as worked out in advance with the Contracting Officer, the Government may permit each Offeror to utilize available equipment at the location site, such as a screen or TV.

The Offeror may not leave any materials with the Government at the conclusion of the presentation. No materials provided will be incorporated into the Contract. No oral statements made by the Government during the Post-Submission Oral Presentation may be used to modify, change, or alter the Phase 2 RFP. Information impacting project requirements of the Phase 2 RFP will be issued in writing by the Contracting Officer to all Phase 2 Offerors.

The materials presented as part of the “preliminary concept” during the Post-Submission Oral Presentation will not substitute for, or augment, written proposal information.

II.A. Proposal Contents Proposals shall consist of the following documents, completed, and executed in accordance with this Phase 1 Solicitation:

(1) Technical Proposal

(2) Other Documents as Required II.B. Proposal Format Offerors are encouraged to make their proposals only as voluminous as is necessary to respond to the preparation instructions set forth in the solicitation. In addition, notice should be taken of the size and page limitations specified in the instructions within this solicitation.

1. In accordance with FAR 52.215-1(c)(1), all proposals and modifications to the proposals shall be submitted electronically via electronic mail (email) to raymondj.porter@gsa.gov. Offeror shall submit their proposal in .pdf format and/or any other electronic format required. The total email size should be less than 25MB or there could be issues with delivery to the POCs listed above. Failure to meet this requirement will result in a rejection of the Offeror’s proposal. It is recommended the Offeror submit their proposal to the aforementioned email with a read receipt request. Hard copy submissions will not be accepted.

2. Contents: The Price Proposal shall consist of the SF 1442 and the Agreement, with prices and/or rates indicated for each price element shown on the pricing form included in Section II of the Agreement. Indicate the Base Contract Price, or if no such distinction is made, the Contract Price, in Block 17 of the SF 1442, which must be fully executed by the Offeror.

3. Qualifications, Exclusions and Conditions If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.

4. Additional Proposal Requirements Failure to provide all information requested may result in the offeror’s proposal being considered non-responsive, therefore not evaluated for price and/or technical factors.

II.C. Price Proposal Pricing Proposal: The pricing proposal, which must be separate from the technical proposal, must contain the following information, otherwise the contractor’s proposal will be deemed ineligible:

· Signed Standard Form 1442 with all amendments acknowledged

· Completed and signed bid sheet

· Evidence of Bonding Capacity*

· GSA Form C301, Representations and Certifications

· GSA Form 527, Contractor’s Qualifications and Financial Information

· If applicable, Joint-Venture Agreement and any Mentor-Protégé Agreements

· The information required under FAR 52.215-1(c)(2)

· Any other information required by the solicitation *Project Bonding Capacity - This will be used as part of the responsibility determination to assess the offeror’s ability to provide an offer guarantee and performance and payment bonds sufficient to cover the maximum estimated value of a single project under this contract. For this procurement, the minimum amount to be covered by the bonding is $25 million. Failure to provide evidence of adequate bonding capacity will render the proposal unacceptable and will not be further evaluated.

Upon determining and documenting that an apparent successful small business offeror lacks certain elements of responsibility (including, but not limited to, capability, competency, capacity, credit, integrity, perseverance, tenacity, and limitations on subcontracting, the contracting officer will withhold contract award (see 19.602-3); and refer the matter to the cognizant SBA Government Contracting Area Office (Area Office) serving the area in which the headquarters of the offeror is located, in accordance with agency procedures, for the issuance or denial of a Certificate of Competency (COC). Any determinations of non-responsibility will follow the procedures in FAR 9.1 and 19.6.

II.D. Technical Proposal Following is a list of evaluation factors that will be used in conjunction with price to identify the offer providing the best value to the Government. There are separate evaluation factors for Phases 1 and 2. Phase I factors will be used to select a short list of the most highly qualified offerors. Price will not be submitted with the Phase I proposals, and it is the intention of the Contracting Officer to select three (3) offerors to submit Phase 2 proposals. The Phase I factors and Phase II factors are listed below:

Phase I

Proposals must address the technical approach, technical qualifications, and the other Phase 1 evaluation factors stated herein. Any proposal not meeting all of the following criteria may result in not being further considered for award.

I. Evaluation Factors:

Factor 1 – Technical Qualifications Subfactor 1.A – Prior Experience Subfactor 1.B – Past Performance Factor 2 – Approach to Design Build Factor 3 – Lead Roof Designer Factor 4 – Lead Elevator Designer

II. Evaluation Factors Defined:

FACTOR 1 – TECHNICAL QUALIFICATIONS

SUB FACTOR 1.A: PRIOR EXPERIENCE ON RELEVANT PROJECTS

Description This factor will measure the number of opportunities the Offeror has had to learn by doing. The Government will examine the breadth, depth and relevance of the Offeror’s prior experience in performing projects similar in size, scope and complexity to the one described in the solicitation.

This factor assesses the experience of the Offeror’s primary team firms in providing similar design and construction services necessary for successfully delivering this project.

Submittal Requirement The minimum submission requirements are met for this factor, when each of the projects are relevant to the characteristics of the project described in this solicitation.

The Offeror shall provide relevant project experience for each of its team-member firms:

· Design/Builder* – One (1) Project

· Design Team – One (1) Project

· General Contractor – One (1) Project

Note that each submission should be a unique project.

*This project can be a design/build project where the offeror’s designer or builder were part of the project team. Additional favorable consideration will be given to offerors where both designer and builder worked together.

Each project submitted shall be limited to a maximum of two (2) pages on the attached Project Worksheet. Additionally, images of completed projects may be provided.

For each project, submit the following data/information:

A. Project title;

B. Location of project;

C. Services provided by the firm (design/build, design only, construction only, supplier only);

D. The Offeror’s level of authority on the project (prime contractor, joint venture partner, major subcontractor, etc.);

E. Total dollar value of the project (awarded price and final contract price);

F. Dollar value of the Offeror’s effort on the project;

G. Type of contract (e.g. firm fixed price, cost reimbursable, incentive fee, award fee, time and materials, CMc, etc.);

H. Dates of contract start and completion (planned vs actual);

I. Building occupancy status during construction J. Project facts including type of facility, features, tenant mission and population, square footage, security level, LEED certification, etc.;

K. A scope narrative explaining how the characteristic of the submitted project relates to the characteristics of the project described in this solicitation;

L. Name, title, address, phone number and email address of the customer contact and building owner who can attest to the quality of the work provided. (It is incumbent upon the Offeror to ensure the information submitted is current and accurate).

Standard for Evaluation The standard is met when the Offeror’s team demonstrates relevant prior experience on three (3) similar projects to this project that are active or were substantially completed in the last ten (10) years.

“Relevant Projects” (having a Similar Size and Complexity) are those that include renovations of facilities that have similar characteristics to those described in the bullets below. GSA will review and rate presented projects, however projects that exhibit similar characteristics to those described below will be rated higher when considering the firm’s performance capabilities. The factors are listed in descending order of importance.

· Elevator modernization in an occupied building

· Roofing replacement on occupied building 50,000 sqft

Additional favorable consideration may be given for:

· Work for General Services Administration

· Higher quantity of similar project experience

· Elevator projects with MAD upgrades included

· Evidence that the Offeror worked on prior projects together with one or more of its proposed team member firms.

· Elevator modernization of 5 or more in an occupied building

· Roofing replacement on occupied buildings of at least 200,000 sq ft

· Solar new or re-installation

· Roof type installed matches the type proposed by the offeror

SUB FACTOR 1.B: PAST PERFORMANCE ON RELEVANT PROJECTS

This factor considers the past performance of the Offeror, General Contractor, A/E Design Firm, and Lead Designer on the projects submitted by the Offeror under Evaluation Factor 1A. Past Performance will be evaluated to determine the probability that the Offeror will successfully perform the project based on demonstrated Past Performance.

References will be contacted by the General Services Administration requesting they fax or email the completed Past Performance Questionnaire to Ray Porter at raymondj.porter@gsa.gov by May 28, 2026, no later than (1:00pm ET).

Note: The email subject line must contain the name of the Offeror, the name of the reference and the solicitation number. The Government reserves the right to contact the identified references provided in an Offeror’s proposal should a survey not be received by the date proposals are due.

Standard for Evaluation This standard is met when the Offeror’s team demonstrates a history of successful past performance on relevant projects. Evidence of past performance as a design-build team may be considered more favorably.

The evaluation will include: an assessment of the overall quality of past performance; record of conforming to contract requirements and to standards of good workmanship; the adherence to contract schedules, including the administrative aspects of performance; the responsiveness of management; the history of reasonable and cooperative behavior and commitment to customer satisfaction; the business-like concern for the interest of the customer and; the firm’s overall performance on their contracts.

The above information will be considered based on the Past Performance Questionnaire to be provided by the references required for this factor, and additional past performance information as described:

A. In addition to the information in the Offeror’s proposal itself, the Government may consider information obtained through interviews with the Offeror’s customers and/or the building's owner or a representative of the owner.

B. In addition to any information contained in or referred to in the Offeror’s proposal, the Government may consider the past performance of the Offeror or its team members on any other projects performed within the past ten (10) years of which the Government has knowledge. The Government has no obligation to ensure that an equal number of references are obtained for each Offeror.

C. The Offeror’s safety record will be a consideration under this factor and will be evaluated based upon responses to the Past Performance Questionnaire.

D. An Offeror who has no record of past performance will receive a neutral rating.

E. If GSA receives a marginal or an unsatisfactory past performance evaluation, the Offeror may be given an opportunity to respond in writing.

Additional favorable consideration may be given for the following:

· Certificates, awards, peer recognition, etc. demonstrating design and/or construction excellence.

Evaluation of Past Performance will be a subjective assessment. The Government is seeking to determine whether the offeror has consistently demonstrated a commitment to customer satisfaction, timely delivery of services, adherence to contract schedules, subcontractor management, safety management, quality control programs, good workmanship, conformance to specifications, and fair and reasonable prices. The Government may choose to contact additional customer(s) not provided by an offeror and may obtain additional information through other sources, such as the Past Performance Retrieval System (PPIRS), and phone interviews using all DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the offeror.

The Offeror must submit a Past Performance Questionnaire (PPQ) (included in the solicitation as Attachment A, completed by the applicable client, for each project included in its proposal for Factor 1. Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), previously submitted PPQ information, and any other known sources not provided by the Offeror. While the Government may elect to consider data from a variety of sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. GSA will not maintain a database of PPQs submitted by Offerors.

FACTOR 2 – APPROACH TO DESIGN BUILD

This factor considers the Offeror’s approach to establishing a design-build team that will proactively and collaboratively work together to satisfy the Government’s performance objectives. To that end, the Government is looking for a holistic approach incorporating expertise in many areas including but not limited to architecture, engineering, interior design, sustainability, construction, operations and maintenance.

Submittal Requirement Each Offeror must submit a written narrative (not to exceed 5 pages) concerning its approach to the DB process. An Offeror may allocate the 5 pages in any manner it chooses.

Standard for Evaluation

The narrative must discuss each of the subjects set forth below. The following bullets are not subfactors; rather, they are elements the Government will consider when evaluating the Offeror’s proposal.

· Philosophy and Design Intent: The Offeror’s philosophy and design intent as related to the project that is described in the solicitation. Such a discussion may include such topics as the parameters of an overall design philosophy; the Offeror’s approach to the challenges of this specific project. The Offeror’s philosophy and design intent should be characterized by clarity, standard grammar, and the absence of clichés or jargon. The Government expects clear, thoughtful phrases that demonstrate the ability of the team to communicate ideas. The Government will evaluate whether the Offeror’s philosophy and design intent is suitable for this project.

· Management Process: The Offeror shall describe their overall management approach to DB including such topics as: roles and responsibilities of team members; description of the lines and methods of communication; decision making; interaction with consultants; the means to integrate client input; the physical location of major design and production work; work to be produced in remote offices; the role of specialty contractors; and, managing quality and cost. The Government will evaluate the probability that the Offeror’s management process will result in a cohesive and collaborative team effort.

· Stipend: Explain how the stipend will be distributed among the team members. The Government will evaluate the extent to which the Offeror will share the stipend in an equitable manner among the team members.

The standard is met when:

· The Offeror’s philosophy and design intent is suitable for this project;

· There is a satisfactory probability that the Offeror’s management process will result in a cohesive and collaborative team effort;

· There is a satisfactory probability that the Offeror will share the stipend in an equitable manner among team members.

Additional favorable consideration may be given for any of the following:

· Clearly demonstrated and defined compatible corporate values and corporate philosophies;

· The proven, successful implementation of the Management Process on any of the projects listed under Evaluation Factor 1.A;

· Entities that have developed a patented process or unique product on which the design builder intends to rely in performing the project identified in the RFQ;

· Written, binding agreements between the team members on the equitable distribution of the stipend.

FACTOR 3 - LEAD ROOF DESIGNER

Lead Roof Designer Profile and Portfolio Description

This factor considers the lead designer’s credentials and quality of project experience on projects of similar size and complexity.

Submittal Requirements:

· Provide a biographical sketch of the Lead Designer, including education, professional experience, and recognition for design efforts inclusive of the portfolio examples. Identify and describe areas of responsibility and commitment to each project. Maximum of (2) two pages.

· Lead Designer's portfolio of no more than (3) three projects completed in the last (10) years, with particular focus on high performance building and technical innovation. For each project, the narrative should address the design approach with salient features and describe how the client's program, image, mission, economic goals, schedule and operational objectives were satisfied by the overall design/planning solution. This section of the proposal should include tangible evidence such as certificates, awards, peer recognition, etc. demonstrating design excellence, and providing a client reference contact for each project, including name, title, address email, and phone numbers. For each project, the proposal may include a representative floor plan, a site plan, a rendered 3-D model, a building section, other appropriate drawings, and photographs. Each project is allotted a maximum of (2) two pages.

Standard for Evaluation

The requirements of this factor are met when:

A. Credentials are complete (education, work history); professional registration;

B. Designer demonstrates history of dedication to clients with complex building projects;

C. Designs demonstrate an understanding and response to specific client requirements and criteria; and D. Designs demonstrate a consistently high level of exploration, rigor and personal commitment to design excellence.

Additional favorable consideration may be given for:

· The quantity of projects of similar scope and complexity

· Prior experience demonstrating aspects more similar to this solicitation

· Evidence of successful past working experience with proposed team members

· Lead Designer has a track record of delivering superior quality;

· Lead Designer demonstrates history of dedication to clients with complex building projects;

· The portfolio includes a project that is of the same size, scope, and complexity as defined in Evaluation Factor 1.A.

Lead Roof Designer's Philosophy & Design Intent Description

This factor considers the lead designer’s flexibility and attitude toward design and application to meet the requirements for this project.

Submittal Requirements

The minimum submission requirements are met when the Offeror submits a statement in the Lead Designer's own words regarding the parameters of the overall design philosophy; collaborative design processes and related issues on this specific project; parameters that may apply in creating high performance, environmentally sustainable workplace environments; and a commitment to integrated and sustainable design of the facility. This section shall not exceed (1) one page in length.

Standard for Evaluation

This factor will measure the following criterion:

A. The Lead Designer’s flexibility and imaginative attitude toward design within the constraints of this project;

B. The Lead Designer's recognition of unique aspects of the subject project and a description of their design approach.

Additional favorable consideration may be given for:

· Design intent to optimize life expectancy and reduced cost of ownership;

· Design philosophy recognizes the salient aspects and constraints for this design.

FACTOR 4 - LEAD ELEVATOR DESIGNER

Lead Elevator Designer Profile and Portfolio Description

This factor considers the lead designer’s credentials and quality of project experience on projects of similar size and complexity.

Submittal Requirements:

· Provide a biographical sketch of the Lead Designer, including education, professional experience, and recognition for design efforts inclusive of the portfolio examples. Identify and describe areas of responsibility and commitment to each project. Maximum of (2) two pages.

· Lead Designer's portfolio of no more than (3) three projects completed in the last (10) years, with particular focus on high performance building and technical innovation. For each project, the narrative should address the design approach with salient features and describe how the client's program, image, mission, economic goals, schedule and operational objectives were satisfied by the overall design/planning solution. This section of the proposal should include tangible evidence such as certificates, awards, peer recognition, etc. demonstrating design excellence, and provide a client reference contact for each project, including name, title, address email, and phone numbers. For each project, the proposal may include a representative floor plan, a site plan, a rendered 3-D model, a building section, other appropriate drawings, and photographs. Each project is allotted a maximum of (2) two pages.

Standard for Evaluation

The requirements of this factor are met when:

A. Credentials are complete (education, work history); professional registration;

B. Designer demonstrates history of dedication to clients with complex building projects;

C. Designs demonstrate an understanding and response to specific client requirements and criteria; and D. Designs demonstrate a consistently high level of exploration, rigor and personal commitment to design excellence.

Additional favorable consideration may be given for:

· The quantity of projects of similar scope and complexity

· Prior experience demonstrating aspects more similar to this solicitation

· Evidence of successful past working experience with proposed team members

· Lead Designer has a track record of delivering superior quality;

· Lead Designer demonstrates history of dedication to clients with complex building projects;

· The portfolio includes a project that is of the same size, scope, and complexity as defined in Evaluation Factor 1.A.

Lead Elevator Designer's Philosophy & Design Intent Description

This factor considers the lead designer’s flexibility and attitude toward design and application to meet the requirements for this project.

Submittal Requirements

The minimum submission requirements are met when the Offeror submits a statement in the Lead Designer's own words regarding the parameters of the overall design philosophy; collaborative design processes and related issues on this specific project; parameters that may apply in creating high performance, environmentally sustainable workplace environments; and a commitment to integrated and sustainable design of the facility. This section shall not exceed (1) one page in length.

Standard for Evaluation

This factor will measure the following criterion:

A. The Lead Designer’s flexibility and imaginative attitude toward design within the constraints of this project;

B. The Lead Designer's recognition of unique aspects of the subject project and a description of their design approach.

Additional favorable consideration may be given for:

· Design intent to optimize life expectancy and reduced cost of ownership;

· Design philosophy recognizes the salient aspects and constraints for this design.

Phase II

Proposals must address the technical approach, technical qualifications, and the other Phase 2 evaluation factors stated herein. Any proposal not meeting all of the following criteria may result in not being further considered for award.

I. Evaluation Factors:

Factor 1 - Design Concept Factor 2 - Key Personnel Factor 3 - Management Plan

II. Evaluation Factors Defined:

EVALUATION FACTOR 1: Design Concept

Description:

The objective of this factor is to evaluate the extent to which the Design Proof of Concept demonstrates how the Offeror will:

· Meet the minimum performance requirements set forth in the RFP,

· Comply with prescriptive requirements set forth in the RFP, and

· Bring innovation, purpose, and vision indicative of an excellence project as evidenced by Design Quality.

Submittal Requirements:

Offeror shall submit the following:

1. Submission of Proof of Concept

Offerors shall provide the information and generally follow the format and structure as set forth in Appendix A (below) to the Phase 2 RFP.

2. Betterments

The Offeror shall include a section entitled “Betterments” in their proposal. For purposes of this evaluation factor, “Betterment” is defined as any element, component or system, which exceeds the minimum performance requirements set forth in the RFP and/or includes the addition of features or amenities that exceed the minimum Program of Requirements.

If Betterments are offered, they must:

· meet or exceed the requirements specified in the RFP;

· enhance the overall quality and performance of the project;

· be clearly identified as Betterments in the proposal;

· be identified by document and page reference to the minimum requirements to be exceeded;

· state the higher performance tier that the Betterment will provide;

· identify any potential conflicts between the Betterment and the minimum requirements; and

· state the anticipated benefit of any such Betterment (e.g., improved functionality or maintainability).

· clearly show cost impact

· clearly show schedule impact

Any Betterment not specifically identified by the Offeror in this section will not be evaluated. If the Offeror is not providing any Betterment, the Offeror must indicate “None” in this section of its submission.

Evaluators will consider the quality, impact and relative significance of each betterment, not the quantity offered.

The page limit for the Betterment submittal is six (6).

3. Design Quality

The following list identifies characteristics of design that the Government will use to evaluate the probability that the Offeror’s Design Concept will achieve the innovation, purpose, and vision. Offerors may provide an additional narrative (not to exceed four pages) to provide additional information to explain how the Design Concept provides for Design Quality.

Design Concept Submission will be reviewed for;

· Roofing System Design Analysis

· Elevator Modernization Design Analysis

· Building Systems Integration Analysis

· Security Analysis

Additional considerations;

· Functionality: The extent to which the Offeror’s Design Concept focuses on simplicity, architectural design and integration of Government Furnished Equipment in the building as characterized by simplicity of design, ease of access and maintainability, and considerations for safety, clear paths of travel and ease of operations.

· Performance: The extent to which the Offeror’s Design Concept provides due consideration to areas such as, performance of the integration of the controls systems and software, energy, water and material efficiency, sustainability factors, ease of operations and facility maintenance.

· Quality: The extent to which the Offeror’s Design Concept considers the quality of materials and finishes, ceiling heights, and provides for functional design that meets primary function but also provides for secondary or tertiary amenities.

· Architectural Design: The extent to which the Offeror’s Design Concept considers the function driving the form and its inclusion/orientation of enhancing features which may include, wayfinding, lighting, and other progressive design strategies.

Standard for Evaluation:

This standard is met when the Design Concept evidences a satisfactory probability that the Offeror will be able to meet the:

· meet the minimum performance requirements set forth in the RFP;

· comply with prescriptive requirements set forth in the RFP, and

· bring innovation, purpose, vision

Additional favorable consideration may be given for the following:

· The quality, impact and relative significance of the Betterments that exceeds the minimum performance and prescriptive requirements.

EVALUATION FACTOR 2: Qualifications and Past Performance of Key Personnel Description:

This factor considers the qualifications and past performance of the Offeror’s key personnel with design-build or integrated project delivery methods. The Government will evaluate the probability that the Offeror’s key personnel will be able to successfully manage the execution of the project. Aspects of consideration include education, experience, training, and the response of the references.

Submittal:

Each Offeror must submit data evidencing the key personnel’s qualifications as set forth in this evaluation factor. This may be provided in any manner that the Offeror chooses and may include, for example, a resume or curriculum vitae. There is a fifteen-page limit for this evaluation factor, including reference information. An Offeror may allocate the pages in any manner it chooses.

Key Personnel should include Principal-In-Charge, Project Manager (design), Project Manager (construction), Construction Superintendent, and Quality Control/Assurance Coordinator (roofs), Quality Control / Assurance Coordinator (elevators).

Each person submitted under this evaluation factor must have worked on at least two (2) projects of similar size, scope, and complexity in the same or similar capacity as one of the key personnel positions described in this evaluation factor. (For purposes of this evaluation factor, the phrase “similar size, scope, and complexity” has the same meaning as that used in Evaluation Factor 1 of Phase 1.) For instance, on the prior project, the key person served in the capacity as the Project Manager, but for the purposes of this evaluation factor, that same person is being proposed as the principal-in-Charge. In such an instance, the proposed person may, depending upon the qualifications, be able to satisfy this requirement.

For each key person, the Offeror shall provide reference information for at least two (2) projects of similar size, scope, and complexity in the same or similar capacity as one of the key personnel positions described in this evaluation factor.

Standard for Evaluation:

The standard is met when the qualifications and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .