D-18922 SH08 R00 - HX SCADA-COMM - TB WIRING DIAGRAM.pdf

PDF 870 KB Posted

Attached to
Halls Substation Control Panels, Bid #3855
Solicitation number
3855
Issued by
Knox County, Tennessee

About this file

This document is a terminal block wiring diagram for the Knoxville Utilities Board (KUB) Halls Substation Control Panels project, specifically detailing the SCADA (Supervisory Control and Data Acquisition) Rack #1 terminal block configuration. The technical schematic depicts a comprehensive wiring diagram for digital input (DI) points, with five terminal blocks (TB1-TB5) representing DNP digital input points ranging from point #0-119. The diagram methodically maps out connection points, slot assignments (AX2_SLOT_B through AX2_SLOT_F), and indicates precise numerical relationships between input connections.

The technical drawing appears to be part of a broader substation rebuild and control system upgrade, with meticulous attention to electrical connectivity and signal routing. The document is dated 3/26/25 and is part of project D-18922, suggesting a planned infrastructure modernization effort for the Halls Substation. While specific pricing details are not present in this technical drawing, the document represents a critical component of the electrical infrastructure design that would be integral to the overall control panel procurement process outlined in KUB's bid #3855.

View the file

Other files

File Type Posted
D-18920 SH03 R00 - HX 125VDC SCH - PNL 1 - AB87 BUS DIFF.pdf PDF
D-18922 SH10 R00 - HX SCADA-COMM - TB WIRING DIAGRAM (13).pdf PDF
Attachment A - Panel 1.pdf PDF
D-18920 SH10 R00 - HX 125VDC SCH - PNL 4 - BB87 BUS DIFF.pdf PDF
33 72 33.16 Substation Control Panels (002).pdf PDF
D-18920 SH06 R00 - HX 125VDC SCH - PNL 3 - HX82.pdf PDF
D-18922 SH09 R00 - HX SCADA-COMM - TB WIRING DIAGRAM (12).pdf PDF
D-18920 SH02 R00 - HX 125VDC SCH - PNL 1 - HX81.pdf PDF
Invitation Letter.pdf PDF
D-18933 SH06 R00 - HX WIRING DIAGRAM - PNL 3 - HX82 TERM BLOCKS.pdf PDF
D-18922 SH02 R00 - HX SCADA-COMM - CONSTRUCTION DETAILS.pdf PDF
D-18922 SH04 R00 - HX SCADA-COMM - AC-DC POWER SCHEMATIC.pdf PDF
D-18922 SH09 R00 - HX SCADA-COMM - TB WIRING DIAGRAM.pdf PDF
D-18922 SH10 R00 - HX SCADA-COMM - TB WIRING DIAGRAM.pdf PDF
D-18920 SH09 R00 - HX 125VDC SCH - PNL 4 - HX83.pdf PDF
D-18933 SH01 R00 - HX WIRING DIAGRAM - PNL 1 - HX81-AB87 POINT-TO-POINT.pdf PDF
D-18933 SH02 R00 - HX WIRING DIAGRAM - PNL 1 - HX81-AB87 TERM BLOCKS.pdf PDF
D-18919 SH01 R00 - HX FRONT VIEWS - RELAY PANELS 1-2.pdf PDF
D-18933 SH05 R00 - HX WIRING DIAGRAM - PNL 3 - HX82 POINT-TO-POINT.pdf PDF
D-18921 SH01 R00 - HX SCADA _ COMM SCHEMATIC.pdf PDF
D-18918 SH02 R00 - HX THREE LINE.pdf PDF
D-18924 SH01 R00 - HX AC PANELS _ STA SERV.pdf PDF
D-18933 SH08 R00 - HX WIRING DIAGRAM - PNL 4 - HX83-BB87 TERM BLOCKS.pdf PDF
Bid Terms and Conditions.pdf PDF
D-18921 SH02 R00 - HX SCADA _ COMM SCHEMATIC (2).pdf PDF
D-18922 SH02 R00 - HX SCADA-COMM - CONSTRUCTION DETAILS (5).pdf PDF
D-18922 SH04 R00 - HX SCADA-COMM - AC-DC POWER SCHEMATIC (7).pdf PDF
D-18922 SH05 R00 - HX SCADA-COMM - WIRING DIAGRAM.pdf PDF
D-18919 SH02 R00 - HX FRONT VIEWS - RELAY PANELS 3-4.pdf PDF
D-18922 SH06 R00 - HX SCADA-COMM - WIRING DIAGRAM.pdf PDF
D-18933 SH07 R00 - HX WIRING DIAGRAM - PNL 4 - HX83-BB87 POINT-TO-POINT.pdf PDF
D-18922 SH01 R00 - HX SCADA-COMM FRONT VIEW (4).pdf PDF
D-18922 SH06 R00 - HX SCADA-COMM - WIRING DIAGRAM (9).pdf PDF
Attachment B - Panel 2.pdf PDF
D-18920 SH05 R00 - HX 125VDC SCH - PNL 2 - 1B87 BUS DIFF.pdf PDF
D-18922 SH07 R00 - HX SCADA-COMM - WIRING DIAGRAM (10).pdf PDF
Attachment D - Panel 4.pdf PDF
Attachment E - SCADA-Comm.pdf PDF
D-18933 SH03 R00 - HX WIRING DIAGRAM - PNL 2 - HXT1-1B87 POINT-TO-POINT.pdf PDF
D-18922 SH08 R00 - HX SCADA-COMM - TB WIRING DIAGRAM (11).pdf PDF
D-18922 SH01 R00 - HX SCADA-COMM FRONT VIEW.pdf PDF
Attachment C - Panel 3.pdf PDF
D-18922 SH05 R00 - HX SCADA-COMM - WIRING DIAGRAM (8).pdf PDF
D-18921 SH03 R00 - HX COMM DETAILS.pdf PDF
D-18921 SH02 R00 - HX SCADA _ COMM SCHEMATIC.pdf PDF
D-18917 SH01 R00 - HX SINGLE LINE.pdf PDF
D-18933 SH04 R00 - HX WIRING DIAGRAM - PNL 2 - HXT1-1B87 TERM BLOCKS.pdf PDF
D-18922 SH03 R00 - HX SCADA-COMM - CONSTRUCTION DETAILS.pdf PDF
D-18920 SH04 R00 - HX 125VDC SCH - PNL 2 - HXT1 DIFF.pdf PDF
D-18920 SH01 R00 - HX 125VDC SCH - PNL 1 - HX81.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFC

3/26/25

D

D

6543210 C

LT:

SC

ALE:

EST#:

APPV.:

W .F.P.I#:

C H

K.:

D

ATE:

M

AXIM

O

JO

B#:

(R

EM

(IN

ST.)

D -18922

SH

EET

O F

D R

AW

N

BY:

D

ESC

R

IPTIO

N

R

EV.

Knoxville U tilities Board

EN

GIN

EERIN

G

G R

ID

H

ALLS (H

X) SU

BSTATIO

N

SC

AD

A & C

O M

M R

AC

KS

TER

M

IN

AL BLO

C K W

IR

IN

G D

IAG

R

AM

H

ALLS SU

BSTATIO

N R

EBU

ILD

TLK

3/25

N O

N E

KU

B

SCADA RACK #1 TERMINAL BLOCKS

LEFT WALL (TOP)

F1 F3

F2 F4

TB124DI_AX2_SLOT_B

DNP DI POINT #0-23

F1 F3

F2 F4

TB224DI_AX2_SLOT_C

DNP DI POINT #24-47

F1 F3

F2 F4

TB324DI_AX2_SLOT_D

DNP DI POINT #48-71

F1 F3

F2 F4

TB424DI_AX2_SLOT_E

DNP DI POINT #72-95

F1 F3

F2 F4

TB524DI_AX2_SLOT_F

DNP DI POINT #96-119

+ 1 + 2 + 3 + 4 + 5 + 6 + 7 + 8 + 9 + 11 + 13 + 15 + 17 + 18 + 19 + 20 + 21 + 22 + 23 + 24 + 25 + 27 + 29 + 31

+ 1 + 2 + 3 + 4 + 5 + 6 + 7 + 8 + 9 + 11 + 13 + 15 + 17 + 18 + 19 + 20 + 21 + 22 + 23 + 24 + 25 + 27 + 29 + 31

+ 1 + 2 + 3 + 4 + 5 + 6 + 7 + 8 + 9 + 11 + 13 + 15 + 17 + 18 + 19 + 20 + 21 + 22 + 23 + 24 + 25 + 27 + 29 + 31

+ 1 + 2 + 3 + 4 + 5 + 6 + 7 + 8 + 9 + 11 + 13 + 15 + 17 + 18 + 19 + 20 + 21 + 22 + 23 + 24 + 25 + 27 + 29 + 31

242425252626272728282929303031313232333334343535363637373838393940404141424243434444454546464747

484849495050515152525353545455555656575758585959606061616262636364646565666667676868696970707171

727273737474757576767777787879798080818182828383848485858686878788888989909091919292939394949595

9696979798989999

J0008436

File details come from the government source that posted it. Updated .