Copy_of_Pricing_Attachment.xlsx

XLSX spreadsheet 150 KB Posted

Attached to
NW 1ST STREET COMPLETE STREETS IMPROVEMENT LOCAL AGENCY PROGRAM (LAP) PROJECT Re-Bid
Solicitation number
26-022
Issued by
Santa Rosa County, Florida

About this file

Pricing Attachment Summary

This is a comprehensive pricing attachment file for the Santa Rosa County Library System's E-Rate Circuits procurement (FCC Form 470 #260020769), which includes multiple service categories and pricing templates for network connectivity solutions. The document contains separate pricing worksheets for Shared Internet/Transport Service (C1_SIA), Wide Area Network Point-to-Point Transport services at multiple bandwidth levels (C1_WAN_Small, C1_WAN_Large), Dedicated Internet Access (C1_DIA), combined DIA/WAN menu pricing (C1_DIA_WAN_menu and C1_DIA_WAN_site), Dark and Lit Fiber services (C1_Dark_Lit), Hotspot Lending Program services (C1_Hotspot), Wi-Fi services for bookmobiles or school buses (C1_BookmobileBus), and Category 2 equipment pricing sheets (C2_Price_Sheet_Grouped, C2_Pricing_Sheet_BySite, and C2_Pricing_Sheet_Catalog). The primary service location is the NOC at 6275 Dogwood Drive, Milton, FL 32570, with Z-locations including five library branches: Pace, Navarre, Gulf Breeze, Jay, and Milton Libraries. The initial contract term is 36 months (July 1, 2026 to June 30, 2029), and proposals must be submitted by March 23, 2026, at 10:00 am through the Santa Rosa County Procurement Portal. The document provides example pricing for various bandwidth levels ranging from 100 Mbps to 20 Gbps for internet services and includes template rows for offerors to complete with their actual pricing.

The pricing attachment requires vendors to complete yellow-highlighted columns with monthly recurring charges (MRC), non-recurring charges (NRC), and installation fees, with clear delineation between E-Rate eligible and E-Rate ineligible costs. Offerors must indicate total initial contract costs, extended costs over the full term, and E-Rate eligibility percentages for all proposed equipment and services. The document emphasizes that discrepancies between the pricing attachment and other proposal documents will be resolved in favor of the pricing attachment figures. Special construction fees, equipment provision specifications, USF fee applicability, and additional service provider surcharges must be noted. For Category 2 equipment, vendors must provide manufacturer information, model numbers, E-Rate eligibility percentages based on manufacturer guidance, and costs for shipping, freight, and installation. The file includes instructions allowing vendors to propose functionally equivalent products to specified models, provided they submit supporting documentation demonstrating equivalency. Santa Rosa County encourages participation from small businesses, minority-owned enterprises, women-owned businesses, and disadvantaged business enterprises, and reserves the right to waive bid irregularities, reject any or all bids, or award based on best interest determination.

View the file

Other files

File Type Posted
NW_1ST_STREET_COMPLETE_STREETS_IMPROVEMENT_LOCAL_AGENCY_PROGRAM_(LAP)_PROJECT_Re-Bid_(Addendum_#7_Revision).pdf PDF
NW_1ST_STREET_COMPLETE_STREETS_IMPROVEMENT_LOCAL_AGENCY_PROGRAM_(LAP)_PROJECT_Re-Bid_(Addendum_#5_Revision).pdf PDF
Surveyor's_Report_(1).pdf PDF
BCTED_Approved_Plans_(2).pdf PDF
CE_Memorandum_(1).pdf PDF
Civil_Plans_(1).pdf PDF
FDOT_LAP_Technical_Specifications_(1).pdf PDF
CRAS_Report_(1).pdf PDF
Drainage_Technical_Specifications_(1).pdf PDF
Geotechnical_Report_(1)_(1).pdf PDF
BCTED_Pavement_Marking_and_Signing_Inspection_Request_Procedure_(1).pdf PDF
BCTED_Tech_Policy_Memo_TPM-23-001_Specifications_for_Retroreflective_Traffic_Sign_Materials_(1).pdf PDF
Contamination_Certification_Letter_(1).pdf PDF
BCSWM_Exemption_Letter.pdf PDF
BCTED_Acceptance_Letter.pdf PDF
DRAFT_Construction_Agreement_052026.pdf PDF
PAYMENT_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
Library_ERate_Circuits.pdf PDF
Library_ERate_Circuits.pdf PDF
Library_ERate_Circuits.pdf PDF
26-022_Draft_Services_Contract.pdf PDF
26-022_Draft_Services_Contract.pdf PDF
26-022_Draft_Services_Contract.pdf PDF
Copy_of_Pricing_Attachment.xlsx XLSX spreadsheet
Copy_of_Pricing_Attachment.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C1_SIA

Pricing Attachment - Shared Internet/Transport Service

Applicant (BEN):• The Pricing Attachment workbook is requested to be completed by all Offerors and included with all proposal submissions.
FCC Form 470 #:• Offerors are only responsible for completing the information in the yellow columns of the table below.
Offeror:• The Filing Entity understands Offerors may structure their service levels differently. Should an Offeror not be able to provide a listed required level of service,
Offeror Contact:the Offeror should enter their closest comparable level of service in the Bandwidth Offered column.
Offeror Email:• Should there be a discrepancy between the fees listed in this Pricing Attachment and any other proposal response document, the costs offered in this document shall prevail.
Service Location NameService AddressInitial Term (Months)Bandwidth (Mbps)Bandwidth Offered
(Mbps)Bandwidth MRCLeased Router/ Modem Fee
MRCStatic IP RequiredStatic IP Fee for the Qty Requested
MRCAdvanced Filtering MRCTotal MRCTotal E-Rate Eligible MRCTotal E-Rate Ineligible MRCStandard Installation NRCSpecial Construction NRCTotal NRCTotal Initial Contract CostTotal E-Rate Eligible Contract CostTotal E-Rate Ineligible Contract CostNotes
Example School A123 School St, ABCville, VA 0123424100100$ 100.00$ 15.001$ - 0$ - 0$ 115.00$ 115.00$ - 0$ 100.00$ - 0$ 100.00$ 2,860.00$ 2,860.00$ - 01 static IP provided at no additional charge
Example School A123 School St, ABCville, VA 0123424200250$ 200.00$ 15.001$ - 0$ - 0$ 215.00$ 215.00$ - 0$ 100.00$ - 0$ 100.00$ 5,260.00$ 5,260.00$ - 0Service level not available, see alternative
BlankBlank000$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0Blank
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Provide the manufacturer make, model and E-Rate eligibility of any vendor provided equip:
Do USF fees apply to any of these services?
Do any additional service provider fees/surcharges apply to any of these services?

C1_WAN_Small Pricing Attachment - Wide Area Network (WAN) Point to Point Transport Service

Applicant (BEN):• The Pricing Attachment workbook is requested to be completed by all Offerors and included with all proposal submissions.
FCC Form 470 #:• Offerors are only responsible for completing the information in the yellow columns of the table below.
Offeror:• The Filing Entity understands Offerors may structure their service levels differently. Should an Offeror not be able to provide a listed required level of service,
Offeror Contact:the Offeror should enter their closest comparable level of service in the Bandwidth Offered column.
Offeror Email:• Should there be a discrepancy between the fees listed in this Pricing Attachment and any other proposal response document, the costs offered in this document shall prevail.

All quoted fees must be for the total cost to light both endpoints of the connection (both A and Z).

Location A (NOC) NameLocation A (NOC) AddressLocation Z NameLocation Z AddressInitial Term (Months)Bandwidth (Mbps)Bandwidth Offered
(Mbps)Bandwidth MRCLeased Router Fee
MRCTotal MRCTotal E-Rate Eligible MRCTotal E-Rate Ineligible MRCStandard Installation NRCSpecial Construction NRCTotal NRCTotal Initial Contract CostTotal E-Rate Eligible Contract CostTotal E-Rate Ineligible Contract CostNotes
Example School A123 School St, ABCville, VA 01234Example School B456 Main St, ABCville, VA 012343610001000$ 400.00$ - 0$ 400.00$ 400.00$ - 0$ 100.00$ 1,500.00$ 1,600.00$ 16,000.00$ 16,000.00$ - 0Equipment included with service fee
Example School A123 School St, ABCville, VA 01234Example School C789 Library St, ABCville, VA 012343615002000$ 600.00$ - 0$ 600.00$ 600.00$ - 0$ 100.00$ - 0$ 100.00$ 21,700.00$ 21,700.00$ - 0Service level not available, see alternative
BlankBlankBlankBlank000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0Blank
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Provide the manufacturer make, model and E-Rate eligibility of any vendor provided equip:
Do USF fees apply to any of these services?
Do any additional service provider fees/surcharges apply to any of these services?

C1_DIA

Pricing Attachment - Dedicated Internet Service

Applicant (BEN):• The Pricing Attachment workbook is requested to be completed by all Offerors and included with all proposal submissions.
FCC Form 470 #:• Offerors are only responsible for completing the information in the yellow columns of the table below.
Offeror:• The Filing Entity understands Offerors may structure their service levels differently. Should an Offeror not be able to provide a listed required level of service,
Offeror Contact:the Offeror should enter their closest comparable level of service in the Bandwidth Offered column.
Offeror Email:• Should there be a discrepancy between the fees listed in this Pricing Attachment and any other proposal response document, the costs offered in this document shall prevail.
Service Location NameService AddressInitial Term (Months)Bandwidth (Mbps)Bandwidth Offered
(Mbps)Bandwidth MRCLeased Router Fee
MRCStatic IP RequiredStatic IP Fee for the Qty Requested
MRCAdvanced Filtering MRCTotal MRCTotal E-Rate Eligible MRCTotal E-Rate Ineligible MRCStandard Installation NRCSpecial Construction NRCTotal NRCTotal Initial Contract CostTotal E-Rate Eligible Contract CostTotal E-Rate Ineligible Contract CostNotes
Example School A123 School St, ABCville, VA 012343610001000$ 500.00$ 20.005$ 14.95$ - 0$ 534.95$ 534.95$ - 0$ 100.00$ - 0$ 100.00$ 19,358.20$ 19,358.20$ - 0
Example School A123 School St, ABCville, VA 012343615002000$ 800.00$ 20.005$ 14.95$ - 0$ 834.95$ 834.95$ - 0$ 100.00$ - 0$ 100.00$ 30,158.20$ 30,158.20$ - 0Service level not available, see alternative
BlankBlank000$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0Blank
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Provide the manufacturer make, model and E-Rate eligibility of any vendor provided equip:
Do USF fees apply to any of these services?
Do any additional service provider fees/surcharges apply to any of these services?

C1_WAN_Large Pricing Attachment - Wide Area Network (WAN) Point to Point Transport Service

Sheet must be completed by vendor and submitted with offer.
1. A response must be included for each row below. If a service level is not available, Offerors must enter N/A. If no charge applies, vendors must enter $0.00.
2. Bandwidth MRC entries must be the total cost for both endpoints of the connection.
3. Initial contract term cost calculations are based on the premise all quoted NRC are applicable to all requested service levels. Should pricing of NRC be dependent on the bandwidth level, Offerors are requested to create new/separate rows for the impacted service levels.
4. Should there be a discrepancy between the fees listed in this Pricing Attachment and any other proposal response document, the costs offered in this document shall prevail.
Applicant (BEN):
FCC Form 470 #:
Offeror:
Offeror Contact:
Offeror Email:DO NOT DELETE COLUMNS P - T
DELETE EXAMPLE CONTENTS AND
HIDE COLUMNS IF NOT PART OF THIS BID REQUEST
Service LocationsInitial TermPoint to Point Transport MRCLeased Router MRCInstallation and Special Construction NRCInitial Contract Term Total CostsInitial Contract Term E-Rate Eligible CostsInitial Contract Term E-Rate Ineligible Costs
"A" Location (NOC) Name"A" (NOC) Address"Z" Location Name"Z" AddressMonths1 Gbps2 Gbps5 Gbps10 Gbps20 Gbps1 Gbps2 Gbps5 Gbps10 Gbps20 GbpsBasic InstallationE-Rate Eligible
Special ConstructionE-Rate Ineligible
Special ConstructionTotal
Special ConstructionApplicable to All Bandwidth Levels?If costs are conditional, explain here.
Melissa L. Zaruba: Offerors are instructed to create a new row for service levels with different NRC fees so that extended costs calculate correctly for all service levels.1 Gbps2 Gbps5 Gbps10 Gbps20 Gbps1 Gbps2 Gbps5 Gbps10 Gbps20 Gbps1 Gbps2 Gbps5 Gbps10 Gbps20 Gbps
Example School A123 School St, ABCville, VA 01234Example School B456 Main St, ABCville, VA 0123460$ 100.00$ 200.00$ 300.00$ 400.00$ 500.00$ 20.00$ 25.00$ 25.00$ 25.00$ 40.00$ 100.00$ 3,750.00$ - 0$ 3,750.00YesN/A$ 11,050.00$ 17,350.00$ 23,350.00$ 29,350.00$ 36,250.00$ 11,050.00$ 17,350.00$ 23,350.00$ 29,350.00$ 36,250.00$ - 0$ - 0$ - 0$ - 0$ - 0
Example School A123 School St, ABCville, VA 01234Example School C789 Library St, ABCville, VA 0123460$ 100.00$ 200.00$ 300.00$ - 0$ - 0$ 20.00$ 25.00$ 25.00$ - 0$ - 0$ 100.00$ - 0$ - 0$ - 0NoConst required for 10+ Gbps$ 7,300.00$ 13,600.00$ 19,600.00$ - 0$ - 0$ 7,300.00$ 13,600.00$ 19,600.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Example School A123 School St, ABCville, VA 01234Example School C789 Library St, ABCville, VA 0123460$ - 0$ - 0$ - 0$ 400.00$ 500.00$ - 0$ - 0$ - 0$ 25.00$ 40.00$ 100.00$ 2,000.00$ - 0$ 2,000.00NoConst required for 10+ Gbps$ - 0$ - 0$ - 0$ 27,600.00$ 34,500.00$ - 0$ - 0$ - 0$ 27,600.00$ 34,500.00$ - 0$ - 0$ - 0$ - 0$ - 0
BlankBlankBlankBlank0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0Blank$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Provide the manufacturer make, model and E-Rate eligibility of any vendor provided equip:
Do USF fees apply to any of these services?
Do any service provider fees/surcharges apply to any of these services?

C1_DIA_WAN_menu Pricing Attachment - Dedicated Internet and Wide Area Network (WAN) Point to Point Transport Services

This sheet should be completed by vendor and submitted with offer.
A response must be included for each row below. If a service level is not offered, vendors must enter N/A. If no charge applies, vendors must enter $0.00.
Should there be a discrepancy between the fees listed in this Pricing Attachment and any other proposal response document, the costs offered in this document shall prevail.
Applicant & BEN:Santa Rosa County Library SystemOfferor:
Form 470 #:260020769Contact:
Initial Term:36-months; 07/01/26 - 06/30/29Email:
#1Dedicated Internet A-Location (NOC)
NOC Address6275 Dogwood Drive, Milton, FL 32570
Dedicated Internet Service Fees for A-Location (NOC)
Bandwidth
(Gbps)E-Rate Eligible NRCE-Rate Ineligible NRCE-Rate Eligible MRCE-Rate Ineligible MRCNotes
1
2
3
4
5
#2Wide Area Network (WAN) Point to Point Transport for Z-Locations*
Wide Area Network (WAN) Point to Point Transport Fees for Z-Locations
Bandwidth (Mbps)E-Rate Eligible NRCE-Rate Ineligible NRCE-Rate Eligible MRCE-Rate Ineligible MRCNotes
500
600
700
800
900
1,000
* Fees quoted are the unit costs for both endpoints.
Special Construction Fees for Z-Locations (Build costs outside of standard installation NRC)
Location NameAddressE-Rate Eligible
Special ConstructionE-Rate Ineligible
Special ConstructionTotal
Special ConstructionApplicable to All Bandwidth Levels?If costs are conditional, explain here.
Pace Library4750 Pace Patriot Boulevard, Pace FL 32571$0.00
Navarre Library8484 James Harvell Road, Navarre, FL 32566$0.00
Gulf Breeze Library1060 Shoreline Dr, Gulf Breeze, FL 32561$0.00
Jay Library5259 Booker Lane, Jay, FL 32565$0.00
Milton Library5541 Alabama St, Milton, FL 32570$0.00

C1_DIA_WAN_site Pricing Attachment - Wide Area Network (WAN) Point to Point Transport Service

Sheet must be completed by vendor and submitted with offer.
1. A response must be included for each row below. If a service level is not available, Offerors must enter N/A. If no charge applies, vendors must enter $0.00.
2. Bandwidth MRC entries must be the total cost for both endpoints of the connection.
3. Initial contract term cost calculations are based on the premise all quoted NRC are applicable to all requested service levels. Should pricing of NRC be dependent on the bandwidth level, Offerors are requested to create new/separate rows for the impacted service levels.
4. Should there be a discrepancy between the fees listed in this Pricing Attachment and any other proposal response document, the costs offered in this document shall prevail.
Applicant (BEN):
FCC Form 470 #:
Offeror:
Offeror Contact:DO NOT DELETE COLUMNS L - P
Offeror Email:DELETE EXAMPLE CONTENTS AND
HIDE COLUMNS IF NOT PART OF THIS BID REQUEST
Dedicated Internet Service LocationInitial TermDedicated Internet (without Transport) MRCLeased Router MRCInstallation and Special Construction NRCAdditional MRCInitial Contract Term Total CostsInitial Contract Term E-Rate Eligible CostsInitial Contract Term E-Rate Ineligible Costs
"A" Location (NOC) Name"A" (NOC) AddressMonths1 Gbps2 Gbps5 Gbps10 Gbps20 Gbps1 Gbps2 Gbps5 Gbps10 Gbps20 GbpsBasic InstallationE-Rate Eligible
Special ConstructionE-Rate Ineligible
Special ConstructionTotal
Special ConstructionApplicable to All Bandwidth Levels?If costs are conditional, explain here.
Melissa L. Zaruba: Offerors are instructed to create a new row for service levels with different NRC fees so that extended costs calculate correctly for all service levels.Static IP RequiredStatic IP Fee for the Qty Required
MRCAdvanced Firewall ServiceDDoS1 Gbps2 Gbps5 Gbps10 Gbps20 Gbps1 Gbps2 Gbps5 Gbps10 Gbps20 Gbps1 Gbps2 Gbps5 Gbps10 Gbps20 Gbps
Example School A123 School St, ABCville, VA 0123460$ 100.00$ 200.00$ 300.00$ - 0$ - 0$ 20.00$ 25.00$ 25.00$ - 0$ - 0$ 100.00$ - 0$ - 0$ - 0No$ 25.00$ 25.00$ - 0$ 7,300.00$ 13,600.00$ 19,600.00$ - 0$ - 0$ 7,300.00$ 13,600.00$ 19,600.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Example School A123 School St, ABCville, VA 0123460$ - 0$ - 0$ - 0$ 400.00$ 500.00$ - 0$ - 0$ - 0$ 25.00$ 40.00$ 100.00$ 2,000.00$ - 0$ 2,000.00No$ - 0$ - 0$ 40.00$ - 0$ - 0$ - 0$ 27,600.00$ 34,500.00$ - 0$ - 0$ - 0$ 27,600.00$ 34,500.00$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wide Area Network (WAN) Point to Point Service LocationsInitial TermWide Area Network (WAN) Point to Point Transport MRCLeased Router MRCInstallation and Special Construction NRCInitial Contract Term Total CostsInitial Contract Term E-Rate Eligible CostsInitial Contract Term E-Rate Ineligible Costs
"Z" Location Name"Z" AddressMonths1 Gbps2 Gbps5 Gbps10 Gbps20 Gbps1 Gbps2 Gbps5 Gbps10 Gbps20 GbpsBasic InstallationE-Rate Eligible
Special ConstructionE-Rate Ineligible
Special ConstructionTotal
Special ConstructionApplicable to All Bandwidth Levels?If costs are conditional, explain here.
Melissa L. Zaruba: Offerors are instructed to create a new row for service levels with different NRC fees so that extended costs calculate correctly for all service levels.1 Gbps2 Gbps5 Gbps10 Gbps20 Gbps1 Gbps2 Gbps5 Gbps10 Gbps20 Gbps1 Gbps2 Gbps5 Gbps10 Gbps20 Gbps
Example School B456 Main St, ABCville, VA 0123460$ 100.00$ 200.00$ 300.00$ 400.00$ 500.00$ 20.00$ 25.00$ 25.00$ 25.00$ 40.00$ 100.00$ 3,750.00$ - 0$ 3,750.00YesN/A$ 11,050.00$ 17,350.00$ 23,350.00$ 29,350.00$ 36,250.00$ 11,050.00$ 17,350.00$ 23,350.00$ 29,350.00$ 36,250.00$ - 0$ - 0$ - 0$ - 0$ - 0
Example School C789 Library St, ABCville, VA 0123460$ 100.00$ 200.00$ 300.00$ - 0$ - 0$ 20.00$ 25.00$ 25.00$ - 0$ - 0$ 100.00$ - 0$ - 0$ - 0NoConst req for 10+ Gbps$ 7,300.00$ 13,600.00$ 19,600.00$ - 0$ - 0$ 7,300.00$ 13,600.00$ 19,600.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Example School C789 Library St, ABCville, VA 0123460$ - 0$ - 0$ - 0$ 400.00$ 500.00$ - 0$ - 0$ - 0$ 25.00$ 40.00$ 100.00$ 2,000.00$ - 0$ 2,000.00NoConst req for 10+ Gbps$ - 0$ - 0$ - 0$ 27,600.00$ 34,500.00$ - 0$ - 0$ - 0$ 27,600.00$ 34,500.00$ - 0$ - 0$ - 0$ - 0$ - 0
BlankBlank0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0Blank$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Provide the manufacturer make, model and E-Rate eligibility of any vendor provided equip:
Do USF fees apply to any of these services?
Do any service provider fees/surcharges apply to any of these services?

C1_Dark_Lit

Pricing Attachment - Dark and/or Lit Fiber Services
Sheet must be completed by vendor and submitted with offer.
1. A response must be included for each row below. If a service level is not available, Offerors must enter N/A. If no charge applies, vendors must enter $0.00.
2. Lit Fiber MRC entries must be the total cost for both endpoints of the connection.
3. Initial contract term cost calculations are based on the premise all quoted One-Time and Spec Construction Fees are applicable to all quoted services on that row.
Should pricing those costs be dependent on the type of service or bandwidth, Offerors are instructed to create new/separate rows for the impacted services.
4. Should there be a discrepancy between the fees listed in this Pricing Attachment and any other proposal response document, the costs offered in this document shall prevail.
Applicant (BEN):
Form 470 #:
Initial Term (mo):Entry must be # of months for formulas to function
Offeror:
Offeror Contact:
Offeror Email:
Service LocationsDark Fiber Specific FeesLit Fiber Specific FeesOne-Time and Special Construction FeesInitial Contract Term Total CostInitial Contract Term E-Rate Eligible CostInitial Contract Term E-Rate Ineligible Cost
"A" (NOC) Location Name"A" (NOC) Address"Z" Location Name"Z" AddressDark Fiber

2 Strands MRC Dark Fiber M&O

MRCDark Fiber Equipment
NRCDark Fiber Equipment Make/ModelLit Service

1 Gbps MRC Lit Service 5 Gbps MRC Lit Service 10 Gbps MRC Lit Service 20 Gbps MRC Lit Service 40 Gbps

MRCInstallation
NRCE-Rate Eligible
Special ConstructionE-Rate Ineligible
Special ConstructionTotal
Special ConstructionApplicable to All Bandwidth Levels?If costs are conditional, explain here.

Melissa L. Zaruba: Offerors are instructed to create a new row for service levels with different NRC fees so that extended costs calculate correctly for all service levels.

Dark Fiber
(2 Strands)1 Gbps Lit5 Gbps Lit10 Gbps Lit20 Gbps Lit40 Gbps LitDark Fiber
(2 Strands)1 Gbps Lit5 Gbps Lit10 Gbps Lit20 Gbps Lit40 Gbps LitDark Fiber
(2 Strands)1 Gbps Lit5 Gbps Lit10 Gbps Lit20 Gbps Lit40 Gbps Lit
Example School A123 School St, ABCville, VA 01234Example School B456 Main St, ABCville, VA 01234$ 500.00$ 20.00$ 1,000.00XYZ Brand - 12345HW$ 500.00$ 1,000.00$ 2,000.00$ 3,000.00$ 4,000.00$ - 0$ - 0$ - 0$ - 0YesN/AERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Example School A123 School St, ABCville, VA 01234Example School C789 Library St, ABCville, VA 01234$ 500.00$ 20.00$ 1,000.00XYZ Brand - 12345HW$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 10,000.00$ - 0$ 10,000.00NoSpec Cons req for Dark Fiber onlyERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0$ - 0ERROR:#VALUE!$ - 0$ - 0$ - 0$ - 0$ - 0
Example School A123 School St, ABCville, VA 01234Example School C789 Library St, ABCville, VA 01234$ - 0$ - 0$ - 0N/A$ 500.00$ 1,000.00$ 2,000.00$ 3,000.00$ 4,000.00$ - 0$ - 0$ - 0$ - 0NoSpec Cons req for Dark Fiber only$ - 0ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$ - 0ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$ - 0ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
BlankBlankBlankBlank$ - 0$ - 0$ - 0Blank$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0YesBlank$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

C1_Hotspot Pricing Attachment - Hotspot Lending Program

Applicant (BEN):• The Pricing Attachment workbook is requested to be completed by all Offerors and included with all proposal submissions.
FCC Form 470 #:• Offerors are only responsible for completing the information in the yellow columns.
Offeror:• Should there be a discrepancy between the fees listed in this Pricing Attachment and any other proposal response document, the costs offered in this document shall prevail.
Offeror Contact:
Offeror Email:
MONTHLY SERVICES
Service/Product TypeBudget Cap Unit Cost (Service)Recurring Service Term (Mos)Quantity RequiredUnit Cost MRCTaxes/Fees/
SurchargesE-Rate Eligible Unit Cost TotalFiltering/CIPA MRC (E-Rate Ineligible)Mobile Device Management MRC (E-Rate Ineligible)E-Rate Ineligible Unit Cost TotalTotal Unit MRCTotal Extended CostAnnual Fees within Service Type Funding Cap
Wireless Internet Service for Off-Premises Use$ 15.00$ - 0$ - 0$ - 0$ - 0$ - 0
DEVICES
Service/Product TypeBudget Cap Unit Cost (Equip)Quantity RequiredMake/ModelUnit Cost NRCConfiguration/ ActivationShipping/DeliveryTaxes/Fees/
SurchargesTotal Unit CostTotal Extended CostFees within Service Type Funding Cap
Wi-Fi Hotspot for Off-Premises Use$ 90.00$ - 0$ - 0$ - 0
HOTSPOT E-RATE BUDGET CALCULATIONS
Library
Sq Footage2024 C2 Enrollment2024 C1 Discount RateHotspot Calculation3 Year Budget Multiplie1 Yr Budget45% Not to Exceed1-Year E-Rate AmountRemaining BudgetTotal Extended Cost$ - 0
10$6,300.00$2,100.00$2,835.00$0.00$6,300.002025-2026 FRN Pre-Discount Calculation$ - 0
Does 2025-2026 FRN Pre-Discount Calculation Exceed 45% of Budget?NO
Does 2025-2026 FRN Pre-Discount Calculation Remaining Budget?NO

C1_BookmobileBus Pricing Attachment - Wi-Fi Services for Bookmobiles or School Buses

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .