• INTERNATIONAL CODE COUNCIL (IBC/IPC/IMC/IFGC - 2018)
• WEST VIRGINIA STATE FIRE CODE.
• NATIONAL FIRE PROTECTION ASSOCIATION (NFPA-2018)
• NATIONAL ELECTRICAL CODE (NFPA 70-2020)
• ASHRAE 90.1 2013
CODES & STANDARDS
ZDS
Design/
Consulting Services
Mechanical * Electrical * IAQ * Energy * Commissioning
135 Corporate Centre Dr.
Scott Depot, WV 25560
Ph: (304) 755-0075
Fx: (304) 755-0076
Web: www.zdsdesign.com
Email: contact@zdsdesign.com
CAS Structural Engineering, Inc.
P.O. Box 469
Alum Creek, WV 25003-0469
304-756-2564 (v) / 304-756-2565 (f)
Email: calalane@aol.com www.casstruceng.com
CAS
STRUCTURAL
ENGINEERING, INC.
C U s e r s v in e e l.
b u s a D o c u m e n ts G S D C M E P B u il d in g V v in e e l.
b u s a .r v t
West Virginia Department of Administration General Services Division
Building #1 House Chambers HVAC Upgrades
ZDS Project Number: GSD-241-C
02/28/2025
1900 Kanawha Boulevard East, Charleston, WV 25305
ELECTRICAL SHEET INDEX
E001 ELECTRICAL TITLE SHEET
ED101 ELECTRICAL DEMOLITION BASEMENT PLAN
EP101 ELECTRICAL POWER BASEMENT PLAN
E120 ROOF POWER PLAN
E401 ENLARGED POWER PLANS
E501 ELECTRICAL DETAILS
E601 ELECTRICAL SCHEMATICS AND SCHEDULES
MECHANICAL SHEET INDEX
M001 HVAC TITLE SHEET
MD101 MECHANICAL DEMOLITION - BASEMENT
MD120 MECHANICAL DEMOLITION - ROOF
MH101 BASEMENT HVAC DUCT PLAN
MP101 BASEMENT MECHANICAL PIPING PLAN
MP102 MECHANICAL PIPING PLANS
M120 ROOF HVAC PLAN
MD301 MECHANICAL DEMO SECTIONS
MH301 MECHANICAL SECTIONS
MP301 MECHANICAL PIPING SECTIONS
M401 MECHANICAL ENLARGED ROOF PLAN
MH401 HVAC DUCT ENLARGED PLANS
MP401 MECHANICAL PIPING ENLARGED PLANS
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M701 CONTROLS DIAGRAM
M901 HVAC DUCT ISOMETRICS
M902 ROOF ISOMETRIC
MP901 NATURAL GAS PIPING ISOMETRIC
GENERAL SHEET INDEX
GS101 GENERAL SITE PLAN
STRUCTURAL SHEET INDEX
S401 STRUCTURAL ENLARGED ROOF PLAN
BID SET
2/28/2025
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
http://www.ZDSDesign.com
135 Corporate Center Drive
Suite 532 Scott Depot, WV 25560
TEL 304/755-0075
FAX 304/755-0076
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
XXX
C U s e rs
\v in e e l.
b u s a
\D o c u m e n ts
\G S
D
C
M E
P
B u ild in g
-V v in e e l.
b u s a
.r v t
/3
/2
:4
:1
P M
GS101
DC
TZ3
GSD-241-C
GENERAL SITE PLAN
Building #1 House Chambers HVAC Upgrades
1900 Kanawha Boulevard East, Charleston, WV 25305
West Virginia Department of Administration General Services Division
GENERAL MECHANICAL SITE NOTES
1 PRIOR TO BRINGING ANY HEAVY EQUIPMENT (TRUCKS, TRAILERS, LIFTS, ETC.) ON
SITE THE CONTRACTOR SHALL DOCUMENT WITH PHOTOS/VIDEO ANY EXISTING
DAMAGE THAT COULD BE CONSTRUED AS BEING CAUSED BY THE CONSTRUCTION
ACTIVITIES. DAMAGED ELEMENTS INCLUDE, BUT ARE NOT LIMITED TO,
SIDEWALKS, CURBS, DRIVEWAYS, PARKING LOTS AND GRASSY AREAS.
DOCUMENTATION SHALL BE PROVIDED TO THE OWNER AND ENGINEER PRIOR TO
STARTING WORK. ANY DAMAGE INCURRED DURING THE CONSTRUCTION
PROCESS SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER AND
ENGINEER. THIS INCLUDES, BUT IS NOT LIMITED TO CONCRETE, ASPHALT, AND
REGRADING/RESEEDING OF GRASSY AREAS.
2 THESE DRAWINGS ARE BASED UPON HISTORICAL DRAWINGS OF THE EXISTING
BUILDING AND FIELD VERIFICATION OF PORTIONS OF THE WORK.
3 CONTRACTOR SHALL USE EXTREME CARE IF WORKING NEAR EXISTING SITE
UTILITIES.
4 CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES DURING CONSTRUCTION.
EXISTING UTILITIES WHICH ARE NOT TO BE REMOVED OR ABANDONED SHALL
REMAIN OPERATIONAL AT ALL TIMES. ANY DAMAGED DEVICES SHALL BE
REPAIRED OR REPLACED AT THE END OF EACH WORK DAY BEFORE LEAVING THE
SITE.
5 SHOULD EXISTING CONDITIONS IN THE FIELD NECESSITATE CONSTRUCTION
METHODS OR MEANS OTHER THAN THOSE SHOWN OR SPECIFIED, THE
CONTRACTOR SHALL NOTIFY THE ENGINEER TO OBTAIN APPROVAL PRIOR TO
PROCEEDING WITH CONSTRUCTION.
6 ALL DISTURBED AREAS SHALL BE RESTORED TO THE ORIGINAL CONDITION OR
BETTER.
7 ANY DAMAGE OUTSIDE SCOPE OF WORK INCLUDING THE CONSTRUCTION ACCESS
SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. METAL PLATES MAY BE
UTILIZED TO PROTECT EXISTING FEATURES.
8 SURROUNDING FACILITIES ARE TO REMAIN IN OPERATION DURING
CONSTRUCTION. ALL WORK SHALL BE CONDUCTED SO AS TO MINIMIZE
DISRUPTION TO THOSE FACILITIES.
9 THE CONTRACTOR SHALL MAINTAIN TRAFFIC AT ALL TIMES. PEDESTRIAN
THRUWAY TRAFFIC AND ACCESS TO ALL BUILDINGS IS TO BE MAINTAINED AT ALL
TIMES. THE CONTRACTOR SHALL PROVIDE THE APPROPRIATE PROTECTIONS
INCLUDING PEDESTRIAN SAFETY AND DIRECTIONAL SIGNS DURING ALL PHASES
OF WORK.
10 SURFACED STREETS AND PARKING AREAS SHALL BE MAINTAINED IN A CLEAN
CONDITION, MUD AND DUST FREE AT ALL TIMES. ADEQUATE MEANS SHALL BE
PROVIDED TO CLEAN TRUCKS AND EQUIPMENT. ALL TOOLS AND EQUIPMENT
SHALL BE STORED WITHIN THE CONTRACTOR'S STAGING AREA.
11 ALL WORK SHALL BE PERFORMED IN A NEAT, PROFESSIONAL AND SAFE MANNER
AND SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL CODES.
12 CONTRACTOR IS RESPONSIBLE FOR LOCATION AND COORDINATION OF ALL
APPLICABLE BELOW AND ABOVE GROUND UTILITIES, PIPING AND EQUIPMENT.
CONTRACTOR SHALL CONTACT SITE UTILITY LOCATOR SERVICE TO OBTAIN ALL
UNDERGROUND UTILITY LOCATIONS PRIOR TO ANY CONSTRUCTION. NEW AND
EXISTING ABOVE AND UNDERGROUND UTILITIES, PIPING AND EQUIPMENT SHALL
BE PROTECTED ALL THE TIMES.
13 CONTRACTOR SHALL COORDINATE EGRESS REQUIREMENTS WITH OWNER WHEN
CONSTRUCTION ACTIVITIES IMPACT USING THE BUILDING EGRESS AS REQUIRED
TO MEET WV STATE FIRE MARSHALL REQUIREMENTS.
14 EXISTING SITE UTILITIES ARE SHOWN TO INDICATE GENERAL LOCATION AND MAY
NOT SHOW ALL EXISTING SITE UTILITIES. FIELD VERIFY LOCATION AND DEPTH OF
ALL EXISTING SITE UTILITIES.
1" = 30'-0"GS101
1 GENERAL SITE PLAN
KEYNOTES
1 CONTRACTOR ENTRANCE TO BUILDING (ACCESS CARD REQUIRED).
2 CONTRACTOR LAYDOWN AREA. PROTECT TREES AND SECURITY LIGHTS FROM
DAMAGE.
3 TEMPORARY ROADWAY TO LAYDOWN AREA. PROTECT TREES, SECURITY LIGHTS,
AND SIDEWALK FROM DAMAGE.
4 EXISTING TREES
5 CALIFORNIA AVENUE
6 EXISTING LIGHTPOLE
7 EXISTING SIDEWALK
8 EXISTING DRIVEWAY TO LOADING DOCK
X
NO DATE REVISION
CHWS
CD
CDR
CWR
CWS
HWR
HWS
G
STM
(E)
CHWR Chilled-Water Return
Chilled-Water Supply
Condensate Drain
Steam Condensate Return
Condenser-Water Return
Condenser-Water Supply
Hot-Water Return
Hot-Water Supply
Natural Gas
Steam Supply
RL
RS
Refrigerant Liquid
Refrigerant Gas
2"
RD Refrigerant Discharge
Mechanical Piping Symbols
Keynote Symbol
Continuation Symbol
Sheet Number Where Detail is Placed
Detail Number on Sheet
Plan Revision Number
General Plan Symbols
Room Name / Number
Point Where New Connects To Existing
Existing Pipe To Remain
Area Being Demolished
Area Not In Contract
Pipe To Be Demolished
Above Ground Piping
Nominal Pipe Size
Below Ground Piping
Pipe Slope (When Applicable)
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN
THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE
USED IN THIS SET OF DRAWINGS.
LP Liquid Propane
1/8" / 12" SLOPE
24"x12"
24"/12"
18"Ø
General Exhaust Air
Outdoor Air
Building Relief Air
Return Air
Supply Air
Transfer Air
Grille, Register, Diffusers
Airflow
Catalog Throw Performance Neck Size / Module Size
Existing Duct To Remain
Oval Duct Size (Width / Height)
Sq. Duct Size (Width x Height)
HVAC Symbols
Rect. Supply Duct Rise / Drop
Mechanical Equipment
Round Duct Size (Diameter)
Duct To Be Demolished
Kitchen Exhaust Duct
Env. Tobacco Smoke
Equipment By Others (Refer To Other Disciplines)
Existing to Remain Equipment
Flue Gas Vent
Combustion Air
Ventilation Air
(E)AHU-2
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
AF
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
CW COLD WATER
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
DPT
DW DISTILLED WATER
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
ES
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
E/A EXHAUST AIR
EAF EXHAUST AIR FAN
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
G
GAL GALLON
GF GAS-FIRED
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M
M/A MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MU/A MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
O/A OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R DUCT RISER
RAF RETURN AIR FAN
R/A RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RL/A RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RS
RW RAIN WATER
SF SQUARE FOOT
S/A SUPPLY AIR
SAF SUPPLY AIR FAN
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACE MOUNT
SP STANDPIPE
SP STATIC PRESSURE
STM STEAM
T THERMOSTAT
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
Abbreviations
Type (See Schedule)
Max NC Rating
Design Airflow Rate
RTU-1
4.0 ton
RTU-1
72,000 Btu/h
72 CFH
3.7 GPM
VAV 1-2
Design Water Flow
Operating Weight
Heating Capacity
Nominal Cooling Capacity
Mechanical Devices
GWR
GWS
Geothermal-Water Return
Geothermal-Water Supply
Existing Relocated Equipment(R)AHU-3
AC AIR CONDITIONING UNIT
ACCU AIR COOLING CONDENSING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CH CHILLER
CT COOLING TOWER
CUH CABINET UNIT HEATER
CHWP CHILLED WATER PUMP
DBP DOMESTIC WATER BOOSTER PUMP
DC DUCT MOUNTED COIL
DCP DOMESTIC WATER CIRCULATING PUMP
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF VENTILATOR
HWP HEATING WATER PUMP
HRU HEAT RECOVERY UNIT
PRV POWER ROOF VENTILATOR
RE RETURN/EXHAUST FAN
RTU ROOFTOP UNIT
SP SUMP PUMP
UH UNIT HEATER
WH WATER HEATER
EQUIPENT ABBREVIATIONS
Damper Types
Laboratory Hood
Unit Identity
Valve Types
2" CHECK
2" BAL
3" CIRC
2" GATE
2" PRV
2" STRAIN
2" M-CNTRL
2" SHUTOFF
1" GAS-CNTRL
Alternate Check Valve
1" REG
1" GAS COCK
1" PLUG
2" BFV
2" GLOBE
2" LOCK
4" 3-WAY CNTRL
2" QUICK
FLUE
C/A
S/A
V/A
O/A
R/A
L/A
T/A
E/A
KED
LH
ETS
Round Supply Duct Rise / Drop
Rect. Return Duct Rise / Drop
Round Return Duct Rise / Drop
Rect. Exhaust Duct Rise / Drop
Round Exhaust Duct Rise / Drop
(E)
TF-1
500 CFM
AC-1
AFF:7'-0" Bottom of Equipment Height
Carbon Dioxide Detector
Carbon Monoxide Detector
Hydrogen Gas Detector
Hazardous Gas Detector
Nitrogen Dioxide Detector
Oxygen Gas Detector
Smoke Damper
Fire Damper
Comb. Fire/ Smoke Damper
Manual Damper
Motorized Damper
Backdraft Damper
Pipe Rise / Drop
Ceiling Diffuser
Round Diffuser
Sidewall Register
Linear Diffuser
6"Ø
SD9 100
TYP. X 4
10"Ø/24x24 H6/9/1729
SD-4 500
6"Ø/1s/48"L
LD-1 120
18"x10"
SG5 500
AFF:9'-0"
Neck Size Airflow
Airflow
Mounting Elevation (Centerline)
Nominal Duct Size
Airflow Neck Size/ Slot(s)/ Active Length
Sidewall Grille
Ceiling Return
16"x16"
RG11 800
AFF:9'-0"
22"x22"/24x24
RG1 2000
Airflow
Mounting Elevation (Centerline)
Nominal Duct Size
Airflow Neck Size / Module Size
Max NC Rating
Type Count for Space
Unit Identity
Gas Supply Input Rate
ET-1
379 lb
Humidity Sensor
Humidistat
Thermostat
Temp/ CO2 Sensor
Temp/ Humidity Sensor
Temperature Sensor
AHU-1
Ball Valve
Balancing Valve
Butterfly Valve
Check Valve
Circuit Setter
Gate Valve
Globe Valve
Locked Shield Valve
Pressure Reducing Valve
Quick Opening Valve
Fluid Strainer
Elec. Control Valve
3-Way Elec. Valve
Emergency Gas Shutoff
Plug Valve
Gas Shutoff Cock
Gas Regulator
2" CHECK
Throw Pattern
Room
PRIOR TO BRINGING ANY HEAVY EQUIPMENT (TRUCKS, TRAILERS, LIFTS,
ETC.) ON SITE THE CONTRACTOR SHALL DOCUMENT WITH PHOTOS/VIDEO
ANY EXISTING DAMAGE THAT COULD BE CONSTRUED AS BEING CAUSED BY
THE CONSTRUCTION ACTIVITIES. DAMAGED ELEMENTS INCLUDE, BUT ARE
NOT LIMITED TO, SIDEWALKS, CURBS, DRIVEWAYS, PARKING LOTS AND
GRASSY AREAS. DOCUMENTATION SHALL BE PROVIDED TO THE OWNER AND
ENGINEER PRIOR TO STARTING WORK. ANY DAMAGE INCURRED DURING THE
CONSTRUCTION PROCESS SHALL BE REPAIRED TO THE SATISFACTION OF
THE OWNER AND ENGINEER. THIS INCLUDES, BUT IS NOT LIMITED TO
CONCRETE, ASPHALT, AND REGRADING/RESEEDING OF GRASSY AREAS.
GENERAL CONDITIONS
GAS COMPANY CONTACT
MIKE PLYMALE
MOUNTAINEER GAS COMPANY
OFFICE TELEPHONE: 888-420-4427
MOBILE TELEPHONE: 304-539-1973
Email: michaelplymale@mgcwv.com
PRIOR TO START OF CONSTRUCTION WORK CONTRACTOR SHALL CONTACT
MOUNTAINEER GAS COMPANY'S SERVICE DEPARTMENT AND SCHEDULE AN
ONSITE MEETING WITH THE PERSON RESPONSIBLE FOR WV CAPITOL
COMPLEX BLDG#1 AND COORDINATE WITH GENERAL SERVICES DIVISION.
GAS UTILITY CONTACT INFORMATION
CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL WORK TO
AVOID CONFLICTS WITH THE FIRE PROTECTION SPRINKLER SYSTEM. IF
PIPING SYSTEM MODIFICATIONS OR RELOCATION ARE NECESSARY THE
CONTRACTOR SHALL PERFORM THE WORK REQUIRED AT NO ADDITIONAL
COST TO THE OWNER. ALL WORK ON THE FP SPRINKLER SYSTEM MUST BE
PERFORMED BY A LICENSED SPRINKLER CONTRACTOR AND MUST COMPLY
WITH ALL APPLICABLE CODES. SHUTDOWN AND DRAINING OF ANY PART OF
THE SYSTEM WILL BE COORDINATED WITH THE OWNER IN ADVANCE AND
PROVISIONS MADE TO PROTECT THE BUILDING WHILE THE SYSTEM IS
DRAINED IN ACCORDANCES WITH THE WV STATE FIRE MARSHAL
REQUIREMENTS AND THE AUTHORITY HAVING JURISDICTION.
SPRINKLER SYSTEM NOTES
HVAC GENERAL NOTES
1 SUPPLY AND RETURN PIPING TO COILS ARE THE SAME SIZE.
2 CONTRACTOR SHALL LOCATE THERMOSTATS AND TEMPERATURE SENSORS AT 5'-0" AFF, A
MINIMUM OF 8" FROM LIGHT SWITCH.
3 REFER TO HVAC DRAWINGS FOR THERMOSTAT AND TEMPERATURE SENSOR LOCATIONS.
4 CONDENSATE DRAINS SHALL BE SUPPLIED FOR ALL COOLING EQUIPMENT. CONTRACTOR SHALL
ENSURE PROPER INSTALLATION AND DRAINAGE AS REQUIRED BY FEDERAL, STATE, AND LOCAL
CODES. CONDENSATE PIPING SHALL BE TYPE "L" COPPER.
5 ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK SHALL BE RATED FOR PRESSURE CLASS OF 2"
W.G. UNLESS NOTED OTHERWISE.
6 COORDINATE THE EXACT LOCATION OF ALL CEILING DIFFUSERS, REGISTERS, AND GRILLES WITH
NEW AND EXISTING LIGHTING.
7 PROVIDE A CAST IN PLACE HOUSEKEEPING PAD FOR EACH PIECE OF MECHANICAL EQUIPMENT -
SEE DETAIL.
8 THIS CONTRACTOR SHALL BE REQUIRED TO REPLACE FILTERS ON HVAC EQUIPMENT AFTER ALL
DUST PRODUCING CONSTRUCTION HAS BEEN COMPLETED AND PRIOR TO THE FINAL PUNCH.
9 ALL RECTANGULAR, ROUND, FLAT OVAL, AND FLEXIBLE DUCTS SHALL BE SIZED AS SHOWN ON
THESE DRAWINGS. MINIMUM INTERNAL DIMENSIONS ARE GIVEN. ALL DUCT SIZES. SHOWN ARE
INTERNAL FREE AREA DIMENSIONS AND EXCLUDE INSULATION. REFER TO SPECIFICATIONS FOR
DUCT INSULATION REQUIREMENTS.
10 INSTALL TURNING VANES IN ALL 90° SUPPLY, RETURN, AND EXHAUST DUCT ELBOWS AND AT ALL
DUCT "TEES" FOR LOW-PRESSURE DUCT.
11 ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED ACCORDING TO THE MOST RECENTLY
PUBLISHED ASHRAE AND SMACNA STANDARDS.
12 THE CONTRACTOR SHALL CAREFULLY COORDINATE THE LOCATION OF ALL DUCTS, GRILLES,
DIFFUSERS, ETC., WITH THE CEILING GRIDS, CEILING SYSTEMS AND ALL OTHER CONTRACTORS
WORK.
13 THESE DRAWINGS ARE BASED UPON HISTORICAL DRAWINGS OF THE EXISTING BUILDING AND
FIELD VERIFICATION OF PORTIONS OF THE WORK, ADDITIONAL FIELD INVESTIGATION BY
CONTRACTOR IS REQUIRED PRIOR TO SUBMISSION OF BIDS TO VERIFY THE INFORMATION
SHOWN IS ACCURATE. CONTRACTOR SHALL PROVIDE UPDATES TO REFLECT ANY CHANGES IN
THE RECORD DRAWINGS TO BE SUBMITTED AT THE CLOSE OF THE PROJECT.
14 NOT ALL DETAILS ARE SHOWN IN ONE LOCATION. REFER TO ISOMETRICS, FLOW DIAGRAMS, DETAILS, ENLARGED PLANS, AND FLOOR PLANS FOR ADDITIONAL INFORMATION.
15 CONTRACTOR SHALL FURNISH AND INSTALL INSULATION ON ALL NEW PIPING, FITTINGS, VALVES
AND EQUIPMENT UNLESS OTHERWISE RECOMMENDED BY THE EQUIPMENT MANUFACTURER.
CONTRACTOR SHALL INCLUDE ADDITIONAL INSULATION IN THE BASE BID PROPOSAL. BEYOND
WHAT IS INDICATED AND NOTED IN THE BID DOCUMENTS, AS FOLLOWS: •PROVIDE A MINIMUM OF
(5) LINEAL FEET (LF) ON EXISTING PIPE AND FITTINGS AT POINTS OF NEW PIPE CONNECTIONS.
•WHERE NEW VALVES AND FITTINGS ARE SHOWN INSTALLED IN EXISTING PIPING SYSTEMS,
PROVIDE A MINIMUM OF FIVE (5) LINEAL FEET (LF) OF INSULATION ON EITHER SIDE OF THE
COMPONENTS FOR THE EXISTING PIPE AND FITTINGS.
•ALLOW FOR AN ADDITIONAL 100 LF OF INSULATION FOR EXISTING PIPE AND FITTINGS IN SIZES
UP TO 8” NPS TO BE APPLIED WHERE MISSING/DAMAGES INSULATION IS ENCOUNTERED AND AS
DIRECTED BY THE OWNER/ENGINEER.
•REFER TO SPECIFICATIONS SECTION FOR DETAILS ON THE INSULATION REQUIREMENTS. ALL
COSTS FOR COMPLETE FURNISHING AND INSTALLING THE ADDITIONAL INSULATION DESCRIBED
HERE SHALL BE INCLUDED IN THE CONTRACTOR’S BASE BID PROPOSAL.
16 ALL DUCTWORK LOCATED ON EXTERIOR OF BUILDING SHALL HAVE TOP SURFACE CROWNED OR
SLOPED TO ENABLE PROPER DRAINAGE.
PROJECT REQUIREMENTS
1 REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.
2 THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, PRIOR TO
FINAL BID, ALL EXISTING CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS WITHIN
RENOVATION AREA AND WITHIN CLOSE PROXIMITY OF THE RENOVATION AREA.
3 THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING AND PROPERLY
DISPOSING ALL CONSTRUCTION WASTE. DISPOSAL AND/OR RECYCLING OF MATERIALS
SHALL BE IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND
REGULATIONS.
4 WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT
CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR
TO START OF WORK. UNSEAL DRAINS AT COMPLETION OF CONSTRUCTION.
5 COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT, LIGHTS, CABLE TRAY,
STRUCTURE, AND EQUIPMENT TO PREVENT CONFLICTS.
6 THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH EXISTING AND
THOSE ILLUSTRATED BY THESE DOCUMENTS AS WELL AS THOSE WHICH CAN BE
REASONABLY ANTICIPATED INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL,
ELECTRICAL, VENTILATION, PLUMBING, AND OTHER SYSTEMS INVOLVED ON THIS PROJECT.
7 FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM
TO ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING
BUT NOT LIMITED TO THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL
MECHANICAL CODE.
8 LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE CEILING.
9 ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0" FROM EDGE OF ROOF.
10 LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE SPACE ABOVE
ELECTRICAL PANELS. TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT.
11 PENETRATIONS OF RATED ASSEMBLIES SHALL BE FIRE STOPPED. FIRE STOPPING SHALL
BE AN APPROVED MATERIAL AS PRESCRIBED IN CSFM STANDARD 43-1 AND SHALL BE U.L.
LISTED.
12 PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH FOUNDATIONS,
FLOORS, WALLS, AND ROOF.
13 MAINTAIN CLEAR ACCESS TO SERVICE EQUIPMENT AND OTHER ACCESSORIES REQUIRING
SERVICE, VISUAL INSPECTION OR HAND OPERATION. WHERE INDICATED OR REQUIRED,
PROVIDE ACCESS PANELS OF THE TYPE SELECTED TO SUIT MATERIALS IN WHICH
INSTALLED.
14 ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL
EQUIPMENT.
15 REFER TO HVAC SERIES DRAWINGS FOR GAS AND A.C. CONDENSATE DRAIN PIPING.
16 PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL ANOTHER SIZE
IS SHOWN.
17 FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE
SEGMENTS, REFER TO DETAILS, SCHEDULES, AND SPECIFICATIONS.
18 INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S
WRITTEN INSTALLATION INSTRUCTIONS, AT A LEVEL OF QUALITY AND WORKMANSHIP
CONSISTENT WITH THE SPECIFICATIONS.
19 LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED ON THE DRAWING, ARE
APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. WORK SHALL BE
COORDINATED WITH ALL OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD.
20 INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL IN ROOMS WITHOUT
CEILINGS.
21 THE CONTRACTOR'S WORK SCHEDULE SHALL BE SUBMITTED TO AND APPROVED BY THE
OWNER.
22 PRIOR TO STARTING WORK, SUBMIT SHOP DRAWINGS FOR ALL MECHANICAL EQUIPMENT.
23 CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS AND SHALL ARRANGE
FOR ALL INSPECTIONS AS REQUIRED.
24 DEMOLITION WORKS SHALL BE SCHEDULED AT ALL TIMES AND BE SUBJECT TO THE
DIRECTION AND APPROVAL OF THE OWNER AND IMPLEMENTED WITHOUT DISRUPTION OF
OCCUPIED AREAS SURROUNDING THE DEMOLITION ZONE.
25 EXISTING ITEMS OR SURFACES TO REMAIN WHICH ARE DAMAGED AS A RESULT OF THIS
WORK SHALL BE REFINISHED OR REPLACED TO THE SATISFACTION OF THE OWNER'S
REPRESENTATIVE AT NO ADDITIONAL COST.
26 NEW EQUIPMENT LOCATED WITHIN 6’ OF EXISTING SKYLIGHTS MUST HAVE FALL
PROTECTION OR METAIL SCREENS AROUND THE SKYLIGHTS TO HOLD THE WEIGHT OF A
PERSON.
27 FIRE SEAL AROUND DUCT AND PIPING PENETRATIONS OF FIRE RATED WALLS. REFER TO
SPECIFICATION.
28 ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE ON
SITE. REPLACE ANY AND ALL CONTRACTOR-SUPPLIED DEFECTIVE DEVICES, ITEMS OR
SYSTEMS AT NO ADDITIONAL COST TO THE OWNER PRIOR TO COMPLETION OF THE
PROJECT.
29 THE PHASING OF THIS WORK IS CRUCIAL. THE CONTRACTOR SHALL WORK WITH OTHER
TRADES INVOLVED WITH THE OWNER TO ENSURE WORK IS COMPLETED WITHIN SPECIFIED
TIME PERIODS.
30 ALL PERMITS AND FEES REQUIRED FOR THE WORK SHALL BE SECURED AND PAID FOR BY
THE CONTRACTOR AND SHALL BE INCLUDED IN THE BASE PRICE.
31 REFER TO OTHER DRAWINGS FOR ADDITIONAL GENERAL NOTES.
32 THE CONTRACTOR SHALL COOPERATE FULLY WITH ALL OTHER TRADES.
33 WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO
NOT CHANGE THE SCOPE OR NATURE OF THE WORK REQUIRED, THE CONTRACTOR SHALL
MAKE THE CHANGES WITHOUT ADDITIONAL COST TO THE OWNER. NO OTHER CHANGES
MAY BE MADE WITHOUT WRITTEN PERMISSION OF THE OWNER'S REPRESENTATIVE.
34 ALL EQUIPMENT, FIXTURES AND MATERIALS SHALL BE NEW AND UNUSED. THE
CONTRACTOR SHALL INSTALL ALL EQUIPMENT, FIXTURES AND MATERIALS IN STRICT
CONFORMANCE TO MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL EQUIPMENT AND
FIXTURES WITH ALL THE ACCESSORIES SUCH AS TRIM, STOPS, HANGERS, CARRIERS,
SUPPORTS, ETC AS REQUIRED FOR COMPLETE INSTALLATION.
35 THE EQUIPMENT ROUGH-IN DIMENSIONS AND THEIR DIMENSIONED LOCATIONS FOR ALL
CONNECTIONS SHALL BE COORDINATED WITH EQUIPMENT FURNISHED. FURNISHED
EQUIPMENT MAY VARY FROM WHAT IS SHOWN ON THE CONSTRUCTION DOCUMENTS;
THEREFORE, THESE ITEMS AND DIMENSIONS SHALL BE VERIFIED WITH THE EQUIPMENT
SUPPLIER, OWNER, AND/OR EQUIPMENT ROUGH-IN DRAWINGS. THE ENGINEER SHALL BE
IMMEDIATELY NOTIFIED OF ANY DEVIATIONS FROM WHAT IS SHOWN OR IMPLIED IN THE
CONTRACT DOCUMENTS, PRIOR TO CONSTRUCTION. FAILURE OF THE CONTRACTOR TO
VERIFY ROUGH-INS OR THEIR LOCATIONS SHALL PLACE THE RESPONSIBILITY FOR ANY
SUBSEQUENT RELOCATION AND/OR ADDITIONAL ROUGH-INS DIRECTLY UPON THE
CONTRACTOR.
36 CONTRACTOR SHALL SEAL ALL PIPING, CONDUIT AND DUCTWORK PENETRATIONS IN FIRE
RATED WALLS, FLOORS AND ROOFS WITH UL APPROVED MATERIALS IN ACCORDANCE WITH
NFPA & SPEC. DIVISION 7.
37 HVAC, PLUMBING, ELECTRICAL, SPRINKLER AND GENERAL TRADES CONTRACTORS SHALL
COORDINATE INSTALLATION OF THEIR WORK IN AREAS WHERE SPACE IS LIMITED AT NO
ADDITIONAL COST. THE PRIORITIES FOR THE SPACE SHALL BE IN THE FOLLOWING ORDER:
1. SANITARY, CONDENSATE AND OTHER PIPING WHICH MUST BE SLOPED FOR PROPER
DRAINAGE. 2. HVAC DUCTWORK. 3. ELECTRICAL CONDUITS 3" AND LARGER 4. SPRINKLER
PIPING.
38 ANY COSTS INCURRED DUE TO LACK OF COOPERATION AMONG THE TRADES SHALL BE
BORNE BY THE CONTRACTOR.
39 THE CONTRACTOR SHALL INCLUDE THE COST IN HIS BASE BID FOR ANY EQUIPMENT THAT
WILL REQUIRE A PREMIUM "QUICK SHIP" COST TO MEET THE REQUIRED SCHEDULE. NO
CHANGE ORDERS WILL BE PERMITTED FOR "QUICK SHIP" COSTS.
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
http://www.ZDSDesign.com
135 Corporate Center Drive Suite 532 Scott Depot, WV 25560
TEL 304/755-0075
FAX 304/755-0076
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
XXX
C U s e rs
\v in e e l.
b u s a
\D o c u m e n ts
\G S
D
C
M E
P
B u ild in g
-V v in e e l.
b u s a
.r v t
/3
/2
:3
:3
P M
M001
DC
TZ3
GSD-241-C
HVAC TITLE SHEET
Building #1 House Chambers HVAC Upgrades
1900 Kanawha Boulevard East, Charleston, WV 25305
West Virginia Department of Administration General Services Division
PROJECT REQUIREMENTS
40 CONTRACTOR SHALL FURNISH AND INSTALL FLEXIBLE CONNECTORS AT ALL DUCT AND
PIPING CONNECTIONS TO AIR-HANDLERS, AND ALL OTHER EQUIPMENT WITH ROTATING
ELEMENTS. FLEXIBLE PIPE CONNECTORS SHALL HAVE RESTRAINING RODS WHERE
RECOMMENDED BY FLEX CONNECTOR MANUFACTURER. FLEXIBLE CONNECTOR SHALL BE
SUITABLE FOR SYSTEM PRESSURE AND TEMPERATURE OPERATING REQUIREMENTS. ALL
MOTORS WITHIN OR LOCATED OUTSIDE OF HVAC AIR HANDLERS SHALL BE ISOLATED FROM
THE AIR HANDLING EQUIPMENT BY MEANS OF RUBBER-IN-SHEAR, SPRING, ETC, ISOLATORS.
41 DO NOT SCALE THE DRAWINGS, WRITTEN DIMENSIONS GOVERN. LARGER SCALE DRAWINGS
SHALL GOVERN SMALLER SCALE DRAWINGS.
42 TEMPERATURE CONTROL WIRING AND CONDUIT (UNLESS OTHERWISE INDICATED ON THE
DRAWINGS AND CONTROL SECTIONS OF SPECIFICATIONS) SHALL BE THE RESPONSIBILITY
OF THE CONTROLS CONTRACTOR. ALL WIRING AND CONDUIT, INCLUDING POWER WIRING,
REQUIRED FOR THE AUTOMATIC TEMPERATURE CONTROL SYSTEM TO BE FULLY
FUNCTIONAL SHALL BE THE RESPONSIBILITY OF THE CONTROLS CONTRACTOR AND ALL
COSTS SHALL BE INCLUDED IN THEIR PROPOSAL.
43 THE CONTROLS CONTRACTOR SHALL ENGAGE AN ELECTRICAL CONTRACTOR TO PROVIDE
ALL POWER WIRING, CONDUIT AND BOXES REQUIRED FOR THE AUTOMATIC TEMPERATURE
CONTROL SYSTEM TO BE FULLY OPERATIONAL. POWER WIRING ASSOCIATED WITH THE
AUTOMATIC TEMPERATURE CONTROL SYSTEM INDICATED ON THE ELECTRICAL DRAWINGS
IS CONSIDERED PART OF THE ELECTRICAL CONTRACTORS SCOPE OF WORK AND SHALL BE
INCLUDED IN THEIR PROPOSAL. ALL COST FOR ADDITIONAL POWER WIRING NOT INDICATED
ON DRAWINGS AND REQUIRED FOR CONTROLS SHALL BE INCLUDED AS PART OF THE
CONTROLS CONTRACTORS PROPOSAL.
44 UPON COMPLETION OF WORK, THE CONTRACTOR SHALL WALK THROUGH THE SITE WITH
THE ENGINEER AND COMPILE A "PUNCH LIST" OF INCORRECT, UNSATISFACTORY AND/OR
INCOMPLETE WORK. FINAL PAYMENT WILL BE CONTINGENT UPON THE COMPLETION OF
THESE ITEMS.
45 CONTRACTOR SHALL KEEP THE PREMISES FREE OF ACCUMULATED WASTE MATERIALS AND
RUBBISH. THE PREMISES SHALL BE SWEPT CLEAN DAILY OF RELATED CONSTRUCTION
DEBRIS. AT THE COMPLETION OF WORK, LEAVE THE JOB SITE FREE OF ALL WASTE
MATERIALS AND BROOM CLEAN.
46 THERE SHALL BE NO SUBSTITUTIONS WITHOUT PRIOR APPROVAL OF THE ENGINEER.
WHERE THE TERMS "EQUAL TO" OR "APPROVED EQUAL" ARE USED, THE ENGINEER SHALL
DETERMINE EQUALITY BASED ON THE INFORMATION SUBMITTED BY THE CONTRACTOR.
47 CONTRACTOR SHALL CUT AND PATCH AS REQUIRED FOR THE INSTALLATION OF NEW
WORK.
48 THE SUBMISSION OF A BID OR PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT THE
CONTRACTOR HAS FAMILIARIZED HIMSELF WITH THE PLANS AND BUILDING SITE. CLAIMS
MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND/OR LABOR DUE TO
DIFFICULTIES WILL NOT BE RECOGNIZED, UNLESS THESE DIFFICULTIES COULD NOT HAVE
BEEN FORESEEN EVEN THOUGH PROPER EXAMINATION HAD BEEN MADE AS DETERMINED
BY THE OWNERS REPRESENTATIVE/ENGINEER.
49 MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SHALL MEET ALL PERTINENT
REQUIREMENTS OF NATIONALLY RECOGNIZED TESTING ORGANIZATIONS SUCH AS UL,
ASTM, ASME, AWWA, AGA AND NFPA AS WELL AS THE MOST CURRENT VERSION OF
INTERNATIONAL BUILDING CODES, THE STATE ADOPTED CODE AND LOCAL AMENDMENTS.
50 TESTING SHALL BE PERFORMED ON ALL WORK UNDER THIS CONTRACT AND SHALL BE
SCHEDULED SO AS TO ALLOW WITNESSING BY THE OWNER'S REPRESENTATIVE. THE
METHODS, TIMES AND DATES, WITNESSES TO, AND RESULTS OF THE TESTING SHALL BE
RECORDED AND SUBMITTED TO ENGINEER FOR REVIEW AND SHALL BE INCLUDED AS PART
OF MAINTENANCE MANUALS.
51 WHERE THE WORK OF THE INSTALLER WILL BE PERFORMED IN CLOSE PROXIMITY TO, OR
WILL INTERFERE WITH WORK OF OTHER TRADES, HE SHALL ASSIST IN WORKING OUT
SPACE CONDITIONS TO MAKE SATISFACTORY ADJUSTMENT AS REQUIRED. AS REQUIRED
FOR COORDINATION THE INSTALLER SHALL PREPARE COMPOSITE WORKING DRAWINGS
AND SECTIONS AT A SCALE NOT LESS THAN 1/4" =1'-0", CLEARLY SHOWING HOW HIS WORK
IS TO BE INSTALLED IN RELATION TO THE WORK OF OTHER TRADES. IF DIRECTED BY THE
ENGINEER, THE CONTRACTOR SHALL PREPARE ADDITIONAL COMPOSITE WORKING
DRAWINGS AND SECTIONS CLEARLY SHOWING HOW WORK IS TO BE INSTALLED IN
RELATION TO THE WORK OF OTHER TRADES. FAILURE OF THE CONTRACTOR TO
COORDINATE HIS WORK WITH THE WORK OF OTHER TRADES SHALL PLACE THE
RESPONSIBILITY FOR AND SUBSEQUENT CORRECTIVE ACTION/ RELOCATION OF SAID WORK
UPON THE CONTRACTOR.
52 MANUFACTURER'S MINIMUM CLEARANCE RECOMMENDATIONS SHALL BE MAINTAINED ON
ALL EQUIPMENT AND DUCTWORK.
53 THE CONTRACTOR SHALL CAREFULLY COORDINATE ALL THERMOSTAT LOCATIONS WITH
INTERIOR FINISHES AND FURNISHINGS. VERIFY LOCATIONS WITH INTERIOR ELEVATIONS.
54 NO PIPING AND PLUMBING SHALL BE ROUTED OVER ELECTRICAL EQUIPMENT IN
ACCORDANCE WITH NEC AND/OR THE AUTHORITY HAVING JURISDICTION. THE HVAC,
PLUMBING AND FIRE PROTECTION CONTRACTORS SHALL COORDINATE WITH THE
ELECTRICAL CONTRACTOR TO PREVENT INSTALLING NEW PIPING OR PLUMBING LINES
OVER ELECTRICAL EQUIPMENT. THE HVAC, PLUMBING, AND FIRE PROTECTION
CONTRACTORS SHALL RELOCATE NEW DUCTWORK, PIPING, AND PLUMBING AT NO
ADDITIONAL COST TO THE OWNER IF IT IS NOT INSTALLED IN ACCORDANCE TO CURRENT
CODES RELATED TO THE ELECTRICAL EQUIPMENT.
55 ALL ITEMS REQUIRED TO BE REMOVED OR RELOCATED FOR INSTALLATION OF NEW WORK
MAY NOT BE INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY THE
LOCATIONS OF ALL EXISTING DEVICES REQUIRING REMOVAL OR RELOCATION PRIOR TO
BIDDING.
56 PRIOR TO BRINGING ANY HEAVY EQUIPMENT (TRUCKS, TRAILERS, LIFTS, ETC) ON SITE THE
CONTRACTOR SHALL DOCUMENT WITH PHOTOS/VIDEO ANY EXISTING DAMAGE THAT COULD
BE CONSTRUED AS BEING CAUSED BY THE CONSTRUCTION ACTIVITIES. DAMAGED
ELEMENTS INCLUDE BUT ARE NOT LIMITED TO, SIDEWALKS, CURBS, DRIVEWAYS, PARKING
LOTS AND GRASSY AREAS. DOCUMENTATION SHALL BE PROVIDED TO THE OWNER AND
ENGINEER PRIOR TO STARTING WORK. ANY DAMAGE INCURRED DURING THE
CONSTRUCTION PROCESS SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER AND
ENGINEER. THIS INCLUDES BUT IS NOT LIMITED TO CONCRETE, ASPHALT, AND
REGRADING/RESEEDING OF GRASSY AREAS.
57 NOT ALL DETAILS AND REQUIREMENTS ARE SHOWN IN ONE LOCATION. REFER TO
ISOMETRICS, FLOW DIAGRAMS, DETAILS, ENLARGED PLANS, SPECIFICATIONS, AND FLOOR
PLANS FOR ADDITIONAL INFORMATION.
58 CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES DURING CONSTRUCTION. EXISTING
UTILITIES THAT ARE NOT TO BE REMOVED OR ABANDONED SHALL REMAIN OPERATIONAL AT
ALL TIMES. ANY DAMAGED DEVICES SHALL BE REPAIRED OR REPLACED AT THE END OF
EACH WORK DAY BEFORE LEAVING THE SITE.
59 SHOULD EXISTING CONDITIONS IN THE FIELD NECESSITATE CONSTRUCTION METHODS OR
MEANS OTHER THAN THOSE SHOWN OR SPECIFIED, THE CONTRACTOR SHALL NOTIFY THE
ENGINEER TO OBTAIN APPROVAL PRIOR TO PROCEEDING WITH CONSTRUCTION.
60 ALL DISTURBED AREAS SHALL BE RESTORED TO THE ORIGINAL CONDITION OR BETTER.
61 ANY DAMAGE OUTSIDE SCOPE OF WORK INCLUDING THE CONSTRUCTION ACCESS SHALL
BE CORRECTED AT THE CONTRACTOR’S EXPENSE. METAL PLATES MAY BE UTILIZED TO
PROTECT EXISTING FEATURES.
62 SURROUNDING FACILITIES ARE TO REMAIN IN OPERATION DURING CONSTRUCTION. ALL
WORK SHALL BE CONDUCTED SO AS TO MINIMIZE DISRUPTION TO THOSE FACILITIES.
63 THE CONTRACTOR SHALL MAINTAIN TRAFFIC AT ALL TIMES. PEDESTRIAN THRUWAY
TRAFFIC AND ACCESS TO ALL BUILDINGS IS TO BE MAINTAINED AT ALL TIMES. THE
CONTRACTOR SHALL PROVIDE THE APPROPRIATE PROTECTIONS INCLUDING PEDESTRIAN
SAFETY AND DIRECTIONAL SIGNS DURING ALL PHASES OF WORK.
64 SURFACED STREETS AND PARKING AREAS SHALL BE MAINTAINED IN A CLEAN CONDITION.
MUD AND DUST FREE AT ALL TIMES. ADEQUATE MEANS SHALL BE PROVIDED TO CLEAN
TRUCKS AND EQUIPMENT. ALL TOOLS AND EQUIPMENT SHALL BE STORED WITHIN THE
CONTRACTOR’S APPROVED STAGING AREA.
65 ALL WORK SHALL BE PERFORMED IN A NEAT, PROFESSIONAL, AND SAFE MANNER AND
SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL CODES.
66 ALL PIPE SHALL BE CLEANED BEFORE THEY ARE INSTALLED AND SHALL BE KEPT CLEAN
UNTIL ACCEPTANCE OF THE COMPLETED WORK BY THE OWNER. OPEN END PIPES SHALL BE
FITTED WITH WATER TIGHT STOPPERS TO PREVENT ENTRANCE OF FOREIGN MATTER
WHEN PIPE-LAYING OPERATIONS ARE INTERRUPTED.
67 CONTRACTOR IS RESPONSIBLE FOR LOCATION AND COORDINATION OF ALL APPLICABLE
BELOW AND ABOVE GROUND UTILITIES, PIPING AND EQUIPMENT. CONTRACTOR SHALL
CONTACT SITE UTILITY LOCATOR SERVICE TO OBTAIN ALL UNDERGROUND UTILITY
LOCATIONS PRIOR TO ANY CONSTRUCTION. NEW AND EXISTING ABOVE AND
UNDERGROUND UTILITIES, PIPING AND EQUIPMENT SHALL BE PROTECTED ALL THE TIMES.
68 ALL BUILDING PENETRATIONS SHALL BE FLASHED AND SEALED PER THE SPECIFICATION
REQUIREMENTS.
69 CONTRACTOR SHALL COORDINATE EGRESS REQUIREMENTS WITH OWNER WHEN
CONSTRUCTION ACTIVITIES IMPACT USING THE BUILDING EGRESS AS REQUIRED TO MEET
WV STATE FIRE MARSHALL REQUIREMENTS.
70 CONTRACTOR SHALL FURNISH AND INSTALL A SPARE PULL STRING AT EACH CONDUIT
INSTALLED AND/OR UTILIZED.
NO DATE REVISION
Title Sheet Revision
X Y
Z AA BB CC DD EE FF GG HH II JJ KK LL MM NN OO PP QQ RR
(E)G
(E)G
(E)G
(E)G
MP301
(E)RF-XX
MD301
MD301
8" LPS
8" L
P S
KEYPLAN
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
http://www.ZDSDesign.com
135 Corporate Center Drive
Suite 532 Scott Depot, WV 25560
TEL 304/755-0075
FAX 304/755-0076
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
XXX
C U s e rs
\v in e e l.
b u s a
\D o c u m e n ts
\G S
D
C
M E
P
B u ild in g
-V v in e e l.
b u s a
.r v t
/3
/2
:3
:2
P M
MD101
DC
TZ3
GSD-241-C
MECHANICAL
DEMOLITION -
BASEMENT
Building #1 House Chambers HVAC Upgrades
1900 Kanawha Boulevard East, Charleston, WV 25305
West Virginia Department of Administration General Services Division
KEYNOTES
1 DEMOLISH AND REPLACE EXISTING RETURN AIR FAN WITH NEW FAN WALL.
DEMOLISH EXISTING PNEUMATIC CONTROLS AND ACTUATORS FOR EXISTING FAN
CONTROLS.
2 MODIFY EXISTING SUPPLY AIR HANDLING UNIT AS REQUIRED TO INTEGRATE
EXISTING EQUIPMENT INTO NEW DOAS SYSTEM. DEMOLISH EXISTING CONTROLS
AND SEE M701 FOR NEW CONTROLS DIAGRAM.
3 FIELD VERIFY EXISTING NATURAL GAS PIPING TO SUPPLY GAS TO NEW ROOFTOP
MOUNTED DOAS EQUIPMENT.
4 ABANDON EXISTING STEAM PREHEAT COIL, STEAM AND CONDENSATE PIPE, AND
STEAM TRAPS. CAP AND INSULATE STEAM AND CONDENSATE LINES. PATCH AND
INSULATE AIR HANDLER CASING TO MATCH EXISTING CONSTRUCTION AND SEAL
TO MAKE AIRTIGHT.
5 REMOVE AND DEMOLISH HUMIDIFIER AND HUMIDIFIER PIPE FROM AIR HANDLER
WITHOUT IMPACTING STRUCTURAL INTEGRITY OF HOUSING.
1/8" = 1'-0"MD101
1 MECHANICAL DEMOLITION - BASEMENT
GENERAL HVAC DEMOLITION NOTES
1 IF DURING CONSTRUCTION OF THIS PROJECT, WORK INVOLVING HAZARDOUS MATERIALS IS
SUSPECTED OR ENCOUNTERED ALL WORK IN THIS AREA SHALL BE DISCONTINUED AND THE
OWNER'S REPRESENTATIVE SHALL BE NOTIFIED IMMEDIATELY AND THE OWNER WITH HIS
OWN FORCES OR BY SEPARATE CONTRACT SHALL BE RESPONSIBLE FOR COMPLETE
INVESTIGATION, REMOVAL, AND DISPOSAL OF THE HAZARDOUS MATERIALS IN
ACCORDANCE WITH APPLICABLE LAWS AND REGULATIONS. IF COSTS ARE INVOLVED
BECAUSE OF SUCH ACTION BY THE OWNER: CONTRACTOR SHALL FILE CLAIM AS PROVIDED
ELSEWHERE IN THE CONTRACT DOCUMENTS.
2 CONTRACTOR SHALL REMOVE EXISTING CEILINGS AND ALL CEILING MOUNTED EQUIPMENT,
DEVICES, ETC. AS REQUIRED FOR NEW WORK. RELOCATE OR REPLACE AS NECESSARY TO
MAINTAIN FULLY OPERATIONAL SYSTEMS AS THEY CURRENTLY EXIST. ANY REQUIRED
REMOVAL, RELOCATION OR REPLACEMENT OF EXISTING CONDUIT, PIPING, DUCTWORK
SYSTEMS, WIRING, ETC. RELATED TO COMPLETING THIS PROJECT SHALL BE INCLUDED IN
BASE BID PROPOSAL AT NO ADDITIONAL COST TO THE OWNER.
3 CONTRACTOR SHALL PATCH AND PAINT TO MATCH EXISTING ADJACENT FINISHES ON ALL
EXISTING WALLS, FLOORS, CEILINGS, AND SURFACES WHERE AREAS ARE EXPOSED
DURING DEMOLITION WORK INCLUDING, BUT NOT LIMITED TO, AREAS BEHIND HVAC
EQUIPMENT, PIPES, DUCTWORK, TRANSFER GRILLES ETC THAT WERE REMOVED.
4 CONTRACTOR SHALL SCHEDULE ALL WORK WITH THE OWNER'S REPRESENTATIVE PRIOR
TO START OF CONSTRUCTION TO ENSURE ADJACENT AREAS REMAIN IN OPERATION AS
REQUIRED.
5 ALL ITEMS REQUIRED TO BE REMOVED OR RELOCATED FOR INSTALLATION OF NEW WORK
MAY NOT BE INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY THE
LOCATIONS OF ALL EXISTING DEVICES REQUIRING REMOVAL OR RELOCATION PRIOR TO
BIDDING AND INCLUDE COSTS IN BASE BID PROPOSAL.
6 CONTRACTOR SHALL CUT AND PATCH AS REQUIRED FOR THE INSTALLATION OF NEW
WORK, RELOCATING EXISTING OR REMOVING EXISTING WORK, EQUIPMENT OR SYSTEMS.
7 OWNER SHALL REMOVE EXISTING LOOSE FURNISHINGS SUCH AS DESKS, CHAIRS, TABLES,
ETC., FOR INSTALLATION OF NEW WORK CONTRACTOR SHALL COORDINATE EXTENT OF
REQUIRED WORK WITH OWNER. CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING AND SCHEDULING WITH THE OWNER A MINIMUM OF (3) DAYS IN ADVANCE
OF WHEN THE FURNISHINGS NEED MOVED AND WILL NOT CONTACT THE OWNER ON
MULTIPLE OCCASIONS DURING A SINGLE WORK DAY. CONTRACTOR SHALL BE
RESPONSIBLE FOR RELOCATION AND REINSTALLATION OF ALL ELECTRICAL, PIPING, LIGHT
SWITCHES, FIRE ALARM DEVICES, SPRINKLERS/FIRE PROTECTION, THERMOSTATS, ETC. AS
REQUIRED FOR INSTALLATION OF NEW WORK. CONTRACTOR SHALL FIELD VERIFY THE
LOCATION AND QUANTITIES OF ALL THE ITEMS TO BE RELOCATED AND/OR REMOVED AND
SHALL BE INCLUDED IN THE BASE BID.
8 DEMOLITION WORK SHALL BE SCHEDULED AT ALL TIMES AND BE SUBJECT TO THE
DIRECTION AND APPROVAL OF THE OWNER AND IMPLEMENTED WITHOUT DISRUPTION OF
OCCUPIED AREAS SURROUNDING THE DEMOLITION ZONE.
9 CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING AND PROPERLY DISPOSING OF
ALL CONSTRUCTION WASTE. DISPOSAL AND/OR RECYCLING OF MATERIALS SHALL BE IN
ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND
REGULATIONS.
10 PRIOR TO ANY DEMOLITION, THE GENERAL CONTRACTOR SHALL COORDINATE BRACING TO
MAINTAIN THE STRUCTURAL INTEGRITY OF THE REMAINING ELEMENTS OF THE BUILDING AS
REQUIRED.
11 PORTIONS OF ROOFTOP MOUNTED DUCTWORK WILL BE INSTALLED SIMULTANEOUSLY.
CONTRACTOR SHALL COORDINATE FULLY WITH OTHER OWNER/CONTRACTOR WORK
INCLUDING PHASING OF WORK AND FINAL DUCTWORK CONNECTIONS FOR BOTH
DEMOLITION AND NEW WORK AS REQUIRED.
12 CONTRACTOR SHALL PROVIDE TEMPORARY PARTITIONS (RATED AND/OR NON-RATED) AS
REQUIRED. REVIEW LOCATIONS OF TEMPORARY PARTITIONS PROTECTION WITH
OWNER/ARCHITECT PRIOR TO START OF WORK.
X
EXHAUST FAN
HOUSING
ROOF ACCESS
ROOF ACCESS
MECH/ELEC
(E)Manual Damper (E
)4 8"
Ø R
/A (E
)4 8"
Ø R
/A
9 9
ROOF WALKING PADS (TYP)
ROOF WALKING PADS (TYP)
(E )4
8" Ø
R /A
(E)48"Ø R/A
(E)48"x40"-48"Ø
(E)48"Ø-48"Ø
PATIO RAILING
ROOFTOP LIGHT
AND MOUNT
BRACKET
ROOFTOP LIGHT
AND MOUNT
BRACKET
ROOF DRAIN
ROOF DRAIN
ROOF DRAIN
ROOF DRAIN
ROOF DRAINROOF DRAIN
ROOF DRAIN
ROOF DRAIN
KEYPLAN
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
http://www.ZDSDesign.com
135 Corporate Center Drive Suite 532 Scott Depot, WV 25560
TEL 304/755-0075
FAX 304/755-0076
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
XXX
C U s e rs \p a u l.
o d e ll\
D o c u m e n ts \G
S D
C M
E P
B u ild in g
-V p a u l.
o d e ll@ z d s d e s ig n .c o m
.r v t
/3
/2
:3
:3
P M
MD120
DC
TZ3
GSD-241-C
MECHANICAL
DEMOLITION - ROOF
Building #1 House Chambers HVAC Upgrades
1900 Kanawha Boulevard East, Charleston, WV 25305
West Virginia Department of Administration General Services Division
KEYNOTES
1 DEMOLISH EXISTING ROOF HOOD AND DAMPER AND CAP OPENING. MAINTAIN EXISTING
OPENING FOR OUTSIDE AIR OR PROVIDE TEMPORARY VENTILATION AIR OPENING UNTIL
DOAS INSTALLATION IS COMPLETE.
2 DEMOLISH EXISTING DUCTWORK SUPPORT AND PROVIDE NEW DUCTWORK SUPPORTS
WITH BOLTED CONNECTIONS TO DUCTWORK. DUCT SUPPORTS SHALL CONFORM TO
EXISTING ROOFING WARRANTY REQUIREMENTS.
3 EXISTING SKYLIGHT WITH EXISTING METAL SCREEN FALL PROTECTION.
4 DEMO AND REPAIR EXISTING DUCTWORK SUPPORTS. ATTACH DUCT SUPPORTS TO ROOF
AS REQUIRED TO MAINTAIN WIND REQUIREMENTS. ROOFING PENETRATIONS AND
PATCHING MUST BE PERFORMED PER ROOFING MANUFACTURER'S INSTRUCTIONS AND
MAINTAIN THE EXISTING 30-YEAR ROOFING WARRANTY.
5 EXISTING SCUPPER AND DOWNSPOUT
6 EXISTING SANITARY SEWER VENT THROUGH ROOF
7 EXISTING MECHANICAL EQUIPMENT
8 EXISTING CHIMNEY
9 EXISTING LADDER
1/8" = 1'-0"MD120
1 ROOF HVAC DEMOLITION PLAN
GENERAL HVAC DEMOLITION NOTES
1 IF DURING CONSTRUCTION OF THIS PROJECT, WORK INVOLVING HAZARDOUS MATERIALS IS
SUSPECTED OR ENCOUNTERED ALL WORK IN THIS AREA SHALL BE DISCONTINUED AND THE
OWNER'S REPRESENTATIVE SHALL BE NOTIFIED IMMEDIATELY AND THE OWNER WITH HIS
OWN FORCES OR BY SEPARATE CONTRACT SHALL BE RESPONSIBLE FOR COMPLETE
INVESTIGATION, REMOVAL, AND DISPOSAL OF THE HAZARDOUS MATERIALS IN
ACCORDANCE WITH APPLICABLE LAWS AND REGULATIONS. IF COSTS ARE INVOLVED
BECAUSE OF SUCH ACTION BY THE OWNER: CONTRACTOR SHALL FILE CLAIM AS PROVIDED
ELSEWHERE IN THE CONTRACT DOCUMENTS.
2 CONTRACTOR SHALL REMOVE EXISTING CEILINGS AND ALL CEILING MOUNTED EQUIPMENT,
DEVICES, ETC. AS REQUIRED FOR NEW WORK. RELOCATE OR REPLACE AS NECESSARY TO
MAINTAIN FULLY OPERATIONAL SYSTEMS AS THEY CURRENTLY EXIST. ANY REQUIRED
REMOVAL, RELOCATION OR REPLACEMENT OF EXISTING CONDUIT, PIPING, DUCTWORK
SYSTEMS, WIRING, ETC. RELATED TO COMPLETING THIS PROJECT SHALL BE INCLUDED IN
BASE BID PROPOSAL AT NO ADDITIONAL COST TO THE OWNER.
3 CONTRACTOR SHALL PATCH AND PAINT TO MATCH EXISTING ADJACENT FINISHES ON ALL
EXISTING WALLS, FLOORS, CEILINGS, AND SURFACES WHERE AREAS ARE EXPOSED
DURING DEMOLITION WORK INCLUDING, BUT NOT LIMITED TO, AREAS BEHIND HVAC
EQUIPMENT, PIPES, DUCTWORK, TRANSFER GRILLES ETC THAT WERE REMOVED.
4 CONTRACTOR SHALL SCHEDULE ALL WORK WITH THE OWNER'S REPRESENTATIVE PRIOR
TO START OF CONSTRUCTION TO ENSURE ADJACENT AREAS REMAIN IN OPERATION AS
REQUIRED.
5 ALL ITEMS REQUIRED TO BE REMOVED OR RELOCATED FOR INSTALLATION OF NEW WORK
MAY NOT BE INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY THE
LOCATIONS OF ALL EXISTING DEVICES REQUIRING REMOVAL OR RELOCATION PRIOR TO
BIDDING AND INCLUDE COSTS IN BASE BID PROPOSAL.
6 CONTRACTOR SHALL CUT AND PATCH AS REQUIRED FOR THE INSTALLATION OF NEW
WORK, RELOCATING EXISTING OR REMOVING EXISTING WORK, EQUIPMENT OR SYSTEMS.
7 OWNER SHALL REMOVE EXISTING LOOSE FURNISHINGS SUCH AS DESKS, CHAIRS, TABLES,
ETC., FOR INSTALLATION OF NEW WORK CONTRACTOR SHALL COORDINATE EXTENT OF
REQUIRED WORK WITH OWNER. CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING AND SCHEDULING WITH THE OWNER A MINIMUM OF (3) DAYS IN ADVANCE
OF WHEN THE FURNISHINGS NEED MOVED AND WILL NOT CONTACT THE OWNER ON
MULTIPLE OCCASIONS DURING A SINGLE WORK DAY. CONTRACTOR SHALL BE
RESPONSIBLE FOR RELOCATION AND REINSTALLATION OF ALL ELECTRICAL, PIPING, LIGHT
SWITCHES, FIRE ALARM DEVICES, SPRINKLERS/FIRE PROTECTION, THERMOSTATS, ETC. AS
REQUIRED FOR INSTALLATION OF NEW WORK. CONTRACTOR SHALL FIELD VERIFY THE
LOCATION AND QUANTITIES OF ALL THE ITEMS TO BE RELOCATED AND/OR REMOVED AND
SHALL BE INCLUDED IN THE BASE BID.
8 DEMOLITION WORK SHALL BE SCHEDULED AT ALL TIMES AND BE SUBJECT TO THE
DIRECTION AND APPROVAL OF THE OWNER AND IMPLEMENTED WITHOUT DISRUPTION OF
OCCUPIED AREAS SURROUNDING THE DEMOLITION ZONE.
9 CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING AND PROPERLY DISPOSING OF
ALL CONSTRUCTION WASTE. DISPOSAL AND/OR RECYCLING OF MATERIALS SHALL BE IN
ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND
REGULATIONS.
10 PRIOR TO ANY DEMOLITION, THE GENERAL CONTRACTOR SHALL COORDINATE BRACING TO
MAINTAIN THE STRUCTURAL INTEGRITY OF THE REMAINING ELEMENTS OF THE BUILDING AS
REQUIRED.
11 PORTIONS OF ROOFTOP MOUNTED DUCTWORK WILL BE INSTALLED SIMULTANEOUSLY.
CONTRACTOR SHALL COORDINATE FULLY WITH OTHER OWNER/CONTRACTOR WORK
INCLUDING PHASING OF WORK AND FINAL DUCTWORK CONNECTIONS FOR BOTH
DEMOLITION AND NEW WORK AS REQUIRED.
12 CONTRACTOR SHALL PROVIDE TEMPORARY PARTITIONS (RATED AND/OR NON-RATED) AS
REQUIRED. REVIEW LOCATIONS OF TEMPORARY PARTITIONS PROTECTION WITH
OWNER/ARCHITECT PRIOR TO START OF WORK.
X
MH401
MP301
MD301
MD301
(E)36"x20" S/A
(E)32"x24" S/A
(E)37"x20" S/A(E)42"x18" S/A
(E)42"x18" S/A(E)36"x24" R/A
(E)31"x24" R/A
(E)65"x40" S/A
60"x24" R/A
(E)34"x24" R/A
(E)20"x20" R/A
(E)42"x18" R/A
(E)42"x18" R/A
(E)48"x18" S/A (E)37"x20" S/A
(E)18"x18" R/A
KEYPLAN
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
http://www.ZDSDesign.com
135 Corporate Center Drive
Suite 532 Scott Depot, WV 25560
TEL 304/755-0075
FAX 304/755-0076
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
XXX
C U s e rs
\v in e e l.
b u s a
\D o c u m e n ts
\G S
D
C
M E
P
B u ild in g
-V v in e e l.
b u s a
.r v t
/3
/2
:3
:2
P M
MH101
DC
TZ3
GSD-241-C
BASEMENT HVAC DUCT
PLAN
Building #1 House Chambers HVAC Upgrades
1900 Kanawha Boulevard East, Charleston, WV 25305
West Virginia Department of Administration General Services Division
1/8" = 1'-0"MH101
1 BASEMENT HVAC DUCT PLAN
HVAC SHEET NOTES
1 REFER TO M00X, P00X, AND E00X SHEETS FOR ADDITIONAL INFORMATION.
2 ALL DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS. CONTRACTOR SHALL
MAKE ALLOWANCE FOR ANY INTERIOR LINING, INSULATION, ETC.
3 ALL NEW DUCT ELBOWS SHALL BE RADIUS TYPE. WITH ENGINEER'S APPROVAL,
CONTRACTOR MAY SUBSTITUTE MITERED ELBOWS WITH TURNING VANES.
4 INSTALL TURNING VANES IN ALL 90° SUPPLY, RETURN, AND EXHAUST DUCT
ELBOWS AND AT ALL DUCT "TEES" IN LOW-PRESSURE DUCT.
5 MC SHALL REINSULATE EXISTING SUPPLY DUCTWORK AS REQUIRED TO MEET
THE SPECIFICATIONS. PROVIDE MISSING INSULATION AND REPAIR DAMAGED
INSULATION AS REQUIRED.
6 COORDINATE ALL EXTERIOR PENETRATIONS INCLUDING ROOF PENETRATIONS
WITH OTHER TRADES TO PROVIDE A COMPLETE AND FULLY WEATHER-PROOF
INSTALLATION.
7 CONTRACTOR SHALL COORDINATE DEVIATIONS IN SIZE, CAPACITIES, FIT, FINISH,
ETC. FOR EXISTING DUCTWORK PRIOR TO INSTALLATION OF NEW DUCTWORK.
ANY PROVISIONS REQUIRED TO ACCOMMODATE A DEVIATION SHALL BE THE
RESPONSIBILTY OF THE CONTRACTOR.
8 ALL CONDENSATE DRAIN PIPING SHALL BE INSULATED TO A MINIMUM THICKNESS
OF 1/2" AND SHALL INCLUDE A VAPOR RETARDANT OUTSIDE THE INSULATION.
SEAL ALL JOINTS AND PENETRATIONS.
9 CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE A COMPLETE AND WORKING
SYSTEM.
10 INSTALL, SUPPORT, AND BRACE NEW DUCTWORK AND ACCESSORIES TO COMPLY
WITH SMACNA GUIDELINES. SEE DETAIL M502 FOR NEW DUCT SUPPORTS.
11 DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS. CONTRACTOR SHALL MAKE
ALLOWANCE FOR ANY INTERIOR LINING, INSULATION, ETC.
12 PROVIDE FLAT BLADE MANUAL VOLUME DAMPERS AT ALL TERMINAL DUCT
BRANCHES AND AS INDICATED.
13 INSTALL EQUIPMENT TO COMPLY WITH MANUFACTURER'S WRITTEN
INSTRUCTIONS. ROOFTOP EQUIPMENT SHALL BE LOCATED NO CLOSER THAN
10'-0" FROM THE ROOF EDGE.
14 CONTRACTOR SHALL ENGAGE A TESTING AND BALANCE FIRM CERTIFIED BY AABC
TO PERFORM TESTING AND BALANCING PROCEDURES ON EACH SYSTEM
ACCORDING TO THE PROCEDURES CONTAINED IN AABC'S "NATIONAL STANDARDS.
15 FOR TESTING AND BALANCING HEATING, VENTILATING, AND AIR CONDITIONING
SYSTEMS PROVIDE TWO COPIES OF THE CERTIFIED TAB REPORTS.
16 THIS DRAWING IS DIAGRAMMATIC IN NATURE AND SHALL NOT BE SCALED TO
DETERMINE THE EXACT LOCATION OR EXTENT OF THE WORK. CONTRACTOR
SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO THE START OF THE WORK.
CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE A COMPLETE AND WORKING
SYSTEM.
17 THIS DRAWING IS BASED ON VISUALLY OBSERVABLE EXISTING CONDITIONS AS OF
THE TIME OF DESIGN. CONTRACTOR SHALL BE RESPONSIBLE TO FULLY VERIFY
ALL EXISTING CONDITIONS, COMPONENTS, ETC. PRIOR TO THE START OF THE
WORK. ANY DEVIATION FROM THIS DRAWING IN KIND, OR IN LOCATION
EXCEEDING 1'-0", SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER.
18 MC SHALL PROVIDE AND COORDINATE TEMPERATURE CONTROL WIRING AND
CONDUIT (UNLESS OTHERWISE INDICATED ON THE DRAWINGS AND
SPECIFICATIONS). ALL WIRING AND CONDUIT, INCLUDING POWER WIRING,
REQUIRED FOR THE AUTOMATIC TEMPERATURE CONTROL SYSTEM TO BE FULLY
FUNCTIONAL SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR
AND ALL COSTS SHALL BE INCLUDED IN THEIR BID.
19 MC SHALL FIELD VERIFY GAS PIPING LOCATION, EXISTING PIPE SIZES, LOCATE ALL
VALVES AND EQUIPMENT DATA AND NOTE THOSE ON RECORD DRAWINGS. THE
INTENT IS TO DEVELOP ACCURATE RECORD DRAWINGS FOR FUTURE
RENOVATIONS TO BE GIVEN TO THE ENGINEER/OWNER.
KEYNOTES
1 VERIFY IF THIS DUCT IS INSULATED AND IF THERE ARE ANY DUCT ACCESSORIES IN
THE SHAFT.
X
MP301
1 1/2" G
(E) 2" G
(E) 6" G
(E)SA FAN
MD301
MD301
MP401
(E) 8" G
1 1/2" G
4" G
KEYPLAN
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
http://www.ZDSDesign.com
135 Corporate Center Drive
Suite 532 Scott Depot, WV 25560
TEL 304/755-0075
FAX 304/755-0076
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
XXX
C U s e rs
\v in e e l.
b u s a
\D o c u m e n ts
\G S
D
C
M E
P
B u ild in g
-V v in e e l.
b u s a
.r v t
/3
/2
:3
:0
P M
MP101
DC
TZ3
GSD-241-C
BASEMENT MECHANICAL
PIPING PLAN
Building #1 House Chambers HVAC Upgrades
1900 Kanawha Boulevard East, Charleston, WV 25305
West Virginia Department of Administration General Services Division
1/8" = 1'-0"MP101
1 BASEMENT MECHANICAL PIPING PLAN
HVAC GENERAL NOTES
1 SUPPLY AND RETURN PIPING TO COILS ARE THE SAME SIZE.
2 CONTRACTOR SHALL LOCATE THERMOSTATS AND TEMPERATURE SENSORS AT 5'-0" AFF, A
MINIMUM OF 8" FROM LIGHT SWITCH.
3 REFER TO HVAC DRAWINGS FOR THERMOSTAT AND TEMPERATURE SENSOR LOCATIONS.
4 CONDENSATE DRAINS SHALL BE SUPPLIED FOR ALL COOLING EQUIPMENT. CONTRACTOR SHALL
ENSURE PROPER INSTALLATION AND DRAINAGE AS REQUIRED BY FEDERAL, STATE, AND LOCAL
CODES. CONDENSATE PIPING SHALL BE TYPE "L" COPPER.
5 ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK SHALL BE RATED FOR PRESSURE CLASS OF 2"
W.G. UNLESS NOTED OTHERWISE.
6 COORDINATE THE EXACT LOCATION OF ALL CEILING DIFFUSERS, REGISTERS, AND GRILLES WITH
NEW AND EXISTING LIGHTING.
7 PROVIDE A CAST IN PLACE HOUSEKEEPING PAD FOR EACH PIECE OF MECHANICAL EQUIPMENT -
SEE DETAIL.
8 THIS CONTRACTOR SHALL BE REQUIRED TO REPLACE FILTERS ON HVAC EQUIPMENT AFTER ALL
DUST PRODUCING CONSTRUCTION HAS BEEN COMPLETED AND PRIOR TO THE FINAL PUNCH.
9 ALL RECTANGULAR, ROUND, FLAT OVAL, AND FLEXIBLE DUCTS SHALL BE SIZED AS SHOWN ON
THESE DRAWINGS. MINIMUM INTERNAL DIMENSIONS ARE GIVEN. ALL DUCT SIZES. SHOWN ARE
INTERNAL FREE AREA DIMENSIONS AND EXCLUDE INSULATION. REFER TO SPECIFICATIONS FOR
DUCT INSULATION REQUIREMENTS.
10 INSTALL TURNING VANES IN ALL 90° SUPPLY, RETURN, AND EXHAUST DUCT ELBOWS AND AT ALL
DUCT "TEES" FOR LOW-PRESSURE DUCT.
11 ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED ACCORDING TO THE MOST RECENTLY
PUBLISHED ASHRAE AND SMACNA STANDARDS.
12 THE CONTRACTOR SHALL CAREFULLY COORDINATE THE LOCATION OF ALL DUCTS, GRILLES,
DIFFUSERS, ETC., WITH THE CEILING GRIDS, CEILING SYSTEMS AND ALL OTHER CONTRACTORS
WORK.
13 THESE DRAWINGS ARE BASED UPON HISTORICAL DRAWINGS OF THE EXISTING BUILDING AND
FIELD VERIFICATION OF PORTIONS OF THE WORK, ADDITIONAL FIELD INVESTIGATION BY
CONTRACTOR IS REQUIRED PRIOR TO SUBMISSION OF BIDS TO VERIFY THE INFORMATION
SHOWN IS ACCURATE. CONTRACTOR SHALL PROVIDE UPDATES TO REFLECT ANY…