D.5 VASD 3-YEAR ASBESTOS INSPECTION 12.06.2023 PART 2 OF 4 - VASD CEILING PATIENT LIFTS.pdf
PDF 20 MB Posted
- Attached to
- 6530--VA San Diego Ceiling Mounted Patient Lifts with Installation and Removal of Existing Patient Lifts
- Solicitation number
- 36C26226Q0944
About this file
This is a photo log documenting asbestos survey findings from a 3-Year Asbestos Survey conducted at VA San Diego Jennifer Moreno Medical Center, Building 1, located at 3350 La Jolla Village Dr, San Diego, CA 92161 (Millennium Project No. 22004.2200). The survey was conducted across multiple floor levels (1st through 4th floor interstitials) between August 29 and October 19, 2023, by Millennium Consulting Associates.
The photo log systematically documents the presence and condition of asbestos-containing materials (ACM) and presumed asbestos-containing materials (PACM) throughout the building's interstitial spaces. Key positive materials identified include thermal system insulation (TSI) blankets on copper piping and hydronic lines, TSI elbows, HVAC duct mastic/sealant (red and brown), HVAC access panel gaskets, drywall/joint compound, and dark grey fireproofing (in various conditions—red painted, green painted, white encapsulated, and newly applied). The survey documents extensive damage to positive fireproofing materials caused by cable runs, hardware cloth placement, metal cover plates, and installation of new hangers and utilities. Additional conditions noted include poor cohesion of newly applied non-ACM fireproofing, open HVAC lines and returns, residual ACM materials from abatement areas, trash and debris accumulation on catwalks, and fireproofing overspray on drywall. The photographic documentation provides visual evidence of both homogeneous positive materials and damage conditions across all surveyed floor levels to support the asbestos survey assessment.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 1 Photo Log – Homogeneous Positive Materials – 1st Floor Interstitial
Project Name:
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 8/29/2023
Photo No 1. Photo No 2. Photo No 3.
Description: TSI blanket on copper piping, typically associated with HVAC hydronic lines
Description: TSI Blanket under fiberglass insulation
Description: White HVAC access panel gasket
Photo No 4. Photo No 5. Photo No 6.
Description: TSI elbows on hydronic lines Description: Red HVAC duct mastic / sealant
Description: Brown HVAC duct mastic / sealant
Building 1 Photo Log – Homogeneous Positive Materials – 1st Floor
Project Name:
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 8/29/2023
Photo No 7. Photo No 8. Photo No 9.
Description: Original drywall / joint compound
Description: TSI elbow Description: 3’ diameter vertical HVAC TSI
Photo No 10. Photo No 11. Photo No 12.
Description: Black / Gray felt with black adhesive on HVAC reheater
Description: HVAC access panel with ACM gasket
Description: Brown duct mastic / sealant under fiberglass insulated line
Building 1 Photo Log – Misc Images – 1st Floor Interstitial
Project Name:
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/17/2023
Photo No 1. Photo No 2. Photo No 3.
Description: Trash pile located in the north-west section – Rm. 1011A.
Description: New application fireproofing (not ACM) with poor cohesion to metal substrates. A truss component is pictured here showing a large percentage originally applied to the truss now lying on the floor / catwalk. Seen throughout; worst in north-east.
Description: Open HVAC line. May be abandoned.
Photo No 4. Photo No 5. Photo No 6.
Description: Open HVAC return. Description: Trash / debris piled up on catwalk. Condition is prevalent throughout, though the north-west and west sections.
Description: Additional debris on catwalk at west section.
Building 1 Photo Log – Misc Images – 1st Floor Interstitial
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/17/2023
Photo No 7. Photo No 8. Photo No 9.
Description: Fiberglass insulation with ACM fireproofing (encapsulated) originally adhered to concrete decking (ceiling) resting on a cardboard box.
Description: Additional general debris on catwalk.
Description: Fiberglass insulation with ACM fireproofing (encapsulated) stacked off the catwalk.
Photo No 10. Photo No 11. Photo No 12.
Description: TSI blanket under an HVAC duct sitting on top of the catwalk. West end.
Description: Fireproofing overspray on drywall at north-west end.
Description: Trash / debris on catwalk at north-west end.
Building 1 Photo Log – Damaged Positive Materials – 2nd Floor
Project Name:
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/17/2023
Photo No 1. Photo No 2. Photo No 3.
Description: Damaged fireproofing on beam at catwalk level. Bare steel can be seen.
Description: Damaged fireproofing on catwalk. This truss component is typically covered by a metal plate, but as seen in this example, this is sometimes not the case.
Even when covered, the cover rests on the fireproofing and damages it over time.
Description: Hardware cloth and utilities resting on fireproofing.
Photo No 4. Photo No 5. Photo No 6.
Description: New hangers for CAT-6 cabling have been drilled or otherwise fastened to the concrete decking, disturbing fireproofing.
Description: A close-up view of a damaged section of fireproofing on a floor beam.
Rusty steel can be seen.
Description: This floor beam shows some damage at the topmost area. This is a common form of damage seen throughout the interstitials from cables or workers walking on the beams to access areas off of the catwalk.
Building 1 Photo Log – Fireproofing Photos – 2nd Floor Interstitial
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/17/2023
Photo No 1. Photo No 2. Photo No 3.
Description: Red painted dark grey fireproofing on truss members.
Description: White encapsulated dark grey fireproofing on truss member.
Description: Green painted, white encapsulated dark grey fireproofing on truss member.
Photo No 4. Photo No 5. Photo No 6.
Description: Blue stained fireproofing – new application (negative).
Description: Green painted dark grey fireproofing.
Description: White encapsulated dark grey fireproofing.
Building 1 Photo Log – Homogeneous Positive Materials – 2nd Floor
Project Name:
VA San Diego Programmatic Asbestos – Hazardous Materials Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/17/2023
Photo No 1. Photo No 2. Photo No 3.
Description: Brown duct mastic on HVAC duct.
Description: White TSI blanket on hydronic lines near valves.
Description: TSI elbows on hydronic lines.
Also present at the top left area of the photo with the rusted metal hanger is hard packed TSI hidden beneath the paper / canvas wrap.
Photo No 4. Photo No 5. Photo No 6.
Description: Grey / black HVAC felt with black adhesive on top of an original reheater.
Description: Drywall / joint compound.
Typically located within the center core.
Description: Both a TSI elbow as well as a hard packed valve (under/around the red valve) can be seen here.
Building 1 Photo Log – Misc Images – 2nd Floor Interstitial
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/17/2023
Photo No 1. Photo No 2. Photo No 3.
Description: New application (negative) fireproofing with poor cohesion. Truss component shows bare metal.
Description: Additional photo of new application (negative) fireproofing with poor cohesion. Fireproofing formerly applied to structural member can be seen on catwalk.
Description: Another photo displaying the new application fireproofing with poor cohesion. Bare steel from structural member can be seen, in addition to the debris resulting from the fireproofing cohesion failure.
Photo No 4. Photo No 5. Photo No 6.
Description: Residual ACM dark grey fireproofing with white encapsulant left over in an abatement area. West wing.
Description: Bag of trash left on catwalk. Description: HVAC ductwork with brown ACM mastic lying on catwalk in addition to other debris.
Building 1 Photo Log – Misc Images – 2nd Floor Interstitial
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/17/2023
Photo No 7. Photo No 8. Photo No 9.
Description: Residual dark grey ACM dark grey fireproofing (encapsulated) on concrete decking.
Description: Open HVAC supply which appears to have been covered with tape to seal it. The interim cover failed over time, resulting in this open HVAC duct.
Description: HVAC supply in mechanical room. Present in mechanical rooms on the perimeter of center core.
Photo No 10. Photo No 11. Photo No 12.
Description: New application blue stained (negative) fireproofing in front of mechanical room. High friction area in front of door showing damage to this non-acm fireproofing.
Description: Foil faced HVAC insulation on ductwork with white non-acm coating.
Description: New application gray fireproofing with poor cohesion.
Building 1 Photo Log – Damaged Positive Materials – 3rd Floor
Project Name:
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/18/2023
Photo No 1. Photo No 2. Photo No 3.
Description: Damaged red painted dark gray fireproofing. Cables can be seen running directly across this truss component, and likely caused the damage.
Description: Another photo showing fireproofing damage. The steel on this beam is visible. A cable can be seen touching the member.
Description: A damaged TSI elbow is shown here. The white, chalky substance is where the asbestos is located, and is normally covered by canvas or paper wrap.
Photo No 4. Photo No 5. Photo No 6.
Description: Another view showing both hardware cloth and cabling running over a structural beam covered with damaged fireproofing. Exposed steel is visible.
Description: A significantly damaged TSI elbow.
Description: Hangers being installed during the survey resting on fireproofing covered members during installation.
Building 1 Photo Log – Fireproofing Photos – 3rd Floor Interstitial
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/18/2023
Photo No 1. Photo No 2. Photo No 3.
Description: White encapsulated dark gray fireproofing on beam at decking.
Description: Red painted dark gray fireproofing.
Description: White encapsulated fireproofing crossing over catwalk with grey colored patch.
Photo No 4. Photo No 5. Photo No 6.
Description: Residual dark grey fireproofing with white encapsulant (top) in an abated area, partially hidden by drywall partition.
New fireproofing with poor cohesion can be seen on the bottom portion of this truss member.
Description: New application fireproofing on truss members.
Description: View of dark gray fireproofing with white encapsulant. Ceiling tiles to the floor below show proximity of the fireproofing to the floor below.
Building 1 Photo Log – Homogeneous Positive Materials – 3rd Floor
Project Name:
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/18/2023
Photo No 1. Photo No 2. Photo No 3.
Description: This photo provides a good visual on the ACM TSI present on larger diameter (approx.. 6 to 12 inch) pipes, especially located at hangers (hanger can be seen as the rusted steel supporting the pipe).
The ACM is the white material on the bottom half of the pipe, beneath the paper.
Description: Another example of hard packed TSI in an elbow. Minor damage can be seen beneath the blue TSI patch in the form of a crack.
Description: A smaller diameter insulated line (white) approximately 2 inches in diameter. Two ACM hard elbows are visible to the right.
Photo No 4. Photo No 5. Photo No 6.
Description: This photo shows a view down a catwalk. TSI hard packed elbows can be seen on the right.
Description: Drywall / joint compound.
Primarily located in the center core.
Description: Another view of both TSI hard packed elbows, as well as the hard packed TSI located at the externally fastened hanger (just to the right of the blue TSI patch).
Building 1 Photo Log – Misc Images – 3rd Floor Interstitial
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/18/2023
Photo No 1. Photo No 2. Photo No 3.
Description: New application fireproofing with poor cohesion. The fireproofing that has fallen off the structural members it was applied to can be seen on the catwalk.
Description: A hole was cut into this plaster wall, behind which is ACM fireproofing.
Overspray of this fireproofing is also likely present on the rear of the plaster, and cannot be seen from the side closest where these holes are typically made.
Description: TSI blanket applied to hydronic lines. An HVAC component can be seen resting directly on the blanket. Very few people recognize this ACM material as being hazardous.
Photo No 4. Photo No 5. Photo No 6.
Description: View of dark grey fireproofing.
On the right, the material is encapsulated with white encapsulant. On the left, the material is encapsulated with clear encapsulant.
Description: View of interstitial area off of catwalk. New TSI is seen in the foreground.
Description: View of truss crossing over the catwalk. The red metal is covering the bottom truss member. Fireproofing under this cover is often observed to be in poor condition due to the cover touching the
Building 1 Photo Log – Damaged Positive Materials – 4th Floor
Project Name:
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1 3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/18/2023
Photo No 1. Photo No 2. Photo No 3.
Description: Cables running over a beam covered with white encapsulated dark grey fireproofing.
Description: Dark grey, red painted fireproofing significant fireproofing damage.
Bare steel of the member can be readily seen.
Description: Newer CAT cables seen running over an I beam with dark grey fireproofing.
Photo No 4. Photo No 5. Photo No 6.
Description: View of dark grey fireproofing covered with hardware cloth and various utilities. This is a common cause of damage to fireproofing, especially directly adjacent and parallel to the catwalks.
Description: Another view of damaged fireproofing likely caused by cable runs.
Also visible is red painted cover over the bottom member of the truss. Note the proximity of the fireproofing to this cover – another commonly damaged area.
Description: New cable runs secured to positive fireproofing resulting in minor damage and potential for future damage if the cables cause friction.
Building 1 Photo Log – Fireproofing Photos – 4th Floor Interstitial
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/18/2023
Photo No 1. Photo No 2. Photo No 3.
Description: Red painted, white encapsulated dark grey fireproofing.
Description: Red and green painted, white encapsulated dark grey fireproofing.
Description: Green painted, white encapsulated dark grey fireproofing.
Photo No 4. Photo No 5. Photo No 6.
Description: Red painted dark grey fireproofing. In the background, green painted dark grey fireproofing is visible.
Description: Both green and red painted, white encapsulated dark grey fireproofing can be seen on this truss element.
Description: Green painted dark grey
Building 1 Photo Log – Homogeneous Positive Materials – 4th Floor
Project Name:
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/18/2023
Photo No 1. Photo No 2. Photo No 3.
Description: Brown duct mastic hidden beneath insulation on this HVAC duct.
Description: TSI elbows; one of the more common sizes at 3”-4” in diameter.
Description: Another view of brown duct mastic on a non – insulated HVAC duct.
Photo No 4. Photo No 5. Photo No 6.
Description: Hard packed TSI elbows on hydronic lines supplying a reheater. White TSI blanket, while not visible in this photo, is often located on the valves and pipes directly below the 3”-4” fiberglass insulation.
Description: Another view on non – insulated ductwork with brown duct mastic.
Description: Visible in this photo is a typical view of fireproofing overspray with white encapsulant. TSI elbows are also visible.
Building 1 Photo Log – Misc Images – 4th Floor
Project Name:
VA San Diego Jennifer Moreno Medical Center 3 - Year Asbestos Survey
Site Location:
VA San Diego Building 1
3350 La Jolla Village Dr, San Diego, CA 92161
Millennium Project No. 22004.2200
Date: 10/19/2023
Photo No 1. Photo No 2. Photo No 3.
Description: Old pipe left on catwalk. Description: A disconnected HVAC duct. Description: Various supplies as well as a trash can full of Tyvek suits.
Photo No 4. Photo No 5. Photo No 6.
Description: A cut in a plaster wall, showing a structural member with dark grey fireproofing.
Description: An open HVAC duct that appears to be new.
Description: A negative air exhausting into the interstitial. It is common to see these lines blowing directly onto fireproofing.