This file is a three-year asbestos inspection report for the VA San Diego Jennifer Moreno Medical Center documenting the presence and condition of asbestos-containing materials (ACM) across multiple buildings and floor levels. The inspection, conducted between October 16 and December 5, 2023 (Millennium Project No. 22004.2200), includes comprehensive photographic documentation and laboratory analysis of suspect materials. Key findings indicate widespread presence of chrysotile asbestos in fireproofing materials (ranging from 12-18% asbestos content), thermal system insulation (TSI) elbows, valves, blankets, and floor tile mastic throughout Building 1's interstitials (1st through 6th floors) and the penthouse, as well as in Building 11. The inspection reveals significant damage to positive ACM materials caused by foot traffic, cable runs, hardware installations, and general facility maintenance activities, with debris observed in multiple high-traffic areas including catwalks.

The laboratory analysis performed by EMSL Analytical, Inc. using polarized light microscopy and AHERA methodology confirmed chrysotile asbestos in dark gray fireproofing samples with yellow or red encapsulation, while several newer application gray fireproofing samples tested negative for asbestos. Damaged materials identified include non-encapsulated fireproofing on structural beams, hard-packed TSI on pipes and fittings often concealed under canvas or paper wrapping, and asbestos-containing mastic beneath non-ACM floor tiles. The report documents that overlaid materials such as hardware cloth, cabling, and utility installations rest directly on or contact ACM surfaces, creating ongoing damage and potential for fiber release. This inspection data directly relates to the solicitation for ceiling-mounted patient lifts at the facility, as installation work will require careful coordination to avoid disturbance of identified ACM materials during equipment installation and removal activities.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 1 Photo Log – Damaged Positive Materials – 5th Floor Interstitial

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/19/2023

Photo No 1. Photo No 2. Photo No 3.

Description: Damaged fireproofing at floor beam. Note debris.

Description: A damaged section of red painted, dark grey fireproofing.

Description: Another photo showing damaged fireproofing. Note the debris in the foreground.

Photo No 4. Photo No 5. Photo No 6.

Description: This hard packed valve on a steam line is damaged, and in a high traffic area over the catwalk. Some debris were observed underneath the valve.

Description: These cables have caused damage to this fireproofing – a common theme.

Description: This TSI elbow is significantly damaged.

Building 1 Photo Log – Fireproofing Photos – 5th Floor

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/19/2023

Photo No 1. Photo No 2. Photo No 3.

Description: Red painted dark grey fireproofing located in the east wing.

Description: White encapsulated dark gray fireproofing. Note the overspray on the concrete decking.

Description: Red painted dark grey fireproofing.

Photo No 4. Photo No 5. Photo No 6.

Description: While this encapsulated overspray is delaminating and considered to be damaged, the view provides an illustration of the substrate (concrete here) that the fireproofing was applied to.

Description: Encapsulated dark grey fireproofing is seen on the truss member, which is also painted red. The same fireproofing can be seen in the form of overspray on the concrete decking.

Description: This partially abated/damaged fireproofing shows a cross sectional cut of a typical fireproofing application. This fireproofing is red painted, white encapsulated and dark grey in color.

Building 1 Photo Log – Homogeneous Positive Materials – 5th Floor

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/19/2023

Photo No 1. Photo No 2. Photo No 3.

Description: A good view of externally fastened hangers which typically have hard packed TSI directly beneath the paper covering them.

Description: Several hard packed TSI elbows.

Description: A larger TSI elbow.

Photo No 4. Photo No 5. Photo No 6.

Description: Brown duct mastic which would be covered by insulation had it not been damaged by traffic.

Description: Another view of brown duct mastic.

Description: Seen in this image is a damaged hard packed TSI tee. The makeup of these hard packed tee’s, elbows, and other fittings show what is normally hidden behind a canvas wrap.

Building 1 Photo Log – Misc Images – 5th Floor

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/19/2023

Photo No 1. Photo No 2. Photo No 3.

Description: This water line was tapped into while this inspection was ongoing. While the workers did not disturb any ACM, there is TSI present on this line that is positive several feet away. TSI elbows were abated in this area, but the much less obvious hard pack hidden under paper / canvas wrap was not.

Description: The hard pack mentioned in the previous photo is seen here at each of these external metal hangers.

Description: Damaged insulation on a water line. Common to see in trafficked areas such as this catwalk when unprotected.

Photo No 4. Photo No 5. Photo No 6.

Description: Another photo displaying damage to non-protected thermal system insulation (TSI). An elbow in this location is no longer present and / or significantly damaged. Note the debris directly on the catwalk.

Description: These TSI elbows appear to only have fiberglass insulation on them.

However, the interior side of the elbows have hard packed ACM TSI. This is unusual and easy to overlook. This area was abated of ACM elbows, but overlooked these.

Description: A view of cabling running under the catwalk.

Building 1 Photo Log – Damaged ACM– 6th Floor

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/17/2023

Photo No 1. Photo No 2. Photo No 3.

Description: Loose ACM fireproofing debris.

Description: TSI Debris and ACM blanket. Description: Damaged TSI wrap around pipe with ACM debris.

Photo No 4. Photo No 5. Photo No 6.

Description: Loose ACM fireproofing debris

Description: Damaged asbestos wrap around valves.

Description: Damaged TSI underneath wire mesh and cables.

Building 1 Photo Log – Fireproofing Photos – 6th Floor

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/19/2023

Photo No 1. Photo No 2. Photo No 3.

Description: View of dark grey fireproofing on truss.

Description: Close-up view of new application (negative) blue stained fireproofing with white encapsulant.

Description: View of red painted fireproofing on beam at decking (ceiling) in an air handling unit.

Photo No 4. Photo No 5. Photo No 6.

Description: New application grey fireproofing with poor cohesion.

Description: White encapsulated dark grey fireproofing next to the same fireproofing painted red.

Description: Another view of red painted dark grey fireproofing with white encapsulant adjacent to the same substrate (dark grey fireproofing).

Building 1 Photo Log – Misc Images – Penthouse

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/16/2023

Photo No 1. Photo No 2. Photo No 3.

Description: Positive TSI elbows. Description: View of elevator Rm. 8000.

The drywall / joint compound is positive in the soffits and non – plaster walls. Positive fireproofing is encased within the soffits.

Description: A view into a cutout portion of the ACM drywall soffits revealing the positive ACM dark grey fireproofing within.

Photo No 4. Photo No 5. Photo No 6.

Description: ACM TSI hard packed elbow.

Also present but not visible under the paper wrap surrounding the TSI is hard packed ACM segments.

Description: Visible in this photo is a large ACM TSI elbow, bottom right. Rm. 8000.

Description: Another view of TSI runs / laterals which contain hard packed positive sections. To recognize these areas, workers need to squeeze / probe for hard packed sections – in nearly all cases, the majority of areas will be soft and easily yield to hand pressure, indicating fiberglass insulation is likely below the paper wrap of the TSI.

Building 1 Photo Log – Damaged Positive Materials – 1st Floor

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/17/2023

Photo No 1. Photo No 2. Photo No 3.

Description: Wooden boards forming a work platform resulting in damage to the non-encapsulated dark gray fireproofing – north-west

Description: Damaged insulation on decking with encapsulated fireproofing.

Throughout interstitial, largely concentrated in the north-west

Description: Various cabling using TSI blanket as anti-abrasion padding.

Distributed throughout interstitial

Photo No 4. Photo No 5. Photo No 6.

Description: Damaged white encapsulated dark grey fireproofing where workers erected a platform – 1st floor interstitial north-west end

Description: Damaged red painted dark grey fireproofing – north-west end Rm. 1011A

Description: Hardware cloth (wire mesh) resting directly on dark grey fireproofing resulting in damage. Throughout interstitial adjacent to catwalks.

Building 1 Photo Log – Damaged Positive Materials – 1st Floor

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/17/2023

Photo No 7. Photo No 8. Photo No 9.

Description: Damaged dark grey fireproofing / red painted dark grey fireproofing. North-west at Rm. A1011A.

Description: Damaged dark grey fire / red painted dark grey fireproofing on top of beam at catwalk level. Prevalent throughout.

Cables can be seen directly contacting the fireproofing.

Description: Additional photo of white encapsulated dark grey fireproofing being damaged by cabling. Prevalent throughout.

Photo No 10. Photo No 11. Photo No 12.

Description: Damaged dark grey fireproofing at catwalk level. Prevalent throughout. Much of this damage appears to be from said beams being walked on to access areas off the catwalk.

Description: Damaged dark grey fireproofing on beam in front of mechanical room door marked “ST9”. Likely caused by foot traffic.

Description: White TSI blanket taped on to HVAC ductwork to prevent head injuries.

Building 1 Photo Log – Damaged Positive Materials – 2nd Floor

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/17/2023

Photo No 1. Photo No 2. Photo No 3.

Description: Damaged fireproofing on beam at catwalk level. Bare steel can be seen.

Description: Damaged fireproofing on catwalk. This truss component is typically covered by a metal plate, but as seen in this example, this is sometimes not the case.

Even when covered, the cover rests on the fireproofing and damages it over time.

Description: Hardware cloth and utilities resting on fireproofing.

Photo No 4. Photo No 5. Photo No 6.

Description: New hangers for CAT-6 cabling have been drilled or otherwise fastened to the concrete decking, disturbing fireproofing.

Description: A close-up view of a damaged section of fireproofing on a floor beam.

Rusty steel can be seen.

Description: This floor beam shows some damage at the topmost area. This is a common form of damage seen throughout the interstitials from cables or workers walking on the beams to access areas off of the catwalk.

Building 1 Photo Log – Damaged Positive Materials – 3rd Floor

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/18/2023

Photo No 1. Photo No 2. Photo No 3.

Description: Damaged red painted dark gray fireproofing. Cables can be seen running directly across this truss component, and likely caused the damage.

Description: Another photo showing fireproofing damage. The steel on this beam is visible. A cable can be seen touching the member.

Description: A damaged TSI elbow is shown here. The white, chalky substance is where the asbestos is located, and is normally covered by canvas or paper wrap.

Photo No 4. Photo No 5. Photo No 6.

Description: Another view showing both hardware cloth and cabling running over a structural beam covered with damaged fireproofing. Exposed steel is visible.

Description: A significantly damaged TSI elbow.

Description: Hangers being installed during the survey resting on fireproofing covered members during installation.

Building 1 Photo Log – Damaged Positive Materials – 4th Floor

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/18/2023

Photo No 1. Photo No 2. Photo No 3.

Description: Cables running over a beam covered with white encapsulated dark grey fireproofing.

Description: Dark grey, red painted fireproofing significant fireproofing damage.

Bare steel of the member can be readily seen.

Description: Newer CAT cables seen running over an I beam with dark grey fireproofing.

Photo No 4. Photo No 5. Photo No 6.

Description: View of dark grey fireproofing covered with hardware cloth and various utilities. This is a common cause of damage to fireproofing, especially directly adjacent and parallel to the catwalks.

Description: Another view of damaged fireproofing likely caused by cable runs.

Also visible is red painted cover over the bottom member of the truss. Note the proximity of the fireproofing to this cover – another commonly damaged area.

Description: New cable runs secured to positive fireproofing resulting in minor damage and potential for future damage if the cables cause friction.

Building 1 Photo Log – Damaged Positive Materials – 5th Floor

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/19/2023

Photo No 1. Photo No 2. Photo No 3.

Description: Damaged fireproofing at floor beam. Note debris.

Description: A damaged section of red painted, dark grey fireproofing.

Description: Another photo showing damaged fireproofing. Note the debris in the foreground.

Photo No 4. Photo No 5. Photo No 6.

Description: This hard packed valve on a steam line is damaged, and in a high traffic area over the catwalk. Some debris were observed underneath the valve.

Description: These cables have caused damage to this fireproofing – a common theme.

Description: This TSI elbow is significantly damaged.

Building 1 Photo Log – Damaged ACM– 6th Floor Interstitial

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location:

VA San Diego Building 1

3350 La Jolla Village Dr, San Diego, CA 92161

Millennium Project No. 22004.2200

Date: 10/17/2023

Photo No 1. Photo No 2. Photo No 3.

Description: Loose ACM fireproofing debris.

Description: TSI Debris and ACM blanket. Description: Damaged TSI wrap around pipe with ACM debris.

Photo No 4. Photo No 5. Photo No 6.

Description: Loose ACM fireproofing debris

Description: Damaged asbestos wrap around valves.

Description: Damaged TSI underneath wire mesh and cables.

Building 11 Photo log- Miscellaneous- 1st Floor

Project Name:

VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey

Site Location: Building 11 Veteran Affairs Jennifer Moreno

Medical Center 3350 La Jolla Village Drive

La Jolla, CA 92161

Millennium Project No. 22004.2200

Date: 12/5/2023

Photo No 1. Photo No 2. Photo No 3.

Description: Damaged non-ACM floor-tile in hallway with asbestos containing mastic exposed beneath.

Description: Damaged non-ACM floor-tile in waiting room with asbestos containing mastic beneath.

Description: Damaged non-ACM floor-tile in waiting-room with asbestos containing mastic beneath.

Photo No 4. Photo No 5. Photo No 6.

Description: Damaged non-ACM floor-tile in hallway near B127 with asbestos containing mastic beneath.

Description: Damaged non-ACM floor-tile in hallway with asbestos containing mastic beneath.

Description: Damaged non-ACM floor-tile in hallway near IA117 with asbestos containing mastic exposed beneath.

Three Year ACM Inspection Department of Veterans Affairs-San Diego Millennium Project No. 22004.2200 -141- 22004.2200

Appendix C

Laboratory Analytical Reports

And Chain of Custody Documents

EMSL Analytical, Inc.

8145 Ronson Road, Suite B San Diego, CA 92111

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302285EMSL Order:

Customer ID: MECA62

Customer PO: 021623-KC

Project ID:

Attention: Phone:Jenice Feiner

Fax:Millennium Consulting Associates, Inc.

Received Date:4683 Chabot Drive, Suite 380 02/17/2023 9:15 AM

Analysis Date:Pleasanton, CA 94588 02/17/2023 - 02/21/2023

Collected Date:

Project: 22004.2199 / 021623-KC

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.16.23-54-1

432302285-0001

15% ChrysotileNon-fibrous (Other)85%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

YELLOW

ENCAPSULATED

DARK GRAY

FIREPROOFING

02.16.23-54-2

432302285-0002

12% ChrysotileNon-fibrous (Other)88%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING ON

COLUMN

02.16.23-54-3

432302285-0003

None DetectedNon-fibrous (Other)30%Min. Wool70%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION GRAY

FIREPROOFING

WITH POOR

COHESION

02.16.23-54-4

432302285-0004

18% ChrysotileNon-fibrous (Other)82%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING ON

COLUMN

02.16.23-54-5

432302285-0005

16% ChrysotileNon-fibrous (Other)84%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

YELLOW

ENCAPSULATED

DARK GRAY

FIREPROOFING

02.16.23-54-6

432302285-0006

18% ChrysotileNon-fibrous (Other)82%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING ON

LOWER BEAM

02.16.23-54-7

432302285-0007

None DetectedNon-fibrous (Other)35%Min. Wool65%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION GRAY

FIREPROOFING

02.16.23-54-8

432302285-0008

None DetectedNon-fibrous (Other)20%Min. Wool80%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION GRAY

FIREPROOFING

Report amended: 05/11/2023 10:36:52 Replaces amended report from: 05/06/2023 16:38:54 Reason Code: Client-Change to PO

Page 1 of 3ASB_PLM_0008_0001 - 1.78 Printed: 5/11/2023 10:37 AM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302285EMSL Order:

Customer ID: MECA62

Customer PO: 021623-KC

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.16.23-54-9

432302285-0009

18% ChrysotileNon-fibrous (Other)82%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

YELLOW

ENCAPSULATED

DARK GRAY

FIREPROOFING

02.16.23-54-10

432302285-0010

18% ChrysotileNon-fibrous (Other)82%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

YELLOW

ENCAPSULATED

DARK GRAY

FIREPROOFING

02.16.23-54-11

432302285-0011

18% ChrysotileNon-fibrous (Other)82%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING

02.16.23-54-12

432302285-0012

18% ChrysotileNon-fibrous (Other)82%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING

WITH YELLOW

ENCAPSULANT

02.16.23-54-13

432302285-0013

18% ChrysotileNon-fibrous (Other)82%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

YELLOW

ENCAPSULATED

DARK GRAY

FIREPROOFING

02.16.23-54-14

432302285-0014

None DetectedNon-fibrous (Other)20%Min. Wool80%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION GRAY

FIREPROOFING

02.16.23-54-15

432302285-0015

18% ChrysotileNon-fibrous (Other)82%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DARK GRAY

FIREPROOFING

02.16.23-54-16

432302285-0016

15% ChrysotileNon-fibrous (Other)85%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DARK GRAY

FIREPROOFING

02.16.23-54-17

432302285-0017

None DetectedNon-fibrous (Other)100%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DARK GRAY

FIREPROOFING

02.15.23-54-18

432302285-0018

<1% ChrysotileNon-fibrous (Other)100%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING ON

CROSS BRACE

02.15.23-54-19

432302285-0019

20% ChrysotileNon-fibrous (Other)80%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING

Report amended: 05/11/2023 10:36:52 Replaces amended report from: 05/06/2023 16:38:54 Reason Code: Client-Change to PO

Page 2 of 3ASB_PLM_0008_0001 - 1.78 Printed: 5/11/2023 10:37 AM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302285EMSL Order:

Customer ID: MECA62

Customer PO: 021623-KC

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.15.23-54-20

432302285-0020

15% ChrysotileNon-fibrous (Other)85%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING

02.15.23-54-21

432302285-0021

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION GRAY

FIREPROOFING ON

FLOOR BEAM

02.15.23-54-22

432302285-0022

None DetectedNon-fibrous (Other)90%Glass10%Gray

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION GRAY

FIREPROOFING

02.15.23-54-23

432302285-0023

15% ChrysotileNon-fibrous (Other)85%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

WHITE

ENCAPSULATED

DARK GRAY

FIREPROOFING

02.15.23-54-24

432302285-0024

None DetectedNon-fibrous (Other)85%Cellulose15%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION GRAY

FIREPROOFING

02.15.23-54-25

432302285-0025

None DetectedNon-fibrous (Other)80%Cellulose

Glass

10%

10%

Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION GRAY

FIREPROOFING ON

BEAM AT DECKING

02.15.23-54-26

432302285-0026

None DetectedNon-fibrous (Other)75%Cellulose

Glass

10%

15%

Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION GRAY

FIREPROOFING

02.15.23-54-27

432302285-0027

None DetectedNon-fibrous (Other)75%Cellulose

Glass

10%

15%

Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION GRAY

FIREPROOFING

Analyst(s)

Amber Phan (9)

Dalia Rodriguez (9)

Joseph Gutierrez (9)

Riva Alger, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. San Diego, CA NVLAP Lab Code 200855-0, CA ELAP 2713, HI L-09-03

Report amended: 05/11/2023 10:36:52 Replaces amended report from: 05/06/2023 16:38:54 Reason Code: Client-Change to PO

Page 3 of 3ASB_PLM_0008_0001 - 1.78 Printed: 5/11/2023 10:37 AM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302464EMSL Order:

Customer ID: MECA62

Customer PO: 2.21.23-KC

Project ID:

Attention: Phone:Jenice Feiner

Fax:Millennium Consulting Associates, Inc.

Received Date:4683 Chabot Drive, Suite 380 02/21/2023 2:00 PM

Analysis Date:Pleasanton, CA 94588 02/23/2023

Collected Date:

Project: 22004.2199 / 2.21.23-KC

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.17.23-54-28

432302464-0001

18% ChrysotileNon-fibrous (Other)82%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

CATWALK - WHITE

ENCAPSULATED

DARK GRAY

FIREPROOFING

02.17.23-54-29

432302464-0002

18% ChrysotileNon-fibrous (Other)82%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

CATWALK - WHITE

ENCAPSULATED

DARK GRAY

FIREPROOFING

02.17.23-54-30

432302464-0003

None DetectedPerlite

Non-fibrous (Other)

10%

65%

Min. Wool25%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION GRAY

FIREPROOFING

02.17.23-54-31

432302464-0004

None DetectedNon-fibrous (Other)80%Cellulose20%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION DARK

GRAY

FIREPROOFING ON

BEAM DECKING

02.17.23-54-32

432302464-0005

None DetectedNon-fibrous (Other)85%Cellulose15%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION DARK

GRAY

FIREPROOFING

02.17.23-54-33

432302464-0006

None DetectedNon-fibrous (Other)70%Cellulose30%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION DARK

GRAY

FIREPROOFING ON

FLOOR BEAM

02.17.23-54-34

432302464-0007

18% ChrysotileNon-fibrous (Other)82%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING

02.17.23-54-35

432302464-0008

None DetectedPerlite

Non-fibrous (Other)

10%

65%

Min. Wool25%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION GRAY

FIREPROOFING

Report amended: 05/06/2023 16:54:10 Replaces initial report from: 02/23/2023 13:49:35 Reason Code: Client-Change to PO

Page 1 of 4ASB_PLM_0008_0001 - 1.78 Printed: 5/6/2023 4:54 PM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302464EMSL Order:

Customer ID: MECA62

Customer PO: 2.21.23-KC

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.17.23-54-36

432302464-0009

16% ChrysotileNon-fibrous (Other)84%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING ON

COLUMN

02.17.23-54-37

432302464-0010

18% ChrysotileNon-fibrous (Other)82%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

CATWALK - WHITE

ENCAPSULATED

DARK GRAY

FIREPROOFING

02.17.23-54-38

432302464-0011

None DetectedNon-fibrous (Other)85%Cellulose15%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION DARK

GRAY

FIREPROOFING

02.17.23-54-39

432302464-0012

None DetectedNon-fibrous (Other)72%Cellulose28%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION DARK

GRAY

FIREPROOFING

02.17.23-54-40

432302464-0013

None DetectedNon-fibrous (Other)70%Cellulose30%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

NEWER

APPLICATION GRAY

FIREPROOFING

02.17.23-54-41

432302464-0014

None DetectedNon-fibrous (Other)85%Cellulose15%Blue

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

WHITE

ENCAPSULATED

BLUE STAINED

FIREPROOFING ON

LATERAL BRACE

02.17.23-54-42

432302464-0015

None DetectedNon-fibrous (Other)85%Cellulose15%Blue

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

WHITE

ENCAPSULATED

BLUE STAINED

FIREPROOFING

02.17.23-54-43

432302464-0016

15% ChrysotileNon-fibrous (Other)85%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

GREEN PAINTED

DARK GRAY

FIREPROOFING

02.17.23-54-44

432302464-0017

15% ChrysotileNon-fibrous (Other)85%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING

02.17.23-54-45

432302464-0018

15% ChrysotileNon-fibrous (Other)85%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

WHITE

ENCAPSULATED

BLUE STAINED

FIREPROOFING

Report amended: 05/06/2023 16:54:10 Replaces initial report from: 02/23/2023 13:49:35 Reason Code: Client-Change to PO

Page 2 of 4ASB_PLM_0008_0001 - 1.78 Printed: 5/6/2023 4:54 PM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302464EMSL Order:

Customer ID: MECA62

Customer PO: 2.21.23-KC

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.17.23-54-46

432302464-0019

20% ChrysotileNon-fibrous (Other)80%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING

02.17.23-54-47

432302464-0020

14% ChrysotileNon-fibrous (Other)86%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL

-DARK GRAY

FIREPROOFING

02.17.23-54-48

432302464-0021

15% ChrysotileNon-fibrous (Other)85%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

CATWALK - WHITE

ENCAPSULATED

DARK GRAY

FIREPROOFING ON

LATERAL BRACE

02.17.23-54-49

432302464-0022

17% ChrysotileNon-fibrous (Other)83%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING

02.17.23-54-50

432302464-0023

16% ChrysotileNon-fibrous (Other)84%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING ON

COLUMN

02.17.23-54-51

432302464-0024

14% ChrysotileNon-fibrous (Other)86%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

CATWALK - WHITE

ENCAPSULATED

DARK GRAY

FIREPROOFING

02.17.23-54-52

432302464-0025

18% ChrysotileNon-fibrous (Other)82%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING

02.17.23-54-53

432302464-0026

20% ChrysotileNon-fibrous (Other)80%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING

02.17.23-54-54

432302464-0027

None DetectedNon-fibrous (Other)70%Cellulose30%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING

02.17.23-54-55

432302464-0028

15% ChrysotileNon-fibrous (Other)85%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

CATWALK - WHITE

ENCAPSULATED

DARK GRAY

FIREPROOFING ON

BEAM AT DECKING

Report amended: 05/06/2023 16:54:10 Replaces initial report from: 02/23/2023 13:49:35 Reason Code: Client-Change to PO

Page 3 of 4ASB_PLM_0008_0001 - 1.78 Printed: 5/6/2023 4:54 PM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302464EMSL Order:

Customer ID: MECA62

Customer PO: 2.21.23-KC

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.17.23-54-56

432302464-0029

15% ChrysotileNon-fibrous (Other)85%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING ON

BEAM AT DECKING

02.17.23-54-57

432302464-0030

15% ChrysotileNon-fibrous (Other)85%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

CATWALK - WHITE

ENCAPSULATED

DARK GRAY

FIREPROOFING

02.17.23-54-58

432302464-0031

15% ChrysotileNon-fibrous (Other)85%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING

02.17.23-54-59

432302464-0032

15% ChrysotileNon-fibrous (Other)85%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

CATWALK - WHITE

ENCAPSULATED

DARK GRAY

FIREPROOFING

02.17.23-54-60

432302464-0033

15% ChrysotileNon-fibrous (Other)85%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

PAINTED DARK

GRAY

FIREPROOFING

Analyst(s)

Alina Hernandez (19)

Joseph Gutierrez (14)

Riva Alger, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. San Diego, CA NVLAP Lab Code 200855-0, CA ELAP 2713, HI L-09-03

Report amended: 05/06/2023 16:54:10 Replaces initial report from: 02/23/2023 13:49:35 Reason Code: Client-Change to PO

Page 4 of 4ASB_PLM_0008_0001 - 1.78 Printed: 5/6/2023 4:54 PM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302620EMSL Order:

Customer ID: MECA62

Customer PO: 02.23.23-KC

Project ID:

Attention: Phone:Jenice Feiner

Fax:Millennium Consulting Associates, Inc.

Received Date:4683 Chabot Drive, Suite 380 02/24/2023 1:30 PM

Analysis Date:Pleasanton, CA 94588 03/02/2023 - 03/03/2023

Collected Date:

Project: 22004.2199

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.22.23-54-61-TSI

432302620-0001

None DetectedNon-fibrous (Other)10%Glass90%Yellow

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 3"

TSI - CANVAS

WRAPPED

FIBERGLASS RUN

02.22.23-54-61-Wrap

432302620-0001A

None DetectedNon-fibrous (Other)10%Cellulose90%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 3"

TSI - CANVAS

WRAPPED

FIBERGLASS RUN

02.22.23-54-62-TSI

432302620-0002

None DetectedNon-fibrous (Other)20%Glass80%Yellow

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 3"

TSI - CANVAS

WRAPPED

FIBERGLASS RUN

02.22.23-54-62-Wrap

432302620-0002A

None DetectedNon-fibrous (Other)40%Cellulose60%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 3"

TSI - CANVAS

WRAPPED

FIBERGLASS RUN

02.22.23-54-63

432302620-0003

65% ChrysotileNon-fibrous (Other)15%Glass20%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

WHITE TSI

"BLANKET",

MECHANICALLY

FASTENED TO 1/2"

COPPER

02.22.23-54-64

432302620-0004

None DetectedNon-fibrous (Other)100%Red

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

"FIRE" PUTTY -

UTILITY

PENETRATION AT

DW/PL/CONCRETE

02.22.23-54-65

432302620-0005

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

PLASTER ON MESH

AT WALL

02.22.23-54-66-TSI

432302620-0006

None DetectedNon-fibrous (Other)20%Glass80%Yellow

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 12"

TSI - CANVAS

WRAPPED

FIBERGLASS RUN

LABELED "STAND" -

FIRE MAIN

02.22.23-54-66-Wrap

432302620-0006A

None DetectedNon-fibrous (Other)30%Cellulose70%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 12"

TSI - CANVAS

WRAPPED

FIBERGLASS RUN

LABELED "STAND" -

FIRE MAIN

Report amended: 05/09/2023 18:00:45 Replaces initial report from: 03/03/2023 14:46:50 Reason Code: Client-Change to PO

Page 1 of 6ASB_PLM_0008_0001 - 1.78 Printed: 5/9/2023 6:01 PM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302620EMSL Order:

Customer ID: MECA62

Customer PO: 02.23.23-KC

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.22.23-54-67

432302620-0007

3% ChrysotileNon-fibrous (Other)97%Brown

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

BROWN DUCT

MASTIC

02.22.23-54-68-TSI

432302620-0008

None DetectedNon-fibrous (Other)15%Glass85%Yellow

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 10"

TSI CANVAS

WRAPPED

FIBERGLASS RUN

LABELED

"DOMESTIC HOT

WATER"

02.22.23-54-68-Wrap

432302620-0008A

None DetectedNon-fibrous (Other)40%Cellulose60%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 10"

TSI CANVAS

WRAPPED

FIBERGLASS RUN

LABELED

"DOMESTIC HOT

WATER"

02.22.23-54-69-Drywall

432302620-0009

None DetectedNon-fibrous (Other)100%Cellulose<1%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DW/JC/TAPE -

UNFINISHED DW

02.22.23-54-69-Joint

Compound

432302620-0009A

<1% ChrysotileNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DW/JC/TAPE -

UNFINISHED DW

02.22.23-54-70-TSI

432302620-0010

None DetectedNon-fibrous (Other)80%Glass20%Silver

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 8"

WHITE TSI WRAP

W/ EXPANDED

HARD BLACK

INSULATION ON 1"

COPPER

REFRIGERANT LINE

02.22.23-54-70-Insulatio n

432302620-0010A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 8"

WHITE TSI WRAP

W/ EXPANDED

HARD BLACK

INSULATION ON 1"

COPPER

REFRIGERANT LINE

02.22.23-54-71-TSI

432302620-0011

None DetectedNon-fibrous (Other)80%Glass20%Silver

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 8"

WHITE TSI WRAP

W/ EXPANDED

HARD BLACK

INSULATION ON 1"

COPPER

REFRIGERANT LINE

02.22.23-54-71-Insulatio n

432302620-0011A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 8"

WHITE TSI WRAP

W/ EXPANDED

HARD BLACK

INSULATION ON 1"

COPPER

REFRIGERANT LINE

Report amended: 05/09/2023 18:00:45 Replaces initial report from: 03/03/2023 14:46:50 Reason Code: Client-Change to PO

Page 2 of 6ASB_PLM_0008_0001 - 1.78 Printed: 5/9/2023 6:01 PM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302620EMSL Order:

Customer ID: MECA62

Customer PO: 02.23.23-KC

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.22.23-54-72-Wrap

432302620-0012

None DetectedNon-fibrous (Other)40%Cellulose60%White/Silver

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 8"

WHITE TSI WRAP

W/ EXPANDED

HARD BLACK

INSULATION ON 1"

COPPER

REFRIGERANT LINE

02.22.23-54-72-Insulatio n

432302620-0012A

None DetectedNon-fibrous (Other)35%Glass65%Black/Yellow

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 8"

WHITE TSI WRAP

W/ EXPANDED

HARD BLACK

INSULATION ON 1"

COPPER

REFRIGERANT LINE

02.22.23-54-73

432302620-0013

4% ChrysotileNon-fibrous (Other)96%Red

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - RED

"FIRE" PUTTY -

UTILITY

PENETRATION AT

DW/PL/CONCRETE

02.22.23-54-74

432302620-0014

50% ChrysotileNon-fibrous (Other)50%White/Black

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 1"

EXPOSED WHITE

GASKET STRIP AT

HVAC ACCESS

PANEL

02.22.23-54-75-Drywall

432302620-0015

None DetectedNon-fibrous (Other)100%Cellulose<1%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DW/JC/TAPE -

UNFINISHED DW

02.22.23-54-75-Joint

Compound

432302620-0015A

2% ChrysotileNon-fibrous (Other)98%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DW/JC/TAPE -

UNFINISHED DW

02.22.23-54-75-Tape

432302620-0015B

None DetectedNon-fibrous (Other)40%Cellulose60%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DW/JC/TAPE -

UNFINISHED DW

02.22.23-54-76

432302620-0016

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

PLASTER ON MESH

AT WALL

02.22.23-54-77

432302620-0017

25%

10%

Amosite

Chrysotile

Non-fibrous (Other)65%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

WHITE CANVAS

WRAPPED LOOSE

WHITE TSI ON 3'x2'

HVAC DUCTING

02.22.23-54-78

432302620-0018

22%

9%

Amosite

Chrysotile

Non-fibrous (Other)69%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

WHITE CANVAS

WRAPPED LOOSE

WHITE TSI ON 3'x2'

HVAC DUCTING

Report amended: 05/09/2023 18:00:45 Replaces initial report from: 03/03/2023 14:46:50 Reason Code: Client-Change to PO

Page 3 of 6ASB_PLM_0008_0001 - 1.78 Printed: 5/9/2023 6:01 PM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302620EMSL Order:

Customer ID: MECA62

Customer PO: 02.23.23-KC

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.22.23-54-79

432302620-0019

20%

10%

Amosite

Chrysotile

Non-fibrous (Other)55%Cellulose15%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

WHITE CANVAS

WRAPPED LOOSE

WHITE TSI ON 3'x2'

HVAC DUCTING

02.22.23-54-80

432302620-0020

3% ChrysotileNon-fibrous (Other)97%Brown

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

BROWN DUCT

MASTIC ON 3'x2'

DUCTING

02.22.23-54-81-Insulatio n

432302620-0021

None DetectedNon-fibrous (Other)2%Min. Wool98%Yellow

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 12"

TSI - CANVAS

WRAPPED

FIBERGLASS RUN

LABELED "STAND" -

FIRE MAIN

02.22.23-54-81-Wrap

432302620-0021A

None DetectedNon-fibrous (Other)10%Cellulose90%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 12"

TSI - CANVAS

WRAPPED

FIBERGLASS RUN

LABELED "STAND" -

FIRE MAIN

02.22.23-54-82

432302620-0022

50% ChrysotileNon-fibrous (Other)50%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

WHITE TSI

"BLANKET",

MECHANICALLY

FASTENED TO 1/2 "

COPPER

02.22.23-54-83

432302620-0023

2% ChrysotileNon-fibrous (Other)98%Brown

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

BROWN HVAC

MASTIC

02.22.23-54-84

432302620-0024

None DetectedNon-fibrous (Other)90%Glass10%Beige

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

HARD WHITE TSI

ON 18" PIPE

02.22.23-54-85

432302620-0025

None DetectedNon-fibrous (Other)90%Glass10%Beige

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

HARD WHITE TSI

ON 18" PIPE

02.22.23-54-86

432302620-0026

None DetectedNon-fibrous (Other)75%Glass25%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

HARD WHITE TSI

ON 18" PIPE

02.22.23-54-87

432302620-0027

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

BLACK BITUMINOUS

TSI WRAP ON ~1"

PIPE

02.22.23-54-88

432302620-0028

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

BLACK BITUMINOUS

TSI WRAP ON ~1"

PIPE

Report amended: 05/09/2023 18:00:45 Replaces initial report from: 03/03/2023 14:46:50 Reason Code: Client-Change to PO

Page 4 of 6ASB_PLM_0008_0001 - 1.78 Printed: 5/9/2023 6:01 PM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302620EMSL Order:

Customer ID: MECA62

Customer PO: 02.23.23-KC

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.22.23-54-89

432302620-0029

None DetectedNon-fibrous (Other)95%Cellulose5%Black

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

BLACK BITUMINOUS

TSI WRAP ON ~1"

PIPE

02.22.23-54-90

432302620-0030

None DetectedNon-fibrous (Other)5%Min. Wool95%Yellow

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 12"

TSI - CANVAS

WRAPPED

FIBERGLASS RUN

LABELED "STAND" -

FIRE MAIN

02.22.23-54-91

432302620-0031

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DARK GRAY HVAC

MASTIC ON NEWER

HVAC

INSTALLATION

02.22.23-54-92

432302620-0032

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DARK GRAY HVAC

MASTIC ON NEWER

HVAC

INSTALLATION

02.22.23-54-93

432302620-0033

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DARK GRAY HVAC

MASTIC ON NEWER

HVAC

INSTALLATION

02.22.23-54-94-Drywall

432302620-0034

None DetectedNon-fibrous (Other)100%Cellulose<1%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DW/JC/TAPE -

UNFINISHED

DRYWALL - NEWER

HVAC

INSTALLATION

02.22.23-54-94-Joint

Compound

432302620-0034A

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DW/JC/TAPE -

UNFINISHED

DRYWALL - NEWER

HVAC

INSTALLATION

02.22.23-54-95

432302620-0035

None DetectedNon-fibrous (Other)100%Cellulose<1%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DW/JC/TAPE -

UNFINISHED

DRYWALL - NEWER

HVAC

INSTALLATION

Unable to separate drywall and joint compound layers cleanly.

02.22.23-54-96-Drywall

432302620-0036

None DetectedNon-fibrous (Other)100%Cellulose<1%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DW/JC/TAPE -

UNFINISHED

DRYWALL - NEWER

HVAC

INSTALLATION

No tape or texture present in sample.

Report amended: 05/09/2023 18:00:45 Replaces initial report from: 03/03/2023 14:46:50 Reason Code: Client-Change to PO

Page 5 of 6ASB_PLM_0008_0001 - 1.78 Printed: 5/9/2023 6:01 PM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302620EMSL Order:

Customer ID: MECA62

Customer PO: 02.23.23-KC

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.22.23-54-96-Joint

Compound

432302620-0036A

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DW/JC/TAPE -

UNFINISHED

DRYWALL - NEWER

HVAC

INSTALLATION

02.22.23-54-97-Wrap

432302620-0037

None DetectedNon-fibrous (Other)10%Cellulose90%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 3"

TSI - CANVAS

WRAPPED

FIBERGLASS RUN

02.22.23-54-97-Insulatio n

432302620-0037A

None DetectedNon-fibrous (Other)10%Min. Wool90%Yellow

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 3"

TSI - CANVAS

WRAPPED

FIBERGLASS RUN

02.22.23-54-98

432302620-0038

50% ChrysotileNon-fibrous (Other)30%Cellulose20%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

WHITE TSI

"BLANKET" -

MECHANICALLY

FASTENED TO 1/2"

COPPER

02.22.23-54-99

432302620-0039

50% ChrysotileNon-fibrous (Other)30%Cellulose20%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

WHITE TSI

"BLANKET" -

MECHANICALLY

FASTENED TO 1/2"

COPPER

02.22.23-54-100

432302620-0040

65% ChrysotileNon-fibrous (Other)25%Cellulose10%White

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

WHITE TSI

"BLANKET" -

MECHANICALLY

FASTENED TO 1/2"

COPPER

Analyst(s)

Alberto Guerrero (15)

Alina Hernandez (12)

Dalia Rodriguez (13)

Joseph Gutierrez (14)

Riva Alger, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. San Diego, CA NVLAP Lab Code 200855-0, CA ELAP 2713, HI L-09-03

Report amended: 05/09/2023 18:00:45 Replaces initial report from: 03/03/2023 14:46:50 Reason Code: Client-Change to PO

Page 6 of 6ASB_PLM_0008_0001 - 1.78 Printed: 5/9/2023 6:01 PM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302810EMSL Order:

Customer ID: MECA62

Customer PO: 02.27.23-KC

Project ID:

Attention: Phone:Jenice Feiner

Fax:Millennium Consulting Associates, Inc.

Received Date:4683 Chabot Drive, Suite 380 02/27/2023 12:30 PM

Analysis Date:Pleasanton, CA 94588 03/04/2023 - 03/06/2023

Collected Date:

Project: 22004.2199

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.21.24-54-101-Wrap

432302810-0001

None DetectedNon-fibrous (Other)40%Cellulose60%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 3"

TSI CANVAS

WRAPPED

FIBERGLASS RUN

02.21.24-54-101-Insulati on

432302810-0001A

None DetectedNon-fibrous (Other)5%Min. Wool95%Yellow

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 3"

TSI CANVAS

WRAPPED

FIBERGLASS RUN

02.21.24-54-102

432302810-0002

None DetectedNon-fibrous (Other)50%Min. Wool50%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - 3"

TSI CANVAS

WRAPPED

FIBERGLASS RUN

02.21.24-54-103

432302810-0003

10% ChrysotileNon-fibrous (Other)90%Gray

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

DARK GRAY

FIREPROOFING

02.21.24-54-104

432302810-0004

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL -

PLASTER ON MESH

AT WALL

02.21.24-54-105-Drywal l

432302810-0005

None DetectedNon-fibrous (Other)100%Cellulose<1%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - DW /

JC / TAPE -

UNFINISHED

DRYWALL - NEWER

INSTALLATION

02.21.24-54-105-Joint

Compound

432302810-0005A

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - DW /

JC / TAPE -

UNFINISHED

DRYWALL - NEWER

INSTALLATION

02.21.24-54-105-Tape

432302810-0005B

None DetectedNon-fibrous (Other)5%Cellulose95%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - DW /

JC / TAPE -

UNFINISHED

DRYWALL - NEWER

INSTALLATION

02.21.24-54-106-Drywal l

432302810-0006

None DetectedNon-fibrous (Other)100%Cellulose<1%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - DW /

JC / TAPE -

UNFINISHED

DRYWALL - NEWER

INSTALLATION

Report amended: 05/10/2023 11:42:46 Replaces initial report from: 03/06/2023 12:28:44 Reason Code: Client-Change to PO

Page 1 of 4ASB_PLM_0008_0001 - 1.78 Printed: 5/10/2023 11:44 AM

Tel/Fax: (858) 499-1303 / (858) 499-1304 http://www.EMSL.com / sandiegolab@emsl.com

432302810EMSL Order:

Customer ID: MECA62

Customer PO: 02.27.23-KC

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

02.21.24-54-106-Joint

Compound

432302810-0006A

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - DW /

JC / TAPE -

UNFINISHED

DRYWALL - NEWER

INSTALLATION

02.21.24-54-106-Tape

432302810-0006B

None DetectedNon-fibrous (Other)5%Cellulose95%Beige

Fibrous

Homogeneous

1ST FLOOR

INTERSTITIAL - DW /

JC / TAPE -

UNFINISHED

DRYWALL - NEWER

INSTALLATION

02.21.24-54-106-Textur e

432…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .