31-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf

PDF 54 KB Posted

Attached to
Bristol Borough 2025 CDBG Curb Ramp Program
Solicitation number
US.193830
Issued by
Bucks County, Brodheadsville CDP, Pennsylvania

View the file

Other files

File Type Posted
13-Doc 00 73 00 1 - Appendix A cover sht.pdf PDF
49-Doc 00 73 00 5 - Appendix C cover sht.pdf PDF
63-Addendum 1 Doc 00 73 00 2 - Appendix A - Davis Bacon Wage Rates.pdf PDF
27-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
25-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
55-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
17-Sec 32 17 26 - ADA DETECTABLE WARNING SURFACE.pdf PDF
12-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
42-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
50-Sec 01 32 16 - NARRATIVE CONSTRUCTION SCHEDULE.pdf PDF
7-Sec 10 14 53 - POST MOUNTED SIGNS.pdf PDF
53-Sec 02 41 16 - DEMOLITION.pdf PDF
10-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
18-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
36-Doc 00 73 00 10 Part 2 Federal Labor Standard Provisions.pdf PDF
40-Doc 00 73 00 3 - Appendix B cover sht.pdf PDF
37-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
35-Doc 00 91 13 - ADDENDA.pdf PDF
22-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
3-Doc 00 43 13 - BID BOND.pdf PDF
26-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
46-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
8-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
57-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
20-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
32-Sec 32 92 00 - FINISH GRADING, SEEDING, AND SODDING.pdf PDF
4-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf PDF
61-Addendum 1.pdf PDF
15-Doc 00 21 13.1 - INSTRUCTIONS FOR ELECTRONIC BIDDING.pdf PDF
34-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
51-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
64-2025-08-05 2025 CDBG Curb Ramp Program Preliminary Bid Tab.pdf PDF
9-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
14-Sec 03 30 00 - CAST IN PLACE CONCRETE.pdf PDF
30-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
41-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
24-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
2-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
44-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
21-Doc 00 73 00 2 - Appendix - Davis Bacon Wage Rates.pdf PDF
5-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
47-Sec 01 33 00 - SUBMITTALS.pdf PDF
39-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
6-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
58-Location Map.pdf PDF
62-Addendum 1 Doc 00 45 13.1 - CONTRACTOR RESPONSIBILITY CERTIFICATION (REV).pdf PDF
29-Doc 00 73 00 7 - Appendix D cover sht.pdf PDF
60-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
16-Doc 00 01 10-TOC.pdf PDF
38-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUDIO-VIDEOTAPING

01 32 36-1

SECTION 01 32 36

AUDIO-VIDEOTAPING

PART 1 GENERAL

1.01 DESCRIPTION

A. Contractor shall utilize a professional electrographer who is actively engaged in preparation of color DVD or CD recordings for municipal construction projects, similar to the Work included in this Contract.

1.02 QUALITY ASSURANCE

A. Owner may make such investigations as Owner deems necessary to determine the ability of the electrographer to perform the work. Contractor shall furnish to Owner all such information and data for this purpose as requested by Owner. Owner reserves the right to reject any electrographer if the investigation of such electrographer fails to satisfy Owner that such electrographer is properly qualified to carry out the work specified herein. Upon rejection of an electrographer by Owner, Contractor shall engage the services of another electrographer, who shall be subject to a similar review and approval process by Owner specified herein, prior to approval by Owner.

B. No construction shall begin prior to review and approval of the DVD’s and/or CD’s covering the existing conditions of the entire project area by Owner’s Engineer. Any recordings that are unacceptable to Owner’s Engineer shall be re-recorded by the electrographer at no additional charge.

All DVD’s and/or CD’s and written records shall become the property of Owner, upon approval and acceptance.

1.03 SUBMITTALS

A. Two (2) complete copies of project DVD’s and/or CD’s shall be provided to Owner’s Engineer for approval.

1.04 JOB CONDITIONS

A. All recording shall be performed during days when good visibility is available. No recording shall be done during when more than ten (10) percent of the project’s ground area is covered with snow, unless otherwise authorized by Owner’s Engineer.

PART 2 PRODUCTS

2.01 EQUIPMENT

A. Mobile Unit

When conventional wheeled vehicles are used, the distance from the camera lens to the ground shall be at least twelve (12) feet in order to ensure that the proper perspective is obtained. In some instances, recorded coverage will be required in areas not accessible by conventional wheeled vehicles. In that case, such coverage shall be obtained by walking or special conveyance approved by Owner’s Engineer.

B. Camera

Video output from the camera used must be capable of producing NTSC-525 lines/60 field. Video output shall provide resolution in the “Y” channel, minimum 500 TV lines at center, utilizing a bias lit beam split prism, in combination with a professional and/or industrial charge-coupled device (CCD) camera, for optimum color imagery and minimum lag through 3.1 meter-candles (10 foot-candles), with geometric distortion not to exceed 1.5% of picture height at any point in the picture area.

C. Audio-video recording medium

Contractor’s electrographer shall utilize professional-grade DVD or CD recording equipment in the preparation of the project recordings. Contractor’s electrographer shall provide a sufficient quantity of DVD’s or CD’s to properly and completely record the work. DVD’s and/or CD’s shall become the property of Owner at the completion of the project.

AUDIO-VIDEOTAPING

01 32 36-2

D. Lighting

Contractor shall provide, if necessary, all lighting and power that is required to fill in any “shadow” areas caused by trees, signs, structures, or other objects.

2.02 RECORDED INFORMATION

A. Audio

Each DVD or CD shall begin with the current date, project name and municipality, and be followed by the general location (intersecting street, municipal boundary line, etc.). The viewing side and direction of progress (northerly, southeasterly, etc.) shall also be included.

B. Video

Periodic transparent alpha-numeric information consisting of the project name, description of area covered, direction of travel, viewing side, etc. shall appear on the screen. All video recordings shall, by electronic means, display continuously and simultaneously generated transparent digital information to include the date and time of recording. The date information shall contain the month, day and year (i.e. 4/15/11) and shall be placed directly below the time information. The time information shall consist of hours, minutes and seconds, separated by colons (i.e. 11:42:22). This transparent information shall appear on the extreme upper left hand third of the screen (or as approved by Owner’s Engineer).

C. Audio-Video Tracks

The DVD or CD shall consist of both visual and audio information, recorded simultaneously. Tracks shall consist of original live recordings and shall not be copies of previous recordings. Audio track shall contain the narrative commentary of the electrographer, recorded simultaneously with his fixed elevation visual record of construction. Owner’s Engineer shall have the option of recording comments on the audio track.

PART 3 EXECUTION

3.01 DVD OR CD COVERAGE

A. The entire project site shall be recorded. The zone of influence shall be extended a minimum of 15 feet from each side of each roadway designated to receive a mill and overlay.

B. Recorded coverage shall include all surface features located within the above mentioned area supported by appropriate audio description. Audio description shall be made simultaneously with video coverage. Such coverage shall include, but not be limited to, all existing driveways, road surface, sidewalks, signs, drainage culverts, visible utilities, retaining walls, railroad grade crossing features, parking areas, curbs, and drainage ditches located within the zone of influence.

C. When applicable, house numbers shall be used to identify houses or other buildings, in such a manner that proposed system structures (i.e. manholes) may be located by reference.

D. The rate of speed in the direction of travel of conveyance shall not exceed 48 feet per minute.

Panning rates and zoom rates shall be controlled sufficiently so that object clarity will not be obscured during playback.

3.02 IDENTIFICATION

A. All DVD’s or CD’s (on the disk and on storage cases) shall be properly identified by number, location, date, project name, and municipality in a manner acceptable to Owner’s Engineer.

B. A record of the contents of each DVD or CD shall be supplied by a sheet identifying each segment in the disk by location. This shall include roll number, street or road viewing, tape counter number, viewing side, starting point, traveling direction and ending destination point.

END OF SECTION