Concrete Pavement Detail.pdf
PDF 104 KB Posted
- Solicitation number
- 36C78623B0001
About this file
This document outlines requirements for a federal construction contract to expand gravesites at Fort McPherson National Cemetery in Nebraska. The contractor shall provide all labor, equipment, materials and supervision to complete site preparation including demolition and removal of existing structures. Key requirements include performing work in accordance with attached drawings and specifications; inspecting the site; developing a project schedule; coordinating work to avoid interfering with cemetery functions; following National Cemetery Administration dignity standards in handling headstones and remains; and disposing of all debris. The contractor must complete all work within 365 calendar days of the notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78623B0001 0003.pdf | ||
| 36C78623B0001 0003.docx | DOCX document | |
| 36C78623B0001 0002.docx | DOCX document | |
| 36C78623B0001 0001.docx | DOCX document | |
| DOL Wage Determination Lincoln County NE.pdf | ||
| Cost Estimate Worksheet.pdf | ||
| Past Performance.pdf | ||
| Plans Part 2.pdf | ||
| Plans Part 1.pdf | ||
| Specifications.pdf | ||
| WAGE-RATES.pdf | ||
| RFI Form.pdf | ||
| IFB _ 36C78623B0001.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MAXWELL, NEBRASKA
890CM3014
APRIL 25, 2023 DW RP Dwg. of
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID SUPPORT
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT McPHERSON NATIONAL
CEMETERY EXPANSION
Fil eP ath :G
:\P
RO
JE
CT
\S
BU
\A
DM
IN
\33
NC
A
MI
DW
ES
T
JV
\08
FO
RT
MC
PH
ER
SO
N\
-B
ID
SU
PP
OR
T\C
ON
CR
ET
E\
DT
-50
0.D W
G
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
CONCRETE PAVEMENT
DT501R
7" 4,000 PSI CONCRETE WITH
WELDED WIRE FABRIC
REINFORCEMENT
COMPACTED SUBGRADE 95% PER
ASTM D-698
6" GRADED
AGGREGATE
BASE COURSE OR
TREATED SUBGRADE
CURB BK-BK
CR
OW
N
METAL STRIP FOR
LONGITUDINAL CONSTRUCTION JOINT
BOTTOM OF PAVEMENT
2" 2" 2" 4' -0" 4' -0"10" 10"
2" LAP
MIN.
TOP OF PAVEMENT
SNAP-IN LEG OR OTHER APPROVED DESIGNS MAY BE USED IN LIEU OF WELDED LEG.
D / 2
1"
WELDS
D = 8"
TRANSVERSE SECTION
LC
HOLES FOR TIE BARS
10'- 2" OVERALL LENGTH
TO BE USED ONLY AGAINST FORMS. SHALL NOT EXTEND THROUGH CONTRACTION JOINTS.
2' -0" 2' -0" 2' -0"1'-1" 1'-1"
PAVEMENT DEPTH
2' -0"
GENERAL NOTES:
DEFORMED TIE BARS WHICH REQUIRE BENDING SHALL BE BILLET STEEL REINFORCING BARS, GRADE 40.
UNLESS OTHERWISE NOTED, LOAD TRANSFER DEVICES AS SHOWN IN DETAIL SHALL BE USED AT ALL CONTRACTION JOINTS ON MAINLINE PAVEMENT.
ALL JOINTS ON THIS PROJECT SHALL BE SAWED AND FILLED WITH SEALANT.
SHAPE OF ALL KEYED JOINTS SHALL BE SIMILAR TO SECTION OF RECESSED FORM LEG AS SHOWN ON THIS SHEET.
ALL LONGITUDINAL JOINTS SHALL BE TIED.
TRANSVERSE JOINTS
D/
CONTRACTION
18"18"
CONSTRUCTION
PLAN
SEE DETAIL "A"
SEE DETAIL "A"
SEE DETAIL "A"
LONGITUDINAL JOINTS
D/
TIED NON-KEYED
2/D
TIED KEYED CONSTRUCTION
2/
D
D
(LOAD TRANSFER)
TWO SEPARATE OPERATIONS
JOINT TO BE SAWED IN
BREAKER
1/2" CORD BOND
JOINT SEALANT (ASTM D1190)
HOT - POURED
PAVEMENT SURFACE
INDUCED CRACKING
SCALE: NONE
DETAIL "A"
1/8"
D/
(C
ON
ST
RU
CT
IO
N
JO
IN
T)
1ST CUT
1/8"
3/8"
D/
(L
ON
GI
TU
DI
NA
LJ
OI
NT
) 13
/8" 3/8
2ND CUT
1/8"
TIED
"D
LONGITUDINAL JOINT TIED
TIE BAR
LONGITUDINAL JOINT
7/8"Ø X 18" SMOOTH DOWEL
BARS @ 12" CTRS. THRU
CONTRACTION JOINT.
DEFORMED TIE BARS #5 X 36" ON 24"
CTRS. THRU LONGITUDINAL JOINTS
CONTRACTION JOINT
DEFORMED TIE BARS
#5 X 36" ON 24" CTRS.
DEFORMED TIE BARS
#5 X 36" ON 24" CTRS.
NOTE: ALL SEALANT IS 1/8" -1/4" BELOW SURFACE AND IS A MINIMUM OF 1/4" THICK. A BACKER
ROD MAY BE USED TO LIMIT THE AMOUNT OF SEALANT NEEDED TO FILL RESERVOIR.
4 + 1/4"
DOWELS
7/8"Ø X 18" ON 12" CTRS.
2/D 2/
D
D
#4 X 3'-0" @ 18" CTRS.
DEFORMED TIE BARS
NOTE: CONTRACTION JOINTS WILL BE CONSTRUCTED AT THE PLANNED LOCATION OR AS DIRECTED BY THE ENGINEER. WHEN NECESSARY TO INTERRUPT CONTINUOUS PLACEMENT FOR A SUBSTANTIAL LENGTH OF TIME OR AT THE END OF A DAY'S POUR, THE CONTRACTOR HAS THE OPTION OF ENDING PLACEMENT AT A CONTRACTION JOINT OR WITH A CONSTRUCTION JOINT LOCATED A MINIMUM OF FIVE (5) FEET FROM A CONTRACTION JOINT. EITHER JOINT TYPE MAY BE CONSTRUCTED BY PLACING A HEADER AT THE END OF THE POUR OR BY PAVING PAST THE JOINT LOCATION, SAWING THE JOINT AFTER THE CONCRETE HAS HARDENED, AND DRILLING HOLES FOR THE TIE BARS OR DOWELS.
SECTION OF
RECESSED
FORM LEG
File details come from the government source that posted it. Updated .