S06 Solicitation Amendment 36C26226Q0944 0001 Ceiling Mounted Patient Lifts.pdf
PDF 263 KB Posted
- Attached to
- 6530--VA San Diego Ceiling Mounted Patient Lifts with Installation and Removal of Existing Patient Lifts
- Solicitation number
- 36C26226Q0944
About this file
This is Amendment 0001 to a Department of Veterans Affairs solicitation for ceiling patient lift system installation and related services. The solicitation number is 36C26226Q0944, issued by the Network Contracting Office 22 in Long Beach, California, with an effective date of July 15, 2026, and a requisition number of 664-26-3-072-0118. The amendment responds to vendor questions and clarifies project scope without extending the solicitation due date of August 12, 2026, at 8:00 AM PDT.
The amendment provides critical clarification on project specifications and vendor responsibilities. The project has a 2-year time scope with 9 phases or sequences. The ceiling space above finished ceilings measures 7 feet to concrete. Existing patient lift tracks will be removed and replaced by the vendor. Electrical drawings provided by the Government represent the basis of design tailored for the patient lift vendor; if offerors propose different requirements, they must clearly communicate changes and provide new drawings at their own cost, with only minor changes accepted without requiring a change order. The General Contractor is responsible for additional modifications including electrical, HVAC, and ceiling work. All track systems are below-ceiling with no recessed configurations. The project requires Level IV Infection Control Risk Assessment (ICRA) compliance. All ceiling patient lift attachment methods must be certified by a structural engineer provided by the offeror and cannot involve Davis Bacon Act requirements or construction services. Vendors must provide real-time usage data transmission via Wi-Fi (or equivalent automatic real-time alternatives without manual intervention), and Class III integrated lift scales are mandatory for patient weight accuracy in specialty care units. Each salient characteristic must be met exactly as written, with the Government reserving the right to decline substantial changes to electrical drawings.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
0001 08-10-2026
664-26-3-072-0118
36C262
Department of Veterans Affairs
Network Contracting Office 22
4811 Airport Plaza Drive
Suite 600
Long Beach CA 90815
Department of Veterans Affairs
Network Contracting Office 22
4811 Airport Plaza Drive
Suite 600
Long Beach CA 90815
To all Offerors/Bidders
36C26226Q0944
07-15-2026
X
X X
X 1
The purpose of this Amendment 0001 is to respond to vendors' questions. See subsequent pages for more details.
The solicitation due date and time, 08/12/2026 at 8:00 AM PDT, remains unchanged.
All other term and conditions also remain unchanged.
EDGAR ALVIZAR
Contracting Officer
CONTINUATION PAGE
The purpose of this Amendment 0001 is to respond to the following vendors’ questions (responses to vendors’ questions are in red):
1. Time scope for the project?
a. 2 years
2. What is in the space above the ceilings?
a. Interstitial space, 7 feet – finished ceiling to concrete above.
3. Will existing tracks remain or be removed?
a. Yes, tracks will be removed and replaced by vendor.
4. Are the Electrical dwgs in the Contract Documents generic or are they tailored for the
Vendor in the same dwg package?
a. They were tailored for the patient lift vendor as the basis of design
5. What is the scope of the patient lift vendor other than installing their equipment?
a. See attached Matrix Responsibility chart below.
6. Who will be responsible for updating Electrical dwgs in the Contract Docs if another patient lift vendor has different requirements?
a. The current drawings represent the basis of design as proposed by the
Government. If an offeror has different requirements, whether substantial or minor changes, the offeror needs to clearly communicate in their submission the different requirements they are proposing. The Offeror is responsible for clearly communicating these changes to include any new drawings at the cost of the
Offeror. Only minor changes that do not require a Change Order/Contract
Modification to the General Contractor contract may be accepted. The
Government reserves the right to decline substantial changes to the electrical drawings.
7. How do I get a copy of the as-built structural dwgs?
a. As-built dwgs can’t be sent over the email as they are much to large to send, so
Vendor must have an ftp site or some way to transfer files.
8. How many phases will this project be scheduled out over and what is the total duration of the project expected to be?
a. See response to Question #1 for time limit. There will be 9 Phases or
Sequences.
9. Are there any ICRA requirements that the manufacturer will be responsible for?
a. Yes, this is a level IV ICRA.
10. Please confirm that all additional modifications (electrical, HVAC, ceiling etc.) will be performed by GC.
a. That is correct; confirmed.
11. Please confirm if any of the track systems will be recessed or if all are below ceiling.
a. No recessed track systems; all are below ceiling.
12. The drawing set shows above ceiling connection methods. Will the manufacture be required to follow these or will they be allowed to install a different method if approved by engineer?
a. Government does not intend to dictate the method the Offeror proposes to attach their proposed Ceiling Patient Lift above the Ceiling as long as a Structural
Engineer (provided by the Offeror) will certify the installation. This is not a construction contract, thus the method to attach the Ceiling Patient Lift above the ceiling cannot require Davis Bacon Act or any process that fall into Construction
Services.
13. Salient Characteristics 4.2.15 through 4.2.17: If a proposed lift system captures all required lift usage, patient load, maintenance, and service data locally and allows the information to be downloaded directly into software for reporting and analysis, rather than transmitting the data via Wi-Fi, would the Government consider this to satisfy the intended functional requirement?
a. Real time usage data is necessitated to maintain compliance with Safe Patient
Handling directives for patient and staff safety. Any alternatives to Wi-Fi transmission will need to comply with providing automatic real-time updates. Real time usage data is necessitated to maintain compliance with Safe Patient
Handling directives for patient and staff safety. Any alternatives to Wi-Fi transmission will need to comply with providing automatic real-time updates seamlessly. This means without extra steps, manual tasks, or employee intervention to trigger the download.
14. Integrated Scale – Salient Characteristic 4.2.12: Is the requirement for an internal Class
III integrated scale considered a mandatory minimum requirement for technical acceptability, or would the Government consider an equivalent solution that provides accurate patient weighing through an alternate integrated method?
a. Class III integrated lift scales are necessary as stated due to patient weight accuracy needs in specialty care units.
15. Equivalent Products: Since this solicitation allows for "or equal" products, is the
Government's evaluation based upon meeting the intended functional capabilities of the salient characteristics, or must each characteristic be met exactly as written?
a. Each characteristic shall be met as written. See the Evaluation Method and the
Salient Characteristics provided in the Solicitation Document.
File details come from the government source that posted it. Updated .