36C78623B0001 0003.pdf

PDF 2 MB Posted

Attached to
Y1PZ--890CM3014: Gravesite Expansion, Ft McPherson National Cemetery
Solicitation number
36C78623B0001
Issued by

About this file

This federal solicitation requests proposals for gravesite expansion services at Fort McPherson National Cemetery in Maxwell, Nebraska. The contractor shall provide all labor, equipment, materials and construction services necessary to complete the site preparation and expansion in accordance with the specifications, drawings and provisions within 365 calendar days. Key requirements include excavation and demolition work; coordination with burial services; compliance with National Cemetery Administration dignity standards; and restoration of all disturbed areas upon completion. The solicitation establishes guidelines for employee conduct, equipment and material storage, and other general provisions. Proposals are due by May 12, 2023.

View the file

Other files

File Type Posted
Concrete Pavement Detail.pdf PDF
36C78623B0001 0003.docx DOCX document
36C78623B0001 0002.docx DOCX document
36C78623B0001 0001.docx DOCX document
DOL Wage Determination Lincoln County NE.pdf PDF
Cost Estimate Worksheet.pdf PDF
Past Performance.pdf PDF
Plans Part 2.pdf PDF
Plans Part 1.pdf PDF
Specifications.pdf PDF
WAGE-RATES.pdf PDF
RFI Form.pdf PDF
IFB _ 36C78623B0001.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

0003 Funds Assurance 890CM3014

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

To all Offerors/Bidders 36C78623B0001

03-13-2023 X

X X

May 12, 2023 / 3PM CST

X 1

Gravesite Expansion Ft McPherson National Cemetery Amendment 0003 is issued to: Response to RFI inquiry questions.

See Continuation page for clarification responses.

The Bid Opening Time/Date is changed from 05/04/2023 - 3PM CST to May 12, 2023 - 3PM CST to allow time to respond to additional RFI questions.

No other changes are made at this time.

All other solicitation Terms and Conditions remain unchanged.

Claude Humphrey Contracting Officer

VA-NCA-2023-0006

CEMHumphC Typewritten Text

CEMHumphC Typewritten Text 05/01/2023

CONTINUATION PAGE

AMENDMENT 0003

Solicitation Number: 36C78623B0001 Project Description: Gravesite Expansion, Ft McPherson National Cemetery

The following changes are hereby incorporated into the referenced solicitation requirement:

1. Change the Bid Opening/Due date from May 4, 2023, to May 12, 2023, the IFB bid submission / due time remains unchanged at 3:00 p.m., CST.

2. Due to interested bidders’ inquiry and statement that they cannot gain access to the Government’s Vendor Portal, Note and be advised that All bids shall be submitted electronically via email to the attention of the Contracting Officer at his/her respective Government’s email address.

The following Request for Information (RFI) questions have been submitted to the Contracting Officer regarding this solicitation. The following questions and responses are provided for bidder’s information and use.

RFI 1. Is this solicitation a Small Business (SB)Set-aside or a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-aside?

Response: This re-bid solicitation requirement is a Small Business Set-aside, as stated on page 1 of the SF 1442, section 10 – ‘This Invitations for Bids (IFB) procurement opportunity is 100% Set-Aside for Small-Business, firms in accordance with FAR 19.502-2, Competition is restricted to Small Business Construction Firms.’

RFI 2. Please verify the Vendor Portal access information.

Response: The Microsoft Teams call-in information is as follows:

Join on your computer or mobile app

Call in (audio only)

+1 872-701-0185, Phone Conference ID: 153 995 408# or

Click here to join the meeting

Meeting ID: 281 625 574 862 / Passcode: 9Le78q

Download Teams | Join on the web tel:+18727010185,,153995408#%20 https://teams.microsoft.com/l/meetup-join/19%3ameeting_Y2MwYTY4Y2UtYTMwZS00OGY5LTgxM2ItMmZlMDVhNTY0MzM3%40thread.v2/0?context=%7b%22Tid%22%3a%22e95f1b23-abaf-45ee-821d-b7ab251ab3bf%22%2c%22Oid%22%3a%22f7132a62-ecdf-4a9d-84a4-af2091990800%22%7d https://www.microsoft.com/en-us/microsoft-teams/download-app https://www.microsoft.com/microsoft-teams/join-a-meeting

RFI 3. The criteria that is provided in the specifications appears to be a loessial silt and/or sandy material, that may not stand up well during excavation and does not seem to make sense given the application.

A. Fills: Materials approved from onsite and off-site sources.

Response: The NCA has No objections to an ‘Alternate fill criteria’ conditional upon bidder's and awarded Contractor’s testing laboratory service provides certification that the material is suitable for the intended purpose except for compaction standards. Recommend compaction to minimum 95% of maximum density per ASTM D698 as required in specification 31 20 11 Paragraph 3.3.D.

RFI 4. Dry Density: 1760 kg/m3 (110 pcf) minimum. – 2. Plasticity Index: 6 maximum.

Liquid Limit: 30 maximum. Based on the off-site samples retrieved and the onsite boring logs, below would be the fill specification found more fitting for this project.

Response: See RFI Response #1.

RFI 5. Cohesive soil with sufficient plasticity to provide an unconfined compressive strength of at least 1.5 tsf when compacted to spec, but not of an expansive nature.

1. Plasticity Index less than 30%.

2. Liquid Limit less than 45%.

Add additional lines, pages, sheets etc., as necessary…

3. Acceptable materials per Unified Classification System ASTM D-2487 CL, ML, CL-ML

4. Compaction: Minimum dry density of 90% Modified Proctor and with a moisture content greater than optimum M.C. minus 1%, to be field verified by density-moisture content testing.

Please advise whether or not the above recommendation would be approved in place of what is currently in the specifications.

Response: See RFI Response #1.

RFI 6. There are two (2) Buy American Act clauses included in specifications, which one is to be used?

Response: The reference Buy American Act found in Section 32 84 00 (1.4.3).

RFI 7. There are no Asphalt Plants within a reasonable proximity to Fort McPherson National Cemetery; there are a couple of Ready-mix Concrete Plants nearby.

Will the Government consider it to be acceptable to replace the proposed asphalt paving with concrete?

If so, please provide Detail for the concrete paving.

Response: See attached Concrete Pavement Detail, drawing DT501R.

RFI 8. RE - DT502.

BITUMINOUS TACK COAT, 0.04 GAL./SY is available but should read 0.4 GA./SY BITUMINOUS PRIME COAT, 0.04 GAL./SY is available but should be 0.15

GAL./SY

Please advise.

Response: For Asphaltic Material Application Rates:

a. The rate of application for bituminous tack coat shall be adequate to bond the new bituminous layer to the existing surface. This shall be from 0.05 to 0.10 Gal/SY when applied to the freshly laid asphaltic concrete. (Per NDOT Spec 504)

b. The rate of application for bituminous prime coat shall be a uniform rate of 0.30 Gal/SY. (Per NDOT Spec 517)

RFI 9. Mix specified (PG 58V-34) is not available in this area.

PG64-22 is the standard.

This mix design comes out of the North Platte Plant (Croell).

Please advise if this would be acceptable.

Response: PG 58V-34 (per AASHTO M332) is the binder grade indicated in the Nebraska DOT Design Manual for use in hot mix asphalt throughout the state.

Locally available binder with closest performance standard to PG58V-34 shall be provided for review and approval during the project submittal process for use in project asphalt mix.

END OF AMENDMENT 0003

See attached document: Concrete Pavement Detail.

(End of Document)

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MAXWELL, NEBRASKA

890CM3014

APRIL 25, 2023 DW RP Dwg. of

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID SUPPORT

VA FORM 08 - 6231

321 4 5 6 7 8 9

FORT McPHERSON NATIONAL

CEMETERY EXPANSION

Fil eP ath :G

:\P

RO

JE

CT

\S

BU

\A

DM

IN

\33

NC

A

MI

DW

ES

T

JV

\08

FO

RT

MC

PH

ER

SO

N\

-B

ID

SU

PP

OR

T\C

ON

CR

ET

E\

DT

-50

0.D W

G

GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

GORDON

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CONCRETE PAVEMENT

DT501R

7" 4,000 PSI CONCRETE WITH

WELDED WIRE FABRIC

REINFORCEMENT

COMPACTED SUBGRADE 95% PER

ASTM D-698

6" GRADED

AGGREGATE

BASE COURSE OR

TREATED SUBGRADE

CURB BK-BK

CR

OW

N

METAL STRIP FOR

LONGITUDINAL CONSTRUCTION JOINT

BOTTOM OF PAVEMENT

2" 2" 2" 4' -0" 4' -0"10" 10"

2" LAP

MIN.

TOP OF PAVEMENT

SNAP-IN LEG OR OTHER APPROVED DESIGNS MAY BE USED IN LIEU OF WELDED LEG.

D / 2

1"

WELDS

D = 8"

TRANSVERSE SECTION

LC

HOLES FOR TIE BARS

10'- 2" OVERALL LENGTH

TO BE USED ONLY AGAINST FORMS. SHALL NOT EXTEND THROUGH CONTRACTION JOINTS.

2' -0" 2' -0" 2' -0"1'-1" 1'-1"

PAVEMENT DEPTH

2' -0"

GENERAL NOTES:

DEFORMED TIE BARS WHICH REQUIRE BENDING SHALL BE BILLET STEEL REINFORCING BARS, GRADE 40.

UNLESS OTHERWISE NOTED, LOAD TRANSFER DEVICES AS SHOWN IN DETAIL SHALL BE USED AT ALL CONTRACTION JOINTS ON MAINLINE PAVEMENT.

ALL JOINTS ON THIS PROJECT SHALL BE SAWED AND FILLED WITH SEALANT.

SHAPE OF ALL KEYED JOINTS SHALL BE SIMILAR TO SECTION OF RECESSED FORM LEG AS SHOWN ON THIS SHEET.

ALL LONGITUDINAL JOINTS SHALL BE TIED.

TRANSVERSE JOINTS

D/

CONTRACTION

18"18"

CONSTRUCTION

PLAN

SEE DETAIL "A"

SEE DETAIL "A"

SEE DETAIL "A"

LONGITUDINAL JOINTS

D/

TIED NON-KEYED

2/D

TIED KEYED CONSTRUCTION

2/

D

D

(LOAD TRANSFER)

TWO SEPARATE OPERATIONS

JOINT TO BE SAWED IN

BREAKER

1/2" CORD BOND

JOINT SEALANT (ASTM D1190)

HOT - POURED

PAVEMENT SURFACE

INDUCED CRACKING

SCALE: NONE

DETAIL "A"

1/8"

D/

(C

ON

ST

RU

CT

IO

N

JO

IN

T)

1ST CUT

1/8"

3/8"

D/

(L

ON

GI

TU

DI

NA

LJ

OI

NT

) 13

/8" 3/8

2ND CUT

1/8"

TIED

"D

LONGITUDINAL JOINT TIED

TIE BAR

LONGITUDINAL JOINT

7/8"Ø X 18" SMOOTH DOWEL

BARS @ 12" CTRS. THRU

CONTRACTION JOINT.

DEFORMED TIE BARS #5 X 36" ON 24"

CTRS. THRU LONGITUDINAL JOINTS

CONTRACTION JOINT

DEFORMED TIE BARS

#5 X 36" ON 24" CTRS.

DEFORMED TIE BARS

#5 X 36" ON 24" CTRS.

NOTE: ALL SEALANT IS 1/8" -1/4" BELOW SURFACE AND IS A MINIMUM OF 1/4" THICK. A BACKER

ROD MAY BE USED TO LIMIT THE AMOUNT OF SEALANT NEEDED TO FILL RESERVOIR.

4 + 1/4"

DOWELS

7/8"Ø X 18" ON 12" CTRS.

2/D 2/

D

D

#4 X 3'-0" @ 18" CTRS.

DEFORMED TIE BARS

NOTE: CONTRACTION JOINTS WILL BE CONSTRUCTED AT THE PLANNED LOCATION OR AS DIRECTED BY THE ENGINEER. WHEN NECESSARY TO INTERRUPT CONTINUOUS PLACEMENT FOR A SUBSTANTIAL LENGTH OF TIME OR AT THE END OF A DAY'S POUR, THE CONTRACTOR HAS THE OPTION OF ENDING PLACEMENT AT A CONTRACTION JOINT OR WITH A CONSTRUCTION JOINT LOCATED A MINIMUM OF FIVE (5) FEET FROM A CONTRACTION JOINT. EITHER JOINT TYPE MAY BE CONSTRUCTED BY PLACING A HEADER AT THE END OF THE POUR OR BY PAVING PAST THE JOINT LOCATION, SAWING THE JOINT AFTER THE CONCRETE HAS HARDENED, AND DRILLING HOLES FOR THE TIE BARS OR DOWELS.

SECTION OF

RECESSED

FORM LEG

File details come from the government source that posted it. Updated .