Cost Estimate Worksheet.pdf
PDF 122 KB Posted
- Solicitation number
- 36C78623B0001
About this file
This statement of work describes requirements for a construction services contract to expand gravesites at Fort McPherson National Cemetery in Nebraska. The contractor shall provide all management, supervision, labor, equipment, materials and tools to complete site preparation including demolition and removal of existing structures. The contractor must perform a site investigation and submit an after-inspection report before starting work. The performance period is 365 calendar days from notice to proceed. The contractor must follow National Cemetery Administration standards and comply with all safety, conduct, operations and reporting requirements detailed in the statement of work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78623B0001 0003.pdf | ||
| Concrete Pavement Detail.pdf | ||
| 36C78623B0001 0003.docx | DOCX document | |
| 36C78623B0001 0002.docx | DOCX document | |
| 36C78623B0001 0001.docx | DOCX document | |
| DOL Wage Determination Lincoln County NE.pdf | ||
| Past Performance.pdf | ||
| Plans Part 2.pdf | ||
| Plans Part 1.pdf | ||
| Specifications.pdf | ||
| WAGE-RATES.pdf | ||
| RFI Form.pdf | ||
| IFB _ 36C78623B0001.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number:
Solicitation Number:
Project Title:
Division Unit of Measure # of Units Unit Cost $ Extended/Total
Cost $ Comments / Remarks Division 0 - Special Sections
General Conditions and Administration
JB 1
Division 01 - General Requirements
Mobilization JB 1
Division 02 - Existing Conditions
Site Investigation JB 1
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Gravesite Expansion
Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number.
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
IFB Contractor Cost Estimate Worksheet
890CM3014
36C78623B0001
Offeror shall use and edit to fit Task Order Project
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Mechanical, Electrical, Plumbing Subtotal
General Construction Subtotal
Total Base Construction Cost
Insurance (if applicable)
Bonding (if applicable)
Overhead ________ % $0.00
Profit ________ % $0.00
GRAND TOTALS $
Sheet1
File details come from the government source that posted it. Updated .