Copy of Att 2 Cost Response Worksheet.xlsx

XLSX spreadsheet 71 KB Posted

Attached to
22EHSLCe-CASRFR: Request for Responses for the EHS Comprehensive Assessment System Vendor
Solicitation number
BD-22-1039-EHS01-EHS01-70914
Issued by
Suffolk County, Massachusetts

About this file

This document is a cost response worksheet for a request for responses (RFR) issued by the Executive Office of Health and Human Services (EOHHS) in Massachusetts for an electronic Comprehensive Assessment System (e-CAS) software solution. The RFR seeks to procure a qualified vendor to implement, maintain, and support the e-CAS solution for certain MassHealth long-term services and supports and behavioral health programs, with potential expansion to other MassHealth programs.

The cost response worksheet covers various cost components, including software acquisition and right-to-use fees, implementation costs for two phases, maintenance and operations support services, and mailing services. Bidders are required to provide detailed cost estimates for each component over an 8-year contract period. The RFR also includes specific requirements and timelines for the implementation and maintenance of the e-CAS solution.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Sheet

BIDDER NAME:

Attachment 2 - Cost Response Worksheet

Instructions The Bidder must submit a cost response in accordance with the instructions presented in this Attachment 2. EOHHS requires that the attached price tables be completed as they are presented. Failure to complete the price tables may disqualify the Bidder’s proposal. All assumptions or constraints made in arriving at the prices proposed in these price tables must be clearly described. Bidders are encouraged to include narrative to describe the assumptions on which this price response is based.

CONTENTS/HIGH-LEVEL INSTRUCTIONS
Schedule 1. Cost Rollup by Category - Complete Change Requests Bank of Hours, Confirm total costs
Schedule 2. Software Acquisition and Right to Use - Complete in full following the instructions on the bottom of the tab
Schedule 3a. Implementation Phase 1 - Complete in full following the instructions on the bottom of the tab
Schedule 3b. Implementation Phase 2 - Complete in full following the instructions on the bottom of the tab
Schedule 4. Maintenance and Support - Complete in full following the instructions on the bottom of the tab
Schedule 5. Mail Management Services - Complete in full following the instructions on the bottom of the tab

0.1 Cost Summary

Schedule 0.1. UCA System Solution Costs - Consolidated HIDE HIDE

COST SUMMARY Table will be populated from information in other schedules.COST SUMMARY Table will be populated from information in other schedules
Scenario #1: IMPLEMENTATION WITH IAE (Referral and Scheduling Modules)Scenario #2: IMPLEMENTATION WITH PROVIDERS (Provider Referral Module)
HIDE12345678Discount rate:1.03HIDE12345678
YEAR 1YEAR 2YEAR 3YEAR 4YEAR 5YEAR 6YEAR 7YEAR 8CONTRACT PERIOD TOTAL COSTYEAR 1YEAR 2YEAR 3YEAR 4YEAR 5YEAR 6YEAR 7YEAR 8CONTRACT PERIOD TOTAL COST
ONE-TIME/NON-RECURRING COSTS:ONE-TIME/NON-RECURRING COSTS:
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ANNUALLY RECURRING COSTS:ANNUALLY RECURRING COSTS:
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

TOTALS $ - 0 ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! TOTALS $ - 0 ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF!

Scenario #1 SUMMARIZED EXPLANATION OF COSTSScenario #2 SUMMARIZED EXPLANATION OF COSTS
One-time/non-recurring costs:One-time/non-recurring costs:

Annually recurring costs: Annually recurring costs:

1. Cost Rollup by Category Schedule 0.2. UCA System Solution Costs - Rollup by Category - Scenarios 1 & 2

Scenario #1: IMPLEMENTATION WITH IAE (Referral and Scheduling Modules)

COST CATEGORIES: YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 CONTRACT PERIOD TOTAL COST BIDDER NOTES

Software Acquisition and Right to Use (Schedule 1): ERROR:#REF! $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 ERROR:#REF! $ - 0

Implementation Tasks (Schedules 3a & 3b)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Phase 1$ - 0$ - 0
Phase 2$ - 0$ - 0$ - 0

Maintenance and Support Tasks (Schedule 4): $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Change Requests bank of 1,200 hours per year (average of 100 per month; refer to time and materials services in Attachment 1, SOW Template, Section 9.3.2) for development, testing and implementation of application changes/modifications - including but not limited to future interfaces, forms and reports - which are outside of the scope of application maintenance or application support, and the management thereof $ - 0

TOTALS ERROR:#REF! $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

2. SW Acq and Right to Use Schedule 1. Software Acquisition and Right to Use - Scenarios 1 and 2 (See Instructions below)

ONE-TIME/NON-RECURRING CHARGES/FEES

ProductProduct Description/ModuleType
(Software license, acquisition fee, activation fee, etc.)Unit
(# individual users, # concurrent users, # sites, enterprise, each, etc.)Charge/
Fee per Unit# UNITS YEAR 1# UNITS YEAR 2# UNITS YEAR 3# UNITS YEAR 4# UNITS YEAR 5COST
YEAR 1COST
YEAR 2COST
YEAR 3COST
YEAR 4COST
YEAR 5TOTAL CONTRACT PERIOD COSTBIDDER NOTES
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTAL (Non-Recurring Charges/Fees)- 0$ - 000000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

RECURRING CHARGES/FEES

ProductProduct Description/ModuleTypeUnitCharge/
Fee per Unit# UNITS YEAR 1# UNITS YEAR 2# UNITS YEAR 3# UNITS YEAR 4# UNITS YEAR 5COST
YEAR 1COST
YEAR 2COST
YEAR 3COST
YEAR 4COST
YEAR 5TOTAL CONTRACT PERIOD COSTBIDDER NOTES
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTAL (Recurring Charges/Fees)- 0- 0- 0- 0- 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL (All Non-Recurring & Recurring Charges/Fees) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

EXPLANATION OF COSTS
One-time/non-recurring:

Recurring:

Instructions:

The information provided by the Bidder in this tab should reflect costs for Software Acquisition and Right to Use for building the e-CAS.

Costs for Software Acquisition and Right to Use should reflect costs associated with fulfillment of requirements in Sections 1.4 and 3.1, 3.2, 3.3 and 3.4 of the RFR and any associated Attachment 6 requirements. Bidders are also asked to provide estimates of Charges/Fees per Unit at contract execution for each year. Please add notes to explain the information and add additional rows, as needed.

3a. Implementation Phase 1 Schedule 3a. e-CAS Implementation Costs - Phase 1

Refer to RFR Sections 3.1 and 3.2Refer to RFR Sections 3.1 and 3.2
ORGANIZATION:

LABOR COSTS

Hours by Project Task
Please see RFR Section 3.6 for Phase1 timeline. Estimates should include total hours by project task for the complete implementation of Phase 1
#Resource NameOrganizationRoleResource Hourly RateProject Initiation, Requirements Gathering, Customization and/or Configuration, Testing, and DeploymentData Interfaces and Trading Partner TestingPilotUser Training and Knowledge TransferProject ManagementTOTAL HOURSTOTAL RESOURCE COSTBidder Notes
May be TBDMay be Vendor or subcontractorExamples: Project Manager, Business Analyst, DeveloperRates must be "fully loaded", i.e. they must build in all costs associated with a labor resource including allocated overhead; Rate is agreed upon for Contract durationIncludes activities defined in RFR Sections 3.2.1, 3.2.2, 3.2.3, 3.2.4, 3.2.7, 3.2.8Includes activities defined in RFR Section 3.2.3Includes activities defined in RFR Section 3.2.5Includes activities defined in RFR Section 3.2.6Includes Project Management and account management (ex. Vendor leadership staff) to support all activities in RFR Section 3.2
1- 0$ - 0
2- 0$ - 0
3- 0$ - 0
4- 0$ - 0
5- 0$ - 0
6- 0$ - 0
7- 0$ - 0
8- 0$ - 0
9- 0$ - 0
10- 0$ - 0
11- 0$ - 0
12- 0$ - 0
TOTAL LABOR COSTS:- 0$ - 0

NON-LABOR COSTS

Explanation of Non-Labor Costs Total Non-Labor Costs $ - 0

IMPLEMENTATION COSTS GRAND TOTAL: $ - 0

3b. Implementation Phase 2 Schedule 3a. e-CAS Implementation Costs - Phase 2

Refer to RFR Sections 3.1 and 3.2Refer to RFR Sections 3.1 and 3.2
ORGANIZATION:

LABOR COSTS

Hours by Project Task
Please see RFR Section 3.6 for Phase 2 timeline. Estimates should include total hours by project task for the complete implementation of Phase 2
#Resource NameOrganizationRoleResource Hourly RateProject Initiation, Requirements Gathering, Customization and/or Configuration, Testing, and DeploymentData Interfaces and Trading Partner TestingPilotUser Training and Knowledge TransferProject ManagementTOTAL HOURSTOTAL RESOURCE COSTBidder Notes
May be TBDMay be Vendor or subcontractorExamples: Project Manager, Business Analyst, DeveloperRates must be "fully loaded", i.e. they must build in all costs associated with a labor resource including allocated overhead; Rate is agreed upon for Contract durationIncludes activities defined in RFR Sections 3.2.1, 3.2.2, 3.2.3, 3.2.4, 3.2.7, 3.2.8Includes activities defined in RFR Section 3.2.3Includes activities defined in RFR Section 3.2.5Includes activities defined in RFR Section 3.2.6Includes Project Management and account management (ex. Vendor leadership staff) to support all activities in RFR Section 3.2
1- 0$ - 0
2- 0$ - 0
3- 0$ - 0
4- 0$ - 0
5- 0$ - 0
6- 0$ - 0
7- 0$ - 0
8- 0$ - 0
9- 0$ - 0
10- 0$ - 0
11- 0$ - 0
12- 0$ - 0
TOTAL LABOR COSTS:- 0- 0- 0- 0- 0- 0$ - 0

NON-LABOR COSTS

Explanation of Non-Labor Costs Total Non-Labor Costs $ - 0

IMPLEMENTATION COSTS GRAND TOTAL: $ - 0

4. Maint and Support Schedule 4. UCA System Maintenance and Operations Support Services Costs

Labor Costs
MAINTENANCE AND OPERATIONS SUPPORT SUBTASK:Resource NameOrganizationRoleResource Hourly RateYEAR 1 HOURSYEAR 2 HOURSYEAR 3 HOURSYEAR 4 HOURSYEAR 5 HOURSLABOR COSTS SUBTOTALS
#May be TBDMay be Vendor or subcontractorExamples: Project Manager, Business Analyst, DeveloperRates must be "fully loaded", i.e. they must build in all costs associated with a labor resource including allocated overhead; Rate is agreed upon for Contract durationQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Year 1Year 2Year 3Year 4Year 5All Years
System Maintenance as defined in Section 3.3.11$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
System Operations as defined in Section 3.3.26$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
System Security Administration as defined in Section 3.3.311$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
System End User Support as defined in Section 3.3.416$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
LABOR COSTS SUBTOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Refer to RFR Sections 3.3 and 3.4 and Attachment 1 Template Statement of Work
Non-Labor Costs
MAINTENANCE AND OPERATIONS SUPPORT SUBTASK:Summary Description of Non-Labor CostsYEAR 1 COSTSYEAR 2 COSTSYEAR 3 COSTSYEAR 4 COSTSYEAR 5 COSTSLABOR COSTS SUBTOTALS
Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Year 1Year 2Year 3Year 4Year 5All Years
System Maintenance as defined in Section 3.3.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
System Operations as defined in Section 3.3.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
System Security Administration as defined in Section 3.3.3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
System End User Support as defined in Section 3.3.4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
NON-LABOR COSTS SUBTOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

MAINTENANCE AND OPERATIONS COSTS GRAND TOTAL: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Instructions:

The cost information in this tab should capture costs for Maintenance and Operations Support for the UCA System using two possible scenarios.

Costs for Maintenance and Operations Support associated with the UCA System includes costs for fulfilling requirements in Section 1.4 and 3.3 and 3.4 of the RFR and any associated Attachment 6 requirements. Costs associated with each component presented in the table shall be populated by the Bidder. Bidders are also asked to provide estimates of hours required to complete each subtask. Please add notes to explain the information and add additional rows, as needed.

Scenario #1 covers assessments conducted by an Independent Assessor Entity (IAE). Key functionality unique for this scenario are referral and scheduling modules, described in Attachment 6. Scenario #2 is for assessments conducted by providers. For this scenario, a schedule module will not be in scope and a provider referral module will be included, as described in Attachment 6.

5. Mail Mgmt Services Schedule 5.UCA System Mailing Services Add On

Outbound Mailing Services Costs (see RFR Section 1.4.4.10.1)YEAR 1YEAR 2YEAR 3YEAR 4YEAR 5SUBTOTAL
(e.g. Printing, Stuffing, Address management)
TOTAL COST$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTAL
Inbound Mailing Services Costs (see RFR Section 1.4.4.10.2)YEAR 1YEAR 2YEAR 3YEAR 4YEAR 5SUBTOTAL
(e.g. Recording metadata, digitizing, developing disposition )

TOTAL COST $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Pass-Through Cost DescriptionYEAR 1YEAR 2YEAR 3YEAR 4YEAR 5SUBTOTAL
(e.g. Postage, Licensing, etc.)
TOTAL COST$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Instructions:

The cost information in this tab should capture costs for UCA System Mailing Services. All Bidders must complete this information, however EOHHS may determine that it wants the Selected Bidder to implement some or all of the services required in Section 1.4.4.10 Mail Management Services, either Outbound mailing services, including postage/shipping costs and/or Inbound mailing services.

Key Assumptions for Notices:

EOHHS expects to generate approximately 100,000 notices per year.