This is a Pre-Bid Meeting Addendum document for Louisa County Public Schools (Virginia) related to Request for Proposal FY2026-1 for the installation of a structured cabling system in a new Career and Technical Education (CTE) Building at Louisa County High School in Mineral, Virginia. The mandatory pre-bid meeting was held on Monday, April 13, 2026, with proposals due by 2:30 p.m. on Thursday, April 30, 2026. The project scope includes comprehensive cabling infrastructure with installation beginning in July 2026 and completion required by March 2027. Key project components identified in the meeting include 24-strand single-mode armored fiber optic cables, Category 6+ cabling, security camera installation, television and projector mounting, vape sensor installation, and access point installation. The School Board will provide televisions, mounts, cameras, vape sensors, firewall sleeves, 120V power, and media converters. Bidders are responsible for providing labor and installation only, including J hook installation every 4 feet where cable trays are not present. All work must comply with specified color standards, and lifts for installation must be coordinated with the general contractor.
The meeting clarified critical installation requirements and specifications that bidders must incorporate into their proposals. Bidders must ensure compliance with BICSI certification requirements, with at least one BICSI-certified Registered Communications Distribution Designer responsible for work review. All cabling must comply with Superior Essex DataGain Category 6+ cables in designated colors by application type, and all work requires certification testing. Contractors must furnish professional liability insurance of $2,000,000 and workers' compensation insurance with employers' liability coverage of $200,000 per accident. The contract term begins upon award and continues through final completion of the building with a required 5-year warranty on all work and components. Payment will be processed by the Louisa County Public Schools Finance Department within 45 days of receipt of correct invoice documentation. No specific budget range or award value is disclosed, and the School Board will use the competitive negotiation process to award the contract to the most qualified offeror.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Louisa County Public Schools RFPFY2026-1 Structured Cabling System - CTE Building Addendum 1
Structured Cable Pre-Bid Meeting Monday April 13, 2026
● LCPS provides TVs, mounts, cameras, vape sensors.
● Bidder provides only labor and installation.
● Where there are no cable trays, J hooks must be installed every 4 feet.
● There will be drops in bathrooms for vape sensors.
● LCPS will provide the template for mounting projectors
● Bidder will get data to TVs which will be installed by our vendor
● Please make sure to follow the color standards
What is the completion date?
March 2027. Installation will begin July 2026.
Do we need to provide fire wall sleeves?
No, these have already been installed, bidder should not need to put any in.
Will lifts be provided for use during installation?
Lifts are most likely available from the GC, but you will need to contact them to ask if they are available for you to use.
Do we need media converters for camera feedback?
No, LCPS will provide 120V and media converter.
Structured Cable Pre-Bid Meeting