This solicitation is for a gravesite expansion project at Fort McPherson National Cemetery. The contractor shall provide all labor, equipment, materials and services required to prepare the site and perform gravesite expansion work in accordance with the drawings, specifications and Statement of Work. The contractor must have experience performing similar work at national cemeteries and adhere to National Cemetery Administration standards and regulations regarding dignified treatment of burial sites. The contractor will have 365 calendar days to complete the work from issuance of the notice to proceed. The work includes site preparation, demolition, excavation, fill and construction of new gravesites. The solicitation provides details on work hours, holiday observance, contractor responsibilities, conduct standards, and environmental, safety and security requirements.
This document outlines requirements for a gravesite expansion project at Fort McPherson National Cemetery. The contractor will be responsible for site preparation, demolition, excavation, fill and construction of new gravesites. The contractor must adhere to National Cemetery Administration standards and complete the work within 365 calendar days of the notice to proceed. The solicitation also specifies work hours, conduct requirements, and environmental, safety and security standards the contractor must follow.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78623B0001 0003.pdf | ||
| Concrete Pavement Detail.pdf | ||
| 36C78623B0001 0003.docx | DOCX document | |
| 36C78623B0001 0002.docx | DOCX document | |
| DOL Wage Determination Lincoln County NE.pdf | ||
| Cost Estimate Worksheet.pdf | ||
| Past Performance.pdf | ||
| Plans Part 2.pdf | ||
| Plans Part 1.pdf | ||
| Specifications.pdf | ||
| WAGE-RATES.pdf | ||
| RFI Form.pdf | ||
| IFB _ 36C78623B0001.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) Funds Assurance
890CM3014
36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle
VA
22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle
VA
22172 To all Offerors/Bidders
36C78623B0001 03-13-2023
X X X
Gravesite Expansion Ft McPherson National Cemetery Amendment 0001 is issued to: Response to RFI inquiry questions.
See Continuation page for clarification responses.
The Bid Opening Time/Date is unchanged and remains the same.
No other changes are made at this time.
All other solicitation Terms and Conditions remain unchanged.
Claude Humphrey Contracting Officer
VA-NCA-2023-0006
CONTINUATION PAGE
AMENDMENT 0001
Solicitation Number: 36C78623B0001 Project Description: Gravesite Expansion, Ft McPherson National Cemetery
The following Request for Information (RFI) questions have been submitted to the Contracting Officer regarding this solicitation. The questions and responses represent all questions submitted to the Contracting Officer prior to the deadline established in the Solicitation. The following questions and responses are provided for bidder’s information and use.
RFI 1. Is the NCA willing to share CAD files with interested bidders, needed to determine excavation and fill quantities?
Response: No, CAD files will be supplied to the successful bidder, after award of the contract.
RFI 2. If the CAD files are not available or shareable, can the NCA provide estimates for ‘excavation and fill quantities for bidding purposes?
Response: No, Prospective bidders are responsible for their own material takeoffs.
RFI 3. Have the plans been run through the State of Nebraska Department of Environment and Energy?
Response: No. NPDES permit will need to be processed.
RFI 4. Has Lincoln County and the State of Nebraska Department of Transportation been consulted regarding the drainage plans and road access?
Response: Lincoln County and NDOT were not part of the plan review.
RFI 5. Would the Government deem it acceptable to replace the proposed asphalt paving with concrete paving; considering that all existing roads are concreate paved?
Response: No, it would not be acceptable to change the specification requirements.
END OF AMENDMENT 0001